Loading...
11-25-1992 BOMMINUTES BID OPENING WEDNESDAY, NOVEMBER 25, 1992 Finance Director Kenneth B. Merrill called the bid opening to order at 2:00 P.M. Also present were Engineer John Rodeberg, Director Randy DeVries, Chuck Barger of RCM, and Administrative Secretary Marilyn J. Swanson. Finance Director Merrill dispensed with the reading of Advertise- ment for Bids, South Park Elevated Water Tower. The following bids were opened and read: Caldwell Tanks CBI Na -Con Pittsburgh -Des Moines Maquire Iron Landmark Struct. $646,400 Single Pedestal 558,100 Single Pedestal 623,200 Single Pedestal 667,175 Single Pedestal 657,360 Composite The bids were referred to the Engineering Department and RCM consultant for review and a recommendation. The meeting adjourned at 2:10 P.M.