cp10-24-2017HUTCHINSON CITY COUNCIL
MEETING AGENDA
TUESDAY, OCTOBER 24, 2017
CITY CENTER — COUNCIL CHAMBERS
(The City Council is provided background information for agenda items in advance by city staff, committees and boards.
Many decisions regarding agenda items are based upon this information as well as: City policy and practices, input
from constituents, and other questions or information that has notyet been presented or discussed regarding an agenda
item)
1. CALL MEETING TO ORDER — 5:30 P.M.
(a) Approve the Council agenda and any agenda additions and/or corrections
2. INVOCATION — Peace Lutheran Church
3. PLEDGE OF ALLEGIANCE
4. RECOGNITION OF GIFTS, DONATIONS AND COMMUNITY SERVICE TO THE CITY
(a) Resolution No. 14797 - Resolution Accepting Donation of Equipment from TDK-
Hutchinson Technology for Wastewater Treatment Facility
(b) Recognition of 3M — Donation to Fire Apparatus/Roadway Safety Project
PUBLIC COMMENTS
(This is an opportunity or members of the public to address the City Council on items not on the current agenda. Ifyou
have a question, concern or comment, please ask to be recognized by the mayor — state your name and address for the
record. Please keep comments under 5 minutes. Individuals wishing to speak for more than five minutes should ask to
be included on the agenda in advance of the meeting. All comments are appreciated, butplease refrain from personal or
derogatory attacks on individuals.)
5. CITIZENS ADDRESSING THE CITY COUNCIL
6. APPROVAL OF MINUTES
(a) Regular Meeting of October 10, 2017
(b) Workshop Meeting of October 10, 2017
CONSENT AGENDA
(The items listedfor consideration will be enacted by one motion unless the Mayor, a member of the City Council or
a city staff member requests an item to be removed. Traditionally items are not discussed.)
7. APPROVAL OF CONSENT AGENDA
(a) Consideration for Approval of Improvement Project Change Orders
1. Change Order No. 3 — Letting No. 6, Project No. 17-06 (Hotel Site Access
Improvemenets)
2. Change Order No. 4 — Letting No. 6, Project No. 17-06 (Hotel Site Access
Improvements)
3. Change Order No. 4 — Letting No. 4, Project No. 16-04 (Golf Course Road Water
Tower Rehab)
4. Change Order 1 — Letting No. 2, Project No. 17-02 (School Road & Roberts Road
Reconstruction)
(b) Consideration for Approval of Items for City Alley 917 Improvements (Letting No. 15,
CITY COUNCIL AGENDA OCTOBER 24, 2017
Project No. 17-15)
1. Resolution No. 14795 - Resolution Declaring Adequacy of Petition and Ordering
Preparation of Report on Improvement
2. Resolution No. 14796 - Resolution Receiving Report and Calling Hearing on
Improvement
(c) Consideration for Approval of Resolution No. 14793 — Resolution for Certification of
Special Assessments from City of Hutchinson to McLeod County Auditor
(d) Consideration for Approval of Resolution No. 14794 - Resolution Adopting Findings of
Fact and Reasons for Approval of a Conditional Use Permit for Light Manufacturing of
Automotive Aftermarket Parts in an I/C Zoning District Located at 760 Airport Road
with Favorable Planning Commission Recommendation
(e) Claims, Appropriations and Contract Payments
PUBLIC HEARINGS — 6:00 P.M.
8. WELLHEAD PROTECTION PLAN PART 2 FOR THE CITY OF HUTCHINSON
MNVIUNICATIONS RE UESTS AND PETITIONS
purpose o this portion o the agenda is to provide the Councilwith information necessary to craft wise policy.
ides items like monthly or annual reports and communications from other entities.)
UNFINISHED BUSINESS
9. APPROVE/DENY ORDINANCE NO. 17-779 — AN ORDINANCE AUTHORIZING THE
SALE OF MUNICIPALLY -OWNED LAND TO TITANIUM PARTNERS, LLC (SECOND
READING AND ADOPTION)
10. APPROVE/DENY ORDINANCE NO. 17-778 — AN ORDINANCE SUSPENDING HOURS OF
LIQUOR SALES ON OCTOBER 29, 2017 (SECOND READING AND ADOPTION)
NEW BUSINESS
11. APPROVE/DENY BID AWARD FOR FIRE DEPARTMENT SELF CONTAINED
BREATHING APPARATUS
12. APPROVE/DENY MNDOT LOCAL ROAD IMPROVEMENT PROGRAM GRANT
APPLICATION
13. APPROVE/DENY SETTING ENTERPRISE FUNDS BUDGET WORKSHOP FOR
NOVEMBER 14, 2017, AT 4:00 P.M.
GOVERNANCE
(The purpose of this portion of the agenda is to deal with organizational development issues, including policies,
performances, and other matters that manage the logistics of the organization. May include monitoring reports,
policy development and governance process items)
2
CITY COUNCIL AGENDA OCTOBER 24, 2017
14. MINUTES FROM COMMITTEES, BOARDS OR COMMISSIONS
�a) Tall Grass/Noxious Weed Monthly Report for September 2017
b) Housing & Redevelopment Authority Board Minutes from September 19, 2017
c) Planning, Zoning, Building Department Quarterly Report
d) City of Hutchinson Financial Report and Investment Report for September 2017
e) Planning Commission Minutes from January — September, 2017
NHSCELLANEOUS
15. STAFF UPDATES
16. COUNCIL/MAYOR UPDATE
ADJOURNMENT
HUTCHINSON CITY COUNCIL c`=y-f 0, a_ �
Request for Board Action 79 M-W
Agenda Item: Equipment Donation from TDK-HT1 for Wastewater Treatment Facility
Department: PW/Eng
LICENSE SECTION
Meeting Date: 10/24/2017
Application Complete N/A
Contact: Kent Exner
Agenda Item Type:
Presenter: Kent Exner
Reviewed by Staff ❑
Consent Agenda
Time Requested (Minutes): 0
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
The City Wastewater Treatment Facility is happy to accept two (2) used Yamaha air diaphragm pumps from
TDK-Hutchinson Technology Inc. The estimated total value of this donation is $1,000.00.
BOARD ACTION REQUESTED:
Approval of Resolution
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No
Included in current budget: Yes
PROJECT SECTION:
Total Project Cost: $ 0.00
Total City Cost: $ 0.00 Funding Source:
Remaining Cost: $ 0.00 Funding Source:
Resolution No. 14797
RESOLUTION ACCEPTING A PROPERTY DONATION
WHEREAS, The City of Hutchinson is generally authorized to accept donations of
real and personal property pursuant to Minnesota Statutes Section 465.03 for the benefit of
its citizens; and,
WHEREAS, the following organization has offered to contribute personal property
set forth below to the City of Hutchinson:
Name of Donor
TDK-Hutchinson Technology Inc.
Type of Property
Yamaha Air Diaphragm Pumps
WHEREAS, it is the intention of the City of Hutchinson to use the equipment
donation for use at the Hutchinson Wastewater Treatment Facility; and
WHEREAS, the City Council hereby finds that it is appropriate to accept the
donation offered,
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF HUTCHINSON, NHNNESOTA:
THAT, the donation described above is hereby accepted by the City of Hutchinson
with the conditions as laid out in the resolution.
Adopted by the City Council this 24th day of October, 2017.
Gary T. Forcier, Mayor
Matthew Jaunich, City Administrator
HUTCHINSON CITY COUNCIL c`=y-f 0, a_ �
Request for Board Action 79 M-W
Agenda Item: Recognition of 3M for donating to our fire apparatus/roadway safety project.
Department: Fire
LICENSE SECTION
Meeting Date: 10/24/2017
Application Complete N/A
Contact: Mike Schumann
Agenda Item Type:
Presenter: Mike Schumann
Reviewed by Staff ❑
Recognition of Gifts/Donations
Time Requested (Minutes): 5
License Contingency N/A
Attachments: No
BACKGROUND/EXPLANATION OFAGENDA ITEM:
We approached 3M around the first of the year asking if they would consider helping us with a fire apparatus roadway
safety project. The most recent new fire truck that we took deliver of came with red and white chevron reflective
angular striping on the rear which is now standard and required for all fire apparatus. The safety enhancement this
provides was immediately noticeable and that is when we came up with the idea to apply this new safety feature to all
of our fire apparatus.
3M has been an excellent partner for the HFD on many past projects as well and they eagerly researched the
materials needed for our request and decided to provide ALL the materials for the project which in turn saved the HFD
several thousand dollars.
During the presentation 3M representatives will be given a framed picture of all HFD fire apparatus displaying the new
chevron striping and tremendous safety improvements they have provided for us.
BOARD ACTION REQUESTED:
Recognize 3M for their generous donation and help with improving safety for all of our Hutchinson Firefighters.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
HUTCHINSON CITY COUNCIL
MEETING NHNUTES
TUESDAY, OCTOBER 10, 2017
CITY CENTER — COUNCIL CHAMBERS
(The City Council is provided background information for agenda items in advance by city staff, committees and boards.
Many decisions regarding agenda items are based upon this information as well as: City policy and practices, input
from constituents, and other questions or information that has notyet been presented or discussed regarding an agenda
item)
1. CALL MEETING TO ORDER — 5:30 P.M.
Mayor Gary Forcier called the meeting to order. Members present were John Lofdahl, Chad
Czmowski, Mary Christensen and Steve Cook. Others present were Matt Jaunich, City
Administrator, Kent Exner, City Engineer and Amber Donley, Attorney
(a) Approve the Council agenda and any agenda additions and/or corrections
Matt Jaunich, City Administrator, noted he would like to add an additional item to the
agenda for consideration. Under the first item under New Business, he will be placing
Consideration for Approval of First Amendment to Purchase Agreement for the hotel project
as the closing date needs to be extended.
Motion by Lofdah, second by Czmowski, to approve the agenda with the additional item
noted. Motion carried unanimously.
2. INVOCATION — Peace Lutheran Church
3. PLEDGE OF ALLEGIANCE
4. RECOGNITION OF GIFTS, DONATIONS AND COMMUNITY SERVICE TO THE CITY
Council Member Cook recognized Hutchinson native Lindsay Whalen and the
Minnesota Lynx for winning the WNBA championship. He also recognized the High
School Marching band that performed at the welcome home parade that was held for the
Lynx in Minneapolis. Lastly, Council Member Cook recognized the unveiling of the new
mural that is located on the back side of the Ace Hardware building on Hassan Street.
(a) Resolution No. 14787 - Acceptance of Cash Donation from Riversong Music Festival for
Music Stage Located in Masonic West River Park
Motion by Lofdahl, second by Cook, to approve Resolution No. 14787. Motion carried
unanimously.
(b) Resolution No. 14788 — Acceptance of Cash Donation from Walter and Lynne Clay for
Police Memorial Park Fund
Motion by Christensen, second by Lofdahl, to approve Resolution No. 14788. Motion
carried unanimously.
PUBLIC COMMENTS
(This is an opportunity or members of the public to address the City Council on items not on the current agenda. Ifyou
have a question, concern or comment, please ask to be recognized by the mayor — state your name and address for the
record. Please keep comments under 5 minutes. Individuals wishing to speak for more than five minutes should ask to
be included on the agenda in advance of the meeting. All comments are appreciated, butplease refrain from personal or
derogatory attacks on individuals.)
5. CITIZENS ADDRESSING THE CITY COUNCIL
6. APPROVAL OF MINUTES
(a) Regular Meeting of September 12, 2017
CITY COUNCIL MINUTES OCTOBER 10, 2017
(b) Workshop Meeting of September 12, 2017
Motion by Cook, second by Lofdahl, to approve the minutes as presented. Motion
carried unanimously.
CONSENT AGENDA
(The items listedfor consideration will be enacted by one motion unless the Mayor, a member of the City Council or
a city staff member requests an item to be removed. Traditionally items are not discussed.)
7. APPROVAL OF CONSENT AGENDA
(a) Consideration for Approval of Resolution No. 14780 — Resolution to Sell at Auction
Surplus Property
(b) Consideration for Approval of Change Order No. 2 — Letting No. 2, Project No. 17-02
(School Road and Roberts Road Reconstruction)
(c) Consideration for Approval of Lease Agreement with Innovative Foam for Space in
Hutchinson Enterprise Center
(d) Consideration for Approval of Restatement of Flexible Benefit Plan
(e) Appointment of Andy Nissen to Airport Commission to September 2022
(f) Consideration for Approval of Purchasing and Installing Backstops and Fencing at
Riverside and Tartan Parks
(g) Claims, Appropriations and Contract Payments
Item 7(f) was pulled for separate discussion.
Motion by Czmowski, second by Christensen, to approve consent agenda with the
exception of Item 7(f). Motion carried unanimously.
Council Member Cook noted that when the discussion of upgrading ballfields was
previously held, Northwoods was included in those discussions but is not included in the
action tonight. Staff members in attendance noted that they believe upgrades to
Northwoods are scheduled to take place in 2018 and not in 2017 like they are at
Riverside and Tartan Parks.
Motion by Cook, second by Lofdahl, to approve Item 7(f). Motion carried unanimously.
PUBLIC HEARINGS — 6:00 P.M.
8. CONSIDERATION FOR APPROVAL OF DECLARING THE PROPERTY AT 141 5TH
AVENUE NE AS A PUBLIC NUISANCEMAZARDOUS BUILDING
Dan Jochum, Planning Director, presented before the Council. Mr. Jochum explained that
this property has been on the City's "list'' for several years as in noncompliance related to
nuisance issues. Mr. Jochum provided a history on the property and how it has changed
owners since 2008. It is currently owned by an investment company based out of Las Vegas,
Nevada. It has been tagged as uninhabitable by the City since 2012. The City's building
official inspected the property in September and is recommending that the property be
removed. Correspondence has been sent to the property owner, however the City has
received no response. Should the Council deem the property a public nuisance/hazardous
building, the City will follow the court process as it did with 430 Water Street to have the
structure razed.
2
CITY COUNCIL MINUTES OCTOBER 10, 2017
No public comments were received.
Motion by Christensen, second by Cook, to close public hearing. Motion carried
unanimously.
Motion by Christensen, second by Lofdahl, to approve Resolution No. 14792 - Resolution
Declaring the Property at 141 5t' Avenue NE as a hazardous building. Motion carried
unanimously.
9. CONSIDERATION FOR APPROVAL OF DECLARATION OF PRIVATE TREE AS A
NUISANCE
John Olson, Public Works Manager, presented before the Council. Mr. Olson explained that
public works staff is requesting that a private tree located at 475 Hwy 7 East be deemed a
hazardous condition and be abated. Should the tree be declared a nuisance, work must be
completed within 20 days to render the tree nonhazardous. Mr. Olson believes that the dead
portion of the tree can be removed rather than removal of the entire tree. The property owner
will be assessed the costs of the removal of the dead portion of the tree.
No public comments were received.
Motion by Czmowski, second by Lofdahl, to close public hearing. Motion carried
unanimously.
Motion by Cook, second by Lofdahl, to approve declaring private tree located at 475 Hwy 7
East as a nuisance and continue with the abatement process as identified by staff. Motion
carried unanimously.
10. ASSESSMENT HEARING AND PROJECT AWARD FOR CITY ALLEY 952
IMPROVEMENT PROJECT (LETTING NO. 14, PROJECT NO. 17-14)
�a) Resolution No. 14790 — Resolution Adopting Assessment
b) Resolution No. 14791 — Resolution Accepting Bid and Awarding Contract
Kent Exner, City Engineer, presented before the Council. Mr. Exner explained that three
bids were received for Alley 952 improvements. The low bid came in from R&R Excavating
in the amount of $89,194.09 which is approximately 18% higher than the engineer's
estimate. This bid reflects prices associated with relatively small quantities of typical road
building work. This project is included in the 2017 Infrastructure Improvement Program.
This alley is located south of 5t' Avenue SE between Jefferson Street SE and Adams Street
SE. The alley improvements include construction of grading, storm sewer, concrete curbing,
bituminous paving and appurtenances. This project is intended to assist with drainage issues
in the area, however property owners will need to make their own accommodations should
their drainage issues not be fully addressed. The assessment amount has not changed to
property owners as originally presented to them. If approved, the project is scheduled to
begin on Monday, October 16, 2017
No public comments were received.
Motion by Cook, second by Lofdahl, to close public hearing. Motion carried unanimously.
Motion by Lofdahl, second by Christensen, to approve Resolution Nos. 14790 and 14791.
Motion carried unanimously.
purpose o t is portion oJ the agenda is to provide the Council with information necessary to craft wise policy.
ides items like monthly or annual reports and communications from other entities.)
11. ANNUAL UPDATE ON THE HUTCHINSON LIBRARY AND PIONEERLAND
LIBRARY SYSTEM
CITY COUNCIL MINUTES OCTOBER 10, 2017
Katy Hiltner, Head Librarian, presented before the Council. Ms. Hiltner distributed materials
pertaining to the library including statistical information and the October calendar of events.
Ms. Hiltner reviewed information pertaining to registered users, library visits, hours, and an
update on the summer reading program.
12. UPDATE ON HISTORIC GRAFFITI PRESERVATION PROJECT AT THE HISTORIC
DEPOT AND REVIEW OF POTENTIAL NEXT STEPS — MCLEOD COUNTY
HISTORIC PARTNERSHIP
Bayley Schluter, Director of McLeod County Historic Partnership, presented before the
Council. Ms. Schluter provided a brief final report of the historic graffiti preservation project
at the Depot. The first phase of this project began in December 2016. The previous director
worked to create a twine grid that could easily be adjusted and wouldn't touch the walls and
hired a photographer who worked to capture each square. A researcher then began to sift
through the text and drawings and bring the graffiti to life. The researcher used several
resources to find a face that matched what was written on the walls decades ago. With the
information, over fifty complete biographies were written with more possible in the future.
The final steps are being taken to organize the photographs and biographies into one
cohesive report that will be made available online through the McLeod County Historical
Society. Once the final report has been submitted and approved by the Minnesota Historical
Society, the Partnership will be able to move forward with making the necessary structural
changes to make the Depot accessible to the residents of McLeod County.
The Partnership is recommending that the City hire a mechanical engineer that could
recommend ways to install an HVAC system and electric lights in a way that wouldn't
disturb the graffiti and also hire a Historic Preservation Consultant to recommend ways to
make the graffiti last another one hundred years. Both of these endeavors are grant fundable
through the Legacy Amendment estimated at $4000-$8000 for a mechanical engineer and
$10,000 for a consultant and the installation of any preservation equipment. Ms. Schluter
noted that by adding HVAC and electricity to the Depot, the City would have a large and
unique space that could be rented out with the meeting room next door. Ms. Schluter
commented that there is no building comparable to the Depot in the state. The floor to
ceiling text and drawings written with wet coal dating back to the early -1900s is like no
other. Ms. Schluter noted that only the property owner can apply for the grant funds. Staff
and Council clarified for Ms. Schluter that the Depot is actually owned by the McLeod
County Rail Authority. Ms. Schluter noted that she will follow up with the chair of the
Authority to request that they pursue applying for grant funds for these next steps.
Ms. Schluter noted that the director of the McLeod County Historical Museum, Lori Pickell-
Stangel, wrote up an estimate for the museum to preserve and store the plat maps that are
hanging in the Council Chambers as discussed at the last Council meeting. On behalf of Ms.
Pickell-Stangel, Ms. Schluter distributed an explanation and a cost estimate.
UNFINISHED BUSINESS
13. APPROVE/DENY ORDINANCE NO. 17-777 - AN ORDINANCE AMENDING
CHAPTERS 93 AND 95 OF THE HUTCHINSON CITY CODE TO ACCOMMODATE
THE ESTABLISHMENT OF A DOG PARK (SECOND READING AND ADOPTION)
Matt Jaunich, City Administrator, noted that this ordinance had its first reading at the last
Council meeting. The changes proposed are related to unleashed dogs due to the new dog
park.
Motion by Cook, second by Czmowski, to approve second reading and adoption of
Ordinance No. 17-777. Motion carried unanimously.
NEW BUSINESS
CITY COUNCIL MINUTES OCTOBER 10, 2017
13.5 APPROVE/DENY FIRST AMENDMENT TO VACANT LAND PURCHASE
AGREEMENT WITH HUTCHCOBBLE, LLC
Miles Seppelt, EDA Director, presented before the Council. Mr. Seppelt noted that the
original purchase agreement had a closing date of October 23, 2017, however that deadline
must be extended. The proposed new closing date is proposed for November 22, 2017.
Brian Forcier, hotel developer, presented before the Council. Mr. Forcier noted that the
project is ready to begin construction soon as financing has been approved and the
remaining line items are being taken care of. Mr. Forcier noted that development plans are
scheduled to be approved by the planning/zoning/building department within the week prior
to going to the Planning Commission.
Motion by Cook, second by Christensen, to approve First Amendment to Vacant Land
Purchase Agreement for hotel development project. Motion carried unanimously.
14. APPROVE/DENY RESOLUTION NO. 14789 - RESOLUTION AUTHORIZING
ISSUANCE, PRESCRIBING THE FORM AND DETAILS AND PROVIDING FOR THE
PAYMENT OF PUBLIC UTILITY REVENUE BONDS, SERIES 2017B
Andy Reid, Finance Director, presented before the Council. Mr. Reid noted that last month the
Council approved the Hutchinson Utilities Commission to go out for bids to finance two new
generators for the HUC. Mr. Reid introduced Nick Anhut from Ehlers & Associates.
Mr. Anhut explained that Mooty's has affirmed the Al rating for Hutchinson Utilities Commission.
A sale of the bonds was held this morning and five bids were received with the low bid at 2.81%
coming in from Piper Jaffrey. The principal amount of the bond was reduced to $16,675,000 due to
a premium bid and lower than budgeted financing costs. This is structured as a 20 -year repayment.
Council Member Cook noted that the capacity contract will now cover the entire bond payment.
Motion by Czmowski, second by Christensen, to approve Resolution No. 14789. Motion carried
unanimously.
15. APPROVE/DENY RESOLUTION NO. 14786 — RESOLUTION AUTHORIZING ISSUANCE
OF $2,535,000 GENERAL OBLIGATION BONDS, SERIES 2017A
Andy Reid, Finance Director, noted the issuance of this bond sale is to finance street
improvements for 2017.
Nick Anhut, Ehlers & Associates, presented before the Council. Mr. Anhut explained that
Standard & Poors has reaffirmed the City's bond rating of AA- and will stand by it for two
years.
Two bids were received this morning with the low bid coming from Baird at 2.54%. $2,445,000
will be the final premium amount due to to premium bid and lower than budgeted financing
costs. This is $60,000 less in total debt service as projected.
Motion by Czmowski, second by Lofdahl, to approve Resolution No. 14786. Motion carried
unanimously.
16. APPROVE/DENY ORDINANCE NO. 17-779 — AN ORDINANCE AUTHORIZING THE
SALE OF MUNICIPALLY -OWNED LAND TO TITANIUM PARTNERS, LLC (FIRST
READING, SET SECOND READING AND ADOPTION FOR OCTOBER 24, 2017)
Matt Jaunich, City Administrator, presented before the Council. Mr. Jaunich explained that
earlier this year the City completed a court action and was declared the legal owner of a 1/10
acre parcel of land near Prospect Street with the intent that a portion of this parcel be
included in the land to be conveyed with the rest of the parcels to the developer of the hotel
5
CITY COUNCIL MINUTES OCTOBER 10, 2017
project. Therefore, this proposed ordinance conveys this piece of land to the hotel developer
for the hotel that will be constructed at the intersection of Hwy 7 and Hwy 15. It was noted
that originally the other parcels were conveyed to Titanium Partners, LLC, however they
have transferred assets to Hutchcobble, LLC. Although the proposed ordinance reads,
"....hereby transferred and conveyed to Titanium Partners, LLC, or its successor", council
members suggested that the words "or assigns" be added to remain consistent with other
documents that have been part of this project.
Motion by Cook, second by Christensen, to approve first reading of Ordinance No. 17-779,
including "or assigns". Motion carried unanimously.
17. APPROVE/DENY ORDINANCE NO. 17-778 —AN ORDINANCE SUSPENDING HOURS OF
LIQUOR SALES ON OCTOBER 29, 2017(FIRST READING, SET SECOND READING
AND ADOPTION FOR OCTOBER 24, 2017)
Matt Jaunich, City Administrator, presented before the Council. Mr. Jaunich noted that the
Minnesota Vikings are playing in London on October 29, 2017, and kickoff in the USA is at
8:30 a.m. Because of this, Buffalo Wild Wings has brought forward a request that liquor
sales begin at 8:00 a.m. on that date to accommodate customers. This ordinance will be
effective for all on -sale license holders on October 29, 2017.
Motion by Cook, second by Christensen, to approve first reading of Ordinance No. 17-778.
Motion carried unanimously.
GOVERNANCE
(The purpose o t is portion of the agenda is to deal with organizational development issues, including policies,
performances, and other matters that manage the logistics of the organization. May include monitoring reports,
policy development and governance process items)
18. MINUTES FROM COMMITTEES, BOARDS OR COMMISSIONS
�a) Library Board Minutes from August 28, 2017
b) Liquor Hutch Quarterly Report
MISCELLANEOUS
19. STAFF UPDATES
Kent Exner — Mr. Exner provided an update on improvement projects. Paving was conducted
yesterday and today on School Road/Roberts Road. The Roberts Road/School Road trails will
be completed near the end of this week or early next week with overall restoration being
completed when the trail work is done. Parking Lot I paving efforts are being coordinated to
take place this week and next week. The alley most likely will not be opened until all paving is
complete. Hotel site access road is in progress, however contaminated material has been
located and will need to be corrected. Substantial completion should be reached by the end of
next week. A South Grade Road intersections study will be undertaken from the Hwy 15
Service Road to Merrill Street. A grant application will be before the Council in the future for
this study. A river lakes/basin study draft was received the other day and staff will be
reviewing it over the next several weeks with the Hutchinson Waters group. An open house
public meeting will then be held with a final draft then presented to the Council. Mr. Exner
also asked all individuals to be safe near the dam spillway due to high water levels.
Matt Jaunich — Mr. Jaunich reminded the Council of the city recognition event being held on
October 26th. Mr. Jaunich also encouraged residents to attend Council meetings when they
rel
CITY COUNCIL MINUTES OCTOBER 10, 2017
have ideas that they would like to see action taken on. Mr. Jaunich noted that some of the items
acted on this evening all began with citizen inquiries.
20. COUNCIL/MAYOR UPDATE
Steve Cook — Council Member Cook commented that the Liquor Hutch quarterly report
shows that Sunday liquor sales have been performing higher than expected. Council
Member Cook also noted that at the last Council workshop Ameresco had offered to
conduct another facility study at no cost to see if any energy improvements can be made.
Staff will reach out to them to see what can be offered. Council Member Cook asked if the
Council needs to have a discussion about creating a policy determining when fees will be
assigned and when they will be waived in improvement projects. Staff agreed creating a
policy to address project fees would be beneficial. He also suggested detailing out the alley
assessment policy.
Gary Forcier — Mayor Forcier commented that harvest has begun so he asked residents to be
safe in their travels on the roadways
ADJOURNMENT
Motion by Cook, second by Christensen, to adjourn at 7:35 p.m. Motion carried unanimously.
7
HUTCHINSON CITY COUNCIL
SPECIAL WORKSHOP
MEETING MINUTES
TUESDAY, OCTOBER 10, 2017, AT 4:00 PM
CITY CENTER — COUNCIL CHAMBERS
1. Call to Order
Mayor Gary Forcier called the meeting to order. Members present were Chad Czmowski, Mary
Christensen, Steve Cook and John Lofdahl. Others present were Matt Jaunich, City Administrator
and Kent Exner, City Engineer and other City staff.
DISCUSSION/REVIEW ITEMS
2. Master Facilities Plan
Dan Jochum, Planning Director, introduced John McNamara of Wold Architects. Mr. Jochum
noted that staff and Council have been working on a Facilities Master Plan for almost a year. Mr.
McNamara provided conceptual plans for the police department, fire department and City Center.
John McNamara, Wold Architects, presented before the Council. Mr. McNamara reviewed
previous discussions that the Council has had at previous workshops concerning sites for the
police department, fire department and City Center. Pertaining to the police department, Mr.
McNamara noted that the current site is rather tight for any expansion. One idea that had been
developed for the location of a new police station was the former EconoFoods site located
between Washington Avenue NE and 1St Avenue NE. Mr. McNamara provided another optional
site south of the depot where currently a plumbing and heating business is located. A third site
presented was the block where the fire station is currently located between Adams Street and
Jefferson Street. Mr. Jochum noted that the fire department has expressed that if there location
should change, their wish is not to be moved any further north than from where they are currently
located. It was noted that the third option for the police station would require that the City
purchase lots that may or may not be for sale and the fire station would need a modest addition
constructed.
Mr. McNamara then reviewed the current fire station site. Mr. McNamara provided conceptual
diagrams for building additions and renovated office space to the fire station. Mr. McNamara
also provided a conceptual diagram for renovations to City Center. No additions are being
recommended to City Center.
Mr. McNamara then reviewed the budget for each project. The police station project cost is
estimated at $8,600,000. The fire station project cost is estimated at $7,000,000. The City Center
project cost is estimated at $3,000,000.
Council Member Cook suggested having an analysis done on adding on to the current police
department so that can be compared to moving to another location. Mr. McNamara noted that
that analysis has been completed and renovation/addition to the current site was estimated at
$8.2-$9 million.
Mr. McNamara noted that staff is recommending that a new police station be constructed on a
selected site, an addition completed to the fire station and modest renovations done to City
Center. Implementation would include a two-year design/construction for a new police station.
Council Member Cook suggested staff researching Options 1 and 3 for a new police station which
are the EconoFoods site as well as the combined site where the current fire station is located.
Council Members Lofdahl and Christensen both noted that they are in favor of both of those sites
as along as sound research is done on costs and benefits to each site.
Discussion was held in regard to future development of the former EconoFoods site and the lack
of inquisitions of the property. General discussion was also held on how to fund such an
expensive project. Mr. McNamara also noted that if/when a new police station is built, it could
be master planned for future expansion to include a public safety building and/or fire station.
Mr. Jaunich noted that the next step is probably for the Council to go through exercises of
actually determining costs for the two options — design, cost, analysis, finance.
An executive summary will be put together and presented to the Council for their approval. The
Council will then consider when to begin the next phase.
Motion by Christensen, second by Cook, to adjourn at 5:10 p.m. Motion carried unanimously.
ATTEST:
Gary T. Forcier
Mayor
Matthew Jaunich
City Administrator
HUTCHINSON CITY COUNCIL c`=y-f 0' a_ �
Request for Board Action 79 M-W
Agenda Item: Approval of Improvement Project Change Order & Work Orders
Department: PW/Eng
LICENSE SECTION
Meeting Date: 10/24/2017
Application Complete N/A
Contact: Kent Exner
Agenda Item Type:
Presenter: Kent Exner
Reviewed by Staff ❑
Consent Agenda
Time Requested (Minutes): 0
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
As construction has proceeded on the below listed projects there has been additional work, project scope revisions,
and/or construction completion date changes. The items specified below have been identified and deemed necessary
to satisfactorily complete the projects per the intent of the original construction contract. The following Change Orders
and/or Work Orders are proposed as noted:
- Change Order No. 3 — Letting No. 6/Project No. 17-06 — Hotel Site Access Improvements
This Changer Order addresses storm sewer revisions and connection to existing concrete pipe. This work results in a
total increase in the Contract in the amount of $3,746.75. This work does not affect the Interim Completion Date or
Final Completion Date.
- Change Order No. 4 - Letting No. 6/Project No. 17-06 - Hotel Site Access Improvement
This Change Order addresses restoration on the property located at 436 Prospect St NE and discharging 8" concrete
tile into the water storage basin. This work results in a total increase in the Contract in the amount of $9,304.95.
This work does not affect the Interim Completion Date or Final Completion Date.
- Change Order No. 4 - Letting No. 4/Project No. 16-04 - Golf Course Road Water Tower Rehab
This Change Order addresses a reduction in the total contract amount as agreed upon between the City and
Contractor. This change order results in a total decrease in the Contract in the amount of $ 18,000.00. This work
does not affect the Interim Completion Date or Final Completion Date.
- Work Order No. 1 — Letting No. 2/Project No. 17-02 — School Road & Roberts Road Reconstruction
This Changer Order addresses the installation of additional bituminous parking area adjacent to the most northerly
unit of the School Road townhomes (320 School Road SW) due to the elimination of driveway access. This work
results in a total increase in the Contract in the amount of $8,427.03. This work does not affect the Interim
Completion Date or Final Completion Date.
BOARD ACTION REQUESTED:
Approval of Change Orders & Work Order
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No
Included in current budget: Yes
PROJECT SECTION:
Total Project Cost: $ 0.00
Total City Cost: $ 0.00 Funding Source:
Remaining Cost: $ 0.00 Funding Source:
STATE AID FOR LOCAL TRANSPORTATION
CHANGE ORDER
City/Germy of City of Hutchinson
Change Order No. 3
Page 1 of 1
FEDERAL PROJECT NO.
STATE PROJECT NO.
LOCAL PROJECT NO.
CONTRACT NO.
NA
NA
L6 P 17-06
L6 P 17-06
CONTRACTOR NAME AND ADDRESS
LOCATION OF WORK
Rosti Construction Company of Minnesota Inc
416 Prospect St NE (Hwy 15/Hwy 7/Prospect)
P O Box 121
TOTAL CHANGE ORDER AMOUNT
Jordan, MN 55352
$3,746.75
In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the work as altered by the following
provisions.
This Changer Order addresses storm sewer revisions and connection to existing concrete pipe. This work results in a total increase in
the Contract in the amount of $3,746.75.
This work does not affect the Interim Completion Date or Final Completion Date. This Change Order results in an increase of $3,746.75
to the contract amount.
COST BREAKDOWN
Item No.
Item
Unit
Unit Price
Quantity
Amount
Funding Category No. 001
2550.602
CORE HOLE INTO EXISTING MANHOLE
LUMP SUM
$343.75
1
$343.75
2506.501
MANHOLE DESIGN 48-4020
LIN FT
$460.00
6.2
$2,852.00
2503.602
CONNECT TO EXISTING 8" CONCRETE DRAIN TILE
EACH
$551.00
1
$551.00
Funding Category No. 001 Total:
$3,746.75
Change Order No. 3 Total:
$3,746.75
Funding category is required for federal projects.
CHANGE IN CONTRACT TIME (check one)
Due to this change the Contract Time:
a. [ ] Is Increased by Working Days b. [ X ] Is Not Changed
[ ] Is Decreased by Working Days
[ ] Is Increased by Calendar Days c. [ ] May be revised if work affected the controlling operation
[ ] Is Decreased by Calendar Days
Approved By Project Engineer: Kent Exner
Signed
Date:
Approved By Contractor: Rosti Construction Company of
Minnesota Inc
Signed
Phone: (320) 234-4212 Date:
Original to Project Engineer; Copy to Contractor
Approved by Hutchinson City Council 09/26/2017.
Signed
Mayor, Gary Forcier
Date: 10/24/2017
Siqned
Phone: (952) 492-5527
City Administrator, Matt Januich
Date: 10/24/2017
Orig. Contract $467,938.55 Prev. CO's $14,708.00 / This CO $3,746.75 Total Revised Contract Amount $486,393.30
STATE AID FOR LOCAL TRANSPORTATION
CHANGE ORDER
City/GeHig of City of Hutchinson
Change Order No. 4
Page 1 of 1
FEDERAL PROJECT NO.
STATE PROJECT NO.
LOCAL PROJECT NO.
CONTRACT NO.
NA
NA
L6 P 17-06
L6 P 17-06
CONTRACTOR NAME AND ADDRESS
LOCATION OF WORK
Rosti Construction Company of Minnesota Inc
416 Prospect St NE (Hwy 15/Hwy 7/Prospect)
P O Box 121
TOTAL CHANGE ORDER AMOUNT
Jordan, MN 55352
$9,304.95
In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the work as altered by the following
provisions.
This Change Order addresses restoration on the property located at 436 Prospect St NE and discharging 8" concrete tile into the water storage
basin. This work results in a total increase in the Contract in the amount of $9,304.95.
This work does not affect the Interim Completion Date or Final Completion Date.
COST BREAKDOWN
Item No.
Item
Unit
Unit Price
Quantity
Amount
Funding Category No. 001
2575.505
SODDING TYPE LAWN
SQ YD
$8.57
35
$299.95
2571.502
DECIDUOUS TREE 1.25" CAL CONT - APPLE
TREE
$212.50
2
$425.00
2503.603
8" YELOMINE RESTRAINT JOINT PVC (DIRECTIONALY DRILLED)
LUMP SUM
$6,500.00
1
$6,500.00
2503.602
CONNECT TO EXISTING 8" CONCRETE DRAIN TILE
EACH
$950.00
1
$950.00
2503.602
8" CLEAN-OUT ASSEMBLY
EACH
$175.00
2
$350.00
3882.100
CONTRACTOR 10% ALLOWANCE (APPLIED TO ITEMS 64,65 & 66 ONLY)
LUMP SUM
$780.00
1
$780.00
Funding Category No. 001 Total:
$9,304.95
Change Order No. 4 Total:
$9,304.95
" Funding category is required for federal projects.
CHANGE IN CONTRACT TIME (check one)
Due to this change the Contract Time:
a. [ ] Is Increased by Working Days b. [ X ] Is Not Changed
[ ] Is Decreased by Working Days
[ ] Is Increased by Calendar Days c. [ ] May be revised if work affected the controlling operation
[ ] Is Decreased by Calendar Days
kpproved By Project Engineer: Kent Exner Approved By Contractor: Rosti Construction Company of Minnesota
Inc
Signed Signed
Date: Phone: (320) 234-4212 Date: Phone: (952) 492-5527
Original to Project Engineer; Copy to Contractor
Approved by Hutchinson City Council 09/26/2017.
Signed
Mayor, Gary Forcier
Date: 10/24/2017
Siqned
City Administrator, Matt Januich
Date: 10/24/2017
Orig. Contract $467,938.55 Prev. CO's $18,454.75 / This CO $9,304.95 Total Revised Contract Amount $495,698.25
L4P16-04
City ofYa�'
7AZ
City of Hutchinson MN
10/10/2017
CITY OF HUTCHINSON, 111 HASSAN ST SE, HUTCHINSON MN 55350
CHANGE ORDER
Change Order No. 4
Page 1 of 1
FEDERAL PROJECT NO.
NA
STATE PROJECT NO.
NA
LOCAL PROJECT NO.
L4P16-04
CONTRACT NO.
L4P16-04
CONTRACTOR NAME AND ADDRESS
LOCATION OF WORK
Osseo Construction Co., LLC
Attn: Timothy J. Popple
Water Tower - Golf Course Road
TOTAL CHANGE ORDER AMOUNT
13812 12th St
-$18,000.00
Osseo WI 54758
In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the work as altered by the following provisions.
This Change Order addresses the reduction in the total contract amount as discussed and agreed upon by City and Contractor.
This additional Change Order does not affect the Substantial Completion Date or the Final Completion Date.
This Change Order results in an decrease to the Contract in the amount of $18,000.00.
COST BREAKDOWN
Item No. Item Unit Unit Price Quantity Amount
DEDUCT ITEMS:
LUMP
46 REDUCTION IN TOTAL CONTRACTAMOUNT SUM $18,000.00 -1 -$18,000.00
Change Order Total: -$18,000.'
* Funding category is required for federal projects.
CHANGE IN CONTRACT TI ME (check one)
Due to this change the Contract Time:
a. [ ] Is Increased by Working Days b. [ X ] Is Not Changed
[ ] Is Decreased by Working Days
[ ] Is Increased by Calendar Days c. [ ] Maybe revised if work affected the controlling operation.
[ ] Is Decreased by Calendar Days
Approved by City Engineer: Kent Exner Approved by Contractor: Osseo Construction Co., LLC
Signed Signed
Date: 10/24/2017 Phone: 320-234-4209 Date: Phone:
Approved by Hutchinson City Council 10/24/2017.
Signed Signed
Mayor, Gary Forcier City Administrator, Matt Jaunich
Date: 10/24/2017 Date: 10/24/2017
Orig. Contract Amt $515,300.00 Change Orders 1-2-3-4: -$16,200.00 Completion Date: 10/07/2016
STATE AID FOR LOCAL TRANSPORTATION
WORK ORDER FOR MINOR EXTRA WORK
Cityp of City of Hutchinson
Work Order No. 1
Page 1 of 1
FEDERAL PROJECT NO.
STATE PROJECT NO.
LOCAL PROJECT NO.
CONTRACT NO.
NA
SAP 133-117-014&SAP 133-116-00
L2P17-02
L2P17-02
CONTRACTOR NAME AND ADDRESS
LOCATION OF WORK
R & R Excavating
School Rd SW & Roberts Rd SW
1149 Hwy 22 South
TOTAL WORK ORDER AMOUNT
Hutchinson, MN 55350
$8,427.03
In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the work as altered by the following
provisions.
This Work Order addresses the need for additional bituminous parking area adjacent to the most northerly unit of School Road Townhomes
(320 School Rd SW) due to elimination of driveway access.
This Work Order does not affect the Interim Completion Date or Final Completion Date. This Work Order results in an increase of $8,427.03 to
the contract amount.
COST BREAKDOWN
Item No.
Item
Unit
Unit Price
Quantity
Amount
Funding Category No. 001
2021.501
MOBILIZATION
LUMP SUM
$1,679.18
1
$1,679.18
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
$12.75
27
$344.25
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
$4.08
32
$130.56
2105.501
COMMON EXCAVATION
CU YD
$52.19
8
$417.52
2574.526
COMMON TOPSOIL BORROW (LV)
CU YD
$79.66
5
$398.30
2112.604
SUBGRADE PREPARATION
SQ YD
$6.25
55
$343.75
2211.503
AGGREGATE BASE (CV) CLASS 5
CU YD
$57.63
8
$461.04
2360.503
TYPE SPWEA240B WEARING COURSE MIXTURE (3")
SQ YD
$85.44
47
$4,015.68
2575.501
SEEDING, HYDROSEED
SQ YD
$10.69
20
$213.80
3882.100
CONTRACTOR 10% ALLOWANCE (APPLIED TO ITEMS 149 & 150 ONLY)
LUMP SUM
$422.95
1
$422.95
Funding Category No. 001 Total:
$8,427.03
Work Order No. 1 Total:
$8,427.03
" Funding category is required for tederal projects.
Approved By Project Engineer: Kent Exner Approved By Contractor: R & R Excavating
Approved by the Hutchinson City Council on 10/24/2017.
Signed Signed
Date: 10/24/2017 Phone: (320) 234-4212 Date: Phone: (320) 587-5918
Original to Project Engineer; Copy to Contractor
Once contract has been fully executed, forward a copy to DSAE for funding review:
The State of Minnesota is not a participant in this contract; signing by the District State Aid Engineer is for FUNDING PURPOSES
ONLY. Reviewed for compliance with State and Federal Aid Rules/Policy. Eligibility does not guarantee funds will be available.
This project is eligible for: Federal Funding State Aid Funding Local funds
District State Aid Engineer: Date:
Orig. Contract $2,049.044.52 Prev. CO/WO $48,688.52 /This CO $8,427.03 Total Revised Contract Amount $2,106,140.08
HUTCHINSON CITY COUNCIL
c`=y-f 0, a_ �
Request for Board Action
79 M-W
Agenda Item: Items for City Alley #17 Improvements Project (L15/P17-15)
Department: PW/Eng
LICENSE SECTION
Meeting Date: 10/24/2017
Application Complete N/A
Contact: Kent Exner
Agenda Item Type:
Presenter: Kent Exner
Reviewed by Staff ❑
Consent Agenda
Time Requested (Minutes): 0
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
City staff requests that the City Council approve the appropriate Resolutions to set
a Public Hearing for the above
referenced project letting at their November 28th meeting.
BOARD ACTION REQUESTED:
Approval of Resolutions
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
RESOLUTION NO. 14795
RESOLUTION DECLARING ADEQUACY OF PETITION AND
ORDERING PREPARATION OF REPORT ON IMPROVEMENT
LETTING NO. 15/PROJECT NO. 17-15
BE IT RESOLVED BY THE CITY COUNCIL OF HUTCHINSON, MINNESOTA:
A certain petition requesting the following improvement:
City Alley #17 located from Milwaukee Ave SW to Miller Ave SW (between Glen St &
Franklin St): Alley improvements by construction of grading, aggregate base, concrete
pavement and appurtenances.
Said Petition is hereby declared to be signed by the required percentage of owners of
property affected thereby. This declaration is made in conformity to Minn. Stat. § 429.035.
2. The petition for proposed L15P17-15 is hereby referred to the Engineer for study and that
person is instructed to report to the Council with all convenient speed advising the Council in
a preliminary way as to whether the proposed improvement is necessary, cost-effective, and
feasible; whether it should best be made as proposed or in connection with some other
improvement; the estimated cost of the improvement as recommended; and a description of
the methodology used to calculate individual assessments for affected parcels.
Adopted by the Council this 24th day of October 2017.
Mayor: Gary Forcier
City Administrator: Matt Jaunich
HUTCHINSON PUBLIC WOR CS/ENGINEERING DEPARTMENT
Hutchinson City Center/111 Hassan St SE/Hutchinson NM 55350-2522/320-234-4209/]FAX320-234-4240
ENGINEERING REPORT & FEASIBILITY STUDY
TO: Mayor & City Council
FROM: Kent Exner, DPW/City Engineer
DATE: October 24, 2017
SUBJECT: Alley Improvement - Alley #17
I have studied the following proposed improvements and find that the proposed project is feasible and recommend it
be constructed:
L15P17-15 City Alley #17 located from Milwaukee Ave SW to Miller Ave SW (between Glen St & Franklin St):
Alley improvements by construction of grading, aggregate base, concrete pavement and
appurtenances.
ESTIMATED COST TOTAL
Construction Cost $88,830
Engineering & Adiministration Fees $18,654
Administration $0
ESTIMATED TOTAL $107,484
ESTIMATED FUNDING TOTAL
Assessable Costs $53,742
City Funds $53,742
ESTIMATED TOTAL $107,484
RESOLUTION NO. 14796
RESOLUTION RECEIVING REPORT AND CALLING HEARING ON IMPROVEMENT
LETTING NO. 15/PROJECT NO. 17-15
WHEREAS, pursuant to a resolution of the Council adopted October 24th 2017, a report has been
prepared by Kent Exner, Public Works Director/City Engineer with reference to the following proposed
improvements:
City Alley #17 located from Milwaukee Ave SW to Miller Ave SW (between Glen St &
Franklin St): Alley improvements by construction of grading, aggregate base, concrete
pavement and appurtenances; and
said report was received by the Council on October 24th 2017.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUTCHINSON,
MINNESOTA:
1. The Council will consider the improvement in accordance with the report at an estimated total cost
of the improvement of $107,484.00.
2. A public hearing shall be held on such proposed improvements on the 28th day of November,
2017, in the Council Chambers of the Hutchinson City Center at 6:00 PM and the Clerk shall give mailed and
published notice of such hearing and improvements as required by law.
Adopted by the Hutchinson City Council this 24th day of October 2017.
Mayor: Gary Forcier
City Administrator: Matt Jaunich
PUBLICATION NO. 8258
NOTICE OF HEARING ON IMPROVEMENT
LETTING NO. 15
PROJECT NO. 17-15
TO WHOM IT MAY CONCERN:
Notice is hereby given that the City Council of Hutchinson, Minnesota, will meet in the Council Chambers of the
Hutchinson City Center, 111 Hassan Street SE, Hutchinson, MN, at 6:00 pm on the 28th day of November,
2017, to consider the making of an improvement of Letting No. 15/Project No. 17-15, an improvement of:
City Alley #17 located from Milwaukee Ave SW to Miller Ave SW (between Glen St & Franklin St): Alley
improvements by construction of grading, aggregate base, concrete pavement and appurtenances
pursuant to Minnesota Statutes, Sections 429.011 to 429.111.
The estimated City cost of said improvement is $53,742.00 and an Assessable cost of $53,742.00 for the
total estimated cost of $107,484.00 A reasonable estimate of the impact of the assessment will be available at
the hearing. Such persons as desire to be heard with reference to the proposed improvement will be heard at
this meeting.
Dated: 10/24/2017
Matt Jaunich, City Administrator
PLEASE NOTE: IT IS IMPORTANT THAT YOU ATTEND THIS HEARING, WHETHER YOU ARE FOR OR
AGAINST THE PROJECT, IN ORDER THAT YOUR COUNCIL CAN BE BETTER INFORMED OF A TRUE
REPRESENTATION OF OPINION.
PUBLISHED IN THE HUTCHINSON LEADER ON
WEDNESDAY, NOVEMBER 15TH 2017 AND WEDNESDAY, NOVEMBER 22ND 2017.
HUTCHINSON CITY COUNCIL City -f
Request for Board Action 7AL =-M
M0
Agenda Item: Resolution 14793 - Special Assessment Certification to McLeod County
Department: Finance
LICENSE SECTION
Meeting Date: 10/24/2017
Application Complete N/A
Contact: Andy Reid
Agenda Item Type:
Presenter:
Reviewed by Staff ❑
Consent Agenda
Time Requested (Minutes): 1
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OF AGENDA ITEM:
Attached is the annual certification of special assessments to be sent to McLeod County for collection in 2018. The
list includes the current year of each assessment roll along with unpaid water, sewer utility bills and/or weed removal
bills.
The special assessment dollars collected in 2018 will be recorded in the appropriate debt fund and used to pay the
2018 debt service on the City's bonded debt.
BOARD ACTION REQUESTED:
Approve resolution 14793 for special assessments to be certified to McLeod County for collection in 2018.
Fiscal Impact: $ 0.00 Funding Source:
FTE Impact: 0.00 Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
RESOLUTION NO. 14793
RESOLUTION FOR CERTIFICATION OF SPECIAL ASSESSMENTS FROM THE CITY OF HUTCHINSON TO MCLEOD COUNTY AUDITOR
BE IT RESOLVED BY THE CITY COUNCIL OF HUTCHINSON, MN;
This is to certify that the following embraces all unpaid assessments levied by the City Council of Hutchinson, MN under Minnesota Statutes, Chapter 429, various
assessments of the City of Hutchinson, to be levied and assessed upon the properties as listed on the "Exhibit A" for the following purposes for the current year and
as required under Minn. Stat. § 429.061, a copy of this Resolution along with the attached "Exhibit A" shall be provided to the McLeod County Auditor
Installment
Term
SA#
Year
Payoff
Balance
Project
Description
Jefferson St SE & Jefferson Ct SE - 10th Ave NE & future
extension of 10th Ave NE to the East - SM/SS/W/ST -
10
10
5059F
2008
$
1,214.26
L9P02-18
Activated 2008
Jefferson St SE & Jefferson Ct SE - 10th Ave NE & future
extension of 10th Ave NE to the East - SM/SS/W/ST -
6
10
5059H
2012
$
31,898.70
L9P02-18
Activated 10/09/2012
Jefferson St SE & Jefferson Ct SE to Toronto Ave SE -
6
9
5070B
2012
$
15,787.12
L3PO4-03
SM/SS/W/ST-Activated 2012
Activation of 2006 deferred assessment for TH 7/15/22
2
10
5079G
2006
$
22,498.15
LlP06-01
SM/SS/W/ST
2008 Pavement Mgmt - Phase 1 - Lewis, W Pishney Ln, E
Pishney Ln, Pishney Ln, Alan, Circle Dr - ST REHAB/ST
10
10
5085
2008
$
15,391.86
L4P08-04
PARTIAL RECON
NE Storm Sewer Phase 2 - 905 Maple St SE - SM/SS/W -
Relevy of 5075 as SA5087A & Activated in 2013 for 2014
5
5
5087A
2013
$
16,426.81
L2P08-02
collection for 5 year term.
10
10
5088
2008
$
2,765.35
LlP08-01
TH 15 & North High Dr Roundabout - SM/SS/W/ST
2008 Pavement Mgmt - Phase 2 - College, Hillcrest,
Montreal, Oakwood, Alley in Blk 4 S1/2 City - ST
10
10
5089
2008
$
7,901.64
L5P08-05
REHAB/ST RECON/ALLEY RECON
Jefferson St SE & Jefferson Ct SE - 10th Ave NE & future
9
10
5090
2009
$
12,064.66
L3P09-03
extension of 10th Ave NE to the East - SM/SS/W/ST
2009 Pavement Mgmt - Phase 2 - Elm St NE, 10th Ave
9
10
5092
2009
$
14,317.60
L4P09-04
NE - W/ST REHAB
8
10
5093
2010
$
89,656.33
L1P10-01
Adams St & Washington Ave E - SM/SS/W/ST
8
10
5094
2010
$
4,252.40
L2P10-02
Sherwood St SE - Edmonton to Airport Rd - SM/SS/W/ST
2011 Pavement Mgmt - James, Kouwe, Water -
7
10
5096
2011
$
40,932.05
L3P11-04
SM/SS/W/ST REHAB
7
10
5097
2011
$
31,998.05
L1P11-01
School Rd NW -ST
7
10
5098
2011
7,872.00
L2P11-02/P11-03 Indust Blvd SE - ST RECONST & Energy Pk - WEAR CRSE
2011 Pavement Mgmt - Phase 2 - Jackson & Roberts - ST
7
10
5099
2011
$
36,223.84
L4P11-05
REHAB
7
10
5100
2011111iff
178,558.37
L5P11-06
Plaza 15 Parking Lot - ST
2012 Pavement Mgmt - Ash, Oak, Maple, TH 15 Service
6
10
5101
2012
$
68,922.11
L3P12-04
Rd #1, 11th Ave NE, Northwoods Ave - ST REHAB
6
10
5102
2012
$
78,955.07
L1P12-01
5th Ave NW - SS/W/ST
Les Kouba Pkwy - Montana to Lind & Lind St - Les Kouba
6
10
5103
2012
$
17,545.85
L8P12-09
Pkwy to 3rd Ave - ST
2013 Pavement Mgmt - Grove St SW, Brown St SW,
Glen St SW, Franklin St SW, Division Ave SW - ST
5
10
5104
2013
$
60,007.22
L3P13-03
OVERLAY/REHAB
5
10
5105
2013
$
129,262.44
L1P13-01
Jefferson St SE - Washington to Oakland - SS/W/ST
2013 Pavement Mgmt - CO#2 - Milwaukee & Miller - ST
5
10
5107
2013
$
1,209.60
L3P13-03
OVERLAY/REHAB
Lynn Rd SW - Washington to Clinton - ST
4
10
5108
2014
$
46,398.51
L2P14-02
OVERLAY/REHAB
4
10
5109
2014
$
196,223.87
L1P14-01
Jefferson St SE - Oakland to Century - SM/SS/W/St
2014 Pavement Mgmt - Dale, TH 15 Service Rd,
Freemont, Lynn, Michael Ct NW, HHC Parking Lot - ST
4
10
5110
2014
$
39,930.87
L3P14-03
MILL/OVERLAY/RECLAIM
2015 Pavement Mgmt - Shady Ridge Rd N W & Golf
3
10
5111
2015
$
22,304.00
L3P15-03
Course Rd NW - SM/SS/W/ST
Installment
Term
SA#
Year
Payoff
Balance
Project
Description
10
5112
2015
$
97,346.16
L1P15-01
2nd Ave SE - Main to Bridge - SM/ST
25 NW 5TH AVE
$66.37
23.065.0080
2016 Pavement Mgmt— Linden, Madson, Milwaukee,
2
10
5113
2016
$
312,569.51
L1P16-01
Church, West Shore — W/SS/SM
8
10 DEFERRED
5093A
2010
$
10,420.00
L1P10-01
Denver Ave SE Extension - Montreal St SE to Bradford St
1
10
5114
2017
$
56,254.00
L1P17-01
SE - SM/ST
715 SW BROWN ST
$114.40
23.145.0590
School Rd SW & Roberts Rd SW Reconstruction - ST
1
10
5115
2017
$
127,900.08
121317-02
RECONST/RECLAIM
791 NW CALIFORNIA ST
$744.85
23.300.0250
01-116-30-16-0540
ALLEY #36 - ALLEY BETWEEN MAIN ST S & HASSAN ST SE
965 SW CHURCH ST
$254.33
23.133.0180
01-116-30-10-0300
& 5TH AVE SE TO 6TH AVE SE - ALLEY
1
2
5116
2017
$
6,531.21
1131317-13
PATCH/MILL/OVERLAY
750 SW DALE ST
$319.06
23.112.2010
06-116-29-02-0460
ALLEY #52 - ALLEY SOUTH OF 5TH AVE SE BETWEEN
1
5
5117
2017
$
13,935.51
L14P17-14
JEFFERSON ST SE & ADAMS ST SE - G/STM/CC/BP
Installment
Term
SA#
Year
DEFERRED
Payoff
ASSESSMENTS
Balance
Project
Description
145 NE 5TH AVE
$13.58
23.056.0530
Adams St & Washington Ave E - SM/SS/W/ST -
25 NW 5TH AVE
$66.37
23.065.0080
DEFERRED FOR A 10 YEARS OR UNTIL HOOKUP OCCURS,
561 SE ADAMS ST
$323.73
23.139.0220
WHICHEVER OCCURS FIRST, WITH INTEREST
8
10 DEFERRED
5093A
2010
$
10,420.00
L1P10-01
ACCRUEING. ACTIVATE IN 2020 FOR 2021 COLLECTION.
7
10 DEFERRED
5096A
2011
$
6,000.00
131311-04
2011 Pavement Mgmt- James, Kouwe, Water -
715 SW BROWN ST
$114.40
23.145.0590
2014 Pavement Mgmt - Dale, TH 15 Service Rd,
486 NW CALIFORNIA ST
$66.37
23.310.0110
36-117-30-06-0310
Freemont, Lynn, Michael Ct NW, HHC Parking Lot - ST
791 NW CALIFORNIA ST
$744.85
23.300.0250
01-116-30-16-0540
MILL/OVERLAY/RECLAIM - DEFERRED FOR 20 YEARS OR
965 SW CHURCH ST
$254.33
23.133.0180
01-116-30-10-0300
UNTIL DEVELOPED,WITH INTEREST ACCRUING,
4
10 DEFERRED
5110C
2014
75,809.35
131314-03
WHICHEVER OCCURS FIRST.
750 SW DALE ST
$319.06
23.112.2010
06-116-29-02-0460
2015 Pavement Mgmt - Shady Ridge Rd NW & Golf
206 SE ERIE ST
$288.20
23.050.1770
06-116-29-05-0770
Course Rd NW-SM/SS/W/ST- DEFERRED WITH
516 SW FRANKLIN ST
$142.50
23.050.4400
06-116-29-12-0750
INTEREST ACCRUING UNTIL SPLIT OR PLATTED OR
3
10 DEFERRED
5112A
2015
$
45,305.00
131315-03
DEVELOPMENT OCCURS.
1
10 DEFERRED
5114A
2017
$
149,222.61
111317-01
Denver Ave SE Extension - Montreal St SE to Bradford St
1
10 DEFERRED
51148
2017
$
78,098.35
L1P17-01
Denver Ave SE Extension - Montreal St SE to Bradford St
BE IT FURTHER RESOLVED
That the following unpaid water, sewer, weed cutting, snow removal and tree removal bills to be certified to the McLeod County Auditor for collection with 2018
taxes.
City
31-117-29-10-0140
Property
ID
Address
141 NE 5TH AVE
Payoff Balance
$498.24
County
23.056.0520
PID #
31-117-29-10-0150
145 NE 5TH AVE
$13.58
23.056.0530
31-117-29-11-0080
25 NW 5TH AVE
$66.37
23.065.0080
06-116-29-10-0240
561 SE ADAMS ST
$323.73
23.139.0220
07-116-29-03-0620
1066 SE BRADFORD ST
$1,400.43
23.160.0450
06-116-29-12-0680
625 SW BROWN ST
$119.76
23.145.0180
06-116-29-12-0990
715 SW BROWN ST
$114.40
23.145.0590
36-117-30-11-0200
486 NW CALIFORNIA ST
$66.37
23.310.0110
36-117-30-06-0310
791 NW CALIFORNIA ST
$744.85
23.300.0250
01-116-30-16-0540
965 SW CHURCH ST
$254.33
23.133.0180
01-116-30-10-0300
705 SW DALE ST
$21.68
23.112.1840
01-116-30-10-1230
750 SW DALE ST
$319.06
23.112.2010
06-116-29-02-0460
206 SE ERIE ST
$288.20
23.050.1770
06-116-29-05-0770
516 SW FRANKLIN ST
$142.50
23.050.4400
06-116-29-12-0750
646 SW FRANKLIN ST
$147.31
23.145.0250
06-116-29-04-0340
135 SW GLEN ST
$31.08
23.050.0980
06-116-29-04-0520
218 SW GROVE ST
$34.62
23.050.2450
01-116-30-01-0250
523 SW HARMONY LN
$26.15
23.112.0100
06-116-29-15-0370
965 SE HASSAN ST
$170.57
23.154.0100
36-117-30-02-0270
900 N HIGH DR NW
$2,137.24
23.309.0030
36-117-30-15-0021
1000 W HWY7
$1,253.31
23.036.4300
06-116-29-03-0080
25 SE JEFFERSON ST
$66.37
23.050.0380
07-116-29-08-0050
1373 SE JEFFERSON ST
$476.97
23.230.0190
01-116-30-11-0260
520 SW LARSON ST
$317.00
23.192.0120
01-116-30-09-0020
564 SW LYNN RD
$243.29
23.112.1630
31-117-29-07-0680
47 NE MCLEOD AVE
$337.77
23.088.0130
01-116-30-09-0540
615 SW MERRILL ST
$249.86
23.167.0470
06-116-29-02-0560
206 SE MONROE ST
$234.13
23.050.1880
31-117-29-12-0270 430 NW WATER ST $809.48 23.056.0840
31-117-29-12-0370 455 NW WATER ST $725.48 23.056.1030
31-117-29-12-0360 465 NW WATER ST $651.98 23.056.0990
31-117-29-01-0070 1005 MAPLE ST NE *TR $250.00 23.238.0014
$12,536.11 Total Utility Billing & Tree Removal to Assess
Adopted by the Hutchinson City Council this 24th day of October 2017.
Gary Forcier, Mayor
Matt Jaunich, City Administrator
HUTCHINSON CITY COUNCIL c`=y-f 0' a_ �
Request for Board Action 79 M-W
Agenda Item: Consideration of a Conditional Use Permit - 760 Airport Road SW
Department: Planning
LICENSE SECTION
Meeting Date: 10/24/2017
Application Complete N/A
Contact: Dan Jochum
Agenda Item Type:
Presenter: Dan Jochum
Reviewed by Staff ❑
Consent Agenda
Time Requested (Minutes): 5
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
Dennis Goebel has applied for a conditional use permit to manufacture automotive aftermarket parts in the I/C Zoning
District. The former Skydive Hutchinson Building would be used for this use. All uses in the I/C zoning district require
a Conditional Use Permit.
The building was used previously as Skydive Hutchinson. The building has been for sale for many years. The
applicant states that the existing building would be used for sales, technical support and manufacturing of automotive
aftermarket parts. CNC milling machines, light fabrication of parts would be done in the building. There would be
occasional vehicles for engine swaps and production development. There would be four employees at the facility.
Nobody from the public spoke regarding this request. The Planning Commission unanimously recommended
approval of the request with the conditions noted by staff.
BOARD ACTION REQUESTED:
Approval of conditional use permit.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
CITY OF HUTCHINSON
MCLEOD COUNTY, MINNESOTA
RESOLUTION NO. 14794
RESOLUTION ADOPTING FINDINGS OF FACT AND REASONS FOR APPROVAL
OF A CONDITIONAL USE PERMIT FOR LIGHT MANUFACTURING OF
AUTOMOTIVE AFTERMARKETPARTS IN AN I/C ZONING DISTRICT LOCATED
AT 760 AIRPORT RD, ROSERUTH ENTERPRISES LLC, APPLICANT.
FACTS
Tim and Rose Eakins are owners of a parcel of land located at 760 Airport Road SW,
Hutchinson, Minnesota; and
2. Roseruth Enterprises LLC has applied for a conditional use permit to operate a light
manufacturing business at this address; and
3. The subject property is legally described as:
FULL LEGAL: Lot 1, Block 2, Fair Grounds Addition, according to the
recorded plat thereof, except that part thereof lying northwesterly of a line
described as follows: Commencing at the most northerly corner of said
Lot 1; thence South 27 degrees 27 minutes 06 seconds East, assumed
bearing, along the southwesterly line of said Lot 1 a distance of 911.12
feet to the beginning of the line to be described; thence North 62 degrees
32 minutes 54 seconds East a distance of 315.03 feet to the northeasterly
line of said Lot 1 and there terminating.
Also a 50.00 foot wide easement for access to the airport over and across
Lot 2 of said Block 2. The northwesterly line of said easement is
described as follows: Commencing at the most northerly corner of said
Lot 1; thence South 27 degrees 27 minutes 06 seconds East, assumed
bearing, along the southwesterly line of said Lot 1 a distance of 967.12
feet to the point of beginning of the line to be described; thence South 62
degrees 32 minutes 54 seconds West a distance of 500.00 feet to the
southwesterly line of said Lot 2 and there terminating.
4. The property is located in the I/C Industrial/Commercial) Zoning District.
5. The request for a conditional use permit is required because of Section 154.066 of the
Hutchinson Zoning Ordinance.
6. Following a public hearing on the application, the City of Hutchinson Planning
Commission has recommended approval of the Conditional Use Permit on October 17,
2017 with the following findings and conditions:
a. The standards for granting a conditional use permit would be met, subject to the
conditions stated.
b. The proposed building improvements shall comply with the standards of the UC
Zoning district and the Zoning Ordinance.
Findings of Fact — Resolution 14794
Conditional Use Permit
760 Airport Rd SW
10/24/2017
Page 2
c. The conditional use permit shall remain in effect as long as the conditions
required by the permit are observed. Any expansion or intensification of a
conditional use requires approval of a new conditional use permit.
d. The Applicant must obtain all necessary permits for any construction that would
be needed.
e. The applicant must pave the parking lot and driveway and have the design
approved by the City of Hutchinson. This work must be completed by June 30,
2018.
f. The septic system and well must be operated per the rules set forth by the State
of Minnesota and McLeod County.
g. The applicant must be aware there is a municipal airport operating on the
adjacent property and cannot interfere with the airport operation in any way.
Any potential use of the airport property to access the rear of the building must
be legally agreed to in a lease or easement with the airport.
h. The apartment/sleeping room cannot be used as an apartment as the zoning does
not allow residential uses in this zoning district.
7. The City Council of the City of Hutchinson reviewed the requested conditional use
permit at its meeting on October 24, 2017 and has considered the recommendation and
findings of the Planning Commission and hereby does recommend approval of the
conditional use permit, subject to the following findings and conditions:
a. The standards for granting a conditional use permit would be met, subject to the
conditions stated.
b. The proposed building improvements shall comply with the standards of the PC
Zoning district and the Zoning Ordinance.
c. The conditional use permit shall remain in effect as long as the conditions
required by the permit are observed. Any expansion or intensification of a
conditional use requires approval of a new conditional use permit.
d. The Applicant must obtain all necessary permits for any construction that would
be needed.
e. The applicant must pave the parking lot and driveway and have the design
approved by the City of Hutchinson. This work must be completed by June 30,
2018.
f. The septic system and well must be operated per the rules set forth by the State
of Minnesota and McLeod County.
g. The applicant must be aware there is a municipal airport operating on the
adjacent property and cannot interfere with the airport operation in any way.
Any potential use of the airport property to access the rear of the building must
be legally agreed to in a lease or easement with the airport.
h. The apartment/sleeping room cannot be used as an apartment as the zoning does
not allow residential uses in this zoning district.
Findings of Fact — Resolution 14794
Conditional Use Permit
760 Airport Rd SW
10/24/2017
Page 3
APPLICABLE LAW
8. The conditional use permit request meets the following standards as required in
Section 154.066 of the City of Hutchinson Municipal Code.
(a) The proposed building or use at the particular location requested is necessary or
desirable to provide a service or a facility which is in the interest of the public
convenience and will contribute to the general welfare of the neighborhood or
community;
(b) The proposed building or use will not have a substantial or undue adverse effect
upon adjacent property, the character of the neighborhood, traffic conditions,
utility facilities and other matters affecting the public health, safety and general
welfare; and
(c) The proposed building or use will be designed, arranged and operated so as to
permit the development and use of neighboring property in accordance with the
applicable district regulations.
CONCLUSIONS OF THE LAW
9. The requested conditional use permit is consistent with the comprehensive plan.
10. The proposed use will not have a substantial or undue adverse effect upon adjacent
property, character of the neighborhood, traffic conditions, utility facilities and other
matters affecting the public health, safety and general welfare.
11. The proposed use will be designed, arranged and operated so as to permit the
development and use of neighboring property in accordance with the applicable
district regulations
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Hutchinson, Minnesota, that the application to issue a conditional use permit to allow Roseruth
Enterprises LLC, applicant, to conduct light manufacturing of automotive aftermarket parts in an
UC zoning district located at 760 Airport Rd SW is hereby approved.
Adopted by the City Council this 24th day of October, 2017.
ATTEST:
Matt Jaunich
City Administrator
Gary T. Forcier
Mayor
STAFF REPORT - PLANNING DEPARTMENT
To: Hutchinson Planning Commission
From: Dan Jochum, AICP
Date: October 12, 2017 for October 17, 2017 Planning Commission Meeting
Application: CONSIDERATION OF A CONDITIONAL USE PERMIT FOR LIGHT MANUFACTURING
FACILITY
Applicant: Dennis Goebel
CONDITIONAL USE PERMIT FOR LIGHT MANUFACTURING
Dennis Goebel has applied for a conditional use permit to manufacture automotive aftermarket parts in the PC
Zoning District. The former Skydive Hutchinson Building would be used for this use. All uses in the PC
zoning district require a Conditional Use Permit.
Conditional Use Permit
760 Airport Road SW
Planning Commission —10-17-2017
Page 2
GENERAL INFORMATION
Existing Zoning: I/C Industrial/Commercial District
Property Location:
Lot Size:
Existing Land Use:
Adjacent Land Use:
Adjacent Zoning:
Comprehensive
Land Use Plan:
Applicable
Regulations:
Analysis:
760 Airport Road SW
8.69 Acres
Vacant Building
Institutional (Airport) and Agriculture
I/C Industrial/Commercial and C4 Fringe Commercial
Commercial
Sections 154.066(C)
Overview:
The building was used previously as Skydive Hutchinson. The building has been for sale for many years. The
applicant states that the existing building would be used for sales, technical support and manufacturing of
automotive aftermarket parts. CNC milling machines, light fabrication of parts would be done in the building.
There would be occasional vehicles for engine swaps and production development. There would be four
employees at the facility.
Site Access:
The site has very good access from Airport road. This use will not generate significant traffic. There will be
four employees coming to the site, occasional delivery vehicles and occasional customers.
Parking/Circulation:
The current gravel parking lot will need to be paved to accommodate this use and be in conformance with the
zoning ordinance. Staff suggests that there be seven parking spaces on-site and one of those shall be handicap
accessible. Seven spaces allows for some employee growth and customer parking. Staff feels this parking will
be sufficient. The driveway will also have to be paved, as will the parking lot drive aisles. The parking lot
paving plan shall be approved by Staff prior to a building permit or occupancy taking place. Since it is already
October and the paving plants are going to be closing down soon, staff is willing to give the applicant until June
30, 2018 to complete the paving.
Utilities
The site is not served by City water and sewer service. It is served by a private well and septic system. These
systems will have to comply with State of Minnesota and McLeod County standards in order for this use to be
conditionally permitted.
Conditional Use Permit
760 Airport Road SW
Planning Commission —10-17-2017
Page 3
Conditional Use Permit:
The Conditional Use Permit (CUP) is required for all new uses in the UC Zoning District
The following are standards for granting a conditional use permit:
(a) The proposed building or use at the particular location requested is necessary or desirable to provide
a service or a facility which is in the interest of the public convenience and will contribute to the
general welfare of the neighborhood or community;
(b) The proposed building or use will not have a substantial or undue adverse effect upon adjacent
property, the character of the neighborhood, traffic conditions, utility facilities and other matters
affecting the public health, safety and general welfare; and
(c) The proposed building or use will be designed, arranged and operated so as to permit the
development and use of neighboring property in accordance with the applicable district regulations.
Recommendation:
Staff recommends approval of the proposal with the following conditions:
1. The standards for granting a conditional use permit would be met, subject to the conditions stated.
2. The proposed building improvements shall comply with the standards of the UC Zoning district and
the Zoning Ordinance.
3. The conditional use permit shall remain in effect as long as the conditions required by the permit are
observed. Any expansion or intensification of a conditional use requires approval of a new
conditional use permit.
4. The Applicant must obtain all necessary permits for any construction that would be needed.
5. The applicant must pave the parking lot and driveway and have the design approved by the City of
Hutchinson. This work must be completed by June 30, 2018.
6. The septic system and well must be operated per the rules set forth by the State of Minnesota and
McLeod County.
7. The applicant must be aware there is a municipal airport operating on the adjacent property and
cannot interfere with the airport operation in any way. Any potential use of the airport property to
access the rear of the building must be legally agreed to in a lease or easement with the airport.
8. The apartment/sleeping room cannot be used as an apartment as the zoning does not allow
residential uses in this zoning district.
WGIS Count 1,025
1,025
ko
Print Date: October 12, 2017
807 Airport Rd SW - Google Maps
Go, gle Maps 807 Airport Rd SW
Page 1 of 1
Image capture: Oct 2014 d 2017 Google United States
Hutchinson, Minnesota
Google, Inc.
Street View - Oct 2014
https:Hwww.google.comlmapsl@44.8661095,-94.3821496,3a,61.2y,239.75h,91.91t/data 10/12/2017
CHECK REGISTER FOR CITY OF HUTCHINSON
CHECK DATE FROM 10/11/2017 - 10/24/2017
Check/
Check Date
Det
Vendor Name
Description
Amount
10/13/2017
EFT562
EFTPS
PAYROLL 9/24 - 10/7/2017
68,777.68
10/13/2017
EFT563
Aflac
PAYROLL 9/24 - 10/7/2017
170.41
10/13/2017
EFT564
Child Support
PAYROLL 9/24 - 10/7/2017
957.17
10/13/2017
EFT565
MN Dept of Revenue
PAYROLL 9/24 - 10/7/2017
12,592.52
10/13/2017
EFT566
PERA
PAYROLL 9/24 - 10/7/2017
48,524.71
10/13/2017
EFT567
TASC-Flex
PAYROLL 9/24 - 10/7/2017
1,886.76
10/13/2017
EFT568
TASC-H S A
PAYROLL 9/24 - 10/7/2017
11,913.00
10/13/2017
EFT569
ICMA
PAYROLL 9/24 - 10/7/2017
2,228.16
10/13/2017
EFT570
VOYA
PAYROLL 9/24 - 10/7/2017
990.00
10/13/2017
EFT571
MNDCP
PAYROLL 9/24 - 10/7/2017
305.00
10/13/2017
198277
NCPERS
PAYROLL 9/24 - 10/7/2017
336.00
10/13/2017
198278
HART
PAYROLL 9/24 - 10/7/2017
662.21
10/24/2017
198279
ACE HARDWARE
VARIOUS R&M SUPPLIES
633.38
10/24/2017
198280
AMERICAN BOTTLING CO
OCTOBER COST OF GOODS - LIQUOR
136.16
10/24/2017
198281
ARCTIC GLACIER USA INC.
OCTOBER COST OF GOODS - LIQUOR
316.12
10/24/2017
198282
B & C PLUMBING & HEATING INC
FALL SERVICE ON ALL EQUIPMENT
3,985.00
10/24/2017
198283
BACHMAN'S
SUMAC & DOGWOOD TREES
617.22
10/24/2017
198284
BELLBOY CORP
OCTOBER COST OF GOODS - LIQUOR
2,102.40
10/24/2017
198285
BERNICK'S
OCTOBER COST OF GOODS - LIQUOR
214.90
10/24/2017
198286
BRANDON TIRE CO
UNIT #295 - NEW TUBE FOR TIRE
30.84
10/24/2017
198287
BRANDON TIRE CO
UNIT #302: INSTALL NEW VALVE
102.88
10/24/2017
198288
BRAUN INTERTEC CORP
PROF SERVICES -PAVEMENT EVALUATION
1,504.00
10/24/2017
198289
BUSINESSWARE SOLUTIONS
HP ELITEBOOK REVOLVE 810 G3
11245.19
10/24/2017
198290
C & L DISTRIBUTING
OCTOBER COST OF GOODS - LIQUOR
23,143.54
10/24/2017
198291
CENTRAL HYDRAULICS
VARIOUS R&M SUPPLIES
802.34
10/24/2017
198292
CENTRAL MCGOWAN
ACETYLENE, HIGH PRESSURE LG/M
134.40
10/24/2017
198293
COLDSPRING
(2) SINGLE LINE LEATHERETTE
710.35
10/24/2017
198294
CROW RIVER AUTO & TRUCK REPAIR
AUTO R&M - POLICE AND PARKS
427.18
10/24/2017
198295
CROW RIVER PRESS INC
VARIOUS OFFICE SUPPLIES
705.50
10/24/2017
198296
CRYSTEEL TRUCK EQUIP
FLAT BED BOX, HYDRO DUMP KIT & INSTALLAT
7,750.00
10/24/2017
198297
DPC INDUSTRIES INC
SODIUM HYPO - SEWER PLANT
913.10
10/24/2017
198298
ECOLAB PEST ELIMINATION
COCKROACH/RODENT PROGRAM
219.49
10/24/2017
198299
ELECTRO WATCHMAN
ANNUAL FIRE ALARM INSPECTION, REPLACED B
29.20
10/24/2017
198300
ELECTRO WATCHMAN
ANNUAL FIRE ALARM INSPECTION
58.40
10/24/2017
198301
FARM -RITE EQUIPMENT
FILTERS - PARKS DEPT
202.89
10/24/2017
198302
FASTENAL COMPANY
EAR PLUGS, EYEWEAR, BATTERIES, PAPER TOW
336.02
10/24/2017
198303
G & K SERVICES
VARIOUS CLEANING/MAINTENANCE SUPPLIES
208.77
10/24/2017
198304
GEB ELECTRICAL INC
CHANGE LITES TO LED AT CITY CENTER & WAT
150.00
10/24/2017
198305
GRAINGER
VARIOUS R&M SUPPLIES
962.93
10/24/2017
198306
HANSEN GRAVEL
SAND FOR VMF FIELD & VETS BATHROOM
515.00
10/24/2017
198307
HAWKINS INC
30% SODIUM HYDROXIDE - WATER PLANT
2,940.21
10/24/2017
198308
HILLYARD / HUTCHINSON
VARIOUS CLEANING/MAINTENANCE SUPPLIES
594.56
10/24/2017
198309
HUTCH AUTO BODY
PAINT PD SUBURBAN DOORS FOR AUCTION
1,200.00
10/24/2017
198310
HUTCHINSON UTILITIES
SEPT UTILITIES SEPT1-OCT 1'2017
102,726.60
10/24/2017
198311
HUTCHINSON, CITY OF
WATER & SEWER 9/1-9/30'17
4,983.06
10/24/2017
198312
INTERSTATE BATTERY SYSTEM MINNEAPOL
SHOP PARTS
370.85
10/24/2017
198313
INTOXIMETERS INC
MOUTHPIECE, DRY GAS
200.00
10/24/2017
198314
JOHNSON BROTHERS LIQUOR CO.
OCTOBER COST OF GOODS - LIQUOR
18,041.01
10/24/2017
198315
KOHLS SWEEPING SERVICE
PILED CONCRETE/ASPHALT; HAULED MATERIAL
1,087.50
10/24/2017
198316
L & P SUPPLY CO
VARIOUS EQUIPMENT PARTS
383.28
10/24/2017
198317
LEAGUE OF MN CITIES
2017 REGIONAL MEETINGS - MATT & JOHN L.
90.00
10/24/2017
198318
LEAGUE OF MN CITIES -INS TRUST
7/1/17 - 12/31/17 INSURANCE PREMIUMS
119,929.00
10/24/2017
198319
LOCHER BROTHERS INC
OCTOBER COST OF GOODS - LIQUOR
21,922.75
10/24/2017
198320
LOGIS
NETWORK & OTHER APPLICATIONS - SEPT
8,075.00
10/24/2017
198321
MCLEOD COUNTY AUDITOR -TREASURER
2017 COUNTY ASSESSMENT CONTRACT
60,963.00
10/24/2017
198322
MEEKER WASHED SAND & GRAVEL
SAND - CREEKSIDE INVENTORY
1,941.11
10/24/2017
198323
MEI TOTAL ELEVATOR SOLUTIONS
OCT-NOV BI -MONTHLY SERVICE
183.33
10/24/2017
198324
MINI BIFF
RENT REG BLUE MINI BIFF
76.50
10/24/2017
198325
MINNESOTA RURAL WATER ASSN
WATER SYSTEMS CLASS
375.00
10/24/2017
198326
MINNESOTA VALLEY TESTING LAB
VARIOUS TESTING
2,252.50
10/24/2017
198327
NORTHERN BUSINESS PRODUCTS
VARIOUS OFFICE SUPPLIES
126.16
10/24/2017
198328
PAUSTIS WINE COMPANY
OCTOBER COST OF GOODS - LIQUOR
4,402.91
10/24/2017
198329
PELLINEN LAND SURVEYING
PROF SERVICES
370.00
10/24/2017
198330
PHILLIPS WINE & SPIRITS
OCTOBER COST OF GOODS - LIQUOR
23,589.24
10/24/2017
198331
PIONEER MANUFACTURING CO
ORANGE PAINT - PARKS DEPT
440.00
10/24/2017
198332
PLUNKETTS PEST CONTROL
GENERAL PEST CONTROL - JAN -APR 2017
769.49
10/24/2017
198333
POSTMASTER
SR NEWSLETTER POSTAGE
98.00
10/24/2017
198334
QUILL CORP
DISINFECTING WIPES - POLICE
79.95
10/24/2017
198335
ROYAL TIRE
FIRESTONE DEST A/T OWL 108S
690.96
10/24/2017
198336
RUNNING'S SUPPLY
VARIOUS R&M SUPPLIES
64.66
10/24/2017
198337
SHORT-ELLIOT-HENDRICKSON INC
PROF FEES - HOTEL SITE /ANTENNA PROJECT
11,884.36
10/24/2017
198338
SOIL CONTROL LAB
LUTHENS MANURE 1: FINISHED COMPOST - PKG
1,047.00
10/24/2017
1198339
1 STAPLES ADVANTAGE
ICORRECTION ROLLER, ENVELOPES, PENS
176.77
CHECK REGISTER FOR CITY OF HUTCHINSON
CHECK DATE FROM 10/11/2017 - 10/24/2017
Check/
Check Date
Det Vendor Name
Description Amount
10/24/2017
198340 THOMSON REUTERS -WEST
WEST INFO CHARGES - SEPT 849.34
10/24/2017
198341 TRI COUNTY WATER
6 MONTHS RENT & ECO SYSTEM 389.25
10/24/2017
198342 TWO WAY COMMUNICATIONS INC
RADIOS / PAGERS BATTERIES 105.00
10/24/2017
198343 USA BLUE BOOK
36' STRIKING HEAD PROBE 95.53
10/24/2017
198344 VIKING BEER
OCTOBER COST OF GOODS - LIQUOR 4,355.05
10/24/2017
198345 VIKING COCA COLA
OCTOBER COST OF GOODS - LIQUOR 462.12
10/24/2017
198346 VIKING SIGNS & GRAPHICS INC
SPONSOR SIGNS / CHEVRON STRIPES FIRE 3,520.00
10/24/2017
198347 VIVID IMAGE
ANNUAL SAFE & SOUND WEBSITE HOSTING & UP 720.00
10/24/2017
198348 WELCOME NEIGHBOR
HUTCH NEW RESIDENT VISITS 60.00
10/24/2017
198349 WILSONS NURSERY INC
POLICEMANS/RIVERSIDE PARKS & EAST RIVER 1,440.00
10/24/2017
198350 WINE COMPANY, THE
OCTOBER COST OF GOODS - LIQUOR 5,506.70
VOIDED CHECKS 198351 thru 198369 - PRINTING ERROR
10/24/2017
198370
ACTIVE NETWORK INC
MAXGALAXY - ANNUAL CONTRACT 12,600.00
10/24/2017
198371
ADULT TRAINING AND HABILITATION CEN
RECYCLING PICK-UP 25.00
10/24/2017
198372
ALPHA WIRELESS
MONTHLY UHF DISPATCH 1,688.19
10/24/2017
198373
AMERICAN DOOR WORKS
BAGGING BUILDING COLD STORAGE: REPLACED 1,005.26
10/24/2017
198374
ANIMAL MEDICAL CENTER ON CROW RIVER
PROCESSING/BOARDING FEES 2,066.00
10/24/2017
198375
ARNESON DISTRIBUTING CO
OCTOBER COST OF GOODS - LIQUOR 491.30
10/24/2017
198376
ARROW TERMINAL LLC
SHOP PARTS - STREETS 161.69
10/24/2017
198377
ARTISAN BEER COMPANY
OCTOBER COST OF GOODS - LIQUOR 1,007.75
10/24/2017
198378
ASPEN MILLS
UNIFORMS - FIRE DEPT 113.12
10/24/2017
198379
AUTO VALUE - GLENCOE
SHOP PARTS: JIC FLARE, POWER WASH 101.87
10/24/2017
198380
AUTOMATIC SYSTEMS CO
WTP - CHANGED TO REDUNDANT PLC PROGRAM 1,381.10
10/24/2017
198381
B.T. LOCK & KEY LLC
SCHLAGE C123, KEEP DUPLICATED 8.05
10/24/2017
198382
BLACK BOX CORPORATION
GIGATRUE CAT6 PATCH PANEL 24 PORT 378.79
10/24/2017
198383
BNO SHEET METAL INC
DUCTWORK FOR DEHUMIDIFIERS - CIVIC ARENA 5,000.00
10/24/2017
198384
BREAKTHRU BEVERAGE
OCTOBER COST OF GOODS - LIQUOR 12,955.57
10/24/2017
198385
BUREAU OF CRIM. APPREHENSION
CJDN ACCESS FEE: STATE GF, BCA 390.00
10/24/2017
198386
CHEMISOLV CORP
CHEMICALS FOR WWTP 6,223.95
10/24/2017
198387
COMMERCIAL REFRIGERATION SYSTEMS IN
EMERGENCY REPAIR - CIVIC ARENA SYSTEM 6,216.50
10/24/2017
198388
CORNER POST EROSION CONTROL
DENVER AVE MOWING 220.00
10/24/2017
198389
CORPORATE MECHANICAL
TRANSFER DDC GRAPHICS TO WASTEWATER JAC 2,028.00
10/24/2017
198390
CREEKSIDE SOILS
50/50 COMPOST BLACK DIRT 31.00
10/24/2017
198391
D2 SERVICES, INC.
SCADA RADIO SYSTEM REPLACEMENT - WWTP 28,988.00
10/24/2017
198392
DEHN, PETER
SAFETY FOOTWEAR REIMBURSEMENT 175.00
10/24/2017
198393
DROP -N -GO INC
SEPT/OCTOBER MAILING SERVICES 1,897.62
10/24/2017
198394
E2 ELECTRICAL SERVICES INC
LABOR WITH MATERIALS - WWTP 916.78
10/24/2017
198395
EBERT CONSTRUCTION
PAY APPLICATION - ENTERPRISE CENTER 661,597.11
10/24/2017
198396
EHLERS & ASSOCIATES INC
PREP: FINAL CALCS ON TIF DEV DIST 6 4,590.00
10/24/2017
198397
EMPLOYMENT RESOURCE CENTER
TEMPORARY STAFFING - CREEKSIDE 2,502.72
10/24/2017
198398
FIRST ADVANTAGE LNS OCC HEALTH SOLU
ALCOHOL & DRUG TESTING 233.14
10/24/2017
198399
FIRST CLASS BUILDERS
REFUND FOR PRICE DIFF ON WATER METER 3/4 95.00
10/24/2017
198400
FLEMMING, JUDY
HIGH TIDES SILVER REFUND 60.00
10/24/2017
198401
G R DANIELS TRUCKING INC
JAY MALONE TO CRYSTEEL TRUCK EQUIP 186.00
10/24/2017
198402
GALCO INDUSTRIAL ELECTRONICS
INTEGR DUPLEX CONTROLLER 372.54
10/24/2017
198403
GOPHER STATE FIRE EQUIPMENT CO.
ABC RECHARGE, O-RING, ABC DRY CHEMICAL 43.00
10/24/2017
198404
GRAPE BEGINNINGS, INC
OCTOBER COST OF GOODS - LIQUOR 258.75
10/24/2017
198405
GREAT NORTHERN ENVIORNMENTAL LLC
SERVICE REPAIR TRAVEL & LABOR - WWTP 1,092.20
10/24/2017
198406
GREEN EARTH LAWN CARE INC
NUISANCE LAWN MOWING - 516 ADAMS 50.00
10/24/2017
198407
HARENS MEDIATION CENTER, LLC
WATER TOWER REHAB ISSUE 949.37
10/24/2017
198408
HARMONY RIVER LIVING CENTER
USED FLOOR SCRUBBER FOR FIRE DEPT 3,000.00
10/24/2017
198409
HOHENSTEINS INC
OCTOBER COST OF GOODS - LIQUOR 429.00
10/24/2017
198410
HOLT TOUR AND CHARTER INC.
NOV 29, 2017: RAMSEY HOUSE, BACHMANS 645.00
10/24/2017
198411
HOVEN, MARTHA
24 WINE BAGS 84.00
10/24/2017
198412
HP INC
LAPTOP & (3) HP ELITEDESK 800 3,034.85
10/24/2017
198413
HUTCHFIELD SERVICES INC
COMMERCIAL JANITORIAL - OCT 2017 HATS 1,415.00
10/24/2017
198414
HUTCHINSON UTILITIES
INSTALL LED LIGHTING LEWIS AVE & LEWIS CIR 7,683.78
10/24/2017
198415
HUTCHINSON WHOLESALE #1550
VARIOUS SHOP SUPPLIES 261.42
10/24/2017
198416
HUTCHINSON YOUTH BASKETBALL ASSN
REIMBURSE FEES COLLECTED - HYBA TRAVEL 15,275.00
10/24/2017
198417
HUTCHINSON, CITY OF
REPLENISH ATM 4,000.00
10/24/2017
198418
INNOVATIVE FOAM
FORGIVABLE LOAN - EDA INCUBATOR BLDG 14,355.00
10/24/2017
198419
INTEPLAST GROUP
POTTING SOIL - CREEKSIDE INVENTORY 15,089.83
10/24/2017
198420
INTERNATIONAL ECON DEV COUNCIL
ANNUAL MEMBERSHIP DUES - MILES 420.00
10/24/2017
198421
INTEX CORPORATION
CRUSH CREEKSIDE CONCRETE/ASPHALT 95,803.72
10/24/2017
198422
ISD #423
FEES SEPTEMBER CLASSES 6,978.50
10/24/2017
198423
J&W ASPHALT, INC.
5' X 6' HEAT - LYNN RD SW & LINDEN AVE 1,000.00
10/24/2017
198424
JASON ALFERNESS
ADAPTIVE RECREATION SOUND SERVICES 2017 100.00
10/24/2017
198425
JJ TAYLOR DIST OF MN
OCTOBER COST OF GOODS - LIQUOR 5,448.25
10/24/2017
198426
JOBS FOUNDATION
RECYCLING OLD ELECTRONICS/PRINTERS 396.00
10/24/2017
198427
JOE MESCAN WINDMILL, LLC
18' WINDMILL, SINK PKG - GOPHER SANCTUARY 2,150.00
10/24/2017
198428
KAHNKE BROTHERS NURSERY
VARIOUS TREE/GRASS/PLANTS FOR PARKS 1,772.37
10/24/2017
198429
KAPING, DEANNE
HOCKEY REFUND 30.00
10/24/2017
1198430
KERI L WILLIAMS
ICONTRACT CLEANING - C.C., LIBRARY, SR DINE 2,044.00
CHECK REGISTER FOR CITY OF HUTCHINSON
CHECK DATE FROM 10/11/2017 - 10/24/2017
Check/
Check Date
Det
Vendor Name
Description
Amount
10/24/2017
198431
KRANZ LAWN & POWER
BELTS, SHIELD, BEARING
192.88
10/24/2017
198432
LANDSCAPE CONCEPTS INC
WEEDING, SPRAYING NORTH ROUNDABOUT
760.00
10/24/2017
198433
LEMKE-JORGENSEN, PAIGE
REFUND DAMAGE DEPOSIT - EVENT CENTER
300.00
10/24/2017
198434
LEXISNEXIS
SEPTEMBER 2017 1 USER
160.63
10/24/2017
198435
LUBE TECH ESI
SHOP SUPPLIES: PISTON PUMP, HOSE, SPOUT
1,418.31
10/24/2017
198436
LYNDE & MCLEOD INC.
COMPOST
104.63
10/24/2017
198437
MARIPOSA PUBLISHING
2017 MINNESOTA REVISION - LEGAL
38.26
10/24/2017
198438
MARTIN-MCALLISTER
PUBLIC SAFETY ASSESSMENT - POLICE
500.00
10/24/2017
198439
MATHESON TRI -GAS INC
ACETYLENE LG, HIGH PRESSURE MD
16.95
10/24/2017
198440
MCLEOD COUNTY RECORDER
HOTEL, JEFFERSON GARAGE VARIANCES
184.00
10/24/2017
198441
MEDICA
NOVEMBER MEDICAL PREMIUMS
124,818.01
10/24/2017
198442
MENARDS HUTCHINSON
VARIOUS R&M SUPPLIES
273.98
10/24/2017
198443
MESSAGE MEDIA
MONTHLY ACCESS FEE - OCT
44.24
10/24/2017
198444
MILLNER HERITAGE VINEYARD & WINERY
OCTOBER COST OF GOODS - LIQUOR
694.20
10/24/2017
198445
MINNESOTA COUNTY ATTORNEY ASSN
2012 PROPERTY RECEIPTS - POLICE
33.00
10/24/2017
198446
MN DEPT OF LABOR & INDUSTRY/CODE
3RD QTR STATE SURCHARGES - BLDG PERMITS
4,200.63
10/24/2017
198447
NASH FINCH COMPANY
3RD QTR 2017: COMMON AREA MAINTENANCE
1,648.37
10/24/2017
198448
NICKLASSON ATHLETIC COMPANY
SOCCER BALLS
247.40
10/24/2017
198449
NORTH AMERICAN SAFETY INC
EARPLUGS, LENS, GLOVES
244.00
10/24/2017
198450
NORTHERN TIER TRANSPORTATION LLC
FREIGHT CREEKSIDE TO CHISHOLM
525.00
10/24/2017
198451
NU -TELECOM
OCTOBER SERVICES
151.05
10/24/2017
198452
O'REILLY AUTO PARTS
VARIOUS AUTO R&M SUPPLIES
250.60
10/24/2017
198453
OEM SERVICE CO, LLC
CREEKSIDE BAGGER - NEW HOPPER PANEL
492.46
10/24/2017
198454
OFFICE DEPOT
VARIOUS OFFICE SUPPLIES
500.95
10/24/2017
198455
PEAT INC.
SPHAGNUM FINE - CREEKSIDE INVENTORY
12,367.50
10/24/2017
198456
PEOPLEREADY INC
TEMPORARY STAFFING - CREEKSIDE
5,663.88
10/24/2017
198457
RANDY'S REPAIR SERVICE
SEMI 475: PARTS, LABOR - NEW BRAKE CLAMB
367.68
10/24/2017
198458
REFLECTIVE APPAREL FACTORY INC
SHIRTS WITH LOGO - STREETS
228.45
10/24/2017
198459
REINER ENTERPRISES INC
FLATBED TRUCKING FOR CREEKSIDE
5,730.20
10/24/2017
198460
SOUTHERN WINE & SPIRITS OF MN
OCTOBER COST OF GOODS - LIQUOR
18,591.72
10/24/2017
198461
SUN LIFE FINANCIAL
DENTAL INSURANCE FOR OCTOBER 2017
5,132.40
10/24/2017
198462
SUNCOAST GARDEN PRODUCTS INC.
2CF TIGER HAMMOCK CYPRESS BLEND - C.S.
5,092.40
10/24/2017
198463
SUSTEEN INC
SECURE VIEW 1 YR RENEWAL
800.00
10/24/2017
198464
THOMPSON, DENEIL
REIMBURSE FOR SAFETY FOOTWEAR
175.00
10/24/2017
198465
TITAN MACHINERY
LOADER: 5500 HR SERVICE - CREEKSIDE
1,301.63
10/24/2017
198466
ULINE
KNIFE, BLADES
52.37
10/24/2017
198467
UNITED PACKAGING & DESIGN
7 SKIDS, 40 X 48 X .22 SLIP SHEETS
6,350.40
10/24/2017
198468
VERIZON WIRELESS
SEP 03 - OCT 02'17
38.25
10/24/2017
198469
VINOCOPIA INC
OCTOBER COST OF GOODS - LIQUOR
1,037.00
10/24/2017
198470
WASTE MANAGEMENT OF WI -MN
REFUSE DISPOSAL SEPT 16TH -30TH
5,529.01
10/24/2017
198471
WEST CENTRAL SANITATION INC.
SEPTEMBER REFUSE HAULING SERVICE
46,265.76
10/24/2017
198472
WEST CENTRAL SHREDDING
3 CONSOLES - CITY CENTER & POLICE
50.00
10/24/2017
198473
WM MUELLER & SONS
MILL & PATCH ROBERTS & 5TH NE, UTILITIES
1,398.78
10/24/2017
198474
WRIGHT COUNTY COURT ADMIN
BAIL AMOUNT - C.KLAUSTERMEIER
200.00
Total - Check Disbursement
1,800,766.64
Department Purchasing Card Activity - September 2017
Date
Dept
Vendor Name
Description
Amount
09/22/2017
ADMIN
ORCHESTRA HALL MUNICIPAL PARKING
Parking Cost for Luncheon with President of Finland
8.00
08/30/2017
FINANCE
PUB 500
Lunch meeting in Mankato with auditors- Andy/Justin
24.00
09/07/2017
FINANCE
AMAZON
Case, chargers, cables for new phone - Andy
62.12
09/27/2017
FINANCE
ARROWWOOD RESORT & CONFERENCE CTR
Hotel for Justin at MNGFOA conference
247.24
09/27/2017
FINANCE
ARROWWOOD RESORT & CONFERENCE CTR
Hotel for Andy at MNGFOA conference
247.24
09/08/2017
IT
PANCHEROS MEXICAN GRIL
LOGIS IT meeting
8.64
09/08/2017
IT
AMAZON
Projector travel case for Marc Sebora
31.99
09/11/2017
IT
AMAZON
HP Display port cables
36.75
09/12/2017
IT
AMAZON
Web Cam and microphone for inspector school code
25.99
09/12/2017
IT
AMAZON
Ink for mobile printers building inspectors
40.58
09/20/2017
IT
AMAZON
UPS for plant 1
255.88
09/22/2017
IT
AMAZON
Screen cleaner kit for IT
29.09
09/22/2017
IT
AMAZON
Memory for Tough Books
73.98
09/27/2017
IT
AMAZON
Hard drive for SCADA 3
31.65
09/28/2017
IT
AMAZON
Hard Drive for Sensus server
102.32
09/28/2017
IT
AMAZON
Hard Drive for Sensus server
25.58
09/28/2017
IT
AMAZON
Hard Drive for Sensus server
25.58
09/01/2017
PLANNING
INTERNATIONAL CODE COUNCIL INC
certification renewals
230.00
08/31/2017
PLANNING
PAYPAL
Continuing education conference
335.00
09/12/2017
PLANNING
DEPARTMENT OF LABOR & INDUSTRY
training - Jim Tiegs
85.00
09/12/2017
PLANNING
DEPARTMENT OF LABOR & INDUSTRY
training - Kyle Dimler
85.00
09/07/2017
POLICE
BCA/TRAINING & DEVELOPMENT
Training
75.00
09/09/2017
1 POLICE
BCA/TRAINING & DEVELOPMENT
ITraining
75.00
CHECK REGISTER FOR CITY OF HUTCHINSON
CHECK DATE FROM 10/11/2017 - 10/24/2017
Check/
Check Date
Det
Vendor Name
Description
Amount
09/11/2017
POLICE
BCA/TRAINING & DEVELOPMENT
Training
75.00
09/11/2017
POLICE
BCA/TRAINING & DEVELOPMENT
Training
75.00
09/20/2017
POLICE
BCA/TRAINING & DEVELOPMENT
Training
75.00
09/25/2017
POLICE
BCA/TRAINING & DEVELOPMENT
Training
250.00
09/25/2017
POLICE
BCA/TRAINING & DEVELOPMENT
Training
25.00
09/25/2017
POLICE
BCA/TRAINING & DEVELOPMENT
Training
25.00
09/25/2017
POLICE
BCA/TRAINING & DEVELOPMENT
Training
175.00
09/25/2017
POLICE
BCA/TRAINING & DEVELOPMENT
Training
175.00
09/26/2017
POLICE
ALICE TRAINING INSTITUTE
Training
595.00
09/26/2017
POLICE
ALICE TRAINING INSTITUTE
Training
595.00
09/26/2017
POLICE
ALICE TRAINING INSTITUTE
Training
595.00
09/26/2017
POLICE
BCA/TRAINING & DEVELOPMENT
Training
25.00
09/24/2017
FIRE
MINNESOTA STATE FIRE CHIE
MSFCA, annual conference in Rochester, MN
1,200.00
09/06/2017
PUB WKS
MD SOLUTIONS
Wayfinding Sign Project Materials
466.55
09/12/2017
PUB WKS
EDUCATION TO GO
Employee Training
129.00
09/14/2017
PUB WKS
AWWA.ORG
Employee Training
290.00
09/20/2017
PUB WKS
MN BROWNFIELDS
Solar Array Award Application
25.00
09/21/2017
PUB WKS
VP MINNESOTA TRANSPORTATI
Transportation Alliance Annual Meeting Registration
110.00
09/02/2017
PRCE
ARC SERVICES/TRAINING
Training Recertification
35.00
09/07/2017
PRCE
SWIMOUTLET.COM
CREDIT Operating Supplies
(35.65)
09/13/2017
PRCE
EPIC SPORTS, INC.
Vollyballs
190.51
09/15/2017
PRCE
AMAZON
Operating Supplies
40.20
09/23/2017
PRCE
CASH WISE
Concession Products
110.98
09/22/2017
PRCE
EPIC SPORTS, INC.
Operating Supplies
202.32
09/05/2017
CREEKSIDE
HOLIDAY INN -EXPRESS
Dan 1 night lodging - Prince Show
99.91
09/05/2017
CREEKSIDE
HOLIDAY INN -EXPRESS
Jake 1 night lodging - Prince Show
99.91
09/07/2017
CREEKSIDE
J&D AUTOMOTIVE LLC
Tire repair on loader while grinding in Willmar MN
193.42
09/10/2017
CREEKSIDE
HARDEES
Dan and Jake - breakfast, Prince Show
10.20
09/08/2017
CREEKSIDE
GROUND ROUND
Becky dinner - Fosters Sales Show
30.00
09/10/2017
CREEKSIDE
FAMOUS DAVES
Dan and Jake - dinner, Prince Show
57.64
09/07/2017
CREEKSIDE
LANIER PARKING
Becky parking at Fosters Sales Show
8.50
09/08/2017
CREEKSIDE
LANIER PARKING
Becky parking at Fosters Sales Show
8.50
09/08/2017
CREEKSIDE
AMERICINN
Becky lodging while at Fosters Sales Show
109.36
09/11/2017
CREEKSIDE
HARDEES
Dan and Jake -dinner, Prince Show
20.64
09/11/2017
CREEKSIDE
KALAHARI RESTAURANT
Dan & Jake - lunch, Prince Show
9.00
09/13/2017
CREEKSIDE
SPS COMMERCE INC
Monthly subscription fees for SPS Commerce
218.70
09/14/2017
CREEKSIDE
CASH WISE
Coffee for staff break room
25.13
09/14/2017
CREEKSIDE
CASH WISE
Coffee for office
27.55
09/19/2017
CREEKSIDE
HAUG IMPLEMENT CO
Replace hydraulic hose on loader in Willmar
142.15
09/21/2017
CREEKSIDE
FAF AG DIVISION
Tarp material to cover windrows
461.70
09/21/2017
CREEKSIDE
FAF AG DIVISION
Tarp material to cover windorw
341.36
09/26/2017
CREEKSIDE
SPS COMMERCE
SPS Commerce -EDI- set-up fees for ACE Hardware
200.00
09/15/2017
LIQUOR
RETAIL INFORMATION TEC
Monthly Card Defender fee
42.75
09/12/2017
EDA
BEST WESTERN
Hotel Room Reimbursed by Red Wing Manufacturers P
98.90
09/20/2017
EDA
LANDY LODGE BAR & GRILL
Lunch for Finance Team member @ FT meeting.
11.79
09/20/2017
EDA
MAIN STREET SPORTS BAR
Lunches for Finance Team meeting.
79.46
09/27/2017
EDA
HUTCH CAFE
Lunches for EDA Board meeting.
105.66
Total - Purchasing
Cards
10,012.77
GRAND TOTAL
1,810,779.41
HUTCHINSON CITY COUNCIL c`=y-f 0' a_ �
Request for Board Action 79 M-W
Agenda Item: Public Hearing for Wellhead Protection Plan Part II
Department: PW/Eng
LICENSE SECTION
Meeting Date: 10/24/2017
Application Complete N/A
Contact: John Paulson
Agenda Item Type:
Presenter: John Paulson
Reviewed by Staff ❑
Public Hearing
Time Requested (Minutes): 15
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
The City of Hutchinson is in the process of developing a wellhead protection plan amendment for its drinking water
supply wells. The completed wellhead protection plan, Part 2, for this system as required in the Minnesota Wellhead
Protection Rule (part 4720.5350, subparts 1-3) has been distributed to adjacent local government units for their review
and is attached for your reference. This portion of the plan includes information pertaining to:
1. The inventory of potential contaminants of concern within the drinking water supply management area;
2. The data that was considered in this portion of the plan;
3. Issues, problems, and concerns within the drinking water supply management area;
4. Goals, objectives, and action strategies to address the issues and concerns within the drinking water supply
management area;
5. A plan evaluation strategy; and
6. A contingency strategy in the event of water system disruption.
The Public Hearing will be an opportunity for the public to provide comments on Part II of the plan.
City staff will provide an overview at the Public Hearing regarding the required changes to Part II of the Wellhead
Protection Plan. Staff will be available at the meeting to receive any public comment and answer questions.
BOARD ACTION REQUESTED:
Approve/Deny Resolution 14782 - Wellhead Protection Plan Part II.
Fiscal Impact: $ 0.00 Funding Source:
FTE Impact: Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost: $ 0.00
Total City Cost: $ 0.00 Funding Source:
Remaining Cost: $ 0.00 Funding Source:
RESOLUTION NO. 14782
RESOLUTION APPROVING
WELLHEAD PROTECTION PLAN (PART II)
PREAMBLE:
Statement of Purpose
The purpose of this resolution is to approve the Wellhead Protection Plan for the City's wells
which has been presented to the City of Hutchinson.
Background
Groundwater is an essential source of fresh water for the public water supply system of City of
Hutchinson.
Virtually any activity on the surface of the ground, which involves hazardous substances, may
contaminate the groundwater. Once polluted, groundwater is difficult, and sometimes impossible,
to clean. The natural microorganisms which help break down some pollutants on the surface of
the ground and in the top soil layers are not present (or not present in sufficient quantities) in
groundwater. The slow rates of groundwater flow, ranging from one foot per day to one foot in
fifty years, limit dilution or dispersal of contaminants. Groundwater contaminated by today's land
uses and activities may remain contaminated for hundreds of years.
The State Of Minnesota (Department of Health) Wellhead Protection Program is requiring all
public water suppliers to develop local wellhead protection programs. A complete program
submission includes the following key elements:
1. Identification of roles and responsibilities
2. Assessment of data elements
3. Delineation of Wellhead Protection Area(s)
4. Vulnerability assessment
5. Identification of potential sources of contamination
6. Establishment of management strategies for the Wellhead Protection Area
7. Evaluation program
8. Water supply contingency strategy
9. Review and comment by the public
10. Implementation of the Wellhead Protection Plan
11. Resolution of disputes
12. Enforcement
As defined by the Federal Safe Drinking Water Act, the wellhead protection area is "the surface
and subsurface area surrounding a water well or wellfield, supplying a public water system,
through which contaminants are reasonably likely to move toward and reach such water well or
well field". In order to develop a wellhead protection plan, each of the twelve (12) above-
mentioned elements must be addressed. The City has addressed all twelve elements.
0*19110j11[97►F
WHEREAS, the City of Hutchinson recognizes the importance of its groundwater supply as a
natural resource used for drinking; and
WHEREAS, it is within the responsibility of the City of Hutchinson, as a public water supplier,
to consider the health, safety and welfare of its customers; and
WHEREAS, the protection of current and potential future sources of groundwater used for
drinking water is worthwhile from the standpoint of resource protection; and
WHEREAS, the City has been presented and has reviewed a plan from the City of Hutchinson
wellhead protection team which details the locations of the potential contaminant sources within
the wellhead protection area, identifies goals, opportunities, and action measures to address
potential risks to groundwater quality, a plan to evaluate WHP plan implementation efforts by the
City of Hutchinson and an Emergency/Contingency Plan in the event of a water system disruption.
NOW, THEREFORE, BE IT RESOLVED that the Hutchinson City Council does hereby agree
to take action to: protect their wells or well fields recharge area which have/has been determined
in compliance with the State of Minnesota Wellhead Protection Program; and
BE IT ALSO RESOLVED that the City of Hutchinson does hereby agree that the Wellhead
Protection Plan developed for the aforementioned Wellhead Protection Area, Drinking Water
Supply Management Area for the City of Hutchinson wells and water supply aquifer is correct and
accurate according to the best available information and will be submitted to the governing
authority Minnesota Department of Health for review and approval; and
BE IT FURTHER RESOLVED that the City of Hutchinson does hereby agree to continue the
wellhead protection planning process by implementing the plan which focuses resources on
reaching the goals, objectives, and management for the contaminants of concern in addition to
maintaining a effective Plan Evaluation Program and Emergency/Contingency Plan.
Adopted by the Hutchinson City Council this 24th day of October 2017.
Mayor, Gary Forcier
City Administrator, Matt Jaunich
2
C
Date: August 10, 2017
To: Joe Nagel, McLeod County Board
Jon Christensen, Hutchinson Township Board
Steve Reiner, Hassan Valley Township Board
Lynn Splittgerber, Acoma Township Board
Paul Merkins, Lynn Township Board
Gary Forcier, City of Hutchinson
Jeremy Bolland, McLeod Soil and Water Conservation District
Ryan Freitag, McLeod Soil and Water Conservation District
Donn Winkler, Mid Minnesota Development Commission
Hutchinson City Center
11 f Hassan Street SE
Hutchinson, MN 55350-2522
320-587-51511Fax 320-2344240
From: John Paulson, City of Hutchinson, Project/Environmental Regulation Manager
Re: Wellhead Protection Plan, Part 2, for the City of Hutchinson
The City of Hutchinson is in the process of developing a wellhead protection plan amendment for its
drinking water supply wells. Enclosed for your review and comment is the completed wellhead protection
plan, Part 2, draft for this system as required in the Minnesota Wellhead Protection Rule (part 4720.5350,
subparts 1-3). This portion of the plan includes information pertaining to:
1. The inventory of potential contaminants of concern within the drinking water supply management area;
2. The data that was considered in this portion of the plan;
3. Issues, problems, and concerns within the drinking water supply management area;
4. Goals, objectives, and action strategies to address the issues and concerns within the drinking water
supply management area;
5. A plan evaluation strategy; and
6. A contingency strategy in the event of water system disruption.
Your comments on this portion of the plan will be accepted through the 60 -day comment period. Please
send your written comments to John Paulson at 111 Hassan Street SW, Hutchinson, MN 55350 by October
16, 2017.
Consistent with the Wellhead Protection Rule (part 4720.5350, subpart 4), a Public Hearing has been
scheduled on October 24, 2017 at 6:00 PM at Hutchinson City Hall, 11 l Hassan Street SW to discuss
issues and address all comments related to the enclosed document.
We look forward to your participation.
cc: Trudi Witkowski, Minnesota Department of Health
Karen Voz, Minnesota Department of Health
Eric Levine, City of Hutchinson Water Department
Kent Exner, City of Hutchinson Public Works
- Printed on recycled paper -
Notice of Part I Informational Meeting to LGU's
LG U
McLeod County Board
Hutchinson Township Board
Hassan Valley Township Board
Acoma Township Board
Lynn Township Board
City of Hutchinson
McLeod SWCD
Mid Minnesota Development Commission
Minnesota Department of Health
City of Hutchinson Water Department
City of Hutchinson Public Works
McLeod SWCD
Minnesota Department of Health
Name
Joe Nagel
Jon Christensen
Steve Reiner
Lynn Splittgerber
Paul Merkins
Gary Forcier
Jeremy Bolland
Donn Winkler
Karen Voz
Eric Levine
Kent Exner
Ryan Freitag
Trudi Witkowski
Address
20849 196th Rd
1245 State Hwy 7 E
15161 Page Ave
24642 Upsala Ln
24513 140th St
111 Hassan St SE
331 3rd Ave N
333 Sixth Street SW, Suite 2
3333 W.Division St. Suite # 212
111 Hassan St SE
111 Hassan St SE
P.O. Box 160
PO Box 64975
City, State, Zip
Hutchinson, MN 55350
Hutchinson, MN 55350
Hutchinson, MN 55350
Hutchinson, MN 55350
Stewart, MN 55385
Hutchinson, MN 55350
Brownton, MN 55312
Willmar, MN 56201-5615
St.Cloud,MN 56301-4557
Hutchinson, MN 55350
Hutchinson, MN 55350
Glencoe, MN 55336
St. Paul, MN 55164-0975
0
f
*mi
•"��•�
'fig-.
• ,
,i
•. �';i`)-. i, I'�. � .
SSSTTT
r'v(�"C'^
'� +
- � �w• �
:.c �.; ;-
_ aye
y�
r
r
Forward
This document presents the wellhead protection (WHP) plan amendment for the City of Hutchinson
that will help provide for an adequate and safe drinking water supply for community residents. It
contains the following components:
• Assessment of the data elements used to prepare the plan;
• Delineation of the wellhead protection area;
• Delineation of the drinking water supply management area;
• Assessments of well and drinking water supply management area vulnerability;
• Impact of land and water use changes on the public water supply wells used by the water
supplier;
• Issues, problems, and opportunities affecting the wells, well water, and the drinking water
supply management area;
• Potential Contaminant Source Inventory and risk assessment
• Wellhead protection goals for this plan;
• Objectives and plan of action for achieving the wellhead protection goals;
• Evaluation program for assessing the effectiveness of this plan; and
• Contingency strategy to address an interruption of the water supply.
Water Supply Wells Included in This Plan
Unique Number
Well Name or Number
Use/Status'
210426
4
P
228800
5
P
233077
6
P
511076
7
P
724408
8
P
1P = Primary Water Supply Well, E = Emergency Backup Well, S = Seasonal Well
WHP Plan Manager
John Paulson
Project/Environmental Regulation Manager
City of Hutchinson
II lHassan Street Southeast
Hutchinson, MN 55350
Phone: 320.234.5682
Ipaulsonkci.hutchinson.mn.us
WHP Team Members
John Paulson
City of Hutchinson
Eric Levine
City of Hutchinson
John Rodeberg
SEH Engineering
Jeff Ledin
SEH Engineering
Karen Voz
MDH Planner
Marilyn Bayerl
Bayerl Water Resources
JPaul sonaci. hutchin son. mn.us
ELevinegci.hutchinson.mn.us
irodeberggsehinc.com
jledingsehinc.com
karen. s. vozg state. mn.us
marilyngbayerlwaterresources. com
Written By
Marilyn Bayerl, Bayerl Water Resources, for SEH Engineering, Inc
Mapping completed by SEH Engineering, Inc.
ii
Chapter 1
Chapter 2
Chapter 3
Table of Contents
Page
Introduction....................................................................................................................... 1
Identification and Assessment of the Data Elements Used to Prepare the Plan ............... 1
Delineation of the Wellhead Protection Area, Drinking Water Supply
Management Area and Vulnerability Assessments.....................................................
Chapter 4: Establishing Priorities and Assigning Risk to Potential Contamination Sources........
Chapter 5: Impact of Land and Water Use Changes on the Public Water Supply Well(s) ...........
Chapter 6: Issues, Problems and Opportunities.............................................................................
Chapter 7: Existing Authority and Support Provided by Local, State and Federal Governments
Chapter8: Goals............................................................................................................................
Chapter 9: Objectives and Plan of Action.....................................................................................
Chapter10: Evaluation Program.....................................................................................................
Chapter11: Contingency Strategy...................................................................................................
List of Figures
Figure 1: Drinking Water Supply Management Area.................................................................
Figure 2: Previous Drinking Water Supply Management Area ..................................................
Figure3: Land Use......................................................................................................................
Figure4: Zoning..........................................................................................................................
Figure5: Future Land Use..........................................................................................................
Figure 6: Potential Contaminant Sources....................................................................................
List of Tables
Table 1: Land Use within the Hutchinson DWSMA.................................................................
Table 2: Current and Future Zoning within the Hutchinson DWSMA....................................
Table 3: Annual Pumping from the Public Water Supply Wells ...............................................
Table 4: Potential Contamination Sources and Assigned Risk for the IWMZ .........................
Table 5: Potential Contamination Sources and Assigned Risk for the Rest of the DWSMA..,
Table 6: Expected Land and Water Use Changes......................................................................
Table 7: Issues, Problems, and Opportunities............................................................................
Table 8: Controls and Programs of the City of Hutchinson.......................................................
Table 9: Local Agency Controls and Programs.........................................................................
Table 10: State and Federal Agency Controls and Programs......................................................
Table 11: WHP Plan of Action....................................................................................................
Table 12: Cooperating Agencies List..........................................................................................
List of Appendices
Appendix I:
Appendix II:
Appendix III:
Appendix IV:
Appendix V:
Appendix VI:
Appendix VII:
Appendix VIII:
7
7
.. 10
.. 10
.. 12
.. 13
.. 14
.. 21
.. 21
zv
V
3
4
5
9
2
2
6
8
8
.. 10
.. 11
.. 12
.. 12
.. 13
.. 16
.. 21
WHPA and DWSMA Delineations and Vulnerability Assessments (Part 1), Part
One WHPP Scoping Document, and Municipal Well Logs
Inventory of Potential Contamination Sources and DWSMA Parcels
Inner Wellhead Management Zone (IWMZ) Potential Contaminant Sources
Alternative Water Supply / Contingency Strategy
Old Municipal Well Report
Part Two WHPP Scoping Document
Glossary of Terms
Implementation Schedule
iii
Legend
Hutchinson Wellhead Protection Plan
Features
- "
o Public Water Supply Well
Q Wellhead Protection Area (WHPA)
r
aA) ater Supply
MnagenVulneratA eilitye (DWSMrinking
QEmergency Response Area
7 Inner Wellhead Management Zone
Minnesota Admin Boundaries
County Boundaries
Municipality Boundaries
/ Aa
. - .
Mcleod County Parcels
k
_
G If CourL'se Rtl
I
a�'' rntleeCAveN
"' ..fes IN
Mtl 1 ren F
-114�
til..._
r
1
A
.
� 3NAveNW
F
I
�
�
�
1 �g'.: _ - tea• �s�Ave NW
_ sz
62$ 1.2$0 2,$00
76
c
' waw AW _
D Feet
-
J 2ndA SW.. -ffer on sts — Ave
SE -
R.1-HutcM1 13121D
Rmmare nierz n
WELLHEAD PROTECTION PLAN
Figure
Part II
WHPA and DWSMA
SEH
�mm
""'°�W�$°@
Hutchinson, Minnesota
Legend
Hutchinson Wellhead Protection Plan
Features
o Public Water Supply Well
QWellhead Protection Area
Low Vulnerability Drinking Water Supply
Management Area
L�
(DWSMA)
Emergency Response
Aa
Inner Wellhead Management Zone
ti^'1
Minnesota Admin Boundaries
I
_
—
7 County Boundaries
Municipality Boundaries
Mcleod County Parcels
Q Public Land Survey (TRS)
Previous Drinking Water Supply
Management Area
(DWSMA)
to
V�
ir.veN as _
Ave SJJ = 2ntlAv, - -
Ibex Map � -m
- 'alJ��-
Ir' •
.n
o
u
�
u
�
g
s
62
�:
....i - -
0 6251250 2.500
°�
w -
OFeet
„a.. .w.a�.�A��.W.�����mare•,m ®m,q..�a,..a�b....,.,�.o•..o,
J
1 .1" H -h 13121G
Rlnt �zte ]t, 612111
WELLHEAD PROTECTION PLAN
Current Previous
Figure
Part II
and
SEH
mm
W�$°@
DWSMA Boundaries
2
a
Hutchinson, Minnesota
Chapter 1 - Introduction
1.1 Background
The wellhead protection (WHP) plan amendment for the City of Hutchinson was prepared by SEH
Engineering, Inc. in cooperation with the Minnesota Department of Health (MDH). Changes in the
size of the DWSMA are significant since the original plan and are shown in Figure 2. It has decreased
from 8,686 to 2,778 -acres. Since the original plan in 2003, the city has drilled a new well, removed
Well #3 from service (sealed), and reduced water usage by about 20 -percent. Well #2 has been
removed from the public water supply system and is used for bulk water. The vulnerability has
remained low.
The city has mitigated all class V wells located in the previous DWSMA. They have also offered well
sealing events and sealed 28 wells in the past ten years of implementation.
This amendment contains specific actions that the city will take to fulfill WHP requirements that are
specified under Minnesota Rules, part 4720.5510 to 4720.5590. Also, the support that Minnesota state
agencies, federal agencies, McLeod County, and others will provide is presented to identify their roles
in protecting the city's drinking water supply. The plan is effective for 10 years after the approval date
specified by MDH and the city is responsible for implementing its WHP plan of action, as described in
Table 11 of this report. Furthermore, the city will evaluate the status of plan implementation at least
every two -and -one-half years to identify whether its WHP plan is being implemented on schedule.
1.2 Plan Appendices
Much of the technical information that was used to prepare this plan is contained in the appendices, but
is summarized in the main body of this plan. In particular:
• Appendix I contains the first part of the plan, consisting of the delineation of the wellhead
protection area (WHPA), the drinking water supply management area (DWSMA), and the
vulnerability assessments for the public water supply wells and the DWSMA. It also contains
the municipal well logs and the Part One Scoping Document. This part of the plan is
summarized in Chapter 3.
• Appendix II contains the inventory of potential contamination sources. This inventory is
discussed in Chapter 4 in terms of assigning risk to the city's water supply and is also discussed
in Chapter 6, relating to issues, problems or opportunities. It also contains a listing of parcels
located within the DWSMA.
• Appendix III contains the Inner Wellhead Management Zone (IWMZ) Potential Contaminant
Sources. This information is discussed in Chapter 4.
• Appendix IV contains the Alternative Water Supply / Contingency Strategy document. This
information is discussed in Chapter 11.
• Appendix V contains the Old Municipal Well report.
• Appendix VI contains the Part Two WHPP Scoping Document outlining the requirements for
this plan.
• Appendix VII contains the Glossary of Terms and Acronyms.
• Appendix VIII contains the Implementation Schedule.
Chapter 2 - Identification and Assessment of the Data Elements
Used to Prepare the Plan
The data elements that are included in this plan were used to 1) delineate the WHPA and the DWSMA
and to assess DWSMA and well vulnerability and 2) document the need for the WHP measures that
will be implemented to help protect the city's water supply from potential sources of contamination.
The city met with representatives from MDH on two occasions to discuss data elements that are
specified in Minnesota Rules, part 4720.5400, for preparing a WHP plan.
The first scoping meeting, held on October 30, 2013, addressed the data elements that were needed to
support the delineation of the WHPA, the DWSMA, and the wells and DWSMA vulnerability
assessments. The second scoping meeting, held on April 11, 2017, discussed the data elements
required to 1) identify potential risks to the public water supply and 2) develop effective management
strategies to protect the public water supply in relation to well and DWSMA vulnerability.
The results of each meeting were communicated to the city by MDH through a formal scoping decision
notice and are presented in Appendices I and VT Not all of the data elements listed in the WHP rule
had to be addressed in the WHP plan because of the non -vulnerable nature of the city's source of
drinking water. The following data elements were reviewed by the WHP team and will be ranked for
prioritization of plan implementation.
Land Use and Zoning are noted in Figures 3 and 4 with projected future land use noted in Figure 5.
Table 1 shows the land use within the DWSMA. This is based on the 2015 National Agricultural
Statistics Service from the United States Department of Agriculture. Land use is predominantly
developed at fifty-four percent, with cropland and water at near twenty percent each. Forested areas
encompass less than ten percent.
Table 2 summarizes Figures 4 and 5 showing current and future zoning which consists mainly of
Residential and Commercial zones within city limits and predominantly agriculture use outside the city
limits. Changes in the future land use noted in the city's Comprehensive Plan shows a decrease in
commercial and industrial uses and identifies the park, open spaces and public land within the past
residential areas.
McLeod County has designated an urban expansion, or Joint Powers Area, area described as
approximately one -mile beyond Hutchinson city limits. Development within this zone is considered
by the county, township and the city. Changes will likely include agricultural to residential use of the
areas within the DWSMA that lie outside the city limits. The City of Hutchinson encompasses less
than half of the DWSMA. The tables below depict the acres included for the current land use and
current and future zoning.
Table 1— Land Use -
Hutchinson DWSMA Table 2 — Current and Future Zoning - Hutchinson DWSMA
Land Class Category
(NASS 2016)
Total
Acres
Emergency Response Area
(ERA)
Barren
10.0
Deciduous Forest
124.0
Developed
216.8
Developed/Open Space
255.0
Grass/Pasture
132.0
Cropland
222.0
Evergreen Forest
1.0
Herbaceous Wetlands
181.0
Open Water
100.0
Shrubland
41.0
Hutchinson City Zoning
Current
Acres
Future
Acres
Commercial
70
20
Industrial
116
73
Residential
1040
578
Park, Open and Public Land
427
Mixed Use
35
McLeod County Zoning
Agricultural
278.7
Conservation District
6.6
R-1 Residential
132.0
Joint Powers Area
1,029.8
The entire land area of the DWSMA is located within McLeod County and the south fork of the Crow
River Watershed. Less than half of the DWSMA is located within the city limits of Hutchinson with
an area on the northwest lying in Hutchinson Township and a on the northeast in Acoma Township.
2
f
Legend
+ -
Hutchinson Wellhead Protection Plan
a r �
Features
o Public Water Supply Well
;,N
- �
Q Wellhead Protection Area (WHPA)
Low Vulnerability Drinking Water Supply
Management Area(DWSMA)
Emergency Response Area
Inner Wellhead Management Zone
�*
Minnesota Admin Boundaries
ACounty Boundaries
Municipality Boundaries
?
1
r .� y `I
Mcleod County Parcels
Land Cover (NASS 2016)
10
Cropland
=Deciduous Forest
-Developed
-Developed/Open Space
49 - r
y�,�►��I+
-
Ir ase as
=Grass/Pasture
=Herbaceous Wetlands
V A&
Open Water
44,
Shrubland
r
..'
+``•
.si +.1.+.•
- _ fC
Intlex Map 44 -m
��
M
-•tir��i'�! i'
�`_y .L IN
mAv
r i•�q� ��,• X's
s
F
o szs 1,250 zsoo
7fi aq
D Feet
1tD "''°
RI°`°ate "'°'�"
WELLHEAD PROTECTION PLAN
2016 NASS
Figure
SEH
mm
Part II
Land Cover
g
auva °s�
Hutchinson, Minnesota
Legend
Hutchinson Wellhead Protection Plan
Features
o Public Water Supply Well
QWellhead Protection Area
- ^ Low Vulnerability Drinking Water Supply
J Management Area(DWSMA)
QEmergency Response Area
7 Inner Wellhead Management Zone
Minnesota Admin Boundaries
County Boundaries
t Municipality Boundaries
Mcleod County Parcels
City of Hutchinson Zoning
• OC -1 MI/C MR -3
OC -2 OR -1 MR -3 PD
MC -3 MR -1 PD MRA
MCA 0R-2
M C-5 M R-2 PD
01-1 MR -2B
I n,
- -- Mcleod County Zoning
_ Agricultural
®Conservation District
® Joint Powers Area
R-1 Residential
R.1 ---3121G
nmroa� nzawn
SEH
WELLHEAD PROTECTION PLAN
Part II
Hutchinson, Minnesota
y}-
Ted-- 0 0 6251,250 2,500
•� �E - OFeet
City and County Figure
Zoning 4
Legend
Hutchinson Wellhead Protection Plan
Features
o Public Water Supply Well
Q Wellhead Protection Area (WHPA)
Low vulnerability Drinking Water Supply
Management Area (DWSMA)
QEmergency Response Area
7 Inner Wellhead Management Zone
Minnesota Admin Boundaries
County Boundaries
--�
Municipality Boundaries
_
. /�,�.i�"; r•/.:r; �, ;:,fir. ../t+
Fe:. ■
Mcleod County Parcels
City of Hutchinson Future Landuse
Plan, 2013)
/`•: :i'r'-'r. !rr{/�
•'�''...
(Comprehensive
MCommercial
MHigh Density Residential Neighborhood
r%r /:
��/ ��: ;�..y j•'r
Medium Density Residential Neighborhood
Low Density Residential Neighborhood
G If cewee rm .'•//:'''; �'.:/�
MIndustrial
MMixed Use
.'!.
• '�fr �' `%"!,G��� _ 13M1 AveNW r'
MPark/Open Space
PubiGnstitutiona
Outside City Limits
i
' i �.- • :...� GeifCo` i_ � I _� � �
' / — �, y•• 5N AveNW i' 6Yh � /,
r
Intlex Map 44 -m '
- IN .
I
��/{
PI
Wells�grP�
�.a:.
ew
.. I {{
3rtl Av�W�+rny �We
R
'•
kkk
•wa,��n�en Av�re
•
.�L
�-.
0 625 1,250 2,500
Feet
a�R'�[ u . i+� i'�; 7r
ru
e`�'�r�y'•
Fad `- "✓_
D
LLL
r -. .w r
�=Nr,'i fk• z,tlsw
- ';dt ='y1.� Ave
zntlA�ese �
.-�••:=i— �r•lrer - _
F rl,51'..ht_
�
en SLS
Jeffrso
.a:a sinisnnaimirc ime.e•. ®m. ..a.•:.vib....ra.s.o•..o
Pf.11—"M13121° WELLHEAD PROTECTION PLAN
nmma� ni swn
Future Landuse
Figure
SEH
mm
Part 11
""°�W�$°@
(Comprehensive Plan, 2013)
5
Hutchinson, Minnesota
Other data element assessments required for this plan are as follows:
Geology: A geologic atlas of McLeod County was completed in 2009 with the hydrogeology
completed in 2013. Geologic information such as 1) bedrock geology, 2) surficial geology, 3)
quaternary stratigraphy, 4) sand distribution model and Precambrian bedrock geology, and 5) bedrock
topography and depth to bedrock was completed as part of that survey. This survey can be found at:
http://www.dnr.state.mn.us/waters/programs/gw section/mappin latesum/mclec_ag html.
Geologic data elements pertinent to the Wellhead Protection Area (WHPA) delineation and
vulnerability status are included in Part One of this Wellhead Protection Plan (WHPP) and were
utilized in the delineation. Part One can be found in Appendix I and is on file with the Minnesota
Department of Health (MDH) and the City Hutchinson.
The current public water supply wells in use are located in the Quaternary Buried Artesian Aquifer and
are between 400 and 475 -feet deep. They are not vulnerable to activities on the surface due to a
confining layer between the aquifer and the surface.
Groundwater Quantity: Adequacy of volume during drought periods has been addressed in Part One
of the Plan. The depth of these wells makes recharge uncertain. It is unknown how long it takes water
from the surface to reach this aquifer so long-term quantity is a consideration. There are no known
high-capacity wells located within two miles of the DWSMA. Ten high-capacity wells were utilized in
the delineation and are listed in Part One. These can be found in Appendix I. There is no known
interference with the city wells from any of these wells. Any new proposed high-capacity wells will be
evaluated by the MN Department of Natural Resources (DNR), the City and MDH to determine
potential impact to the public water supply. If a new well is needed by the City, they will work with
the MDH to determine placement.
While permitted withdrawal from each of the city wells is allowed at one -billion gallons per year,
actual historic well use is considerably less as shown in Table 3. The city is currently working with the
DNR on their Water Supply Plan to address consumption, conservation and emergency management.
ANNUAL WELL PUMPING AMOUNTS Table 3
(IN MILLIONS OF GALLONS)
YEAR '_4
2010
2011
2012
2013
2014
Well 4
165.41
131.14
154.23
137.56
187.26
Well 5
124.85
135.88
133.93
138.22
132.55
Well 6
140.26
138.69
131.31
131.42
150.71
Well
160.75
152.66
146.64
119.72
0.95
Well 8
161.10
150.43
137.99
154.22
192.59
TOTAL
752.37
708.81
704.10
681.14
664.05
There are no known environmental bore holes in the DWSMA. There are monitoring wells located in
the shallow aquifer.
Groundwater Quality: Tritium analysis was conducted on the PWS wells aquifer. Tritium is a
radioactive isotope of hydrogen that was released into the atmosphere during testing of hydrogen
bombs. When Tritium is found in groundwater in amounts greater than one tritium unit, it is an
indicator that recharge due to rainfall has occurred in the United States. Levels of Tritium have not
been detected above one tritium unit, meaning there is no influence from the surface since 1953. The
City of Hutchinson will work to maintain their good water quality the community has come to expect
and comply with requirements of the Safe Drinking Water Act.
Data elements were reviewed by the WHP team and ranked for prioritization of plan implementation.
I
Chapter 3 - Delineation of the Wellhead Protection Area,
Drinking Water Supply Management Area and Vulnerability
Assessments
A detailed description of the process used for 1) delineating the WHPA and the DWSMA, and
2) preparing the vulnerability assessments of the city water supply wells and DWSMA is presented in
Appendix L This work was completed by Short Elliott Hendrickson, Inc (SEH).
3.1 WHPA and DWSMA Delineation
Figure 1 shows the boundaries of the WHPA and the DWSMA. The WHPA was delineated using
computer simulations of groundwater movement to generate the underground capture zones for city
Wells 5 (Unique No. 462924), 6 (Unique No. 596649), 7 (Unique No. 693065), and 8 (Unique No.
753671). The DWSMA boundary was designated using the following criteria:
• Center -lines of highways, streets, roads, or railroad rights -of -ways;
• Public Land Survey coordinates;
• Parcel boundaries.
3.2 Well Vulnerability Assessment
The construction and water quality obtained from each primary well used by the City of Hutchinson is
included in the assessment of well vulnerability. The vulnerability of the city wells is considered non -
vulnerable because they are constructed so that each well is adequately sealed into the borehole and
does not pump water that contains human -caused contaminants.
3.3 DWSMA Vulnerability Assessment
The low vulnerability assigned to the DWSMA was determined using geologic, soils, and groundwater
chemistry information and indicates that the source water aquifer is covered by at least 50 continuous
feet of clay -rich geological material.
Chapter 4 - Establishing Priorities and Assigning Risk to
Potential Contamination Sources
The types of potential contamination sources that may exist within the DWSMA were derived from the
information collected to satisfy the data element requirements (Chapter 2). The impact assigned to
each data element as part of the assessment process was used to assess the types of potential
contamination sources that may present a risk to the city's drinking water supply. The low
vulnerability assessment for the DWSMA indicates that, generally, only unknown wells, wells 300 -feet
in depth to 500 -feet in depth need to be considered. Other types of boreholes, excavations that may
reach the aquifer, and certain types of Environmental Protection Agency Class V Wells are also likely
to impact the city wells and require consideration.
4.1 Contaminants of Concern
None of the human -caused contaminants regulated under the federal Safe Drinking Water Act have
been detected at levels indicating that any well itself serves to draw contaminants into the aquifer as a
result of pumping.
4.2 Inventory Results and Risk Assessment
A description of the locations of potential contamination sources is presented in Appendix IT The
MDH "County Well Index", along with the well disclosure website and city knowledge was utilized to
locate wells. EPA sent a Class V Well Inventory for the DWSMA area. Base maps, Land Use, Land
Cover and Zoning were derived from MDH, DNR, the MN Geologic Survey, McLeod County and the
City of Hutchinson. The Old Municipal Well inventory, as shown in Appendix V, was provided by
MDH.
7
The Inner Wellhead Management Zone is defined as 200 -feet from the city wells. A survey of this
area is shown for each well in Appendix III A summary of the results for the IWMZ is listed in
Table 4. Table 5 and Figure 6 present these results for the remainder of the DWSMA. The DWSMA
focuses on wells 300 -feet deep to 500 -feet deep. The priority assigned to each type of potential
contamination source addresses 1) the number inventoried, 2) its proximity to a city well, 3) the
capability of local geologic conditions to absorb a contaminant, 4) the effectiveness of existing
regulatory controls, 5) the time required for the City of Hutchinson to obtain cooperation from
governmental agencies that regulate it, and 6) the administrative, legal, technical, and financial
resources needed. A high (H) risk potential implies that the potential source type has the greatest
likelihood to negatively impact the city's water supply and should receive highest priority for
management. A low (L) risk potential implies that a lower priority for implementing management
measures is assigned.
Table 4 - Potential Contamination Sources and Assigned Risk for the IWMZ
Potential Source Type
Well
Well
Well
Well
Well
Level
of
1
#4
#5
#6
#7
#8
Risk
SB 1— Buried sewer serving one bldg.
2
1
3
3
2
M
SBM — Buried sewer -municipal (pressurized, open
jointed or unapproved materials)
1
1
H
DWT — Discharge water treatment waste
1
1
1
L
SDI — Stormwater Drain Pipe
1
1
2
2
2
L
WEL — Operating Well
1
1
2
L
Recommendations for the IWMZ include replacement of cracking or leaking sewer lines. Strategies to
implement all measures in the IWMZ will be included in the implementation section of this plan.
Table 5 - Potential Contamination Sources and Assigned Risk for the Rest of the DWSMA
Potential Source Type
Total
Number
Level of
Risk
Wells 300-500 feet deep
2
L
Unknown Wells
1
H
Public Water Supply Wells
5
L
Class V Wells
0
L
All wells will be addressed in the management strategies with emphasis on sealing unused/unsealed
wells. A listing of sealed wells is available at city hall.
Chapter 5 - Impact of Land and Water Use Changes on the Public
Water Supply Wells
The city estimates that the following changes to the physical environment, land use, surface water, and
groundwater -may occur over the 10 -year period that the WHP plan amendment is in effect (Table 6).
This is needed to determine whether new potential sources of contamination may be introduced in the
future and to identify future actions for addressing these anticipated sources. Land and water use
changes may introduce new contamination sources or result in changes to groundwater use and quality.
The anticipated changes may occur within the jurisdictional authority of the city. Table 6 describes the
anticipated changes to the physical environment, land use, and surface water or groundwater in
relationship to the 1) influence that existing governmental land and water programs and regulations
may have on the anticipated change, and 2) administrative, technical, and financial considerations of
the City of Hutchinson and property owners within the DWSMA.
Table 6 - Expected Land and Water Use Changes
Expected Change
(Physical
Impact of the Expected
Influence of Existing
Government Programs and
Administrative, Technical, and
Environment, Land
Change On the Source
Regulations on the
Financial Considerations Due to
Use, Surface Water,
Water Aquifer
Expected Change
the Expected Change
Groundwater)
Physical Environment:
None
Does not apply
Does not apply
None anticipated
Land Use: Potential
change from cropland to
None
Does not apply for wellhead
Does not apply for wellhead
residential outside city
protection purposes.
protection purposes.
limits.
Groundwater: Less
demand with
Less depletion of the drinking
Work with MDH and DNR to
MDH and DNR have regulatory
conservation measures
water resource aquifer.
mitigate concerns.
authority.
Chapter 6 - Issues, Problems, and Opportunities
6.1 Identification of Issues, Problems and Opportunities
The City of Hutchinson has identified water and land use issues and problems and opportunities related
to 1) the aquifer used by the city water supply wells, 2) the quality of the well water, or 3) land or
water use within the DWSMA. The city assessed 1) input from public meetings and written comments
it received, 2) the data elements identified by MDH during the scoping meetings, and 3) the status and
adequacy of the city's official controls and plans on land and water uses, in addition to those of local,
state, and federal government programs. The results of this effort are presented in the following table,
which defines the nature and magnitude of contaminant source management issues in the city's
DWSMAs. Identifying issues, problems and opportunities, including resource needs, enables the city
to 1) take advantage of opportunities that may be available to make effective use of existing resources,
2) set meaningful priorities for source management and 3) solicit support for implementing specific
source management strategies.
6.2 Comments Received
There have been several occasions for local governments, state agencies, and the general public to
identify issues and comment on the city's WHP plan. At the beginning of the planning process, local
units of government were notified that the city was going to develop its WHP plan and were given the
opportunity to identify issues and comment. A public information meeting was held to review the
results of the delineation of the wellhead protection area, DWSMA, and the vulnerability assessments.
The meetings of the city's wellhead protection team were open to the public.
10
A public hearing was held before the completed WHP plan was sent to 1VIDH for state agency review
and approval. While there were no issues identified at the local government, state agency and/or the
public informational meeting, the wellhead protection team has identified the following issues:
Table 7- Issues, Problems, and Opportunities
11
ImpactedProblem
Opportunity Associated
Adequacy of Existing
Issue Identified
Feature
Associated with the
with the Identified
Controls to Address
Identified Issue
Issue
the Issue
The city needs to
The city will pursue 100%
The city does not have
There may be unknown
Aquifer
assess if these wells
funding to seal unused and
authority to require that
wells located within the
Well water quality
presents a threat to the
unsealed wells located
unused wells be properly
DWSMA
DWSMA
aquifer based upon
within the DWSMA if they
sealed.
depth, construction,
meet the priority criteria
The MDH has authority
and state of repair.
outlined in the PCSI.
to require well sealing.
The city needs to
locate unused,
The city can partner with
The city does not have
Wells located within the
Aquifer
unsealed wells and
McLeod County and utilize
authority to require that
DWSMA need to be
Well water quality
assess which wells
MDH implementation grant
unused wells be properly
assessed for sealing
DWSMA
present a threat to the
dollars to help property
sealed.
potential.
aquifer based upon
owners pay for the costs of
The MDH has authority
their construction,
properly sealing unused
depth, and state of
wells.
to require well sealing.
rep air.
The city will locate wells
The city needs to
The city does not have
in the Old Municipal
locate and verify
The city can apply for
authority to require that
Well Inventory if
Aquifer
sealing if unverified
MDH grant funding to seal
unused wells be sealed.
possible and assess for
and seal if unsealed,
wells
The MDH has authority
sealing potential.
unused.
to require well sealing.
Recharge potential to the
Long range planning
The city will complete the
DNR Conservation Plan,
The city has the authority
Quaternary Buried
for water supply is
present educational
to restrict water use is
Artesian Aquifer
Aquifer
uncertain. Additional
information to consumers
needed.
(QBAA) at the depths of
DWSMA
aquifer draw by other
and encourage voluntary
The DNR has authority f
the public water supply
sources may affect the
conservation. Complete leak
high-capacity wells.
wells is unknown.
resource.
detection/water audit.
The city has the authority
Additional high-capacity
Five agricultural
The city can work with the
to restrict wells within
wells within the QBAA
Aquifer
processing/industrial
DNR and MDH to evaluate
the city limits of the
may affect the public
DWSMA
processing wells
any new proposed high-
DWSMA.
water supply wells.
currently exist in the
capacity wells within the
The DNR has authority
dee BAA.
p Q
DWSMA.
to restrict high-capacity
wells.
McLeod County, Acoma
The city does not have
Over 50% of the
The city does not have
and Hutchinson Townships
the authority to regulate
DWSMA is located
Aquifer
regulatory authority
and the city of Hutchinson
wells and permitting
outside the municipal
DWSMA
over land use and/or
has a joint powers
outside city limits.
boundary of Hutchinson.
wells in this area.
agreement for orderly
McLeod County has
development in this area.
regulatory authority.
The city needs to
The city can apply for
There may be unknown
Aquifer
inform property
MDH grant funding to
The EPA has authority
Class V Wells located in
Well water quality
owners of what a
inform the property owners
over Class V Wells in
the DWSMA.
DWSMA
Class V Well is and
within the DWSMAs.
Minnesota.
how to report.
11
It is difficult to foresee or plan for the future. The City of Hutchinson will use its planning and
management capabilities within this plan to respond to any new/unknown source water protection
issues that may impact the quality or quantity of its drinking water in the future.
Chapter 7 - Existing Authority and Support Provided by Local,
State, and Federal Governments
In addition to its own controls, the City of Hutchinson will rely upon partnerships formed with local
units of government, state agencies, and federal agencies with regulatory controls or resource
management programs in place to help implement its WHP plan. The level of support that a local,
state, and federal agency can provide depends on its legal authority, as well as the resources available
to local governments.
7.1 Existing Controls and Programs of the City of Hutchinson
The DWSMA is located almost entirely within the city limits of Hutchinson. Table 8 shows the legal
controls and/or programs that the city has identified to support the management of potential
contamination sources within the DWSMA.
Table 8 - Controls and Programs of the City of Hutchinson
Type of Control
Program Description
Program Description
New wells within the city limits of Hutchinson are not
City Well Ordinance
allowed.
Planning and Zoning
Well sealing assistance up to $500 or 75% of cost.
Cross -connection Ordinance
Existing wells must be separated from the municipal
Cost -share Programs
water system.
Stormwater Ordinance
Infiltration restrictions.
Land Use and Zoning Controls
Joint Powers
Comprehensive Plan
Long-range growth planning with McLeod County.
7.2 Local Government Controls and Programs
The McLeod County SWCD provides cost -share for well -sealing projects.
Table 9 - Local Agency Controls and Programs
Government Unit
Name of Control/Pro ram
Program Description
McLeod County
County Comprehensive Plan
Education and grant funding for water quality
Planning and Zoning
Local Water Management Plan
priorities
McLeod County
SWCD
Cost -share Programs
Well Sealing Cost -Share
McLeod County, Acoma and
Manage development within approximately a
Joint Powers
Hutchinson Townships, and the
one -mile delineated boundary of the city limits
City of Hutchinson.
of Hutchinson.
7.3 State Agency and Federal Agency Support
MDH will serve as the contact for enlisting the support of other state agencies on a case-by-case basis
regarding technical or regulatory support that may be applied to the management of potential
contamination sources. Participation by other state agencies and the federal government is based on
legal authority granted to them and resource availability.
12
Furthermore, MDH 1) administers state regulations that affect specific potential sources of
contamination and 2) can provide technical assistance to property owners to comply with these
regulations.
The following table identifies the specific regulatory programs or technical assistance that state and
federal agencies may provide to the City to support implementation of the WHP plan. It is likely that
other opportunities for assistance may be available over the 10 -year period that the plan is in effect due
to changes in legal authority or increases in funding granted to state and federal agencies. Therefore,
the table references opportunities available when the city's WHP plan was first approved by MDH.
Table 10 - State and Federal Agency Controls and Programs
Government
Type of Program
Program Description
Unit
MDH has authority over the construction of new
State Well Code for Municipal
municipal wells and the sealing of wells. MDH staff
MDH
Wells
in the Well Management Program offer technical
(Minnesota Rules, Chapter 4725)
assistance for enforcing well construction codes,
maintaining setback distances for certain
contamination sources, and well sealing.
MDH has staff that will help the city identify
MDH
WHP
technical or financial support that other
governmental agencies can provide to assist with
managing potential contamination sources.
DNR can require that anyone requesting an increase
Water appropriation permitting
in existing permitted appropriations, or to pump
DNR
(Minnesota Rules, Chapter 6115)
groundwater, must address concerns regarding the
impacts to drinking water if these concerns are
included in a WHP plan.
EPA
Class V Wells
The EPA has authority over Class V wells. Owners
are required to notify the EPA.
7.4 Support Provided by Nonprofit Organizations
The Minnesota Rural Water Association (MRWA) will assist the City of Hutchinson with
implementing its WHP plan by providing 1) referenced education and outreach materials for land
owners, 2) technical assistance for implementing the individual WHP action items listed in the plan,
and 3) support to the city for assessing the results of plan implementation.
Chapter 8 - Goals
Goals define the overall purpose for the WHP plan, as well as the end points for implementing
objectives and their corresponding actions. The WHP team identified the following goals after
considering the impacts that 1) changing land and water uses have presented to drinking water quality
over time and 2) future changes that need to be addressed to protect the community's drinking water:
• Maintain a safe and adequate drinking water supply for community residents;
• Create public awareness and general knowledge about the importance of WHP for maintaining
a safe and adequate drinking water supply.
• Promote water conservation practices to ensure an adequate water supply in the future.
13
Chapter 9 - Objectives and Plan of Action
Objectives provide the focus for ensuring that the goals of the WHP plan are met and that priority is
given to specific actions that support multiple outcomes of plan implementation.
Both the objectives and the wellhead protection measures (actions) that support them are based on
assessing 1) the data elements (Chapter 2), 2) the potential contaminant source inventory (Chapter 4),
3) the impacts that changes in land and water use present (Chapter 5) and 4) issues, problems, and
opportunities referenced to administrative, financial, and technical considerations (Chapter 6).
9.1 Objectives
The following objectives have been identified to support the goals of the WHP plan for the City of
Hutchinson:
1. Create public awareness and general knowledge about the importance of WHP for maintaining
an adequate and safe drinking water supply;
2. Increase the knowledge base regarding quantity of water available — maintain adequate
drinking water supply and promote conservation.
3. Gather new information on potential contaminants.
4. Manage potential contaminants.
5. Ensure emergency preparedness of local agencies.
6. Create awareness among LGUs about the importance of protection of the drinking water supply
aquifer.
7. Maintain communications with the MDH, MRWA and other agencies able to assist with
implementation of this plan.
8. Collect additional data to substantiate information contained within this Plan, and to provide
more detail for future Plan amendments.
9. Conduct regular evaluations of Plan implementation and effectiveness.
9.2 WHP Measures and Action Plan
Based upon the factors, the WHP team has identified WHP measures that will be implemented by the
city over the 10 -year period that its WHP plan is in effect. The objective that each measure supports is
noted as well as 1) the lead party and any cooperators, 2) the anticipated cost for implementing the
measure and 3) the year or years in which it will be implemented.
The following categories are used to further clarify the focus that each WHP measure provides, in
addition to helping organize the measures listed in the action plan:
• Data Collection
• IWMZ Management
• Land Use Management
• Potential Contamination Source Management
• Public Education and Outreach
• Reporting and Evaluation
• Water Use and Contingency Strategy
14
9.3 Establishing Priorities
WHP measures reflect the administrative, financial, and technical requirements needed to address the
risk to water quality or quantity presented by each type of potential contamination source. Not all of
these measures can be implemented at the same time, so the WHP team assigned a priority to each. A
number of factors must be considered when WHP action items are selected and prioritized
(part 4720.5250, subpart 3):
• Contamination of the public water supply wells by substances that exceed federal drinking
water standards.
• Quantifiable levels of contamination resulting from human activity.
• The location of potential contaminant sources relative to the wells.
• The number of each potential contaminant source identified and the nature of the potential
contaminant associated with each source.
• The capability of the geologic material to absorb a contaminant.
• The effectiveness of existing controls.
• The time needed to acquire cooperation from other agencies and cooperators.
• The resources needed, i.e., staff, money, time, legal, and technical resources.
The City of Hutchinson defines a priority for implementing a WHP measure as maintaining the
quantity and high quality drinking water they have come to expect. Table 11 lists each measure that
will be implemented over the 10 -year period that the city's WHP plan is in effect, including the
priority assigned to each measure.
15
Table 11 - WHP Plan of Action
MONITORING, DATA COLLECTION, AND ASSESSMENT:
WELL AND CONTAMINANT SOURCE MANAGEMENT:
LMumcipal Well Management Practices
Responsible
Implementation Time Frame
�,
o
WHP Measure 05: Provide a map of the DWSMA to
Description
Objective
o
Party &
Cost
a
Cooperators
--
0
N
0
N
N
0
N
N
0
N
MNDOT and the local Fire, Street and County Highway
McLeod
1. Groundwater Quality & Quantity Monitoring
Hutchinson
Departments pointing out the specific location of city
5/6
H
County
Time
X
WHP Measure 01: The City will contact the MDH
Hydrologist or consultant when planning routine pump
2/7/8
L
MDH
Up to
wells near roads. Request their awareness and prompt
X
MNDOT
or well maintenance on city well 48 (724408) to televise
Consultant
$10,000
response to accidents, spills & clean-up efforts near the
and verify existing well record if grant funding is
PWS wells.
available.
WHP Measure 02: The City will contact the MDH
7/8
H
MDH
Staff
X
during year 7 to conduct Tritium testing on city well 48.
Hutchinson
Time
WHP Measure 03: The City will contact the MDH by
MDH
Staff
year 7 to set up testing on city wells for "vulnerability
7/8
H
Hutchinson
Time
X
suite" — the city will collect samples.
2. Well Inventory and Prioritization
WHP Measure 04: Update the well inventory as data is
3/8
H
Hutchinson
Staff
�------------On-Gomg------------�
collected. Review the status of existing wells and add
MDH
Time
new wells identified in the DWSMA.
WELL AND CONTAMINANT SOURCE MANAGEMENT:
LMumcipal Well Management Practices
WHP Measure 05: Provide a map of the DWSMA to
Hutchinson
MNDOT and the local Fire, Street and County Highway
McLeod
Staff
Departments pointing out the specific location of city
5/6
H
County
Time
X
wells near roads. Request their awareness and prompt
MNDOT
response to accidents, spills & clean-up efforts near the
PWS wells.
16
WELL AND CONTAMINANT SOURCE MANAGEMENT (cont):
17
Responsible
Implementation Time Frame
Description
Objective
o
Party &
Cost
�+a
Cooperators
-
No
.
N0
N
N0
N
N0
N
N
N
N
N
N
2. Inner Wellhead Management Zone
WBP Measure 06: Any sewer lines observed to be
4
L
Hutchinson
TBD
F ------------As Needed ------------4
leaking, cracked or deteriorated should be replaced.
WHIP Measure 07: Implement all measures identified
4
M
Hutchinson
TBD
F------------On-Going------------4
within the IWMZ.
WHIP Measure 08: The city will manage the
Staff
stormwater pipe within the IWMZ for optimal
4
L
Hutchinson
(-------------On-Going------------4
performance.
Time
WHIP Measure 09: Review and update the IWMZ
Hutchinson
Staff
survey form for all wells in the system in year 6
3/8
H
NMH
X
working in coordination with NMH.
MRWA
Time
WHIP Measure 010: Monitor setbacks for all new
4
H
Hutchinson
Staff
------------As Needed ------------4
potential sources of contamination within the IWMI.
NMH
Time
3. Class V Wells
Hutchinson
Measure #11: If a Class V Well is dentified,
WHP i
3/7
L
EPA
Staff
Time
F ------------As Needed ------------4
contact NMH Planner.
NMH
4. High Capacity Well Management
WHP Measure 012: If the city becomes aware of a
new high capacity well identified or proposed within
Hutchinson
Staff
one -mile of the DWSMA, they will contact NMH
3/7
M
DNR
Time
F ------------As Needed ------------4
Hydrologist to evaluate the effect that proposed
NMH
pumping may have on the boundaries of the delineated
WHPA or DWSMA.
17
WELL AND CONTAMINANT SOURCE MANAGEMENT (cont.
EDUCATION AND OUTREACH:
Responsible
Implementation Time Frame
00
Description
Objective
o
Party &
Cost
�+a
Cooperators
-
o
N
.
0
N
N
0
N
N
0
N
5. Old Municipal Wells
Hutchinson
Staff
WHP Measure 013: Locate wells in the Old Municipal
4/7
H
Hutchinson
TBD
Time
X
X
X
X
X
X
X
X
X
Well inventory and assess for sealing potential.
management /unused wells, water conservation practices
MDH
MRWA
$1,000
WHP Measure 014: Obtain a cost estimate and apply
and sealing information. Obtain information from
for MDH SWP Grant or MDH Well Management funds
4
H
Hutchinson
TBD
X
X
to seal Old Municipal Wells if feasible and restore site as
WHP Measure #17: Request brochures from MDH. Place at
MDH
Hutchinson
Staff
necessary. Submit information to MDH.
city hall and the local library to inform citizens of proper well
1/4
M
X
X
6. Private Well Management
NIDH
Time
WHP Measure 015: Continue current well -sealing
Hutchinson
program. Apply for a MDH SWP Grant to seal the high
4
H
MDH
TBD
(-------------On-Going------------4
priority unused unsealed wells identified in the
DWSMA.
EDUCATION AND OUTREACH:
18
Responsible
Implementation Time Frame
00
Description
Objective
o
Party &
Cost
a�+
.
oOJJJW_J�_
N
0Cooperators
NN
1. WHP and Drinking Water Protection Education
Hutchinson
Staff
WHP Measure #16: Review annually and update web page
on the city website as needed, including well
1/4
M
MDH
Time
X
X
X
X
X
X
X
X
X
X
management /unused wells, water conservation practices
MRWA
$1,000
and sealing information. Obtain information from
MRWA and/or MDH websites.
WHP Measure #17: Request brochures from MDH. Place at
Hutchinson
Staff
city hall and the local library to inform citizens of proper well
1/4
M
X
X
NIDH
Time
usage.
18
EDUCATION AND OUTREACH (cont):
LAND USE AND PLANNING:
Responsible
Implementation Time Frame
oo
Responsible
Description
Objective
. o
Party
Party &
Cost
Description
Objective
o
Party &
Cost
o
•�+a
Cooperators
-
o
N
-
0
N
N
0
N
N
0
N
WHP Measure #18: Distribute leak detection tablets as
Hutchinson
Staff
available to high water users and make available at city hall to
1/4
L
WHP Measure 022: Review and update the DNR
F------------On-Going------------4
encourage leak detection in toilets and conservation of water.
Hutchinson
Staff
Time
DNR
Time
WHP Measure #19: Include information on water
1/4
L
Hutchinson
Staff
X
Water Supply Plan as required.
X
X
conservation tips and practices in billing inserts.
MDH
Time
WHP Measure #23: Incorporate water conservation practices
Hutchinson
within city owned facilities to demonstrate water conservation
1/4
WHP Measure #20: Include information on water
1/4
L
Hutchinson
Staff
X
X
X
X
X
X
X
X
X
X
conservation practices in the Consumer Confidence Report.
MDH
Time
Technical Assistance Program (MNTAP) to businesses on
1/4
L
MRWA
Time
WHP Measure #21: Provide information encouraging use of
X
Hutchinson
Staff
rain barrels by homeowners on the city website and participate
1/4
L
water conservation practices.
F------------On-Going------------4
in the CROW rain -barrel program.
CROW
Time
LAND USE AND PLANNING:
19
Responsible
Implementation Time Frame
oo
Description
Objective
. o
Party
Party &
Cost
aCooperators
o
OJJJ�6�6
1. Water Use Management
WHP Measure 022: Review and update the DNR
5
H
Hutchinson
Staff
Time
X
Water Supply Plan as required.
WHP Measure #23: Incorporate water conservation practices
Hutchinson
within city owned facilities to demonstrate water conservation
1/4
L
MDH
TBD
F------------On-Going------------4
practices if funding is available.
WHP Measure #24: Promote assistance from Minnesota
Hutchinson
Staff
Technical Assistance Program (MNTAP) to businesses on
1/4
L
MRWA
Time
X
X
X
X
X
water conservation practices.
WHP Measure #25: Provide a home water audit for water
use customers when water billings indicate an unusually
1/4
L
Hutchinson
F------------On-Going------------4
higher than normal customer usage.
19
WBP COORDINATION, REPORTING, AND EVALUATION:
20
Responsible
Implementation Time Frame
Description
Objective
o
Party &
Cost
�+a
Cooperators
-
o
N
.
0
N
N
0
N
N
0
N
1. WHP Coordination
WBP Measure # 26: Hold a meeting every other year
with the WHP Team and local resource partners involved
8
M
Hutchinson
Staff
X
X
X
X
X
in plan implementation to discuss new WHP issues, past
Time
year's accomplishments and activities planned for the
upcoming year.
2. Implementation Tracking and Reporting Activities
8
H
Hutchinson
Staff
X
X
X
X
X
X
X
X
X
X
WBP Measure # 27: Maintain a "WHP folder" that
contains documentation of WHP activities you have
MDH
Time
completed and a date that it was done.
3. WHP Program Evaluation Plan Reporting
WBP Measure 028: Complete and submit an
8
H
MDH
Hutchinson
Staff
X
X
X
X
evaluation report on completed WHP activities to your
MDH
Time
city council every 2.5 years.
WBP Measure # 29: Summarize all WHP Plan
Hutchinson
Staff
implementation efforts in a report to MDH in the 8 1h
8
M
X
MDH
Time
year.
WBP Measure 030: It is difficult to foresee or plan for
the future. The city will use its planning and
management capabilities within this plan to respond to
4/8
M
Hutchinson
TBD
F------------On-Gomg------------�
any new/unknown source water protection issues that
MDH
may impact the quality or quantity of its drinking water
in the future.
20
9.4 Commitments from Cooperators
The agencies listed in Table 12 have available programs to support the City of Hutchinson with
implementing the WHP measures in which they are identified.
Table 12 - Cooperating Agencies List
Agency
Measure
MDH
1-4, 9-17, 19, 20, 23, 27-30
MCLEOD COUNTY
5
CROW
21
MNDOT
5
MRWA
9, 16,24
EPA
11
DNR
12,18
Chapter 10 - Evaluation Program
Evaluation is used to support plan implementation and is required under Minnesota Rules,
part 4720.5270, prior to amending the city's WHP plan. Plan evaluation is specified under Objective 9
and provides the mechanism for determining whether WHP action items are achieving the intended
result or whether they need to be modified to address changing administrative, technical, or financial
resource conditions within the DWSMA. The city has identified the following procedures that it will
use to evaluate the success with implementing its WHP plan:
The WHP team will meet annually, or at a minimum, every two -and -one-half years to assess
the status of plan implementation and to identify issues that impact the implementation of
action steps throughout the DWSMA;
2. The city will assess the results of each action item that has been taken annually to determine
whether the action item has accomplished its purpose or whether modification is needed.
Assessment results will be presented every 2.5 years to the city council.
3. The city will prepare a written report that documents how it has assessed plan implementation
and the action items that were carried out. The report will be presented to MDH at the first
scoping meeting held with the city to begin amending the WHP plan.
Chapter 11 -Contingency Strategy
The Alternative Water Supply and Contingency Strategy can be found in Appendix IVof this Plan.
The purpose of this Contingency Strategy is to establish, provide and keep updated, certain emergency
response procedures and information for the City of Hutchinson which may become vital in the event
of a partial or total loss of public water supply services as a result of natural disaster, chemical
contamination, or civil disorder of human -caused disruptions.
21
HUTCHINSON CITY COUNCIL c`=y-f 0, a_ �
Request for Board Action 79 M-W
Agenda Item: Ordinance to Sell City-Owned Land to Titanium Partners
Department: Legal
LICENSE SECTION
Meeting Date: 10/24/2017
Application Complete N/A
Contact: Marc A. Sebora
Agenda Item Type:
Presenter: Marc A. Sebora
Reviewed by Staff ❑
unfinished Business
Time Requested (Minutes): 0
License Contingency N/A
Attachments: No
BACKGROUND/EXPLANATION OFAGENDA ITEM:
As you may recall, earlier this year the City completed a court action and was declared the legal owner of a 1/10 acre
parcel of land near Prospect Street with the intent that a portion of this parcel be included in the land to be conveyed
with the rest of the parcels to the developer of the hotel project.
As required under the Hutchinson City Charter, all land owned by the City must be conveyed by ordinance.
This is the second reading and proposed adoption of the ordinance conveying the property to the hotel developer. As
suggested at the last Council meeting, the word "assigns" has been added to the ordinance. I recommend that you
approve this ordinance.
BOARD ACTION REQUESTED:
Approve second reading and adoption of Ordinance No. 17-779.
Fiscal Impact: $ 0.00 Funding Source: N/A
FTE Impact: 0.00 Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
ORDINANCE NO. 17-779
PUBLICATION NO.
AN ORDINANCE OF THE CITY OF HUTCHINSON, MINNESOTA, AUTHORIZING THE SALE OF
MUNICIPALLY OWNED REAL PROPERTY
THE CITY OF HUTCHINSON ORDAINS:
Section 1. That the municipally owned real property legally described as follows:
Lot 12, Block 13, TOWNSITE OF HUTCHINSON, NORTH HALF, according to the plat
thereof on file and of record in the office of the County Recorder in and for McLeod County,
Minnesota. EXCEPTING THEREFROM the North 199.5 feet of said Lot 12. ALSO
EXCEPTING THEREFROM the South 97 feet of said Lot 12
for good and valuable consideration is hereby transferred and conveyed to Titanium Partners, LLC, or its
successor or assigns.
Section 2. The City Administrator, Matthew Jaunich, or his designee is authorized to sign any
and all documents on behalf of the City to effectuate the closing of this transaction.
Section 3. This ordinance shall take effect upon its adoption and publication.
Adopted by the City Council this 24th day of October, 2017.
Gary T. Forcier
Mayor
ATTEST:
Matthew Jaunich
City Administrator
HUTCHINSON CITY COUNCIL c`=y-f 0, a_ �
Request for Board Action 79 M-W
Agenda Item: Ordinance No. 17-778 - An Ordinance Suspending Hours of Liquor Sales
Department: Police
LICENSE SECTION
Meeting Date: 10/24/2017
Application Complete N/A
Contact: Daniel T. Hatten
Agenda Item Type:
Presenter: Daniel T. Hatten
Reviewed by Staff ✓❑
Unfinished Business
Time Requested (Minutes): 2
License Contingency N/A
Attachments: No
BACKGROUND/EXPLANATION OFAGENDA ITEM:
Buffalo Wild Wings is requesting they be allowed to sell liquor on Sunday October 29, 2017, beginning at 8:00 am to
accommodate the unusual hours of the Minnesota Viking's football game. The Vikings game is being played in
London so kickoff begins at 8:30 am central time. This request would expand the the hours of sales for liquor by two
and half hours on Sunday October 29, 2017, only.
The current City Ordinance states:
112.088 HOURS AND DAYS OF SALES.
No sale of intoxicating liquor shall be made between the hours of 1:00 a.m. and 10:00 a.m. on Sunday, nor between
12:00 midnight and 8;00 a.m. on Monday, nor between the hours of 1:00 a.m. and 8:00 a.m. on Tuesday through
Saturday.
I have reviewed this request and see no issues of concern. I would recommend this authorization of expansion of
hours be authorized for all establishments selling liquor within the City of Hutchinson for the one day, Sunday October
29, 2017.
No changes have been made to the proposed ordinance since the first reading held at the last Council meeting.
BOARD ACTION REQUESTED:
I recommend approval of Ordinance No. 17-778, suspending the hours of liquor sales on Sunday, October 29, 2017.
Fiscal Impact: $ 0.00 Funding Source: 0
FTE Impact: 0.00 Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
ORDINANCE NO. 17-778
AN ORDINANCE ALTERING ENFORCEMENT OF HUTCHINSON CITY
ORDINANCE 112.088 PERTAINING TO HOURS OF LIQUOR SALES ON
OCTOBER 29, 2017
Findings of the City Council:
That the Minnesota Vikings football team is playing an NFL football game in London,
England on October 29, 2017;
That kick-off for the football game is at 8:30 a.m. central standard time and will be
nationally televised;
That the restaurants in the City of Hutchinson holding liquor licenses generally have high
customer counts for viewing of the Vikings football games;
That Section 112.088 of the Hutchinson City Code states that no on -sale of intoxicating
liquor may be made before 10:00 a.m. on Sundays;
That a request has come before the City from a liquor license holder requesting that sales
of on -sale intoxicating liquor may be made starting at 8:00 a.m. on October 29, 2017, to
accommodate customers viewing the Minnesota Vikings football game,
Therefore, the Council of the City of Hutchinson does hereby ordain that Hutchinson City
Code § 112.088 shall be altered to allow on -sale intoxicating liquor sales to begin at 8:00 a.m. on
October 29, 2017, only.
Adopted by the City Council this 24th day of October, 2017.
Attest:
Matthew Jaunich, City Administrator Gary T. Forcier, Mayor
HUTCHINSON CITY COUNCIL c`=y-f 0' a_ �
Request for Board Action 79 M-W
Agenda Item: Award bid for Fire Department Self Contained Breathing Apparatus (SCBA)
Department: Fire
LICENSE SECTION
Meeting Date: 10/24/2017
Application Complete N/A
Contact: Mike Schumann
Agenda Item Type:
Presenter: Brandon Vik/Mike Schumlel
Reviewed by Staff ❑
New Business
Time Requested (Minutes): 10
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
On the September 26th, 2017 Hutchinson City Council Meeting authorization was given to the HFD to release a
specification for bid acceptance for replacing all of the fire departments SCBA's.
The bid window is open until Monday October 23rd, 2017. At this time we have no further detailed information to
attach until we have had time to review the submitted bids. As soon as the details are reviewed we will e-mail all
council members with that information prior to the scheduled city council meeting on October 24th, 2017. A detailed
presentation will also be given at the city council meeting so that any and all questions may be answered.
The fiscal impact selection below indicates the estimated and budget CIP impact. Actual cost may vary depending on
bids received.
Thank you,
Mike Schumann
BOARD ACTION REQUESTED:
Review and award the proposed bid for replacing all the HFD SCBA.
Fiscal Impact: $ 135,000.00 Funding Source: CIP
FTE Impact: Budget Change: No
Included in current budget: Yes
PROJECT SECTION:
Total Project Cost: $ 135,000.00
Total City Cost: Funding Source:
Remaining Cost: $ 135,000.00 Funding Source: CIP
2017 Hutchinson Fire Department SCBA Replacement Project
Scott/ea Scott - Total MSA/ea MSA - Total
Description (Major Sub -Assemblies)
20 - SCBA Carrier Harness Assemblies
Voice amplification integrated
35 - SCBA Face Piece Assemblies
Voice amplification add on assembly
40 - SCBA Cylinder Assemblies
Base Total
Description (Other Assemblies)
EBS or Dual EBSS
Face piece with 5 point adjustability
Face piece spectical eye glass insert (3)
harness chest strap (20)
*Thermal Imaging Camera (13)Scott (9) MSA
SCBA Accountability System
Hoses, regulators, etc, for Ladder truck (2)
*Additional rechargeable battery packs
*Multi bank battery charging station
*Akaline batteries ($240/yr - $3,600/life)
Cylinder Adapters for RDC, RIT, Re -fill, etc.
Sub Total
Trade-in allowance / Credit / Buy Back
Grand Total
Batteries over lifetime + labor to change
Warranty: Pak - Electronics - Voice Amp - TIC
EST. GRAND TOTAL INCLUDING WARRANTY
$4,526 $90,520
$4,287 $85,744
n/a
included
$279 $9,779
$253 $8,838
included
n/a
$958 $19,160
$872 $34,870
$119,459.00 $129,451.70
$141,672 $140,191
($7,600) ($6,235)
$134,072 $133,956
$7,920 0
15-10-3-2 year 15-5 year
$141,992 $133,956
n/a
n/a
0
0
47
141
109
327
39
780
12.75
255
1432
18616
795
7155
n/a
n/a
260
520
765
1530
n/a
228
456
n/a
416
240
n/a
(4)479
1916
(2)300
600
$141,672 $140,191
($7,600) ($6,235)
$134,072 $133,956
$7,920 0
15-10-3-2 year 15-5 year
$141,992 $133,956
Hutchinson Fire
Department
SCBA
Replacement Project 2017-2018
DETAILED EVALUATIONS AND TESTING
CONDUCTED ON SCOTT AND MSA
BRAND PACKS WITH COMPETITIVE BIDS
RECEIVED FOR BOTH.
Scott X3
Scott X3 Facepeiece
Scott X3
Pros:
pop. Familiar and Easy to use
► Good Warranty (15-10-3-2 years)
►Articulating Shoulder Mount
Poo. Dual Pressure Reducers, Redundant System
Poo. Dual PASS Alarms
► Color Coded Lights on Exterior of Pack
► Well Built and Presented Well by Reps
Scott X3
Cons:
Quick Connect Requires Two Hand Operation
► Voice Amp not as Clear as MSA and non-integrated
► Voice Amp on Face piece (extra weight and batt.)
► Multiple Battery Locations and Sizes
No Lumbar Adjustment
Not as Comfortable as MSA
Poor Location of TIC (Extra Weight and Batt.)
► TIC is Fixed Mounted to Face Piece (weight/operation)
Quarter Turn Connection to Face Piece
► Cannot Fill Rescue Equipment From any Tank w/out adap.
C7
a
NC
L
MSA G1 Facepiece
MSA GI
Pros:
► Single Lithium Ion Rechargeable Battery Pack Powers Everything
► Easy Battery Removal (NO tools required)
► Best Overall Fit for Comfort and Ergonomics Pack and Facepiece
► Adjustable Lumbar Support & Articulating Shoulder Support
► Best Warranty (15 years on everything and 5 years on TIC)
► Better Thermal Imaging (located on pack ... more users)
Clear Voice Amplifier Integrated and Located on Pack
Regulator Connection Easier (push to connect)
Streamlined Design, Less Snag Potential
Easier Quick Connect Operation for Cylinder
Dual PASS Alarm with LED Lights on Rear of Pack
Can Fill other Equipment From any Bottle w/out adapters
► Better Service with Four Minnesota Service Technicians
► Simple Routine Service for Staff
MSA GI
Cons:
► Committee literally found NO cons.
Note: other FD currently using MSA GI SCBA;
St. Paul, Minneapolis, Mankato, North Mankato,
Maple Grove, Morris, Oakdale, East Bethel,
Maplewood, Eagan, Willmar, Redwood Falls,
Roseville, New Brighton, Fergus Falls, Delano,
Virginia, Plymouth
Proposal
The Hutchinson Fire
Department is
recommending the
purchase of MSA brand
SCBA per the received bid
evaluations.
HUTCHINSON CITY COUNCIL c`=y-f 0, a_ �
Request for Board Action 79 M-W
Agenda Item: Approval of MnDOT Local Road Improvement Program (LRIP) Grant Application
Department: PW/Eng
LICENSE SECTION
Meeting Date: 10/24/2017
Application Complete N/A
Contact: Kent Exner
Agenda Item Type:
Presenter: Kent Exner
Reviewed by Staff ❑
New Business
Time Requested (Minutes): 10
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
City staff requests that the City Council authorize City staff to submit a MnDOT Local Road Improvement Program
(LRIP) grant application prior to the submittal deadline on November 3, 2017. Per previous discussions with the City's
Resource Allocation Committee, City staff is currently working with a traffic engineering consultant to analyze potential
configuration improvements along South Grade Road (from State TH 15 through the Merrill Street intersection).
Looking forward, if these identified potential improvements and/or the proposed trail implementation immediately west
of this area appear to be quality projects/candidates, an LRIP grant (eligible up to $1,000,000.00) would be very
beneficial to help offset the City's construction costs.
Additional information and drawings will be reviewed at the City Council meeting prior to any action being taken on
this item.
BOARD ACTION REQUESTED:
Approval of Grant Application
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
DEPARTMENT OF
TRANSPORTATION
News Release
Aug. 1, 2017
Contact: Sue Roe
Office: 651-366-4268
Cell: 651-503-2467
Susan.Roe@state.mn.us
MnDOT accepting applications for Local Road Improvement Program
funding
ST. PAUL, Minn. — Minnesota cities, counties and townships can apply for funding support for transportation infrastructure
projects on local roads as part of the Minnesota Department of Transportation's Local Road Improvement Program.
Approximately $25.3 million in bond funds is available for constructing or reconstructing local roads in 2018, 2019 or 2020.
Funding may be requested for projects that will reduce traffic crashes on rural County State Aid Highways, for projects on
local roads that have regional significance or for the local share of a trunk highway project.
Types of projects previously funded include roundabouts, pavement reconstruction, curve and roadway alignment,
pavement resurfacing and reconditioning, and safety improvements such as turn lanes, traffic signals and rural intersection
warning systems.
"This funding assists cities, counties and townships in paying costs associated with eliminating a transportation system
deficiency. In turn, this program promotes local, regional or state economic development efforts and improves safety," said
Mitch Rasmussen, State Aid Division assistant commissioner.
Deadline for counties and state aid cities (population greater than 5,000) is Nov. 3, 2017.
Deadline for non -state aid cities and townships is Dec. 1, 2017.
The application and more information is available online at www.dot.state.mn.us/stateaid/Trip. Applications can be
submitted electronically at saltirhelp.dot@state.mn.us.
Questions about the solicitation may be directed to Patti Loken at 651-366-3803 or Patti.Loken@state.mn.us.
Since the program was created in 2005, the Local Road Improvement Program has provided about $139.8 million in grant
funds to 289 projects.
www.mndot.gov
HUTCHINSON CITY COUNCIL c`=y-f 0, a_ �
Request for Board Action 79 M-W
Agenda Item: Calling a Special Budget Workshop Meeting for 4 pm on November 14
Department: Administration
LICENSE SECTION
Meeting Date: 10/24/2017
Application Complete N/A
Contact: Matt Jaunich
Agenda Item Type:
Presenter: Matt Jaunich
Reviewed by Staff ❑
New Business
Time Requested (Minutes): 1
License Contingency N/A
Attachments: No
BACKGROUND/EXPLANATION OFAGENDA ITEM:
Staff is working on finalizing the details of the 2018 budget. To assist us with that process, I would like to have a
workshop meeting with the council to discuss and review the enterprise fund budgets for next year. The workshop will
review the proposed budgets for Liquor Hutch, Creekside, Refuse/Garbage, Water, Sewer and Stormwater. We'll be
looking to call the workshop meeting for 4 pm before our next regularly scheduled council meeting.
BOARD ACTION REQUESTED:
Approval of calling a special budget workshop meeting for 4:00 p.m. on November 14
Fiscal Impact: $ 0.00 Funding Source:
FTE Impact: Budget Change: No
Included in current budget: Yes
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
Hutchinson Properties Orded To Be Cleared By City DateofReport: 10/17/2017
Enforcement
Number
Address
Parcel
Category Date Filed
Status
Date Closed
EEN17-0162
463 James St NW
31-117-29-11-0320
Tall Grass/Noxious Weed 09/01/2017
Closed
09/06/2017
EEN17-0163
550 School Rd SW
02-116-30-09-0050
Tall Grass/Noxious Weed 09/19/2017
Closed
09/26/2017
EEN17-0164
516 Adams St SE
06-116-29-07-0690
Tall Grass/Noxious Weed 09/19/2017
Abated by City
10/16/2017
Total Records: 3
Enforcement.CodeOfficer = John Paulson AND
Enforcement.DateFiled Between 9/1/2017 12:00:00 AM AND
10/1/2017 11:59:59 PM
Population: All Records
Status Descriptions
Abated by City = Ordered by City to be cleared using Contractor
Closed = Mowed by Owner
'M=0�
HRA
HUTCHINSON HOUSING AND
REDEVELOPMENT AOTP40RITY
Regular Board Meeting Tuesday, September 19, 2417, 7:40 AM
Minutes
1. CALL TO ORDER: Chair Renee Lynn Johnson Kotlarz called the meeting to order. Members
Present: Gary Forcier, Eileen Henry, Steve Jensen, and Nikki Willemssen. Staff Present: Jean
Ward and Judy Flemming.
2. CONSIDERATION OF MINUTES OF THE REGULAR BOARD MEETING ON AUGUST 15, 2017
Steve Jensen moved to approve the Minutes of the regular board meeting as written. Nikki
Willemssen seconded and the motion carried unanimously.
3. FINANCIAL REPORTS
a. Steve Jensen moved to approve City Center General Fund payments of $18,387.43 for
checks 8871 to 8878. Nikki Willemssen seconded and the motion carried unanimously.
b. Steve Jensen moved to approve City Center August 31, 2017 financial statements. Nikki
Willemssen seconded and the motion carried unanimously.
c. Steve Jensen moved to approve Park Towers operating account payments of $25,483.63 for
checks 14055 to 14084 and approve Park Towers Security Account payments of $528.75 for
checks 1556 to 1557. Gary Forcier seconded and the motion carried unanimously.
d. Steve Jensen moved to approve Park Towers July 2017 Financial Reports. Nikki Willemssen
seconded and the motion carried unanimously.
4. PARK TOWERS UPDATE
a. Occupancy Report -- 99% occupied.
b. Park Towers' August Newsletter: FYI
k. Nikki Willemssen moved to approve the Third Amendment to Option and Structure Lease
Agreement with AT&T. Steve Jensen seconded and the motion carried unanimously.
DOWNTOWN RENTAL REHAB PROJECT LOG
Jean Ward and Judy Flemming reviewed with the Board the Downtown Rental Rehab project
log.
4. PARK TOWERS UPDATE Continued
c. Chair Renee Lynn Johnson Kotlarz opened at 7:30 A.M. the PUBLIC HEARING
- Jean Ward reviewed 2018 PHA Annual Plan and 2018 Capital Fund Form 50075.1,
additions to 2017-2021 CFP 5 year -plan and review revisions to ACOP and Lease
VAWA provisions.
Gary Forcier moved to close the public hearing and Steve Jensen seconded.
With no comments, Chair Renee Lynn Johnson Kotlarz, closed the public hearing.
d. Steve Jensen moved to approve Resolution #2017-4 PHA Certification of Compliance with
PHA Plans and Related Regulations. Nikki Willemssen seconded and the motion carried
unanimously.
e. Nikki Willemssen moved to approve Resolution #2017-5 Civil Rights Certification HUD -
50077 -CR. Steve Jensen seconded and the motion carried unanimously.
f. Steve Jensen moved to approve the 2018 Capital Fund Plan and additions to 2017 -2421 CFP
5- Year Plan. Nikki Willemssen seconded and the motion carried unanimously.
September 19, 2017 Minutes Page l of 2
g. Steve Jensen moved to approve the revisions to ACOP and Lease VAWA Provisions. Gary
Forcier seconded and the motion carried unanimously.
h. Steve Jensen moved to approve Resolution #2017-6 to approve Park Towers' 2018 budget
Nikki Willemssen seconded and the motion carried unanimously.
i. Nikki Willemssen moved to approve Resolution #2017-7 to adopt Passbook Savings Rate
Procedure. Steve Jensen seconded and the motion carried unanimously.
j. Nikki Willemssen moved to approve no change in 2018 flat rent. Gary seconded and the
motion carried unanimously.
6. CONSIDERATION OF CITY TIF FUNDED LIVE AND WORK IN HUTCHINSON FOR
FIRST TIME HOMEBUYER WORKFORCE INITIATIVE TO COMMIT UP TO $100,000
OUT OF AN AVAILABLE BALANCE OF $380,000 AS OF 6/30/2017
Steve Jensen moved to approve the City TIF funded Live and Work in Hutchinson for first time
homebuyer workforce initiative and to commit up to $100,000 for the initiative with a maximum
loan of $5,000 per property. Nikki Willemssen seconded and the motion carried unanimously.
7. CONSIDERATION OF SUBORDINATION REQUEST FOR EVEN SCDP FARRELL LOAN
Nikki Willemssen moved to approve the subordination request for ENEN SCDP Farrell loan.
Steve Jensen seconded and the motion carried unanimously.
8. OTHER COMMUNICATIONS —
a. SOUTHWEST CONTINUUM OF CARE COMMITTEE MEETING MINUTES FROM
AUGUST 10, 2017 — McLeod Homeless Task Force - H.O.M.E (Hutchinson Options
McLeod Emergency Shelter) working with local landlord to use apartments to create
emergency shelter/transitional housing.
b. Highfield Apartments scheduled to open November I".
c. Look out for a Fair Housing Discrimination Hotline Scam. More information on HRA &
City website.
d. The McLeod County Tax Forfeiture Auction is November 16`h at 9:30AM
e. Jean Ward is working on a fund balance policy.
9. ADJOURNMENT
Steve Jensen moved to adjourn and Nikki Willemssen seconded. There being no other business,
Chair Renee Lynn Johnson Kotlarz declared the meeting adjourned.
Recorded by Jean Ward, HRA Executive Director
orcier, Secretary./Treasurer
September 19, 2017 Minutes Page 2 of 2
Planning, Zoning and Building Dept. Monthly Report
3rd Quarter 2017
Building Department Permit Activities
A Commercial New 1760 Butler Field Dr SW (New Airport Hanger) - $386,777; 210 Hassan St SE (Mid Country Bank Drive
B Through) -$50,000
Commercial/Ind. Remodel 1110 Hwy 7 W (Cenex Fueling Station) - $162,860; 1525 Montral St SE (Menards Remodel) -
$1,800,000; 1011 Hwy 15 S (Hutch Health Peds Rehab) - $424,042; 950 School Rd SW (Charter School
C remodel phase 2) - $250,000
New Single Family 1679 Mahogany Ct SW - $368,426; 730 Alaska Ct NW - $50,000; 1423 Herigage Ct NW - $211,217; 1427 Heritage Ct
NW - $145,151;1367 Heritage Ave NW - $198,645; 1412 Sherwood St SE - $186,552; 1418 Sherwood St SE -
$186,552; 1392 Bradford St SE - $291,823; 715 Park Island Dr SW - $243,682; 400 Toronto Blvd SE - $280,047; 1445
C.nIgnry I n SF - 037 643
Other Building Inspection Activities July 19, SW Chapter Meeting; September 20, SW Chapter Mtg.
Evergreen Meals served July - September
Week of
3rd Qtr. 2016
3rd Qtr. 2017
2016 Year to Date
2017 Year to Date
Total Number Inspections
Stewart
393
1036
160
904
282
2342
Total Number Plan Review
week
56
58
93
134
120
143
Building Permits Issued by Type
Number of Permits &
Valuation
Number of Permits &
Valuation
Year to Date Number
Permits & Valuation
Year to Date Number
Permits & Valuation
Commercial (new)
0
$0.00
2 $436,777.00
0
$0.00
8
$7,747,526.00
Commercial ( additions/remodels)
29
$6,197,310.00
23 $3,138,177.00 B
55
$6,763,362.00
57
$44,294,049.00
Total Commercial
29 $6,197,310.00
25 $3,574,954.00
55
$6,763,362.00
65 $52,041,575.00
Industrial (new)
0
$0.00
0 $0.00
0
$0.00
0
Industrial (additions/remodels)
0
$0.00
1 $10,000.00
0
$0.00
6
$632,767.00
Total Industrial
0
$0.00
1 $10,000.00
0
$0.00
6
$632,767.00
Fire Sprinkling
1
$11,536.00
5 $116,259.00
2
$12,486.00
17
$177,419.00
New Residential
12
$2,168,522.00
11 $2,299,738.00
18
$3,412,840.00
23
$4,557,022.00
Residential mist (additions/remodels)
39
$236,748.00
48 $558,459.00
97
$632,071.00
107
$1,017,206.00
Set Fee permits (reside, reroof, window)
1621
534
3871
1490
HRA Permits
2
$45,710.00
4 $392,100.00
3
$45,710.00
8
$452,700.00
Waived Fees
0
$0.00
0 $0.00
0
$0.00
0
$0.00
Subtotal Building Permits 245 $8,659,826.00
628 $6,951,510.00
562
$10,866,469.00 1716 $58,878,689.00
Mechanical
53
$346,775.00
74 $949,487.00
137
$564,413.00
1711
$6,136,582.00
HRA Mechanical
2
$18,200.00
1 $0.00
5
$19,100.00
2
Plumbing
36
$0.00
28 $0.00
69
81
HRA Plumbing
0
$0.00
11$0.00
1
2
Total Valuation
336 $9,024,801.00 732 $7,900,997.00
774
$11,449,982.00 19721 $65,015,271.00
*Set fees not included in valuation
A Commercial New 1760 Butler Field Dr SW (New Airport Hanger) - $386,777; 210 Hassan St SE (Mid Country Bank Drive
B Through) -$50,000
Commercial/Ind. Remodel 1110 Hwy 7 W (Cenex Fueling Station) - $162,860; 1525 Montral St SE (Menards Remodel) -
$1,800,000; 1011 Hwy 15 S (Hutch Health Peds Rehab) - $424,042; 950 School Rd SW (Charter School
C remodel phase 2) - $250,000
New Single Family 1679 Mahogany Ct SW - $368,426; 730 Alaska Ct NW - $50,000; 1423 Herigage Ct NW - $211,217; 1427 Heritage Ct
NW - $145,151;1367 Heritage Ave NW - $198,645; 1412 Sherwood St SE - $186,552; 1418 Sherwood St SE -
$186,552; 1392 Bradford St SE - $291,823; 715 Park Island Dr SW - $243,682; 400 Toronto Blvd SE - $280,047; 1445
C.nIgnry I n SF - 037 643
Other Building Inspection Activities July 19, SW Chapter Meeting; September 20, SW Chapter Mtg.
Evergreen Meals served July - September
Week of
Hutchinson
Park
Towers
Silver Lake
Glencoe
Brownton
Stewart
week
632
160
63
282
115
120
week
817
294
93
421
120
236
week
828
328
89
438
115
275
week
1097
372
210
762
193
278
week
564
195
71
384
211
144
3938
1349
526
2287
754
1053
Total Meals served April - June 9907
Dates Closed July 3, 4; September 4
Planning and Zoning Quarterly Activities Year: 3rd Quarter, 2017
Activity
Number
Additional Info.
Number of Planning Applications Reviewed and
7
Consideration of a Conditional Use Permit
Processed
to move in a detached garage in a C-3
zoning district located at 234 Jefferson St
SE; consideration of a Site Plan and
Variance to reduce parking stall size and
street right-of-way setback for a hotel
located at 416 Prospect St NE;
Consideration of an Amendment to the City
Code of Ordinances, Chapter 154:
Dynamic Signs; Consideration of a 2 lot
Preliminary and Final Plat for LJM Addition
located at 579 2nd Ave SE; Consideration
of a Conditional Use Permit for a Brewery
and Tap Room in a C-4 zoning district
located at 900 Hwy 15 S; Consideration of
a Vacation of ROW on Lots 3, 4 and 5
Block 1 Bridewater Estates 2nd Addition;
Consideration of a Conditional Use Permit
for light manufacturing of automotive
aftermarket parts in an I/C zoning district.
Number of Joint Planning Board Applications
2
Consideration of a Conditional Use
Reviewed and Processed
Permit for a Feedlot located at 21416
Hwy 15 N, Section 19, Hutchinson
Township; Consideration of Sketch
Plan for lot splits in Woodview Acres,
Section 25, Acoma Township.
Number of Planning Commission Meetings
3
Consideration of a Variance to reduce side
and rear setback from 6 feet to 3 feet to
construct new detached garage on existing
site located at 436 Hassan St SE;
Consideration of a Variance to reduce the
corner side setback from25 feet to 11.4
feet to rebuild a detached garage located
at 605 Lynn Rd SW; Consideration of a
Preliminary/Final Plat and a Conditional
Use Permit to construct a new building and
an addition to the existing building located
at 579 2nd Ave SE; Consideration of a
Conditional Use Permit to move in a
detached garage in a C-3 zoning district
located at 234 Jefferson St SE;
consideration of a Site Plan and Variance
to reduce parking stall size and street right-
of-way setback for a hotel located at 416
Prospect St NE; Consideration of an
Amendment to the City Code of
Ordinances, Chapter 154: Dynamic Signs;
Consideration of a Conditional Use
Permit for a Feedlot located at 21416
Hwy 15 N, Section 19, Hutchinson
Township; Consideration of Sketch
Plan for lot splits in Woodview Acres,
Section 25, Acoma Township.
Number of Joint Planning Meetings
2
Consideration of a Conditional Use
Permit for a 30' x 38' accessory
structure in front of house line located
at 20449 Ko lin Rd, Section 26,
Acoma Twnshp; Consideration of a
Variance for feedlot less than '/4 mile
from neighboring property located at
21416 Hwy 15 N, Section 19,
Hutchinson Twnshp; Consideration of
a Final Plat located at Maurer Heights,
Section 15, Lynn Twnshp;
Consideration of a Conditional Use
Permit for a Feedlot located at 21416
Hwy 15 N, Section 19, Hutchinson
Township; Consideration of Sketch
Plan for lot splits in Woodview Acres,
Section 25, Acoma Township.
Number of Zoning Reviews for Building Permits
35
(Compliance with Zoning Code
Number of Land Use Permits Issued - (Fences,
50
small sheds, patios, driveways, detached decks, etc.)
Number of Zoning Review for Sign Permits
15
Number of Predevelopment/Pre Application
7
Larry Murphy, KFC Redevelopment,
Meetings
Hotel, Brewery, Uponor, Manufacturing
Compan
Number of Misc. Planning Meetings
46
City Council - 4
PBZ Staff Mtg - 6
Directors Mtg - 5
Facility Update-3
Resource Allocation - 2
Facilities Plan & 2016 Energy Use
Planning Staff mtg - 2
John Lofdahl
Larry Murphy
430Water St
Mike Corcoran
Tour Tax Forfeiture Properties
KFC Redevelopment
Chad Czmowski
Core Planning
2020 Census
Hotel One-stop-shop
Doug Hanneman
Public Arts - 2
DNR
Jerry Gassman
Dan Hart
Land Use Training (Bloomington)
Betsy Price
Uponor Stie Mtg
MITGI
Dennis Goebel
Brewery
Planning Conference (Mankato)
Number of Zoning Enforcement Cases
9
Hwy 15 S
Number of Walk-In Customers Served
993
Site Visits 10 430 Water St, Caribou, HHS, 110 N
High Dr, WCI Bldg, 460 Rose Ln
HUTCHINSON CITY COUNCIL
c`=y-f 0' a_ �
Request for Board Action
79 M-W
Agenda Item: September 2017 Financial and Investment Reports
Department: Finance
LICENSE SECTION
Meeting Date: 10/24/2017
Application Complete N/A
Contact: Andy Reid
Agenda Item Type:
Presenter:
Reviewed by Staff ❑
Governance
Time Requested (Minutes): 0
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
For Council review, attached are the September Financial Reports for the general fund and enterprise funds. Also
attached is the September Investment Report.
Feel free to contact me with any questions. Thank you.
BOARD ACTION REQUESTED:
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
REVENUE AND EXPENDITURE REPORT for CITY of HUTCHINSON
PERIOD ENDING SEPTEMBER 30, 2017
TOTAL REVENUES 1,053,071 7,792,328 12,300,128 4,507,800 63.4 6,638,452 11,463,235 57.9
Wages & Benefits
870,655
5,961,656
8,175,052
2,213,396
2017
5,444,719
7,595,480
2016
Supplies
2017 ACTUALS
2017
AVAILABLE
% BDGT
2016 YTD
2016
% BDGT
55.3
SEPTEMBER
YTD
BUDGET
BALANCE
USED
ACTUAL
BUDGET
USED
General Fund
Miscellaneous Expenses
25,250
201,728
552,075
350,347
36.5
189,200
525,226
Taxes
-
2,533,570
4,763,796
2,230,226
53.2
2,280,967
4,581,035
49.8
Other Taxes
10,646
165,116
300,000
134,884
55.0
158,641
272,000
58.3
Licenses & Permits
50,299
624,056
283,550
(340,506)
220.1
209,314
271,500
77.1
Intergovernmental Revenue
284,323
1,414,167
1,423,830
9,663
99.3
1,277,968
1,284,330
99.5
Charges for Services
98,500
1,803,980
2,817,291
1,013,311
64.0
1,439,254
2,350,666
61.2
Miscellaneous Revenues
6,618
192,359
339,500
147,141
56.7
143,898
291,300
49.4
Transfers -In
598,166
1,021,355
2,292,161
1,270,806
44.6
1,097,139
2,332,404
47.0
Fines & Forfeitures
4,519
37,725
55,000
17,275
68.6
31,273
55,000
56.9
Capital Contributions
-
-
25,000
25,000
-
-
25,000
-
TOTAL REVENUES 1,053,071 7,792,328 12,300,128 4,507,800 63.4 6,638,452 11,463,235 57.9
Wages & Benefits
870,655
5,961,656
8,175,052
2,213,396
72.9
5,444,719
7,595,480
71.7
Supplies
50,674
631,806
866,545
234,739
72.9
426,230
770,593
55.3
Services & Charges
151,618
1,678,718
2,596,456
917,738
64.7
1,867,426
2,461,936
75.9
Miscellaneous Expenses
25,250
201,728
552,075
350,347
36.5
189,200
525,226
36.0
Transfers -Out
50,000
100,000
100,000
-
100.0
99,755
600,000
16.6
Capital Outlay
-
5,623
10,000
4,378
56.2
5,024
10,000
50.2
TOTAL EXPENDITURES
1,148,196
8,579,530
12,300,128
3,720,598
69.8
8,032,353
11,963,235
67.1
NET REVENUE
(95,126)
(787,202)
-
787,202
(1,393,901)
(500,000)
Comments
Revenues:
Licenses & Permits Building permit revenue is driving the positive results in this category for the year.
Intergovernmental Revenue The increase from 2016 is due to higher LGA needed to offset the reduced HUC PILOT transfer for 2017.
We are using $1,000,000 of LGA in 2017 compared to $862,500 in 2016.
Charges for Services The increase from 2016 is due to new revenue from the Waterpark operations.
Miscellaneous Revenues The increase from 2016 is due to the Ag Systems donation toward the body camera program ($40K).
Transfers -In The decrease from 2016 is due to HUC's drop in operating revenue for 2015 when applied to the 2.75% PILOT calculation.
Expenditures:
Wages & Benefits The increase from 2016 is due to new expense to staff the Waterpark operations.
Services & Charges The decrease from 2016 is due to the timing in payment of the 3rd & 4th quarter insurance premiums. The League's new
software system caused delays in processing our 7/1/2017 policy renewal, delaying the premium payment to October.
REVENUE AND EXPENDITURE REPORT for CITY of HUTCHINSON
PERIOD ENDING SEPTEMBER 30, 2017
2017 ACTUALS
SEPTEMBER YTD
General Fund Expense by Department
2017 2016
2017 AVAILABLE % BDGT 2016 YTD 2016 % BDGT
BUDGET BALANCE USED ACTUAL BUDGET USED
Mayor & City Council
4,848
29,127
49,962
20,835
58.3
24,466
44,290
55.2
City Administrator
42,872
297,551
395,266
97,715
75.3
286,143
430,251
66.5
Elections
-
-
6,850
6,850
-
5,000
15,950
31.3
Finance Department
28,786
258,087
355,653
97,566
72.6
272,145
361,468
75.3
Motor Vehicle
25,863
161,424
217,890
56,466
74.1
160,880
203,836
78.9
Assessing
-
-
46,496
46,496
-
60,953
60,911
100.1
Legal
28,940
213,006
294,100
81,094
72.4
201,043
288,193
69.8
Planning
16,390
112,638
151,585
38,947
74.3
77,999
149,972
52.0
Information Services
46,962
363,138
535,168
172,030
67.9
348,473
504,738
69.0
City Hall Building
16,281
122,680
173,368
50,688
70.8
80,411
131,322
61.2
Police Department
332,473
2,304,008
3,216,585
912,577
71.6
2,223,150
3,062,565
72.6
Hospital Security
31,962
211,949
296,977
85,028
71.4
206,278
293,886
70.2
Emergency Management
224
21,595
10,000
(11,595)
216.0
5,385
12,800
42.1
Safety Committee
-
9,896
10,000
104
99.0
8,600
9,500
90.5
Fire Department
34,624
225,390
343,461
118,071
65.6
210,989
306,733
68.8
Protective Inspections
26,822
183,077
236,552
53,475
77.4
182,157
227,556
80.0
Engineering
47,786
319,201
418,877
99,676
76.2
290,384
402,714
72.1
Streets & Alleys
171,303
1,078,715
1,548,036
469,321
69.7
1,071,930
1,517,341
70.6
Park/Recreation Administration
23,747
177,626
233,898
56,272
75.9
177,045
222,323
79.6
Recreation
27,619
179,682
232,724
53,042
77.2
164,640
234,397
70.2
Senior Citizen Center
8,057
64,213
84,801
20,588
75.7
62,558
83,747
74.7
Civic Arena
21,460
220,583
333,284
112,701
66.2
207,832
323,727
64.2
Park Department
78,928
688,205
879,100
190,895
78.3
674,804
852,751
79.1
Recreation Building
48,503
157,801
211,726
53,925
74.5
120,855
170,818
70.8
Events Center
20,940
172,775
259,478
86,703
66.6
174,546
243,017
71.8
Evergreen Building
1,628
17,508
26,225
8,717
66.8
15,839
25,450
62.2
Library
3,124
153,454
211,842
58,388
72.4
153,234
206,365
74.3
Waterpark
16,344
404,645
424,753
20,108
95.3
-
-
-
Cemetery
12,879
91,359
132,974
41,615
68.7
106,049
130,785
81.1
Airport
3,488
73,144
103,679
30,535
70.5
68,224
104,635
65.2
Unallocated General Expense
25,343
267,054
858,818
591,764
31.1
390,344
1,341,194
29.1
TOTAL EXPENDITURES
1,148,196
8,579,530
12,300,128
3,720,598
69.8
8,032,353
11,963,235
67.1
Liquor Fund
Sales
Miscellaneous Revenues
TOTAL REVENUES
Cost of Sales
Wages & Benefits
Supplies
Services & Charges
Miscellaneous Expenses
Transfers -Out
Capital Outlay
Depreciation Expense
Debt Service
TOTAL EXPENDITURES
NET REVENUE
REVENUE AND EXPENDITURE REPORT for CITY of HUTCHINSON
PERIOD ENDING SEPTEMBER 30, 2017
2017 ACTUALS
SEPTEMBER YTD
2017 2016
2017 AVAILABLE % BDGT 2016 YTD 2016 % BDGT
BUDGET BALANCE USED ACTUAL BUDGET USED
506,632
4,503,506
6,123,000
1,619,494
73.6
4,354,864
5,868,000
74.2
39
1,803
4,000
2,197
45.1
2,006
3,000
66.9
506,671
4,505,309
6,127,000
1,621,691
73.5
4,356,870
5,871,000
74.2
374,778
3,399,182
4,591,390
1,192,208
74.0
3,301,687
4,398,810
75.1
71,072
451,259
662,377
211,118
68.1
409,767
568,211
72.1
3,277
10,604
24,250
13,646
43.7
14,745
17,400
84.7
18,638
153,173
218,550
65,377
70.1
155,240
198,350
78.3
-
3,895
5,850
1,955
66.6
3,901
5,650
69.0
-
500,000
500,000
-
-
475,000
-
20,000
20,000
9,685
20,000
48.4
80,000
80,000
-
80,200
-
-
-
127,635
127,635
-
-
128,055
-
467,765
4,018,114
6,230,052
2,211,938
64.5
3,895,024
5,891,676
66.1
38,906
487,195
(103,052)
(590,247)
461,846
(20,676)
September Sales
2017
Year to Date Sales
Change
Comments
2017
2016
Change
Liquor Sales Revenue: Liquor
1,482,579
1,450,435
2.2%
Beer
2,260,094
2,181,422
3.6%
Wine
662,227
639,147
3.6%
Other
98,606
83,860
17.6%
-2.4%
4,503,506
4,354,864
3.4%
Customer Count
181,364
174,465
4.0%
Average Sale per Customer $
24.83 $
24.96
-0.5%
Gross Margin on Sales
24.5%
25.0%
Labor to Sales Ratio
10.0%
10.8%
September Sales
2017
2016
Change
164,791
160,237
2.8%
257,622
239,936
7.4%
72,287
64,226
12.6%
11,932
8,853
34.8%
506,632
473,252
7.1%
21,060
19,191
9.7%
$ 24.06 $
24.66
-2.4%
24.2% 25.0%
9.4% 9.7%
REVENUE AND EXPENDITURE REPORT for CITY of HUTCHINSON
PERIOD ENDING SEPTEMBER 30, 2017
2017 ACTUALS
SEPTEMBER YTD
2017 2016
2017 AVAILABLE % BDGT 2016 YTD 2016 % BDGT
BUDGET BALANCE USED ACTUAL BUDGET USED
Water Fund
Year to Date Sales
Comments
2017 2016
Change
Water Sales Revenue: Residential
853,168 853,611
-0.1%
Sales
229,785
1,839,206
2,384,950
545,744
77.1
1,765,382
2,306,000
76.6
Local Sales Tax
73,796
397,373
625,000
227,627
63.6
330,576
685,000
48.3
Intergovernmental Revenue
-
-
-
-
-
500
-
-
Charges for Services
2,103
46,416
50,000
3,584
92.8
56,198
50,000
112.4
Miscellaneous Revenues
3,640
26,124
92,000
65,876
28.4
18,522
85,000
21.8
Capital Contributions
-
-
-
-
-
-
-
-
TOTAL REVENUES
309,324
2,309,120
3,151,950
842,831
73.3
2,171,178
3,126,000
69.5
Wages & Benefits
59,801
354,353
461,635
107,282
76.8
350,158
479,983
73.0
Supplies
13,460
90,459
126,600
36,141
71.5
91,285
122,400
74.6
Services & Charges
38,630
332,969
522,250
189,281
63.8
373,700
507,350
73.7
Miscellaneous Expenses
704
7,824
12,200
4,376
64.1
10,675
13,500
79.1
Transfers -Out
-
-
60,000
60,000
-
-
43,145
-
CapitalOutlay
32,118
54,034
250,000
195,966
21.6
47,366
250,000
18.9
Depreciation Expense
-
-
1,205,000
1,205,000
-
-
1,150,000
-
Debt Service
-
1,345,961
1,481,305
135,344
90.9
1,262,363
1,408,611
89.6
TOTAL EXPENDITURES
144,712
2,185,601
4,118,990
1,933,389
53.1
2,135,547
3,974,989
53.7
NET of REVENUES & EXPENDITURES
164,612
123,519
(967,040)
(1,090,559)
35,630
(848,989)
Year to Date Sales
Comments
2017 2016
Change
Water Sales Revenue: Residential
853,168 853,611
-0.1%
Commercial
270,890 283,873
-4.6%
Industrial
265,150 231,413
14.6%
Base Charge
314,907 313,571
0.4%
WAC Charge
78,540 22,750
245.2%
Other
56,552 60,164
-6.0%
Total
1,839,206 1,765,382
4.2%
Local Sales Tax YTD local sales tax
revenue includes a final accounting of the June sales tax and the estimated tax for July.
REVENUE AND EXPENDITURE REPORT for CITY of HUTCHINSON
PERIOD ENDING SEPTEMBER 30, 2017
2017 ACTUALS
SEPTEMBER YTD
2017 2016
2017 AVAILABLE % BDGT 2016 YTD 2016 % BDGT
BUDGET BALANCE USED ACTUAL BUDGET USED
Sewer Fund
Year to Date Sales
Comments
2017 2016
Change
Sewer Sales Revenue: Residential
1,171,856 1,204,698
-2.7%
Sales
269,958
2,482,513
3,330,000
847,487
74.5
2,406,621
3,213,000
74.9
Local Sales Tax
73,796
397,373
625,000
227,627
63.6
330,576
685,000
48.3
Intergovernmental Revenue
-
-
-
-
-
-
-
-
Licenses & Permits
5,100
6,500
1,400
78.5
5,200
7,000
74.3
Charges for Services
-
5,963
3,500
(2,463)
170.4
1,295
4,000
32.4
Miscellaneous Revenues
3,954
45,630
123,000
77,370
37.1
30,368
117,000
26.0
Capital Contributions
-
-
-
-
-
-
-
-
TOTAL REVENUES
347,708
2,936,580
4,088,000
1,151,420
71.8
2,774,060
4,026,000
68.9
Wages & Benefits
60,768
407,168
655,584
248,416
62.1
457,146
622,085
73.5
Supplies
5,628
100,696
219,650
118,954
45.8
139,154
236,100
58.9
Services & Charges
63,673
543,106
780,450
237,344
69.6
620,135
742,550
83.5
Miscellaneous Expenses
-
19,740
32,500
12,760
60.7
30,523
24,500
124.6
Transfers -Out
-
-
60,000
60,000
-
-
43,145
-
CapitalOutlay
165,199
288,881
350,000
61,119
82.5
276,930
350,000
79.1
Depreciation Expense
-
-
1,623,000
1,623,000
-
-
1,530,000
-
Debt Service
-
1,344,895
1,460,650
115,755
92.1
1,439,408
1,568,854
91.7
TOTAL EXPENDITURES
295,269
2,704,486
5,181,834
2,477,348
52.2
2,963,295
5,117,234
57.9
NET of REVENUES & EXPENDITURES
52,439
232,094
(1,093,834)
(1,325,928)
(189,235)
(1,091,234)
Year to Date Sales
Comments
2017 2016
Change
Sewer Sales Revenue: Residential
1,171,856 1,204,698
-2.7%
Commercial
328,540 337,804
-2.7%
Industrial
592,485 547,594
8.2%
Base Charge
274,067 272,344
0.6%
SAC Charge
103,224 29,900
245.2%
Other
12,341 14,281
-13.6%
Total
2,482,513 2,406,621
3.2%
Local Sales Tax YTD local sales tax revenue includes a final accounting of the June sales tax and the estimated tax for July.
REVENUE AND EXPENDITURE REPORT for CITY of HUTCHINSON
PERIOD ENDING SEPTEMBER 30, 2017
Wages & Benefits
21,535
128,316
188,733
60,417
2017
120,172
190,804
2016
Supplies
2017 ACTUALS
2017
AVAILABLE
% BDGT
2016 YTD
2016
% BDGT
45.5
SEPTEMBER
YTD
BUDGET
BALANCE
USED
ACTUAL
BUDGET
USED
Refuse Fund
Miscellaneous Expenses
-
1,253
5,750
4,497
21.8
2,711
3,750
Sales
99,542
886,084
1,193,300
307,216
74.3
873,905
1,149,500
76.0
Intergovernmental Revenue
-
6,172
12,500
6,328
49.4
5,900
12,500
47.2
Miscellaneous Revenues
955
6,969
7,000
31
99.6
4,657
2,500
186.3
TOTAL REVENUES
100,497
899,225
1,212,800
313,575
74.1
884,461
1,164,500
76.0
Wages & Benefits
21,535
128,316
188,733
60,417
68.0
120,172
190,804
63.0
Supplies
4,799
33,533
62,400
28,867
53.7
28,382
62,400
45.5
Services & Charges
58,689
467,904
731,550
263,646
64.0
468,202
704,727
66.4
Miscellaneous Expenses
-
1,253
5,750
4,497
21.8
2,711
3,750
72.3
Transfers -Out
-
805,000
805,000
-
-
55,000
-
CapitalOutlay
190,374
190,374
36,760
95,000
38.7
Depreciation Expense
-
138,000
138,000
-
-
124,000
-
Debt Service
-
23,680
24,261
581
97.6
23,124
24,260
95.3
TOTAL EXPENDITURES
85,023
654,686
2,146,068
1,491,382
30.5
679,351
1,259,941
53.9
NET of REVENUES & EXPENDITURES
15,474
244,539
(933,268)
(1,177,807)
205,110
(95,441)
REVENUE AND EXPENDITURE REPORT for CITY of HUTCHINSON
PERIOD ENDING SEPTEMBER 30, 2017
Debt Service The new expenditure for 2017 is related to the financing of the Rotochopper grinder that was purchased in early August. The
financing agreement is for five years with the principal payments in advance, not in arrears. This first debt payment for 2017
is all principal and no interest.
2017
2016
2017 ACTUALS
2017
AVAILABLE
% BDGT
2016 YTD
2016
% BDGT
SEPTEMBER
YTD
BUDGET
BALANCE
USED
ACTUAL
BUDGET
USED
Compost Fund
Sales
18,748
1,770,213
1,991,476
221,263
88.9
1,960,706
1,636,796
119.8
Charges for Services
5,135
17,352
58,500
41,149
29.7
12,026
58,500
20.6
Miscellaneous Revenues
1,890
12,804
7,000
(5,804)
182.9
34,317
6,000
572.0
TOTAL REVENUES
25,773
1,800,369
2,056,976
256,607
87.5
2,007,050
1,701,296
118.0
Cost of Sales
11,600
1,152,420
1,348,002
195,582
85.5
1,267,752
1,117,265
113.5
Inventory Cost Adjustment
(89,006)
(445,143)
(538,028)
(92,885)
82.7
(317,679)
(525,746)
60.4
Wages & Benefits
66,887
423,679
582,363
158,684
72.8
415,497
559,899
74.2
Supplies
11,289
57,666
78,626
20,960
73.3
60,561
70,257
86.2
Services & Charges
38,510
220,727
231,004
10,277
95.6
180,950
188,573
96.0
Miscellaneous Expenses
230
7,362
14,000
6,638
52.6
6,294
13,500
46.6
Transfers -Out
-
-
110,000
110,000
-
-
110,000
-
CapitalOutlay
623,000
623,000
157,162
150,000
104.8
Depreciation Expense
-
174,000
174,000
-
134,000
-
Debt Service
-
87,833
-
(87,833)
-
-
-
-
TOTAL EXPENDITURES
39,511
1,504,545
2,622,967
1,118,422
57.4
1,770,537
1,817,748
97.4
NET of REVENUES & EXPENDITURES
(13,739)
295,824
(565,991)
(861,815)
236,513
(116,452)
Year to Date Sales
Comments
2017
2016
Change
Compost Sales
Bagged
1,515,708
1,577,163
-3.9%
Bulk
138,014
230,609
-40.2%
Other
116,491
152,934
-23.8%
Total
1,770,213
1,960,706
-9.7%
Bulk sales is down mainly due to having no bitcon inventory over the
summer. We should see some late season bitcon
sales
after the October crushing of 26,000 tons of concrete and blacktop, adding 20,000 yards of bitcon to inventory.
Debt Service The new expenditure for 2017 is related to the financing of the Rotochopper grinder that was purchased in early August. The
financing agreement is for five years with the principal payments in advance, not in arrears. This first debt payment for 2017
is all principal and no interest.
REVENUE AND EXPENDITURE REPORT for CITY of HUTCHINSON
PERIOD ENDING SEPTEMBER 30, 2017
2017 ACTUALS
SEPTEMBER YTD
2017 2016
2017 AVAILABLE % BDGT 2016 YTD 2016 % BDGT
BUDGET BALANCE USED ACTUAL BUDGET USED
Storm Water Utility
Sales
74,067
664,848
881,475
216,627
75.4
641,792
855,867
75.0
Licenses & Permits
705
4,540
1,500
(3,040)
302.7
2,900
-
-
Charges for Services
-
560
-
(560)
-
-
-
-
Miscellaneous Revenues
1,965
11,325
7,000
(4,325)
161.8
10,253
7,000
146.5
Capital Contributions
-
-
-
-
-
-
-
-
TOTAL REVENUES
76,737
681,273
889,975
208,702
76.5
654,945
862,867
75.9
Wages & Benefits
26,587
178,159
256,432
78,273
69.5
169,023
243,986
69.3
Supplies
666
11,356
38,800
27,444
29.3
9,651
43,925
22.0
Services & Charges
50,045
167,986
163,600
(4,386)
102.7
100,805
164,100
61.4
Miscellaneous Expenses
-
3,970
11,250
7,280
35.3
8,621
11,250
76.6
Transfers -Out
-
-
-
-
-
-
-
CapitalOutlay
15,337
170,000
154,663
9.0
120,000
Depreciation Expense
-
153,000
153,000
-
-
133,000
Debt Service
-
148,950
160,550
9,867
93.5
145,633
150,850
70.2
TOTAL EXPENDITURES
77,298
525,758
953,632
426,141
55.1
433,734
867,111
50.0
NET of REVENUES & EXPENDITURES
(561)
155,515
(63,657)
(217,439)
221,211
(4,244)
REVENUE AND EXPENDITURE REPORT for CITY of HUTCHINSON
PERIOD ENDING SEPTEMBER 30, 2017
Wages & Benefits
2,863
18,293
39,495
21,202
2017
24,842
59,470
2016
Supplies
2017 ACTUALS
2017
AVAILABLE
% BDGT
2016 YTD
2016
% BDGT
30.4
SEPTEMBER
YTD
BUDGET
BALANCE
USED
ACTUAL
BUDGET
USED
HATS Operation
Miscellaneous Expenses
25
25
5,600
5,575
0.4
-
5,171
Intergovernmental Revenue
6,650
100,947
162,280
61,333
62.2
97,206
156,045
62.3
Charges for Services
18,462
169,142
325,000
155,858
52.0
168,373
530,000
31.8
Miscellaneous Revenues
136
1,230
3,500
2,270
35.1
856
3,150
27.2
Transfers -In
50,000
100,000
100,000
-
100.0
99,755
99,755
100.0
TOTAL REVENUES
75,248
371,318
590,780
219,462
62.9
366,191
788,950
46.4
Wages & Benefits
2,863
18,293
39,495
21,202
46.3
24,842
59,470
41.8
Supplies
35,122
203,063
341,650
138,587
59.4
160,817
528,600
30.4
Services & Charges
18,134
95,511
162,000
66,489
59.0
102,720
161,200
63.7
Miscellaneous Expenses
25
25
5,600
5,575
0.4
-
5,171
-
CapitalOutlay
-
4,863
42,035
37,172
11.6
-
33,600
-
TOTAL EXPENDITURES
56,145
321,755
590,780
269,025
54.5
288,378
788,041
36.6
NET of REVENUES & EXPENDITURES
19,103
49,563
-
(49,563)
77,813
909
Comments
Charges for Services The main activity in this category is the sale of fuel to City departments, the State, County and Hutchinson Utilities.
Supplies The main activity in this category is the cost of fuel for the fueling system.
Oppenheimer & Co. Inc.
PPENIEIMER 85 Broad ewYorsNY STATEMENT OF
New York, NY 10004
(212) 668-8000 ACCOUNT
Transacts Business on All Principal Exchanges Svc
News and Information
Assets maturing during the next 60 days appear at the end of this statement.
Please see the last page of this statement for important information from Oppenheimer & Co.
Inc., including the availability of our Statement of Financial Condition as of June 30, 2017.
A document entitled "Information for Senior Investors" appears immediately following this
statement.
Portfolio Summary
Net Value of Accrued Interest $58,412.11 $51,819.81
Total Asset Value does not include Direct Investments, Accrued Interest or unpriced securities_
Eligible for FDIC insurance up to standard maximum insurance amounts, Not SIPC insured.
Cash Activity Summary
Opening Cash Balance
This
Previous
Estimated
Net Miscellaneous Credits/Debits
Period
Period
Annual Income
Net Advantage Bank Deposit Activity
09/30/17
08/31/17
$0.00
Advantage Bank Deposits*
$0.01
$771.92
$0.00
Mutual Funds
7,926,070.37
8,639,184.16
72,444.28
Government Agency Bonds
3,392,339.00
3,398,341.00
55,000.00
Municipal Bonds
2,977,925.00
2,994,655.00
70,010.00
Certificates of Deposit
8,551,448.21
7,821,154.02
139,753.50
Total Asset Value
$22,847,782.59
$22,854,106.10
$337,207.78
Net Value of Accrued Interest $58,412.11 $51,819.81
Total Asset Value does not include Direct Investments, Accrued Interest or unpriced securities_
Eligible for FDIC insurance up to standard maximum insurance amounts, Not SIPC insured.
Cash Activity Summary
Opening Cash Balance
$0.00
Net Buy and Sell Transactions
-15,022.30
Net Miscellaneous Credits/Debits
-6,252.41
Net Income Activity
20,502.80
Net Advantage Bank Deposit Activity
771.91
Closina Cash Balance
$0.00
Account Number: D25-5019707 Tax ID Number: ON FILE
For the Period: 09/01/17 - 09/30/17 Last Statement: 08/31/17
Page 1 of 13
CITY OF HUTCHINSON MINNESOTA
111 HASSAN ST SE
HUTCHINSON MN 55350-2522
Financial Advisor Office Serving Your Account
SULLIVAN/SULLIVAN 50 SOUTH SIXTH STREET
X2J SUITE 1300
(800) 258-3387 MINNEAPOLIS, MN 55402
Internet Address: www.opco.com
Income Summary
Reportable This Period Year to Date
Advantage Bank Dep Interest
$0.02
$0.22
Corporate Accrued Int Received
0.00
276.85
Corporate Interest
13,638.87
56,624.01
Municipal Interest
0.00
13,362.50
Government Interest
0.00
19,812.50
Dividends
6,863.91
18,994.87
Total Reportable
$20,502.80
$109,070.95
PPENHEIMFP,
TOTAL POSITIONS
PORTFOLIO OVERVIEW
Multiple Portfolios
report as of 10/2/17
POSITIONS INCLUDED IN PORTFOLIO ANALYSIS
Original Face Value
$15,119,000.00
Current Face Value
$15,119,000.00
Estimated Portfolio Totals
Estimated Portfolio Averages
Est Annual Income
$269,563.50
Original Face Value
$15,119,000.00
Coupon
1.78%
Valid Positions
47
Current Face Value
$15,119,000.00
Maturity
3.53 yrs
Exceptions
1
Market Value
$15,081,676.21
Effective Maturity
2.64 yrs
Total Positions
48
Accrued Interest
$61,456.16
Modified Duration
2.52
Includes all positions with recognized CUSIP and valid quantity provided
Total Market Value
$15,143,132.37
Yield to Maturity
2.09%
Please see exception report for positions not included in reports.
Yield to Worst
1.91
POSITIONS W/ MARKET PRICE
Positions
47 of 47
Market Price
99.75
Priced Orig. Face Value
$15,119,000.00
Rating
Priced Current Face Value
$15,119,000.00
a
a
a
Priced Positions
47 of 47
Priced Market Principal
$15,081,676.21
Average Coupon
1.78%
Average Price
99.75
Includes all positions with recognized CUSIP, quantity and market price on report date
Original Face: the original dollarvalue at issuance
Current Face: the dollarvalue afterthe current factor is applied
Includes all positions with recognized CUSIP, quantity, market price and derived calculations on report date.
Coupon and Market Price weighted by Current Face Value, all others weighted by Market Value.
Please see the last page of this report for detail.
Page 2 of 41
PPENHEIMEI, PORTFOLIO SUMMARY - CURRENT FACE VALUE WEIGHTED - ALL SECURITY TYPES
Multiple Portfolios
report as of 1012117
PORTFOLIO SUMMARY
Portfolio Totals Fed Exempt
Fed Taxable
Current Face Value -
$15,119,000
Positions -
47
Accrued Interest -
$61,456
Est Annual Income -
$269,564
* Portfolio Average
22.5%
Avg Coupon Rate -
1.783%
Avg Maturity -
3.5yrs
* Current Face Value -weighted.
For Avo Maturity calculations, Deroetual securities assume 40
Current Face Value -weighted
PORTFOLIO RATING SUMMARY
RATING DISTRIBUTION
HOLDINGS BY SECURITY TYPE
Total
Positions Face (000)
0/b Face
$15,119,000
Agency
5 $3,400.0
22.5%
47 of 47
Asset Backed
- -
-
$61,456
CD
36 $8,719.0
57.7%
$269,564
CEF
- -
-
CMO
AA 4 $2,000.0 13.2%
A
m
Corp
-
-
1.783%
Muni
6 $3,000.0
19.8%
3.5yrs
Pass Thru
- -
-
Preferred
0
Treas
-
-
Total
47 $15,119.0
100.0
Current Face Value -weighted
PORTFOLIO RATING SUMMARY
RATING DISTRIBUTION
**Ratina Positions Face (000) % Face
AAA
zs
AAA 7 $4,400.0 29.1%
m
> AA
u
13
AA 4 $2,000.0 13.2%
A
m
BAA
u A
0
Below BAA - - -
v BAA
O1
NR 36 $8,719.0 57.7%
M
Below
Total 47 $15,119.0 100.0%
u BAA
v
a
NR
0 10 20 30 40 s0 60
** Best of Short/Long term equivalent Moody's or Standard & Poor's Rating. Current Face Value -weighted.
Best of Short/Long term equivalent Moody's or Standard & Poor's Rating. Current Face Value -weighted.
Please see the last page of this report for detail.
Page 4 of 41
PPEPIHEI IEP PORTFOLIO SUMMARY - CURRENT FACE VALUE WEIGHTED - ALL SECURITY TYPES
Multiple Portfolios
report as of 1012117
Jan
Agency $15,500
CD $6,253
Muni:Non AMT -
Muni:Subj AMT -
Muni:Taxable -
32
28
24
20
W
Q 16
LL
e 12
8
4
0
MATURITY EXPOSURE 1
1� 1� 1 14 '66 tip as 10 tib tiVA ti� ti9 96 99�' 9� 9a 9� 91p 9� 9� 9°J o 1x Jai
J ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ryOaOp
Qy<
Current Face Value -weighted.
ESTIMATED COUPON CASH FLOW SUMMARY
MATURITY SCHEDULE
Year
Face (000)
% Year Face (000)
2017
-
2031 -
2018
$1,958.0
13.0% 2032 - -
2019
$2,162.0
14.3% 2033 - -
2020
$2,460.0
16.3% 2034 - -
2021
$2,880.0
19.0% 2035 - -
2022
$4,419.0
29.2% 2036 - -
2023
-
- 2037 - -
2024
$1,000.0
6.6% 2038 - -
2025
$240.0
1.6% 2039 - -
2026
-
- 2040 - -
2027
-
- 2041+ - -
2028
-
- Perpetual - -
2029
2030
Jan
Agency $15,500
CD $6,253
Muni:Non AMT -
Muni:Subj AMT -
Muni:Taxable -
32
28
24
20
W
Q 16
LL
e 12
8
4
0
MATURITY EXPOSURE 1
1� 1� 1 14 '66 tip as 10 tib tiVA ti� ti9 96 99�' 9� 9a 9� 91p 9� 9� 9°J o 1x Jai
J ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ry0 ryOaOp
Qy<
Current Face Value -weighted.
Seal Oct Nov Dec
ESTIMATED COUPON CASH FLOW SUMMARY
Feb Mar
Agr May Jun
Jul Aug
$5,000 -
$2,500 $4,500 -
$15,500 $5,000
$9,433 $16,057
$6,291 $19,673 $14,569
$6,253 $9,433
$13,363 -
- $21,643 -
- $13,363
Seal Oct Nov Dec
Total
- $2,500 $4,500 -
$55,000
$16,057 $6,291 $19,673 $14,569
$144,554
- - $21,643 -
$70,010
Total $21,753 $27,796 $16,057 $8,791 $45,816 $14,569 $21,753 $27,796 $16,057 $8,791 $45,816 $14,569 $269,564
Reflects extended cash flow estimates assuming portfolio composition as of report date. Please refer to Definitions for more complete explanation.
Please see the last page of this report for detail.
Page 5 of 41
PPENHEIMER PORTFOLIO SUMMARY - MARKET VALUE WEIGHTED - ALL SECURITY TYPES
Multiple Portfolios
report as of 1012117
I PORTFOLIO SUMMARY 1
Portfolio Totals Fed Exempt
Fed Taxable
Total
Priced Current Face
$15,119,000
$15,119,000
Positions -
47
47 of 47
Market Value -
$15,081,676
$15,081,676
Accrued Interest -
$61,456
$61,456
Total Market Value -
$15,143,132
$15,143,132
Est Annual Income -
$269,564
$269,564
Portfolio Averages
** Coupon Rate -
1.783%
1.783%
Maturity -
3.5yrs
3.5yrs
Effective Maturity
2.6yrs
2.6yrs
Modified Duration
2.5
2.5
Yield To Maturity -
2.09%
2.09%
Yield To Worst -
1.91%
1.91%
** Market Price -
99.753
99.753
** Par Verpalue wtd, other avgs Mkt Value wtd. Incl only positions
with mkt value & calcs on report date.
For petual securities avg calcs, Final Maturity assume 40 yrs,
Yield to Maturity uses strip yield.
PORTFOLIO RATING SUMMARY
AAA AA
NR
Includes only positions with market value & calculations on report date. Market Value -weighted.
POSITIONS BY SECURITY TYPE
Agency] �CD
� Agency 22.5%
Asset Backed 0.0%
CD 57.8%
CIF 0.0%
CMO 0.0%
Corp 0.0%
� Muni 19.7%
Pass Thru 0.0%
■ Preferred 0.0%
Treas 0.0%
Total: 100.0%
Muni
Includes only positions with market price & calculations on report date. Market Value -weighted.
100
90
80
70
~y 60
F s0
0 40
30
20
10
0
SECURITY FEATURES
❑ AAA
29.0%
❑ AA
13.2%
❑ A
0.0%
❑ BAA
0.0%
❑ Below BAA
0.0%
❑ NR
57.8%
Total:
100.0%
Includes only positions with market value & calculations on report date. Market Value -weighted.
POSITIONS BY SECURITY TYPE
Agency] �CD
� Agency 22.5%
Asset Backed 0.0%
CD 57.8%
CIF 0.0%
CMO 0.0%
Corp 0.0%
� Muni 19.7%
Pass Thru 0.0%
■ Preferred 0.0%
Treas 0.0%
Total: 100.0%
Muni
Includes only positions with market price & calculations on report date. Market Value -weighted.
100
90
80
70
~y 60
F s0
0 40
30
20
10
0
SECURITY FEATURES
Includes only positions with market price & calculations on report date. Market Value -weighted.
Please see the last page of this report for detail.
Page 6 of 41
Ga�`9,o ocG 0+0`0 Ca+9,o Q9�0 iQOwo
Includes only positions with market price & calculations on report date. Market Value -weighted.
Please see the last page of this report for detail.
Page 6 of 41
PPEINHFIMEI1 PORTFOLIO SUMMARY - MARKET VALUE WEIGHTED - ALL SECURITY TYPES
MATURITY EXPOSURE
32
28
24
20
F
16
e 12
8
4
0
lip ,0,0,y0,y0,y0,y0,y0,y0,y0,y0,y0,y0,y0,y0,y0,y0,y0,y0,y0,0,y0,y0 ,l0v01,
0t
Q
Includes only positions with market price & calculations on report date. Market Value -weighted.
DURATION EXPOSURE
35
30
25
Y 20
i
e is
10
ST_
0
0NOti030a0y060�
Includes only positions with market price & calculations on report date. Market Value -weighted.
Multiple Portfolios
report as of 1012117
Please see the last page of this report for detail.
Page 7 of 41
PORTFOLIO EXPOSURE
MaturitV
Effective Maturity
Duration to Worst
Average: 3.53yrs
Average: 2.64yrs
Average:
2.52
Year $Mkt %Mkt
$ Mkt %Mkt
Year $ Mkt % Mkt
2017
-
$1,494,829
9.9% 00-01
$3,454,296
22.8%
2018
$1,959,467
12.9%
$2,707,827
17.9% 01-02
$1,698,704
11.2%
2019
$2,177,543
14.4%
$3,079,012
20.3% 02-03
$4,838,958
32.0%
2020
$2,459,558
16.2%
$3,200,126
21.1% 03-04
$1,715,612
11.3%
2021
$2,873,310
19.0%
$1,225,776
8.1% 04-05
$2,434,267
16.1%
2022
$4,430,117
29.3%
$2,434,267
16.1% 05-06
-
2023
-
-
- 06-07
$1,001,295
6.6%
2024
$1,001,295
6.6%
$1,001,295
6.6% 07-08
-
2025
$241,843
1.6%
-
- 08-09
-
2026
-
-
- 09-10
-
2027
-
-
- 10-11
-
2028
-
-
- 11-12
-
2029
-
-
- 12-13
-
2030
-
-
- 13-14
-
2031
-
-
- 14-15
-
2032
-
-
- 15-16
-
2033
-
-
- 16-17
-
2034
-
-
- 17-18
-
2035
-
-
- 18-19
-
2036
-
-
- 19-20
-
2037
-
-
- 20-21
-
2038
-
-
- 21-22
-
2039
-
-
- 22-23
-
2040
-
-
- 23-24
-
2041+
-
-
- 24-25
-
Perpet
-
-
- 25-26
-
26-27
27-28
28-29
30+
Avg life used
in Effective Maturity
for principal
pay -downs.
Includes only
positions with market
price
& calculations on report date. Market Value -weighted.
For Avg Maturity calculations,
perpetual securities assume 40 yrs.
Please see the last page of this report for detail.
Page 7 of 41
(-jPPENHEIMER
PORTFOLIO POSITION DETAIL
Multiple Portfolios
report as of 10/2/17
Page 1 of 3
A Type St
Qty
Cpn
Maturity
Mdy S&P % Mkt
Duration
Acq Cost
Acq Yid
$ Acq Cost
Mkt Price
Accrued Int
Security Description
C CUSIP
Insurer
Convexity
Acq Date
Mkt Yid
$ Adj Cost
Mkt $ Value
Unreal Gn/Ls
ALLY BK MIDVALE UTAH
B CD
248
1.250
02/26/18
NR
NR 1.65%
0.40
$100.00
1.249
$248,000
100.08
$331
Conditional Puts - Death of holder
02006LNY5
0.00
05/09/17
1.044
$248,000
$248,201
$201
BANK NORTH CAROLINA THOMASVILLE N
B CD
245
1.000
02/27/18
NR
NR 1.62%
0.40
$100.00
1.000
$245,000
99.94
$47
Conditional Puts - Death of holder
06414QXX2
0.00
05/09/17
1.158
$245,000
$244,846
($154)
MERRICK BK SOUTH JORDAN UTAH
B CD
245
0.900
05/10/18
NR
NR 1.62%
0.60
$100.00
0.900
$245,000
99.90
$145
Conditional Puts - Death of holder - Restrict
59013JNV7
0.00
05/09/17
1.071
$245,000
$244,750
($250)
KEY BK NATL ASSN OHIO
B CD
245
1.000
05/11/18
NR
NR 1.62%
0.60
$100.00
1.000
$245,000
99.90
$980
Conditional Puts - Death of holder - Restrict
49306SWN2
0.01
05/09/17
1.174
$245,000
$244,745
($255)
CONNECTONE BANK
B CD
245
1.000
05/14/18
NR
NR 1.62%
0.61
$100.00
1.000
$245,000
99.89
$141
Conditional Puts - Death of holder
20786ABM6
0.00
05/09/17
1.177
$245,000
$244,738
($262)
BANK LEUMI USA NEW YORK N Y
B CD
245
1.250
06/22/18
NR
NR 1.62%
0.71
$100.00
1.249
$245,000
99.93
$873
Conditional Puts - Death of holder
063248GE2
0.01
05/09/17
1.354
$245,000
$244,816
($184)
BANK INDIA NEW YORK BRH
B CD
245
1.500
09/12/18
NR
NR 1.62%
0.93
$100.00
1.500
$245,000
100.02
$201
Conditional Puts - Death of holder - Restrict
06279H2Q5
0.02
09/14/17
1.480
$245,000
$245,042
$42
ENERBANK USA SALT LAKE CITY UTAH
B CD
240
1.350
10/04/18
NR
NR 1.59%
0.99
$100.00
1.350
$240,000
99.84
$0
Conditional Puts - Death of holder - Restrict
29266NVE4
0.01
05/09/17
1.513
$240,000
$239,611
($389)
MAIN STIR BK CORP WHEELING WV
B CD
245
1.450
02/14/19
NR
NR 1.62%
1.35
$100.00
1.450
$245,000
99.82
$185
Conditional Puts - Death of holder
56034WAP6
0.02
05/09/17
1.583
$245,000
$244,561
($439)
WORLDS FOREMOST BK SYDNEY NEB
A CD
200
1.300
05/28/19
NR
NR 1.32%
1.63
$100.00
1.300
$200,000
99.25
$57
Conditional Puts - Death of holder
981571 CM2
0.03
05/26/16
1.760
$200,000
$198,508
($1,492)
RIVERSIDE CALIF CMNTY COLLEGEDIST
B Muni -Taxable CA
500
2.345
08/01/19
Aa2
AA 3.35%
1.78
$101.50
1.657
$507,485
101.00
$2,052
TAXABLE -Material Events
76886PFA6
0.04
05/09/17
1.787
$506,150
$504,980
($1,170)
AMERICAN EXPRESS FSB
B CD
247
2.150
11/13/19
NR
NR 1.65%
2.04
$100.00
2.150
$247,000
100.57
$2,095
Conditional Puts - Death of holder - Restrict
02587CCR9
0.05
05/09/17
1.873
$247,000
$248,403
$1,403
CIT BK SALT LAKE CITY UTAH
B CD
240
2.100
11/13/19
NR
NR 1.60%
2.04
$100.00
2.100
$240,000
100.78
$1,988
Conditional Puts - Death of holder - Restrict
17284C3N2
0.05
05/09/17
1.723
$240,000
$241,865
$1,865
BMW BANK OF NORTH AMERICA - UT
B CD
245
1.550
12/16/19
NR
NR 1.62%
2.14
$100.00
1.550
$245,000
99.58
$1,165
Conditional Puts - Death of holder - Restrict
05580AFT6
0.06
05/09/17
1.745
$245,000
$243,969
($1,031)
TBK BK SSB DALLAS TEX
B CD
245
1.600
12/16/19
NR
NR 1.62%
2.16
$100.00
1.596
$245,000
99.69
$215
Callable 12/17@100 - Conditional Puts - Dea
87219RBC7
0.05
05/09/17
1.745
$245,004
$244,236
($768)
BARCLAYS BANK DELAWARE
B CD
240
2.050
12/17/19
NR
NR 1.60%
2.14
$100.00
2.049
$240,000
100.75
$1,469
Conditional Puts - Death of holder
06740KJC2
0.06
05/09/17
1.702
$240,000
$241,795
$1,795
SALLIE MAE BK SALT LAKE CITY UT
B CD
245
1.750
03/09/20
NR
NR 1.62%
2.36
$100.00
1.749
$245,000
99.90
$305
Conditional Puts - Death of holder - Restrict
795450ZT5
0.07
05/09/17
1.792
$245,000
$244,755
($245)
MASSACH USETTS ST GO BDS
BMuni-Taxable MA
500
2.090
05/01/20
Aa1
AA 3.33%
2.48
$100.00
2.090
$499,995
100.43
$4,441
TAXABLE -Material Events
57582P2T6
0.08
05/09/17
1.917
$499,995
$502,165
$2,170
MB FINL BK N A CHICAGO ILL
B CD
245
1.300
05/11/20
NR
NR 1.61%
2.56
$100.00
1.300
$245,000
99.32
$201
Conditional Puts - Death of holder - Restrict
55266CRK4
0.07
05/09/17
1.569
$245,000
$243,322
($1,678)
CENTENNIAL BK CONWAY ARK
B CD
245
1.300
05/20/20
NR
NR 1.61%
2.58
$100.00
1.300
$245,000
99.17
$122
Conditional Puts - Death of holder
15135KBA8
0.07
05/09/17
1.624
$245,000
$242,959
($2,041)
THIRD FED SVGS & LN ASSN OF CLEVEL
B CD
245
1.900
09/15/20
NR
NR 1.62%
2.85
$100.00
1.900
$245,000
100.00
$242
Conditional Puts - Death of holder - Restrict
88413QBQO
0.10
09/15/17
1.899
$245,000
$245,005
$5
CAPITAL ONE, NATIONAL ASSOCIATION
B CD
245
1.400
09/21/20
NR
NR 1.59%
2.88
$100.00
1.400
$245,000
98.15
$122
Conditional Puts - Death of holder
14042RCA7
0.10
05/09/17
2.045
$245,000
$240,470
($4,530)
Please see the last page of this report for detail.
Page 36 of 41
Multiple Portfolios POSITION DETAIL as of 10/02/2017 Page 2 of 3
Security Description
A Type
C CUSIP
St
Qty
Cpn
Maturity
Mdy S&P % Mkt
Insurer
Duration
Convexity
Acq Cost
Acq Date
Acq Yid
Mkt Yid
$ Acq Cost
$ Adj Cost
Mkt Price
Mkt $ Value
Accrued Int
Unreal Gn/Ls
WEBBANK
B CD
245
2.000
09/28/20
NR
NR 1.63%
0.23
$100.00
2.000
$245,000
100.22
$81
Callable 12/17@100 - Conditional Puts - Dea
947547JR7
0.00
09/28/17
1.067
$245,000
$245,532
$532
FIRST BUSINESS BK MADISON WIS
B CD
245
1.400
11/13/20
NR
NR 1.60%
3.01
$100.00
1.400
$245,000
98.44
$1,353
Conditional Puts - Death of holder
31938QR89
0.11
05/09/17
1.917
$245,000
$241,185
($3,815)
CAPITAL ONE BK USA NATL ASSN GLEN
B CD
245
2.050
12/29/20
NR
NR 1.63%
3.10
$100.00
2.049
$245,000
100.39
$1,335
Conditional Puts - Death of holder
14042OS43
0.11
05/09/17
1.923
$245,000
$245,963
$963
COM ENITY CAP BK SALT LAKE CITY UTA
B CD
245
1.600
06/07/21
NR
NR 1.60%
3.56
$100.00
1.600
$245,000
98.74
$301
Conditional Puts - Death of holder - Restrict
20033AQP4
0.13
05/09/17
1.956
$245,000
$241,906
($3,094)
COMMUNITY BK PASADENA CALIF
B CD
245
1.550
06/15/21
NR
NR 1.60%
3.59
$100.00
1.550
$245,000
98.72
$198
Conditional Puts - Death of holder - Restrict
203507BA5
0.13
05/09/17
1.908
$245,000
$241,871
($3,129)
EAST BOSTON SVGS BK BOSTON MA
B CD
245
1.500
06/23/21
NR
NR 1.60%
3.58
$100.00
1.500
$245,000
98.36
$1,037
Conditional Puts - Death of holder
27113PBEO
0.15
05/09/17
1.960
$245,000
$240,972
($4,028)
FEDERAL HOME LN MTG CORP CALL 2%
B Agency
500
2.000
07/26/21
Aaa
AA- 3.30%
3.64
$100.00
2.000
$500,000
99.53
$1,861
Callable 01/18@100
3134GBYJ5
0.15
07/26/17
2.130
$500,000
$497,630
($2,370)
FEDERAL HOME LOAN MORTGAGE CORP
B Agency
500
1.000
10/28/21
Aaa
AA+ 3.31%
1.05
$100.00
1.000
$500,000
99.71
$2,153
Callable 10/17@100 - Multi -Step Coupon
3134GASK1
0.02
05/09/17
1.743
$500,000
$498,545
($1,455)
FEDERAL HOME LOAN MTG CORP
B Agency
900
1.000
11/19/21
Aaa
AA+ 5.96%
2.07
$99.90
1.190
$899,100
99.79
$3,350
Callable 11/17@100 - Multi -Step Coupon
3136G2SA6
0.05
05/09/17
2.039
$899,100
$898,119
($981)
MIZRAHI TEFAHOT BANK, LTD
B CD
245
1.250
11/30/21
NR
NR 1.62%
0.16
$100.00
1.247
$245,000
100.03
$294
Callable 11/17@100 - Multi -Step Coupon - Co
606857Q78
0.00
05/09/17
1.056
$245,000
$245,074
$74
STATE BK INDIA NEW YORK N Y
B CD
247
2.350
01/26/22
NR
NR 1.66%
4.07
$100.00
2.349
$247,000
101.12
$1,113
Conditional Puts - Death of holder - Restrict
8562845Z3
0.19
05/09/17
2.077
$247,000
$249,766
$2,766
GOLDMAN SACHS BK USA NEW YORK
B CD
247
2.300
03/08/22
NR
NR 1.65%
4.18
$100.00
2.299
$247,000
100.79
$405
Conditional Puts - Death of holder
38148PGX9
0.20
05/09/17
2.112
$247,032
$248,954
$1,922
COMENITY BK WILMINGTON DE
A CD
200
2.300
03/29/22
NR
NR 1.34%
4.26
$100.00
2.300
$200,000
100.73
$63
Conditional Puts - Death of holder
20036DXN2
0.19
03/29/17
2.130
$200,000
$201,456
$1,456
SYNCHRONY BK RETAIL CTF DEP PROGR
B CD
245
2.400
04/07/22
NR
NR 1.64%
4.21
$100.00
2.400
$245,000
101.12
$2,900
Conditional Puts - Death of holder - Restrict
87164XPZ3
0.21
05/09/17
2.137
$245,000
$247,754
$2,754
MARYSVILLE MICH PUB SCHS DIST GO U
B Muni -Taxable
MI
500
2.317
05/01/22
Aa1
3.26%
4.26
$98.85
2.565
$494,230
98.24
$4,924
TAXABLE -Material Events
574446GV6
0.21
05/09/17
2.728
$494,230
$491,210
($3,020)
NEW YORK N Y CITY TRANSITIONAL FIN A
B Muni -Taxable
NY
500
1.650
05/01/22
Aa1
AAA 3.23%
4.34
$99.43
1.771
$497,125
97.29
$3,506
Make Whole Call Only - Make Whole Call Exp
64971 WJ35
0.22
05/09/17
2.278
$497,125
$486,425
($10,700)
JP MORGAN CHASE BANK NA
B CD
245
1.250
05/31/22
NR
NR 1.62%
2.59
$100.00
1.243
$245,000
99.63
$1,057
Callable 11/17@100 - Multi -Step Coupon - Co
48125Y21_7
0.08
05/09/17
1.579
$245,000
$244,096
($904)
FEDERAL HOME LN MTG CORP CALL STE
B Agency
1,000
2.100
07/27/22
Aaa
AA+ 6.63%
0.31
$100.00
2.100
$1,000,000
100.00
$3,850
Callable 10/17@100 - Multi -Step Coupon
3134GBYN6
0.00
07/27/17
2.092
$1,000,000
$1,000,000
AMERICAN EXPRESS CENTURIAN BK CTF
B CD
245
2.350
08/08/22
NR
NR 1.63%
4.54
$100.00
2.350
$245,000
100.33
$899
Conditional Puts - Death of holder - Restrict
02587DV47
0.24
08/08/17
2.277
$245,000
$245,809
$809
FEDERAL HOME LOAN MORTGAGE CORP
B Agency
500
2.000
08/22/22
3.30%
2.78
$100.00
2.000
$500,000
99.61
$1,139
Callable 11/17@100 - Multi -Step Coupon
3134GBB27
0.09
08/22/17
2.140
$500,000
$498,045
($1,955)
DISCOVER BK GREENWOOD DEL
B CD
245
2.450
11/18/22
NR
NR 1.64%
4.75
$100.00
2.450
$245,000
100.73
$2,286
Conditional Puts - Death of holder
254672WU8
0.26
05/09/17
2.297
$245,000
$246,798
$1,798
WELLS FARGO BANK NA 84 MO
B CD
245
1.650
11/23/22
NR
NR 1.63%
1.12
$100.00
1.650
$245,000
100.48
$1,484
Callable 11/18@100 - Multi -Step Coupon -Co
94986TWE3
0.02
05/09/17
1.222
$245,000
$246,178
$1,178
COMMERCE CALIF CMNTY DEV COMMN S
B Muni -Taxable
CA
500
3.000
08/01/24
AA 3.29%
6.09
$105.32
2.200
$526,595
99.15
$2,625
DID - TAXABLE - Material Events -AGMC in
20056UAV6
AGMC
0.43
05/09/17
3.140
525210
495725
$29485
Please see the last page of this report for detail.
Page 37 of 41
Multiple Portfolios
POSITION DETAIL as of 10/02/2017 Page 3 of 3
'See glossary for ACCT legend
Please see the last page of this report for detail.
Page 38 of 41
A Type St
Qty Cpn Maturity Mdy S&P % Mkt
Duration
Acq Cost
Acq Yid
$ Acq Cost
Mkt Price
Accrued Int
security Description
C CUSIP
Insurer
Convexity
Acq Date
Mkt Yid
$ Adj Cost
Mkt $ Value
Unreal Gn/Ls
IEW YORK N Y CITY TRANSITIONAL FIN A
B Muni -Taxable NY
500 2.600 11/01/24 Aa1 AAA 3.30%
6.35
$97.35
2.998
$486,750
99.48
$5,525
:allable 11/22@100 -TAXABLE -Material Ev
64971QJ38
0.46
05/09/17
2.680
$486,750
$497,420
$10,670
ISBC BANK USA, NATIONAL ASSOCIATIO
B CD
240 2.250 03/11/25 NR NR 1.60%
2.36
$100.00
2.249
$240,000
100.63
$340
:allable 03/20@100 - Multi -Step Coupon - Co
40434ASB6
0.07
05/09/17
1.985
$240,000
$241,502
$1,502
'See glossary for ACCT legend
Please see the last page of this report for detail.
Page 38 of 41
MINUTES
HUTCHINSON PLANNING COMMISSION
Tuesday, January 17, 2017
5:30 p.m.
1. CALL TO ORDER 5:30 P.M.
The January 17, 2017 Planning Commission meeting was called to order by
Commissioner Norton at 5:30 p.m. Members in bold were present Chair Hantge,
Commissioner Kalenberg, Commissioner Norton, Commissioner Lofdahl,
Commissioner Wick, Commissioner Forcier, and Commissioner Fahey. Also present
were Dan Jochum, City Planner, Kent Exner, City Engineer, Marc Sebora, City
Attorney, John Paulson, City Environmental Specialist and Andrea Schwartz, City of
Hutchinson Permit Technician
2. PLEDGE OF ALLEGIANCE
3. OATH OF OFFICE
A. John Lofdahl — this was taken care of at the last City Council meeting
4. ELECTION OF OFFICERS
Tabled to next meeting when all members are present
5. CONSENT AGENDA
A. CONSIDERATION OF MINUTES DATED December 20, 2016.
Motion by Commissioner Fahey, Second by Commissioner Lofdahl. Motion
approved.
Motion to Approve — Motion to Reject
6. PUBLIC HEARINGS
A. CONSIDERATION OF A CONDITIONAL USE PERMIT FOR A DAYCARE
CENTER IN AN R-2 ZONING DISTRICT LOCATED AT 700 MAIN STREET
N UNIT G, STEW & SALLY HUNTER, APPLICANT.
Dan Jochum, City Planner addressed the Commission.
Mr. Jochum reviewed the application as outlined in the Commission's packets.
Approximately 50 children, ages 6 mo. to 12 years old. Peak times 7-8 am. and
4-6 pm. Parking circulation — not a large demand, 5 spots will be sufficient.
Circular area available to continue driving through during drop off. Parking to
be saved for parents or drop offs not employees.
Minutes
Hutchinson Planning Commission
January 17, 2017
Page 2
Current gravel parking spaces to be paved to meet the last 2 parking spaces.
Stew Hunter, applicant, noted the "gravel" area is actually a current loading dock
and is old concrete that would need to be filled in and repaved.
Recommendation is just to have 5 spaces. These 2 extra spaces could be in a
different spot.
Commissioner Fahey expressed extra caution with the maintenance room next
door. Firewall precaution. Mr. Hunter noted he had talked to the Fire Marshall
and Fire Chief about this and a 2 hr. wall will be good, but the State Dept. has
not been out on site yet.
Motion by Kalenberg, second by Fahey to close hearing at 5:47 p.m.
Motion by Commissioner Fahey to approve with staff recommendations. Second
by Commissioner Wick. Motion approved. Item will be on City Council
consent agenda on 1/24/2017.
Motion to close hearing — Motion to approve with staff recommendations — Motion to reject
7. NEW BUSINESS
8. UNFINISHED BUSINESS
Landscape ordinance from last month's meeting, city council tabled and staff will
be looking further into this. Look at more green space and tree species.
9. COMMUNICATION FROM STAFF
A. Upcoming Meetings
Dan Jochum noted that we have no applications for the February Planning
Commission meeting at this time.
10. ADJOURNMENT
Motion by Commissioner Lofdahl, Second by Commissioner Fahey to adjourn at
5:49 p.m.
MINUTES
HUTCHINSON PLANNING COMMISSION
Tuesday, May 16, 2017
5:30 p.m.
1. CALL TO ORDER 5:30 P.M.
The May 16, 2017 Planning Commission meeting was called to order by Chair Fahey at
5:30 p.m. Members in bold were present Chair Fahey, Vice Chair Wick,
Commissioner Garberg, Commissioner Wirt, Commissioner Lofdahl, and
Commissioner Forcier. Also present were Dan Jochum, City Planner, John Olson, City
Public Works, Marc Sebora, City Attorney, John Paulson, City Environmental Specialist
and Andrea Schwartz, City of Hutchinson Permit Technician
2. PLEDGE OF ALLEGIANCE
3. CONSENT AGENDA
A. CONSIDERATION OF MINUTES DATED April 18, 2017.
Motion by Commissioner Forcier, Second by Commissioner Wirt. Motion
approved.
Motion to Approve — Motion to Reject
4. PUBLIC HEARINGS
A. CONSIDERATION OF A CONDITIONAL USE PERMIT AND SITE PLAN
FOR A MULTI UNIT TOWNHOME DEVELOPMENT IN AN R-4 ZONING
DISTRICT LOCATED AT 875 CENTURY AVE SW.
Dan Jochum, City Planner addressed the Commission.
Mr. Jochum reviewed the application as outlined in the Commission's packets.
Access roads are too narrow. Fire code is 26 ft width. Developer is working on
this. This can be a condition to the approval. Some of the parking lots need to
have handicap parking added. Curbing will be looked at with the City.
Sidewalks have been added to connect to city walk paths. Garbage enclosure
near the residential homes on the NW corner should be moved. Pond takes care
of stormwater management. Landscaping, good screening to the NW corner,
would like to see some more screening on the N line.
Lofdahl — garbage relocation? City staff will work with developer.
Garberg — size requirement on trees? 8ft
Minutes
Hutchinson Planning Commission
May 16, 2017
Page 2
Lofdahl — time frame? July/August
Forcier — phase 2? Dirt work will happen right away. Roads and parking will be
completed as needed.
Motion by Commissioner Wick, second by Commissioner Wirt to close hearing
at 5:46 p.m.
Motion by Commissioner Garberg to approve with staff recommendations.
Adding item 16 of 26 ft street openings. Second by Commissioner Lofdahl.
Motion approved. Item will be on City Council consent agenda on 5/23/2017.
B. CONSIDERATION OF A PRELIMINARY AND FINAL PLAT FOR SHIMPA
ADDITION LOCATED AT 937 LEWIS AVE SW AND 235 LAKE ST SW.
Dan Jochum, City Planner addressed the Commission.
Mr. Jochum reviewed the application as outlined in the Commission's packets.
Wirt — set back? 6 ft on side. This will now give them about 24 ft side lot.
Motion by Commissioner Wick, second by Commissioner Lofdahl to close
hearing at 5:50 p.m.
Motion by Commissioner Forcier to approve with staff recommendations.
Second by Commissioner Garberg. Motion approved. Item will be on City
Council consent agenda on 5/23/2017.
Commissioner Wick will now be running the meeting as Commissioner Fahey
has a part in in the request.
C. CONSIDERATION OF A CONDITIONAL USE PERMIT FOR A SCHOOL IN
AN R-2 ZONING DISTRICT LOCATED AT 950 SCHOOL RD SW.
Dan Jochum, City Planner addressed the Commission.
Mr. Jochum reviewed the application as outlined in the Commission's packets.
This building was originally set us as a school. All requirements are met
Motion by Commissioner Lofdahl, second by Commissioner Wirt to close
hearing at 5:53 p.m.
Motion by Commissioner Wirt to approve with staff recommendations. Second
by Commissioner Lofdahl. Motion approved. Item will be on City Council
consent agenda on 5/23/2017.
Minutes
Hutchinson Planning Commission
May 16, 2017
Page 3
Motion to close hearing — Motion to approve with staff recommendations — Motion to reject
5. NEW BUSINESS
6. UNFINISHED BUSINESS
7. COMMUNICATION FROM STAFF
A. Dan recently attended the National Planning Commission in NY — feels that we
should update the zoning code. Make it simpler, easier to follow. Maybe look
more at the format (use charts and tables). Sign ordinance. Planning and
Building Department is very busy right now. There is a 3 week delay in plan
review.
B. Upcoming Meetings
Dan Jochum noted that we have two possible applications for the June Planning
Commission meeting at this time.
8. ADJOURNMENT
Motion by Commissioner Wick, Second by Commissioner Wirt to adjourn at 6:00
p.m.
MINUTES
HUTCHINSON PLANNING COMMISSION
Tuesday, July 18, 2017
5:30 p.m.
1. CALL TO ORDER 5:30 P.M.
The July 18, 2017 Planning Commission meeting was called to order by Commissioner
Lofdahl at 5:30 p.m. Members in bold were present Chair Fahey, Vice Chair Wick,
Commissioner Garberg, Commissioner Wirt, Commissioner Lofdahl, and
Commissioner Forcier. Also present were Dan Jochum, City Planner, John Olson, City
Public Works, Marc Sebora, City Attorney, John Paulson, City Environmental Specialist
and Andrea Schwartz, City of Hutchinson Permit Technician
2. PLEDGE OF ALLEGIANCE
3. CONSENT AGENDA
A. CONSIDERATION OF MINUTES DATED May 16, 2017.
Motion by Commissioner Garberg, Second by Commissioner Wirt. Motion
approved.
Motion to Approve — Motion to Reject
4. PUBLIC HEARINGS
A. CONSIDERATION OF A VARIANCE TO REDUCE SIDE AND REAR
SETBACK FROM 6 FEET TO 3 FEET TO CONSTRUCT NEW DETACHED
GARAGE ON EXISTING SITE LOCATED AT 436 HASSAN ST SE.
Dan Jochum, City Planner addressed the Commission.
Mr. Jochum reviewed the application as outlined in the Commission's packets.
Mr. Jochum reviewed the definitions of practical difficulties to some of the newer
members of the Planning Commission. Planning Staff has already reviewed this
as follows - Reasonableness, yes; Uniqueness, no, garage would fit but is preferred
to be moved back; Essential character, yes, there are other "non -conforming"
garages in the area.
Commissioner Lofdahl asked if other garages are built prior to zoning ordinance?
Yes.
Minutes
Hutchinson Planning Commission
July 18, 2017
Page 2
Commissioner Wirt questioned if the alley could get paved in the future and need
to be widened? Alley is currently 16 ft wide and can get tight with plowing and
drainage. It does not look like the alley will be paved any time soon.
Victoria Langen (applicant) — would like to raise the foundation of the new garage
to help with drainage from the ally and hoping this will help to have the garage set
back farther from the house not having the grade too high next to the house. She
would also like the new garage to look in proportion to the setback of other garages
in the area.
Mr. Jochum questioned if the garage would be able to be built smaller?
Homeowner stated the request is for the use they need (2 cars and motorcycles).
Commissioner Lofdahl questioned if the garage could be moved a bit and could
be made a bit smaller. He does agree with Planning Staff that the request does not
meet the hardship of 92.
Commissioner Garberg would like to see the 6 ft setback on the ally but would
allow the 3 ft on the interior side.
Mr. Sebora gave information on the legal aspect of the variance and changing to
allow the variance on the side setback only. He stated that the Commission needs
to be able to justify their decision of hardship. We also need to watch the precedent
the Commission could be setting for other properties in the future.
Motion by Commissioner Wirt, second by Commissioner Forcier to close hearing
at 6:13 p.m.
Motion by Commissioner Forcier to reject the application and require the 6 foot
setbacks. Second by Commissioner Garberg. Motion rejected. Item will be on
City Council consent agenda on 7/25/2017.
B. CONSIDERATION OF A VARIANCE TO REDUCE THE CORNER SIDE
SETBACK FROM 25 FEET TO 11.4 FEET TO REBUILD A DETACHED
GARAGE LOCATED AT 605 LYNN RD SW.
Mr. Jochum reviewed the application as outlined in the Commission's packets.
Mr. Jochum noted there are large mature trees on the lot that will be effected if the
garage is built to the setbacks of the ordinance.
Reasonable, yes; Uniqueness, yes, large mature trees in the way; Essential
character, yes, other garages in this area are at the same setback and do not hinder
drainage. Also noted that the size of the garage is not changing.
Motion by Commissioner Garberg, second by Commissioner Forcier to close
hearing at 6:21 p.m.
Minutes
Hutchinson Planning Commission
July 18, 2017
Page 3
Motion by Commissioner Garberg to approve with staff recommendations.
Second by Commissioner Forcier. Motion approved. Item will be on City Council
consent agenda on 7/25/2017.
C. CONSIDERATION OF A PRELIMINARY/FINAL PLAT AND A
CONDITIONAL USE PERMIT TO CONSTRUCT A NEW BUILDING AND
AN ADDITION TO THE EXISTING BUILDING LOCATED AT 579 2ND AVE
SE.
Mr. Jochum reviewed the application as outlined in the Commission's packets.
Mr. Murphy is looking at installing concrete to the south of the addition of the
existing building to the meet up with the current street apron. Parking would be
made available to the East side of the existing building. 4 parking spots required
1 of them being handicap.
Staff has 10 recommendations:
1. Four paved parking spaces are required on site, of which one must be a handicap
space.
2. The zoning ordinance requires the parking area and access drives be paved with an
all-weather surface such as, concrete or bituminous. The access drives from the street
to the front of each building must be a minimum of 24 feet wide and be paved with an
all-weather surface. The parking area will also require an adequate drive
aisle/turnaround that are paved.
3. The City shall approve a final site layout plan that clearly shows the parking areas
and access drives that will be improved with an all-weather surface.
4. The area located between the two existing curb cuts within the right-of-way along 2nd
Ave. SE shall be planted with grass.
5. Any outdoor storage on the site will be required to be screened with a fence.
6. If the appearance of the lot is not neat and tidy or is unsightly, as determined by the
City, the conditional use permit may be revised and may be amended accordingly to
address these issues.
7. The standards for granting a conditional use permit would be met, subject to the
conditions stated.
8. The proposed building and site improvements shall comply with the standards of the
I/C district and the Zoning Ordinance, as well as all other City regulations.
9. The conditional use permit shall remain in effect as long as the conditions required by
the permit are observed. Any expansion or intensification of a conditional use or
change to another conditional use requires approval of a new conditional use permit.
10. If the proposed use fails to start operation within one year of the conditional use permit
being granted, the conditional use permit shall be deemed null and void and a new
conditional use permit must be applied for.
Motion by Commissioner Wirt, second by Commissioner Lofdahl to close hearing
at 6:37 p.m.
Minutes
Hutchinson Planning Commission
July 18, 2017
Page 4
Motion by Commissioner Forcier to approve with 10 staff recommendations.
Second by Commissioner Wirt. Motion approved. Item will be on City Council
consent agenda on 7/25/2017.
Motion to close hearing — Motion to approve with staff recommendations — Motion to reject
1. NEW BUSINESS
2. UNFINISHED BUSINESS
3. COMMUNICATION FROM STAFF
A. Wick and Garberg attended Commissioner Training.
B. Upcoming Meetings
Dan Jochum noted that we have no applications for the August Planning
Commission meeting at this time but the Hotel Project should be on the agenda.
Sign ordinance revision may also be on this agenda.
4. ADJOURNMENT
Motion by Commissioner Forcier, Second by Commissioner Garberg to adjourn at
6:45 p.m.
MINUTES
HUTCHINSON PLANNING COMMISSION
Tuesday, August 15, 2017
5:30 p.m.
1. CALL TO ORDER 5:30 P.M.
The August 15, 2017 Planning Commission meeting was called to order by Commissioner
Lofdahl at 5:30 p.m. Members in bold were present Chair Fahey, Vice Chair Wick,
Commissioner Garberg, Commissioner Wirt, Commissioner Lofdahl, and
Commissioner Forcier. Also present were Dan Jochum, City Planner, John Olson, City
Public Works, Marc Sebora, City Attorney, John Paulson, City Environmental Specialist
and Andrea Schwartz, City of Hutchinson Permit Technician
2. PLEDGE OF ALLEGIANCE
3. OATH OF OFFICE
Robert Hantge
4. CONSENT AGENDA
A. CONSIDERATION OF MINUTES DATED July 18, 2017.
Motion by Commissioner Lofdahl, Second by Commissioner Forcier. Motion
approved.
Motion to Approve — Motion to Reject
5. PUBLIC HEARINGS
A. CONSIDERATION OF A CONDITIONAL USE PERMIT TO MOVE IN A
DETACHED GARAGE LOCATED AT 234 JEFFERSON ST SE.
Dan Jochum, City Planner addressed the Commission.
Mr. Jochum reviewed the application as outlined in the Commission's packets.
Mr. Jochum noted that the Planning staff recommends approval and that the garage
must meet all setbacks.
Noted that old CUP stays with the property and the remodel will/can continue.
Glen 210 (owner), garage doors facing alley.
Motion by Commissioner Hantge, second by Commissioner Wick to close hearing
at 5:39 p.m.
Minutes
Hutchinson Planning Commission
August 15, 2017
Page 2
Motion by Commissioner Lofdahl to approve with 5 staff recommendations.
Second by Commissioner Forcier. Motion approved. Item will be on City Council
consent agenda on 8/22/2017.
B. CONSIDERATION OF A SITE PLAN AND VARIANCE TO REDUCE
PARKING STALL SIZE AND STREET RIGHT-OF-WAY SETBACK FOR A
PROPOSED HOTEL LOCATED AT 416 PROSPECT ST NE.
Site Plan is not a public hearing but Variance is.
Mr. Jochum reviewed the application as outlined in the Commission's packets.
Brian Forcier — titanium partners - gave a brief overview of his company
Brian Forcier — Cobble Stone Suites — gave a brief overview of their brand of hotel
Staff recommends to lose some of the green space in front of the building to widen
the side walk larger and the parking stalls longer. Staff also recommends the
exterior of the building to be more high quality (to meet the Hwy 7 Master Plan).
Wirt — any vehicle access to back of building? No.
Fahey questioned elevation change from base of building to screening. 1064.7 to
1076. Building will sit 20 some feet above the screening. This does meet all
required zoning ordinances. Fence is 8 ft.; trees may grow to 10 ft.
Staff is recommending approval of the Site Plan and Variance. With exterior,
sidewalk, parking stalls, fire truck area and more.
Wirt — what do we lose in trees on the N side. Some of the larger trees will need
to be removed on the subject property for the retaining wall.
Wirt — AC units on roof? No, they are under the windows for each room and at
the end of the hallways.
Garberg — number of parking spaces? Employees, trailers, semi -trucks? Where is
overflow parking? The code does not require anything additional to one parking
space per room. Developer is looking into overflow parking. It has been
recommended for no parking on Prospect St.
Wirt — what is quality lap siding? Not vinyl, good use of color, all the way around
the building.
Jim Riley 465 Main St N — why can't contamination be cleaned up? There is a
Response Action Plan in place. If the soil is disturbed it needs to be cleaned up.
If it is not disturbed it can remain. There have been borings taken to know where
contamination is located. Mr. Lofdahl gave a brief explanation of MPCA action
on contamination.
Minutes
Hutchinson Planning Commission
August 15, 2017
Page 3
Mr. Riley is concerned about the commercial property encroaching farther north.
Mr. Lofdahl commented on the zoning
486 Prospect Hillary Schumann — concerned about parking and traffic patterns.
Also questioned the retaining wall.
16 5th Ave NE Linda Rutzine — What sort of lighting will impact her back yard?
Lighting is not permitted to leave the property of the hotel.
Motion by Commissioner Wick, second by Commissioner Hantge to close hearing
at 6:44 p.m.
Motion by Commissioner Lofdahl to approve with all 19 staff recommendations
including siding. Second by Commissioner Hantge. Motion approved. Item will
be on City Council consent agenda on 8/22/2017.
C. CONSIDERATION OF AN AMENDMENT TO THE CITY CODE OF
ORDINANCES, CHAPTER 154: DYNAMIC SIGNS.
Commissioner Forcier excused herself for conflict of interest.
Mr. Jochum reviewed the application as outlined in the Commission's packets.
Area outside of Hasan to Franklin. C2, I1, I2
Lofdahl - this will not impose on Historic area
Motion by Commissioner Garberg, second by Commissioner Wirt to close hearing
at 6:54 p.m.
Motion by Commissioner Wirt to approve with staff recommendations. Second
by Commissioner Hantge. Motion approved. Item will be on City Council consent
agenda on 8/22/2017.
Motion to close hearing — Motion to approve with staff recommendations — Motion to reject
1. NEW BUSINESS
2. UNFINISHED BUSINESS
3. COMMUNICATION FROM STAFF
A. Upcoming Meetings
Dan Jochum noted that we have one applications for the September Planning
Commission meeting at this time.
Minutes
Hutchinson Planning Commission
August 15, 2017
Page 4
4. ADJOURNMENT
Motion by Commissioner Wick, Second by Commissioner Wirt to adjourn at 6:58
p.m.
MINUTES
HUTCHINSON PLANNING COMMISSION
Tuesday, September 19, 2017
5:30 p.m.
1. CALL TO ORDER 5:30 P.M.
The September 19, 2017 Planning Commission meeting was called to order by Chair Fahey
at 5:30 p.m. Members in bold were present Chair Fahey, Vice Chair Wick,
Commissioner Garberg, Commissioner Wirt, Commissioner Lofdahl, and
Commissioner Forcier. Also present were Dan Jochum, City Planner, John Olson, City
Public Works, John Paulson, City Environmental Specialist, Marc Sebora, City Attorney
and Andrea Schwartz, City of Hutchinson Permit Technician
2. PLEDGE OF ALLEGIANCE
3. CONSENT AGENDA
A. CONSIDERATION OF MINUTES DATED August 15, 2017.
Chair Fahey was present and called the meeting to order and Commissioner Wick
was also present.
Motion by Commissioner Wick, Second by Commissioner Hantge. Motion
approved.
Motion to Approve — Motion to Reject
4. PUBLIC HEARINGS
A. CONSIDERATION OF A 2 LOT PRELIMINARY AND FINAL PLAT FOR
LJM ADDITION LOCATED AT 579 2ND AVE SE.
Dan Jochum, City Planner addressed the Commission.
Mr. Jochum reviewed the application as outlined in the Commission's packets.
This application was seen in the July Planning Commission meeting. The
applicant has decided to change from one lot to two lots.
Existing building do meet all requirements.
Motion by Commissioner Wick, second by Commissioner Lofdahl to close
hearing at 5:35 p.m.
Minutes
Hutchinson Planning Commission
September 19, 2017
Page 2
Motion by Commissioner Lofdahl to approve with staff recommendations.
Second by Commissioner Wirt. Motion approved. Item will be on City Council
consent agenda on 9/26/2017.
B. CONSIDERATION OF A CONDITIONAL USE PERMIT FOR A BREWERY
AND TAP ROOM IN A C-4 ZONING DISTRICT LOCATED AT 900 HWY 15
S.
Mr. Jochum reviewed the application as outlined in the Commission's packets.
There is plenty of room for parking on this property, however the lot in back is
gravel and may need to be paved in the future if overflow parking becomes an
issue.
Jochum went through site access in detail noting that the primary access is off Hwy
15, however north bound traffic can't get to the main entrance due to the median.
There will be some traffic using Linden Ave. and other city streets to get to the
site. Staff also asked for clarification from the applicant on whether or not food
trucks would be onsite. It was noted that they will likely have some food trucks
at some point and they would be parked in front. Staff noted that additional
parking should be provided in back for any spaces taken up by a food truck.
Staff would like to see a more accurate site plan at time of building permit
application especially with parking and parking lot measurement. Need to identify
where food truck parking will be located. Staff is recommending approval of this
site plan with a condition being added regarding a more detailed site plan being
provided with building permit and noting the location of food truck parking.
Fahey — if growth happens what does the applicant do? New CUP? Staff would
handle it administratively.
Ron Duering 225 Hwy 15 S — worried about smell, kids, speed zone with
intoxicated people. He is opposed to the project.
Carol Johnson — Lakewood Dr. — lighting in this area is very poor
There are sidewalks on both sides of the Hwy and on Linden Ave.
1934 Major Ave Ken Bentz (owns properties on Franklin)—needs access to garage
from "alley" will need easement. Possible drainage issue from this proptery. Also
does not want snow removal pushed onto his property to the East. Dan Jochum
noted the easement issue will need to be handled on the side not a condition. Dan
Hart noted that they would work with landowner on snow removal.
Lofdahl — will there be outdoor music? The City does have a noise ordinance. The
applicant will also need permitting for this. Jochum noted that this use would be
no different than any other business that wanted to do a special event.
Minutes
Hutchinson Planning Commission
September 19, 2017
Page 3
Wick — garbage from Brewery/Tap Room?
Daniel Hart — applicant — very willing to work with neighbors on snow removal,
drainage, etc. Outdoor seating will be fenced in. This location is not meant to be
a bar type. Meant to do a tasting and make a purchase to take home such as liquor
stores. Closing at II pm. Food truck and live music will be brought in
occasionally and follow city guidelines. All deliveries will be during daytime
hours. Smell should only take on the odor of oatmeal.
Wick — how much can be produced on site? This will depend on the liquor license.
They should be below what the license holds.
Garberg — would like to see lighting improved on Linden.
Motion by Commissioner Wick, second by Commissioner Hantge to close hearing
at 6:15 p.m.
Motion by Commissioner Hantge to approve with 5 staff recommendations plus
detailed site plan info and food truck location. Second by Commissioner Garberg.
Motion approved. Item will be on City Council consent agenda on 9/26/2017.
C. CONSIDERATION OF A VACATION OF ROW ON LOTS 3,4 AND 5 BLOCK
1 BRIDEWATER ESTATES 2ND ADDITION.
Mr. Jochum reviewed the application as outlined in the Commission's packets.
Motion by Commissioner Lofdahl, second by Commissioner Wick to close
hearing at 6:20 p.m.
Motion by Commissioner Lofdahl to approve with staff recommendations.
Second by Commissioner Wick. Motion approved. Item will be on City Council
agenda new business on 9/26/2017 requiring two readings.
Motion to close hearing — Motion to approve with staff recommendations — Motion to reject
1. NEW BUSINESS
A. RESOLUTION OF THE CIT OF HUTCHINSON PLANNING COMMISSION
FINDING THAT A MODIFICATION TO THE DEVELOPMENT PROGRAM
FOR DEVELOPEMTN DISTRICT NO. 4 AND A TAX INCREMENT
FINANCING PLAN FOR TAX INCREMENT FINANCING DISTRICT NO. 4-
19 CONFORM TO THE GENERAL PLANS FOR THE DEVELOPMENT AND
REDEVELOPMENT OF THE CITY.
Minutes
Hutchinson Planning Commission
September 19, 2017
Page 4
Miles Seppelt presented to the Commissioners. TIF district will assist if any
contaminated soil is found. The district will be taken down after initial building
and development has taken place.
Hantge to approve Lofdahl second. Approved
B. DISCUSSION REGARDING POSSIBLITY OF BECOMING A BRONZE
LEVEL SOLSMART COMMUNITY.
a. Zoning Review
John Paulson presented to the board - SolSmart has given us some guidelines
for becoming bronze certified. Some of the steps are to have the information
available on our City web page with contact information and guidelines. We
the City will be going forward with some of these steps just to have the
information available to the City just for good practice for residents interested
in solar, even if the City of Hutchinson does not get Bronze Certified.
Dan Jochum noted that the solar projects will not receive special treatment and
will be looked at as an accessory structure.
2. UNFINISHED BUSINESS
3. COMMUNICATION FROM STAFF
A. Upcoming Meetings
Dan Jochum noted that we have one applications for the September Planning
Commission meeting at this time. Also a potential for one vacation of easement.
4. ADJOURNMENT
Motion by Commissioner Wick, Second by Commissioner Wirt to adjourn at 6:43
p.m.