06-17-1991 BOMMINUTES
BID OPENING
MONDAY, JUNE 17, 1991
The meeting was called to order at 2:00 P.M. by City Administrator
Gary D. Plotz. Also present were Engineer John Rodeberg and Admin-
istrative Secretary Marilyn Swanson.
The reading of Publication No. 4247, Advertisement for Bids, Phase
A - Repair And Modification To Hutchinson Dam On South Fork of Crow
River, Letting No. 10, Project No. 90-20, was dispensed with.
The following bids were opened and read:
All Tech Engineering
Bloomington, MN $23,820.00
DNCON Inc.
Lakeville, MN 49,891.75
Jay Bros., Inc.
Hugo, MN 37,183.00
The bids were referred to the Engineering Department for recommen-
dation of award at the next City Council meeting.
The meeting adjourned at 2:05 P.M.