03-17-2000 BOMMINUTES
BID OPENING
MARCH 17, 2000
City Administrator Gary D. Plotz called the bid opening to order at 10:30 a.m. Also
present were Director Dolf Moon, Coordinator Lawrence Winter, and Administrative
Secretary Marilyn J. Swanson.
Plotz dispensed with the reading of Publication No. 6124, Advertisement for Bids,
Prefabricated Restroom Facility.
The following bids were opened and read:
Biological Mediation Systems, Inc.
Ft. Collins, CO
Precast Concrete Products
Spokane, WA
$43,220.00 — Base Bid
NO LABOR PROVIDED;
City Responsibility for
Unloading & On -Site Setup
BREAKDOWN:
$42,020.00 — Prefab. Restroom
1,200.00 — Additional Costs:
■ Transportation
(FOB Site)
■ Unloading
■ Non - Standard
Color Setup
$27,683.83 ea. — Total Bid
Cortez Flush Toilet Building
BREAKDOWN:
$23,383.83 — Building
2,700.00 — Freight to Site
1,600.00 — Crane to Offload Bldg.
& Connect to Sewer/
Water/Electrical
The bids were referred to staff for review and a recommendation.
The meeting adjourned at 10:45 a.m.