Loading...
03-06-1990 BOMMINUTES BID OPENING TUESDAY, MARCH 6, 1990 City Administrator Gary D. Plotz called the bid opening to order at 2:00 P.M. Also present: Assistant Engineer Cal Rice and Ad- ministrative Secretary Marilyn Swanson. The reading of Publication No. 4087, Advertisement for Bids, Letting No. 1, Project No. 90-04, was dispensed with. The fol- lowing bids were opened and read: Juul Contracting Co. Hutchinson, MN $58,520.55 Randy Kramer Excavating Watkins, MN 66,495.65 Duininck Bros., Inc. Prinsburg, MN 70,753.70 Machtemes Construction Waconia, MN 74,846.70 The bids were referred to the Engineering Department for review. The bid opening adjourned at 2:10 P.M. -9