03-06-1990 BOMMINUTES
BID OPENING
TUESDAY, MARCH 6, 1990
City Administrator Gary D. Plotz called the bid opening to order
at 2:00 P.M. Also present: Assistant Engineer Cal Rice and Ad-
ministrative Secretary Marilyn Swanson.
The reading of Publication No. 4087, Advertisement for Bids,
Letting No. 1, Project No. 90-04, was dispensed with. The fol-
lowing bids were opened and read:
Juul Contracting Co.
Hutchinson, MN $58,520.55
Randy Kramer Excavating
Watkins, MN 66,495.65
Duininck Bros., Inc.
Prinsburg, MN 70,753.70
Machtemes Construction
Waconia, MN 74,846.70
The bids were referred to the Engineering Department for review.
The bid opening adjourned at 2:10 P.M.
-9