Loading...
03-17-2000 BOMMINUTES BID OPENING MARCH 17, 2000 City Administrator Gary D. Plotz called the bid opening to order at 10:30 a.m. Also present were Director Dolf Moon, Coordinator Lawrence Winter, and Administrative Secretary Marilyn J. Swanson. Plotz dispensed with the reading of Publication No. 6124, Advertisement for Bids, Prefabricated Restroom Facility. The following bids were opened and read: Biological Mediation Systems, Inc. Ft. Collins, CO Precast Concrete Products Spokane, WA $43,220.00 — Base Bid NO LABOR PROVIDED; City Responsibility for Unloading & On -Site Setup BREAKDOWN: $42,020.00 — Prefab. Restroom 1,200.00 — Additional Costs: ■ Transportation (FOB Site) ■ Unloading ■ Non - Standard Color Setup $27,683.83 ea. — Total Bid Cortez Flush Toilet Building BREAKDOWN: $23,383.83 — Building 2,700.00 — Freight to Site 1,600.00 — Crane to Offload Bldg. & Connect to Sewer/ Water/Electrical The bids were referred to staff for review and a recommendation. The meeting adjourned at 10:45 a.m.