Loading...
PC Packet 10.18.16 AGENDA HUTCHINSON PLANNING COMMISSION Tuesday,October 18, 2016 5:30 p.m. 1.CALL TO ORDER 5:30 P.M. 2.PLEDGE OF ALLEGIANCE 3.OATH OF OFFICE –JESSICA FORCIER 4.CONSENT AGENDA A.CONSIDERATION OF MINUTES DATED SEPTEMBER 20, 2016. 5.PUBLIC HEARINGS A.CONSIDERATION OF A CONDITIONAL USE PERMIT FOR THE OPERATION OF AN ASSISTED LIVINGFACILITY IN AN R-2 ZONING DISTRICT LOCATED AT225 SHADY RIDGE RD NW. B.CONSIDERATION OF A CONDITIONAL USE PERMIT FOR CONSTRUCTION OF A DRIVE THROUGH AUTOMATIC TELLER MACHINE (ATM)IN A C-4 ZONING DISTRICT LOCATED AT 1060 HIGHWAY 15 S. 6.NEW BUSINESS 7.UNFINISHED BUSINESS 8.COMMUNICATION FROM STAFF A.Upcoming Meetings 9.ADJOURNMENT MINUTES HUTCHINSON PLANNING COMMISSION Tuesday,September 20, 2016 5:30 p.m. 1.CALL TO ORDER 5:30 P.M. The September 20, 2016 Planning Commission meeting was called to order by Chair Hantgeat 5:30 p.m. Members in bold were present Chair Hantge, Commissioner Kirchoff, Commissioner Kalenberg,Commissioner Norton, Commissioner Arndt, Commissioner Wick, andCommissioner Fahey. Also present were Dan Jochum,City Planner,Kent Exner, City Engineer, Marc Sebora,City Attorney,and Kyle Dimler, City Building Official. 2.PLEDGE OF ALLEGIANCE 3.CONSENT AGENDA A.CONSIDERATION OF MINUTES DATED JULY 19, 2016. Motion by Commissioner Norton, Second by Commissioner Fahey. Motion approved. Motion to Approve–Motion to Reject 4.PUBLIC HEARINGS A.CONSIDERATION OF A CONDITIONAL USE PERMIT FOR A POLE- FRAMED ADDITION TO AN EXISTING BUILDING AT 1110 HIGHWAY 7 EAST FOR THE PURPOSE FO RETAIL SALES, INCLUDING OUTDOOR STORAGE AND DISPLAY. Dan Jochum, City Planner addressed the Commission. Mr. Jochum reviewed the application as outlined in the Commission’s packets. Mr. Jochum noted the proposal is for a 3,500 sq. ft. addition to the existing 4,000 sq. ft. building. Mr. Jochum noted that the required setbacks on the site will be met as proposed. Mr. Jochum noted that the parallel parking on the north side of the parking lot proposal is not necessary and Staff recommends removal of the parallel parking noted on the west side of the building as it interferes with required fire apparatus access space. Mr. Jochum noted that Staff recommends requiring verification of a formal agreement with the neighboring property to the east for shared use of the site access in the NE corner of the site. Minutes Hutchinson Planning Commission September 20, 2016 Page 2 Mr. Jochum noted Staff would like to have a certificate of survey submitted at the time of permit application for any construction to verify location of all building areas and site drainage. Mr. Jochum noted the existing outdoor storage on the owner’s site is in an orderly manner. Staff would like to see an opaque fence around outdoor storage but the applicant would like to have visibility for items for sale on their site. Mr. Jochum stated that this site is not within any of the City’s zoning districts which require any particular aesthetic components. Commissioner Kalenberg asked if the outsheds would be just like utility sheds. Mr. Jochumstated that the outsheds need to be in compliance with both the building code requirements and the zoning requirements and the structures are maintained in good repair. Chair Hantge called Misty 23502 215th St. Hutchinson, MN owner of Treasure Shed addressed the Commission. Misty stated she would like to use the outbuildings as they are a component of their business’s image and would be maintained in good condition. Commissioner Fahey asked for information regardingthe outdoor doors of the building. Mike Howe of Cleary Corp addressed the Commission and stated the final doors of the proposed addition would be designed by a consulting architect. Mr. Jochum noted that sizing of doors will be reviewed by Staff at the time of permit application. Chair Hantge asked for clarification of where the outdoor storage is proposed to be. Mr. Jochum noted that the storage would be on the south side and the east sides of the proposed addition. Mr. Jochum shared that all parking areas will need to be improved to commercial property standards of having either bituminous or concrete surfaces. Commissioner Kalenberg recommended fencing on south side of property be an opaque fence so neighboring property owners would not be exposed to the outdoor storage items. Mr. Jochum stated that the City ordinance does provide for outdoor display of retail items and distinguishes between these items and outdoor storage. Minutes Hutchinson Planning Commission September 20, 2016 Page 3 The applicant stated they would be agree Fahey, Norton to close hearing at 5:50 p.m. Motion by Commissioner Fahey to approve with Staff recommendations with the change of outdoor storage on south side having opaque fencing. Second by Norton.Motion approved. Item will be on City Council consent agenda on 9/27/2016. Motion to close hearing –Motion to approve with staff recommendations–Motion to reject B.CONSIDERATION OF A CONDITIONAL USE PERMIT FOR AN 11 UNIT ADDITION TO AN EXISTING BUILDING AND GARAGE AT 1025 DALE ST. SW. Dan Jochum, City Planner, addressed the Commission. Mr. Jochum reviewed the application as documented in the Commission’s packets. Mr. Jochum stated that there are multiple items that the developer/owner must complete formally prior to any permitting of future development. These items include the provision of a fire apparatus access agreement with the church to the north of their property, proper number of parking stalls being provided (33 spaces total), and the provision of a formal easement for a water service main. Mr. Jochum stated that the storm water retention pond constructed as part of the original building project will need to be evaluated and possibly modified to accommodate any additional site drainage. This will be reviewed by the City Engineer. Mr. Jochum noted that the signed copy of the water main easement was received by Staff prior to the Commission’s meeting. Motion by Fahey Second by Wick to close public hearing at 5:56 p.m. Motion by Commissioner Norton to recommend approval with the Staff recommendations 1-10, Second by Commissioner Fahey. Motion approved. Item will be on City Council consent agenda 9/27/2016. Motion to close hearing –Motion to approve with staff recommendations–Motion to reject Minutes Hutchinson Planning Commission September 20, 2016 Page 4 C.CONSIDERATION OF A VARIANCE TO REDUCE THE SETBACK FOR A GARAGE ADDITION AT 1109 LEWIS AVE. SW. Dan Jochum, City Planner, addressed the Commission. Mr. Jochum reviewed a survey of the applicant’s site and the relevant property line. There is an existing encroachment of the existing single-family dwelling on the site. Mr. Jochum noted that the applicant is proposing to add a second stall to the attached garage on this property, which is quite common in contemporary residential lots. Mr. Jochum noted that there is already hard surfacedlandscaping and bituminous which in effect indicates that there is no additional impervious coverage added as part of this proposal. Mr. Jochum reviewed the 3-part test required by MN Statute to approve a variance to the City’s Zoning Ordinance. Staff generally believes that the proposal meets the requirements of the 3-part test and recommends approval. Mr. Jochum noted the practical difficulties are having a one-stall garage and difficulty of placing agarage in the rear yard due to site topography. Motion Norton Second by Wick to close hearing at 6:02 p.m. Motion by Commissioner Arndt, Second by Commissioner Kalenberg to approve with 6 noted Staff recommendations. Motion approved. Item will be on City Council consent agenda 9/27/2016. Motion to close hearing –Motion to approve with staff recommendations–Motion to reject 5.NEW BUSINESS A.CONSIDERATION OF A SITE PLAN REVIEW AT 1164 BENJAMIN AVE. SE. Dan Jochum, Planning Director, reviewed the application before the Commission. Mr. Jochum noted the application is fairly straightforward as the development is a largely unoccupied industrial park development. Mr. Jochum reviewed the civil drawing showing layout of the proposed site. Mr. Jochum noted that Staff held a One Stop Shop meeting with the project architect this afternoon and Staff did not have any strong concerns with the Minutes Hutchinson Planning Commission September 20, 2016 Page 5 proposal and more detailed plans will be reviewed by Staff at the time of permit application, should the project proceed. Commissioner Norton asked what was used for guidance of the design as it seems quite industrial. Miles Seppelt, EDA Director statedthat guiding idea was to make multiple 4,000 sq. ft. bays available for potential tenants and there is room for an additional 2 bays to the south. The type of building was designed with a targeted manufacturing business clientele. No outside storage is anticipated on this site. Commissioner Kalenberg asked to verify if there is no access on the south side of the building. Chair Hantge asked if the Fire Department had reviewed the limited access. Mr. Seppelt noted that City Fire Staff has reviewed the site plan and is comfortable with the proposed access provision. Motion by Commissioner Fahey, Second by Commissioner Kalenbergmoved to approve. Motion approved. Motion to close hearing –Motion to approve with staff recommendations–Motion to reject 6.UNFINISHED BUSINESS Dan Jochum reviewed the progress of the signage as part of the City’s Way Finding project. There are 5 directional signs along the river and 3 additional kiosk signs provided at this time. 7.COMMUNICATION FROM STAFF A.Upcoming Meetings Dan Jochum noted that one application has been received and an additional one is anticipated for the October Planning Commission meeting. 8.ADJOURNMENT Motion by Commissioner Norton, Second by Commissioner Arndtto adjourn at 6:15p.m. STAFFREPORT –PLANNING DEPARTMENT To:Hutchinson Planning Commission From:Dan Jochum, AICP and City of Hutchinson Planning Staff Date:October 13,2016, forOctober 18,2016, Planning Commission Meeting Application:CONSIDERATION OF A CONDITIONAL USE PERMIT FOR AN ASSISTED LIVING FACILITY IN AN R-2 ZONING DISTRICT LOCATED AT 225 SHADY RIDGE ROAD NW. Applicant:JEFF KRIEG,APPLICANT CONDITIONAL USE PERMITFOR AN ASSITED LIVING FACILITY The reason for thisrequest is that the existing Cedar Crest Facility has been closed for over 1 year which requires a new conditional use permit to be applied for. The applicant is seeking to utilize the building for an assisted living facility for seniors needing assistance for mental health.The building has 45 beds in it. Conditional Use Permit 225 Shady Ridge Road NW–Assisted Living Facility Planning Commission –10-18-16 Page 2 GENERAL INFORMATION Existing Zoning:R-2(MediumDensity Residential District) Property Location:225 Shady Ridge Road NW Lot Size:.86Acres Existing Land Use:Vacant Assisted Living Facility Adjacent Land Use:Single Family Residential and Commercial Adjacent Zoning:R-2 Medium Density Residentialand C-4 Fringe Commercial Comprehensive Land Use Plan:Medium Density Residential Applicable Regulations:Sections154.057(C) (3) Analysis: Overview: The facility as it currently existshas 45 beds in it. The applicant proposes to have a maximum of 45 beds in the facility as well. The applicant states that nothing physically is changing with the interior or exterior of the property;it will be just as it was when Cedar Crest operated their assisted living facility in the building. As noted above the facility is proposed to be an assisted living facility for seniors needing assistance with mental health. The facility will operate under a State of Minnesota Housing with Services License. The applicants are also licensed by the State for a Comprehensive Home Healthcare License, which used to be called a Class A license which assisted living/nursing facilities were licensed under. There will be a maximum of 7 employees on staff at any one time according to the applicant. The site currently has a parking lot that is accessed off of Shady Ridge Road NW. At present there are approximately 14 parking spaces in the parking lot. However, four of the spaces encroach into City right-of-way which is a violation of City Code. Because of this, a condition will be added to the CUP that the parking lot can’t encroach into the City right-of-way and must meet the 5 foot parking lot setback. It appears that 4 parking spaces will be impacted by this condition, which still leaves 10 parking spaces on site which will be adequate for employee parking (up to 7 employees) and will leave room for up to 3 visitors/guests spaces. It is important to note that the City can’t discriminate regarding which type of licensed facility is being proposed. There are various facilities in Hutchinson that cater to a wide array of medical issues. Conditional Use Permit: The Conditional Use Permit (CUP) is required because the old Conditional Use Permit expired due to the building being vacant and unoccupied for a period of time. The following are standards for granting a conditional use permit: Conditional Use Permit 225 Shady Ridge Road NW–Assisted Living Facility Planning Commission –10-18-16 Page 3 (a)The proposed building or use at the particular location requested is necessary or desirable to provide a service or a facility which is in the interest of the public convenience and will contribute to the general welfare of the neighborhood or community; (b)The proposed building or use will not have a substantial or undue adverse effect upon adjacent property, the character of the neighborhood, traffic conditions, utility facilities and other matters affecting the public health, safety and general welfare; and (c)The proposed building or use will be designed, arranged and operated so as to permit the development and use of neighboring property in accordance with the applicable district regulations. Recommendation: Staff recommends approval of the proposal with the following conditions: 1.The standards for granting a conditional use permit would be met,subject to the conditions stated. 2.The proposed useshall comply with the standards of the R-2district and the Zoning Ordinance. 3.The use must meet all applicable building and fire code regulations. Any remodeling and/or additions must also meet applicable building and fire code regulations. 4.The conditional use permit shall remain in effect as long as the conditions required by the permit are observed. Any expansion or intensification of a conditional use requires approval of a new conditional use permit. 5.The Applicant must obtain all necessary permits for any construction that would be needed. 6.The applicant is required to bring the parking lot in compliance with City Code by removing the existing parking spaces that encroach into the City right-of-way. Additionally, the 5-foot setback needs to be met for the parking lot along Shady Ridge Road NW. STAFFREPORT –PLANNING DEPARTMENT To:Hutchinson Planning Commission From:Dan Jochum, AICP and City of Hutchinson Planning Staff Date:October 13,2016, forOctober 18,2016, Planning Commission Meeting Application:CONSIDERATION OF A CONDITIONAL USE PERMIT FOR CONSTRUCTION OF A DRIVE THROUGH ATM LOCATED AT 1060 HWY 15 SO. Applicant:NOVATION CREDIT UNION, APPLICANT CONDITIONAL USE PERMITFOR DRIVE THROUGH ATM Novation Credit Union has applied for a Conditional Use Permit to construct a drive up automatic teller machine (ATM) on property owned by the Hutchinson Mall. Drive-through Banking Facilities are allowed by Conditional Use Permitin the C-4 Zoning District. Conditional Use Permit 1060 HWY 15 So.–Drive Through ATM Planning Commission –10-18-16 Page 2 GENERAL INFORMATION Existing Zoning:C-4 Fringe Commercial District Property Location:1060 HWY 15 SO. Lot Size:12.78Acres Existing Land Use:ParkingLot Adjacent Land Use:Commercial Land Use Adjacent Zoning:C-4 Fringe Commercial Comprehensive Land Use Plan:Commercial Applicable Regulations:Sections154.064(C) (1) Analysis: Overview: Novation Credit Union is seeking a Conditional Use Permit to locate adrive-through ATM on the eastern side of the Hutchinson Mall Parking Lot. Drive-through banking facilitiesare conditionally permitted within the C- 4 Zoning District. th Staff reviewed this application at the October 11Planning Staff meeting. There was discussion regarding the amount of traffic in theMall parking lotand how the traffic is somewhat of a “free for all”in this area. The consensus was that the traffic patterns in themall area are less than ideal. The consensus was that if designed properly, the ATM facility would not make the traffic conditions any worse and may actually improve things by having the area more delineated. Theconsultant for Novation has provided a Memo, which is attached. The conclusion and recommendation from theengineer states that “The proposed ATM with channelization islands is feasible and will not create safety, parking capacity or other operational concerns.” Please see the attached plan that identifies the location of theATM and the traffic flow around the area. Based on both staff review and the consultant engineer’s memo City Staff is recommending approval of this project with the conditions noted below. Conditional Use Permit: The Conditional Use Permit (CUP) is required for the drive-through banking (ATM) facility. The following are standards for granting a conditional use permit: Conditional Use Permit 1060 HWY 15 So.–Drive Through ATM Planning Commission –10-18-16 Page 3 (a)The proposed building or use at the particular location requested is necessary or desirable to provide a service or a facility which is in the interest of the public convenience and will contribute to the general welfare of the neighborhood or community; (b)The proposed building or use will not have a substantialor undue adverse effect upon adjacent property, the character of the neighborhood, traffic conditions, utility facilities and other matters affecting the public health, safety and general welfare; and (c)The proposed building or use will be designed, arranged and operated so as to permit the development and use of neighboring property in accordance with the applicable district regulations. Recommendation: Staff recommends approval of the proposal with the following conditions: 1.The standards for grantinga conditional use permit would be met, subject to the conditions stated. 2.The proposed building improvements shall comply with the standards of the C-4 Zoning district and the Zoning Ordinance. 3.The conditional use permit shall remain in effect as long as the conditions required by the permit are observed. Any expansion or intensification of a conditional use requires approval of a new conditional use permit. 4.The Applicant must obtain all necessary permits for any construction that would be needed. 5.If at some point in the futurethe use is creating a public safety hazard the City reserves theright to further reviewtheConditional Use Permit with the applicant and add conditions to mitigate negative effects. MEMORANDUM TO:Todd Brandel, Branch Manager Novation Credit Union, Hutchinson FROM:Mike Kotila, PE Senior Transportation Engineer DATE:September 23, 2016 RE:Feasibility Study –ATM site at Hutchinson Mall SEH No. NOVCU 138752 Thismemorandum evaluates the feasibility of constructing a drive through automatic teller machine (ATM) site in the Hutchinson Mall parking lot. Factors considered in the evaluation include peak period traffic demand, queuing space, accessibility, traffic circulation, and loss of parking. BACKGROUND Novation Credit Union (NCU) currently operates a drive through ATM site at their branch office building site located at1250Highway 15 Southin Hutchinson. The branch office operation has been relocated into a downtown locationand the current site has been closed with the exception of the ATM. NCUdesires to relocate the ATM operation in theretaildistrict along Highway 15 South. The preferred location for the drive through ATM site is along the east side of the Hutchinson Mall parking lot in Hutchinson, Minnesota. The owners of the Hutchinson Mall are supportive of the proposed ATM site. Existing and Projected ATM Demand The current ATM site experiences peak demands on Fridays, especially 3M plant“payday Fridays”. NCU provided historical data for use of the existing ATM site to use as a baseline for projected demand at a new ATM site. Thenumber ofhourly transactions experienced on Friday, August 26, 2016 are shown in Table 1. The peak hour of demand was 12-1 pm with 15 transactions occurring at the ATM. Traffic queues at the existing ATM site are observed to be minimal. The typical duration of an ATM transaction is about 45 seconds. This suggests that an ATM has the potential to serveup to 90customersper hour. This efficiency of service results in short waiting times and short vehicle queues. NCU customers comprise the majority of ATM users at this site.The growth in ATM use is expected to follow growth in customer base which is modest. NCU staff does not expect an increase in ATM usage. Engineers | Architects | Planners | Scientists Short Elliott Hendrickson Inc., 10901 Red Circle Drive, Suite 300, Minnetonka, MN 55343-9302 SEH is 100% employee-owned | sehinc.com | 952.912.2600 | 800.734.6757 | 888.908.8166 fax Novation Credit Union –ATM Site Feasibility Study September 23, 2016 Page 2 Table 1 –Existing NCU ATM Site Hourly Demand(Friday,August 26, 2016) HOURNUMBER OF TRANSACTIONSCOMMENT (FRIDAY, AUGUST 26, 2016 7–8 AM 6 8–9 AM 4 9–10 AM 14 10–11 AM 8 11–12 PM 2 12–1 PM 15 HIGHEST HOUR 1–2 PM 14 2–3 PM 8 3–4 PM 9 4–5 PM 9 5–6 PM 7 6–7 PM 8 7–8 PM 9 8–9 PM 4 Proposed ATM Site Locationand Operation Attached is Exhibit1 which depicts a concept configuration for the ATM site located along the easterly edge of the existing mall parking lot. Raised concrete islands will be constructed to create the desired traffic circulation pattern through the ATM lane. The main shopping center north-south drive aisle will not be impeded by the ATM operation. Customers will enter the ATM lane from the south; the ATM will be positioned to serve the driver side (left side) of the vehicle. The existing east-west parking lot drive aisles are set up for one-way flow with angled parking stalls. The proposed ATM islands will block direct access from the outer circulatory roadway to/from one inbound parking aisle and one outbound aisle. As shown in the exhibit, movements to and from these laneswill be accommodated in the plan. To encourage drivers to follow the intended driving lanes to the inbound parking aisle, an additional end cap island is proposed. This end cap island would also protect the existing light standard positioned in the parking lot. Service to the ATM machine will be performed through anATM cabinet door positioned on the back side of the ATM. Servicevehicles will stop on theparking lotside of the ATM as to not impedetraffic flow on the main north south drive aisle of theshopping center. The ATM lane as shown will accommodate a queue of up to fourvehicles. Guidance for queue storage at 1 ATM’s suggest thata queue length storage forat least threevehiclesshould be provided.If circumstances ever occur that exceed the vehicle storage provided within the ATM lane, the overflow will occur within the parking lot. Site Impacts The introduction of raised islands for the ATM sets up a potential improvement to the overall operationof the mall parking lot. Currently, the parking bays and drive aisles are painted on the bituminous surface. Parking 1)Drive-Through Queue Generation; Countingcars.com; Mike Spack, etal, 2012 Novation Credit Union –ATM Site Feasibility Study September 23, 2016 Page 3 lot demanddoes not typically consume a majorityof the available capacity. Drivers tend to cut across the parking lot in direct lines toward their destination rather than following the painted drive aisles.The proposed islands will channelize flow to the drive aisles. While not part of this project, additional raised end cap islands could be considered as future parking lot improvements to create a more orderly flow through all of the drive aisles. The proposed ATM operation as shown in Exhibit 1 will reduce the capacity of the parking lot by 33spaces. The reduction in spaces is not an operational concern based upon historical parking demands during peak seasonswhich have been observed to be well under the capacity of the parking lot. Conclusion and Recommendation The proposed ATM site with channelization islands is feasible and will not create safety, parking capacity or other operational concerns. The proposed change should be considered by the City of Hutchinsonthrough the appropriate site plan review and permitting process. Attachments: Exhibit1–Proposed ATM Concept Plan c:Kristi Mukomela, Novation Credit Union John Rodeberg, SEH p:\\ko\\n\\novcu\\138936\\1-genl\\14-corr\\ncu atm feasibility memorandum.docx 1)Drive-Through Queue Generation; Countingcars.com; Mike Spack, etal, 2012