07-15-1982 BOMMINUTES
BID OPENING
THURSDAY, JULY 15, 1982
The bid opening was opened by Administrative Secretary Marilyn Swanson at 2:00 P.M.
Present were: Administrative Secretary Marilyn Swanson and Fire Marshal George
Field.
The letter mailed to contractors for estimates on the demolition of the Old Armory
Building was reviewed by Mrs. Swanson. The following bids were then opened and
read:
Ed Rettman Jr. Excavating
Darwin, MN
Kennedy Excavating Co.
Benson, MN
Erickson & Templin Contracting
Hutchinson, MN
Juul Contracting
Hutchinson, MN
$26,564.00
- Base Bid
2,405.00
- Item No. 1
13,595.00
- Item No. 2
42,564.00
- Total
28,000.00
- Base Bid
4,900.00
- Item No. 1
8,500.00
- Item No. 2
41,400.00
- Total
30,000.00
- Base Bid
1,500.00
- Item No. 1
10,000.00
- Item No. 2
41,500.00 -
Total
32,500.00 -
Base Bid
2,000.00 -
Item No. 1
12 ,500.00
- Item No. 2
47,000.00
- Total
There being no further business, the bids were referred to the Old Armory Research
Committee and City staff for review. The bid opening adjourned at 2:10 P.M.