Loading...
04-09-1990 BOMMINUTES BID OPENING MONDAY, APRIL 9, 1990 The meeting was called to order at 2:00 P.M. by City Administra- tor Gary D. Plotz. Also present: Director of Engineering John Rodeberg, Asst. Engineer Cal Rice and Administrative Secretary Marilyn Swanson. The reading of Publication No. 4093, Advertisement for Bids, Letting No. 2, Project No. 90-08, was dispensed with. The fol- lowing bids were opened and read: Duininck Bros., Inc. Prinsburg, MN $379,012.68 Wm. Mueller & Sons, Inc. Hamburg, MN 374,441.54 The bids were referred to the Director of Engineering for review and a recommendation. The meeting adjourned at 2:05 P.M.