Loading...
03-10-1989 BOMMINUTES BID OPENING FRIDAY, MARCH 10, 1989 Finance Director Kenneth B. Merrill called the bid opening to order at 2:00 P.M. Also present was Administrative Secretary Marilyn Swanson. The reading of Publication No. 3968, Advertisement for Bids, Letting No. 1, - Project No. 89-01, was dispensed with. The following bids were opened and read: Juul Contracting Co., Inc. Hutchinson, MN 175,208.60 Latour Construction Maple Lake, MN 83,880.75 Southern Minnesota Construction Mankato, MN 96,805.00 Kuemper Incorporated Bird Island, MN 70,862.30 Rickert Excavating, Inc. Brownton, MN 69,604.00 The bids were referred to the Engineering Department. A public hearing will be held prior to awarding the bid in April or early May. The bid opening adjourned at 2:10 P.M. 9