11-25-1992 BOMMINUTES
BID OPENING
WEDNESDAY, NOVEMBER 25, 1992
Finance Director Kenneth B. Merrill called the bid opening to order
at 2:00 P.M. Also present were Engineer John Rodeberg, Director
Randy DeVries, Chuck Barger of RCM, and Administrative Secretary
Marilyn J. Swanson.
Finance Director Merrill dispensed with the reading of Advertise-
ment for Bids, South Park Elevated Water Tower. The following bids
were opened and read:
Caldwell Tanks
CBI Na -Con
Pittsburgh -Des Moines
Maquire Iron
Landmark Struct.
$646,400 Single Pedestal
558,100 Single Pedestal
623,200 Single Pedestal
667,175 Single Pedestal
657,360 Composite
The bids were referred to the Engineering Department and RCM
consultant for review and a recommendation.
The meeting adjourned at 2:10 P.M.