03-10-1989 BOMMINUTES
BID OPENING
FRIDAY, MARCH 10, 1989
Finance Director Kenneth B. Merrill called the bid opening to order at 2:00 P.M.
Also present was Administrative Secretary Marilyn Swanson.
The reading of Publication No. 3968, Advertisement for Bids, Letting No. 1, -
Project No. 89-01, was dispensed with. The following bids were opened and read:
Juul Contracting Co., Inc.
Hutchinson, MN 175,208.60
Latour Construction
Maple Lake, MN 83,880.75
Southern Minnesota Construction
Mankato, MN 96,805.00
Kuemper Incorporated
Bird Island, MN 70,862.30
Rickert Excavating, Inc.
Brownton, MN 69,604.00
The bids were referred to the Engineering Department. A public hearing will be
held prior to awarding the bid in April or early May.
The bid opening adjourned at 2:10 P.M.
9