03-28-1988 HUCMRegular Meeting March 28, 1988 Commissioner Daggett, Commissioner Lyke, Commissioner Cornell and Commissioner Richards were present, Commissioner Beatty was absent; also present were Mgr. Hakel, Counsel Peterson, Jane Hodgins, Hutchinson Leader staff writer and Sue Winter. President Daggett called the meeting to order at 1:00 p.m. The minutes of February 29, 1988 regular meeting were reviewed. A motion was made by Commissioner Cornell, seconded by Commissioner Richards to accept the minutes with the noted changes as discussed. (page 3, second paragraph - add treasury bills and notes as acceptable collateral requirements). Motion was unanimously carried. The February payables for both entities were discussed. A motion was made by Commissioner Lyke, seconded by Commissioner Cornell to accept the payables as presented. Motion was unanimously carried. Mark Flaten, American Risk Services consultant, and Ivan Larson presented quotes for fire insurance coverage for plants #1 and #2 (copy attached). After discussion, Mark Flaten recommended the quote from League of Minnesota Cities. A motion was made by Commissioner Lyke, seconded by Commissioner Richards to accept the quote for fire insurance coverage from League of Minnesota Cities in the amount of $33,425. Motion was unanimously carried. Dave Schmidt of Associated Consultants and "Butch" Wentworth presented recommendation for precast manholes to be utilized in the construction of two 13.8 KVA feeders. North Star Concrete $24,258 A motion was made by Commissioner Lyke, seconded by Commissioner Cornell to award the bid for precast manholes to North Star Concrete in the amount of $24,258. Motion was unanimously carried. Dave Schmidt discussed potential transformers. He recommended oil filled porcelain type transformers. After discussion, it was decided to contact United Power Association to see if Hutch Utilities could carry in its inventory, on a loan basis, one potential transformer. A motion was made by Commissioner Lyke, seconded by Commissioner Cornell authorizing staff to get quotes and to order three potential transformers. Motion was unanimously carried. 1 / / - �a Mark Flaten and Ivan Larson discussed insurance coverage for Rolls Royce gas generator and power turbine. A motion was made by Commissioner Cornell, seconded by Commissioner Lyke to bind coverage for Rolls Royce gas generator and power turbine with Hartford for 30 days. Motion was unanimously carried. Mgr. Hakel presented the February financial statements. A motion was made by Commissioner Cornell, seconded by Commissioner Lyke to accept the financial statements as presented. Motion was unanimously carried. A list of uncollectible accounts (bankruptcies) was discussed. A motion was made by Commissioner Cornell, seconded by Commissioner Lyke authorizing management to charge -off electric in the amount of $393.42 and gas in the amount of $230.70, totaling $624.15, detailed listing on pages 1401E and 632G of the April general journal. Motion was unanimously carried. The following bid letting policy was presented: Bid Letting Policy The following procedure shall be followed when sealed bids are required pursuant to the Uniform Municipal Contracting Law. Specifications shall be prepared and submitted to the commission for approval. If approved, the commission shall 1. Set the time and date for the bid opening; 2. Designate which employees and consultnats shall open, review and evaluate the bids; 3. Set the manner in which the solicitation for bids will be published; and 4. Determine bond requirements. The employees and consultants designated by the commission shall 1. Open the bids; 2. Review them to determine compliance, and; 3. Evaluate and make a recommendation to the commission. A motion was made by Commissioner Cornell, seconded by Commissioner Richards to adopt the above policy. Motion was unanimously carried. 1 [I 1 13 Commissioner Daggett and Commissioner Lyke were appointed to meet with two council members in regard to contribution to the general fund of the City of Hutchinson for 1989. Wally Hombach, "Butch" Wentworth and Ivan Larson discussed work loads for the summer of 1988 (copies attached). Manager's Report: 1. The May regular meeting will be held on May 31 at 1:00 p.m. The June regular meeting will be held on June 23 at 1:00 p.m. 2. Minnesota Municipal Utilities Association's summer meeting will be held in Alexandria, MN on June 19 -22, 1988. A motion was made by Commissioner Lyke, seconded by Commissioner Cornell authorizing the attendance of the Commissioners and general manager. Motion was unanimously carried. 3. In regard to retirement reserve fund, Mgr. Hakel contacted several City departments. After discussion, it was decided not to set up a retirement reserve fund. 4. Getting quotes for return envelopes for utility statements. 5. Employee handbook will be discussed at next month's meeting. 6. In regard to the installation of underground ducts and manholes for construction of two 13.8 KVA feeders, a motion was made by Commissioner Lyke, seconded by Commissioner Cornell authorizing bid letting on April 25, 1988 at 9:00 a.m. for the installation of underground ducts and manholes. Motion was unanimously carried. 7. Mgr. Hakel informed the Commission she would be retiring in the near future. Filling the positions of general manager and administrative director would be discussed at a future meeting. Old Business: Commissioner Cornell asked about joint billings and meter reading with the water department. After discussion, it was decided Commissioner Cornell could look into this further. New Business: None The following are February payables: ADVERTI( FURNISHING '6, 0 1.VEFY-0F. PRECAST MANHOLES ' FOR THE HUTCHINSON UTILITIES COMMISSION CITY OF HUTCHINSON,'MINNESOTA PROJECT N0. 871Q8 - 1988 ' Notice is hereby given that the Hutchin- son. Utilities; Commission of th'e.. City of Hutchinson, Hutchinson, Minnesota, hereinafter;referred, to as the Owner, will receive. sealed Bids' at the Hutchinson Utilities .Offices until 10:00 A.M. on the 28th dayof March, 1988, and will public= ' ly .open and read; aloud such Bids on the following.lmprovement(s). ' Tfie Furnishing and Delivery, of Precast Manholes for the Hutchinson . Utilities Commission; City of Hutchinson, Min - hesota. "Said bids, WiIV be acted : upon "by the Qwner.at their regular meeting to.be held at the :Hutchinson Utilities Office et .1:00 :on March 28, .1.988 ror a later time' and place as may. then be. fixed.., Proposals - shall be ,properly endorsed and delivered • in an envelope marked; "BIDS .FOR THE FURNISHING AND DELIVERY'OF PRECAST, MANHOLES FOR THE HUTCHINSON UTILITIES QOMMISSION; CITY, Or HUTCHINSON,, MINNESOTA, PROJECT NO. 817198, 1988 ", and'shall be addressed to:. Hut' chir)son Utilities ,Commission,' +225 Michigan ,Street, Hutchinson, Minnesota' 55350:, " All Proposals shall be submitted in' triplicate`' do the`'Bidder's own' letterhead in facsimile of the, Proposal Form en -.los, edin'AheSpeaif6tions,,orby. tiliz'o1 the Proposal' Form ' enclosed" {it`hq specifications by,typing;the, official,namg of the Bidder at the of 'the form. ' Each : Proposal shall':,be' accompanied by a,Bid-Bond made payable to the Hut- chinson Utilities ,.Commission in the amount of five percent (5 %) of the Bid, a guarantee that the, Bidder will, enter into the proposeq,Contract and provide a Per formance and Maintenance. Bond after his, Bid shall have,been:accepted, No Bidder may withdraw his Bid or Pro- posal for a period of thirty (30) days after date'of opening of Bids: At the aforementioned time and place, of ..at:. such fater time 'and; 4Place as:-i Owner then may, fix',' the :Owner will ac{ upon Proposals; received and 'within , its sole discretion may. award Contract(s) for j the furnishing of said material. Payment for said Improvements will be made in. cash.to be derived frgm- available cash. on hand and /or 'from the proceeds of the sale of revenue' bonds, . which said — bonds will be, payable solely and only out Of the future net earnings of the municipal electric utility of said City. The City shall `not ;incur any genera) obllgation for said lmprovements, and neither, the Contract for .`said Im': provemerntsi nor said. revenue, borf,ds shall constitute,a general obligatiori:;of'Said.City{ or be payable in any manner by taxation, an be `in rd der'no circumstances,shaltthe City i ny manner liable by reason of the' failure of,said net earnings to be'sufficient for the payment thereof.' " Work shall be started within .ten (10) clays after award of Contract(s) and shall be. completed'within the'time stated in the ;Specifications /Contractor's Proposal. " 'Specifications are on file at the Office of the, Director of Utilities, and Associated Consultants Engineers, Inc., 3131 Fern brook Lane North, Minneapolis, Min- nesota 55441, where they are, available for examination. Copies'thereof may be ,obtained, from' Associated Consultants P, ,engineers, Jnc., at no charge. The:. Hutchinson Utilities Commission reserves the right to •reject 'any and' all Bids. Hutchinson Utilities,Commission By /s /Thomas Lyke; Secretary, rATTESTED:;: -, By /s/ I3uth Hakel, Manager Date 2 -12 =88 20;.22 n AFFIDAVIT OF PUBLICATION <1� STATE OF MINNESOTA) COUNTY OF McLEOD)ss. W. L. Kasich, being duly sworn, on oath says he is and during all the times herein stated has been the publisher and printer of the newspaper known as the Hutchinson Leader and has full knowledge of the facts herein stated as follows: (1) Said newspaper is printed in the English language in newspaper format and in column and sheet form equivalent in printed space to at least 1,200 square inches; (2) Said newspaper is a semi - weekly and is distributed at least twice each week; (3) Said newspaper has 25% of its news columns devoted to news of local interest to the community which it pur- ports to serve and does not wholely duplicate any other publication and is not made up entirely of patents, plate matter and advertisements; (4) Said newspaper is circulated in and near the municipality which it purports to serve, has at least 500 copies regularly delivered to paying subscribers, has an average of at least 75% of its total circulation currently paid or no more than three months in arrears and has entry as second class matter in its local post office. (5) Said newspaper purports to serve the City of Hutchinson in the County of McLeod and it has its known office of issue in the City of Hut- chinson in said county, established and opened during its regular business hours for the gathering of news, sale of adver- tisements and sale of subscriptions and maintained by managing officer of said newspaper or persons in its employ and subject to his direction and control during all such regular business hours and devoted exclusively during such business hours to the business of the newspaper and business related thereto. (6) Said newspaper files a copy of each issue im- mediately with the State Historical Society. (7) Said newspaper is made available at single or subscription prices to any person, corporation, partnership or other unincorporated association requesting a newspaper and making the applicable payment. (8) Said newspaper has complied with all the foregoing conditions for at least one year preceding the day or dates of publication mentioned before. (9) Said newspaper has filed with the Secretary of State of Minnesota prior to Januaary 1, 1966, and each January 1 thereafter an affidavit in the form prescribed by the Secretary of State and signed by the managing officer of said newspaper and sworn to before a notary public stating that the newspaper is a legal newspaper. He further states on oath that the printed Advertisement for Bids hereto attached as a part hereof was cut from the columns of said newspaper, and was printed and published therein in the English language once each week, for two successive weeks, that it was first so published on Thursday the 10 day of Mn roh 19_ 88 — and was thereafter printed and published on every Thursday to and including the 18 day of M r h 19 88 , and that the following is a printed copy of the lower case alphabet from A to Z both inclusive and is hereby acknowledged as being the size and kind of type used in the composition and publication of said notice, to wit: aDCdelgh mmroP4a4nwxn SubscriJiLk �bgf�p(Agq � day of � 19 LOUISE JESSEN {>r COMM A (No commissfon Explm JKL 0.1904 C) 3- -I c..c-)mm m M.. •• n .. a 0 O a -h -n - s- �•occoa o V+ -3 -s C+ .. •s N•C< e+ =.0 Oo o o Sy 03 WO �a m fl. Z d (D N c*-fim occto e+ c+ ►-+ A n Or C W � J. r, a -��• coo I— N %D (A (A p J. WOOmc+ V J. (D N 3cC+f<D J..a. i p O -+• � m e+ O J• C+ (A 'CN N c J. m C N C+ to 3 O O O QQ m OV1W Sc+J• 0 CL M as ►� 7 CS � p�W m Z Z � p3c .� J z -J oo <� - I (A M L Imo %DNz OD � n r -+• Ct S 3 w a � m a "r� J. "O m a o i rh •j m J. Q V O n 00 rc p V to a � m 0) �--• z l + o v� X cam+ m S � N V n Hutchinson Utility Commission Prepared By: American Risk Services, Inc. �r ^cam Leac�s� a vY,,p,..r s9 }� c, �,�5 88 -03-28 EMPLOYERS HARTFORD NSIU NSIU 28,482,012 36,606 34,876 Yes No Yes No No DIC 10,000,000 31,647,000 42,606 40,476 44,808 25,000,000 25,000,000 100,000 10,000 25,000 Yes Yes No No INSURANCE RENEWAL EVALUATION Yes No Yes No LMCIT/ SUBJECT OF COVERAGE HARTFORD AETNA LMCIT HARTFORD Insurance Agent: Ins Planners Ins Planners Ins Planners Ins Planner Named Perils Proposal (As Expiring): Blanket Limit: 31,647,680 Premium: Deductible $51000: Deductible $50,000: Deductible $100,000: 38,292 Deductible $250,000: Deductible $500,000: Flood Aggregate Limit: Earthquake Annual Limit: Transit Coverage Limit: Transit Deductible: Expiditing Expense: Replacement Cost: Yes Same Site Replacement Cost Requirement: No Agreed Amount Clause: Yes Boiler & Machinery Required: No Mandatory Engineering Required: No All Risk Policy Form: Blanket Limit: 31,647,000 31,647,680 31,647,000 31,647,000 Premium: - -. ( Deductible $5,000: 33,425 44,908 Deductible $50,000: Deductible $100,000: 42,960 43,039 Deductible $250,000: Deductible $500,000: Flood Aggregate Limit: 25,000,000 31,647,680 25,000,000 Earthquake Annual Limit: 25,000,000 31,647,680 25,000,000 DIC Deductible: 100,000 250,000 500,000 Transit Coverage Limit: 100,000 100,000 Transit Deductible: 10,000 10,000 Expiditing Expense: 25,000 25,000 Replacement Cost: Yes Yes Yes Yes Same Site Replacement Cost Requirement: No No No No Agreed Amount Clause: Yes Yes Yes Yes Boiler & Machinery Required: Yes No No Yes Mandatory Engineering Required: Yes No No Yes BOILER & MACHINERY Incorporated in the UniTech Policy Rewrite current contract: 35,585 37,557 35,585 Prepared By: American Risk Services, Inc. �r ^cam Leac�s� a vY,,p,..r s9 }� c, �,�5 88 -03-28 EMPLOYERS HARTFORD NSIU NSIU 28,482,012 36,606 34,876 Yes No Yes No No DIC 10,000,000 31,647,000 42,606 40,476 44,808 25,000,000 25,000,000 100,000 10,000 25,000 Yes Yes No No Yes Yes No Yes No Yes 37,557 � A Summer Work Schedule Complete second (alternate) high voltage service to new Raw Waste Water pumping station. Change loop switch make final connections to new Waste Water Treatment plant. Change loop switch County Road 12 and School Road North. More switching capability and fuse protection for load conductors. Install junction box west of Heritage Center and complete loop in area. One block three phase. Convert to 13,800 volt, the 4160 volt north of Highway 7, west of School Road North and Shady Ridge Road. Will reduce load on 1500 KVA Step Down transformer at Happy Chef - 2 year program. Convert to underground, the overhead conductor which crosses Highway 7 East at Wigens and goes south to feed Country Kitchen and surrounding area. Problems with tree growth. Continue converting overhead to underground along Second Avenue Southwest and east of Dale Street and south to Fourth Avenue Southwest. Three blocks primary and secondary. Complete one block - primary and secondary between Fourth and Fifth Avenue Southeast. One -half block east of Main Street South. Convert 900 block of Second Avenue Southwest to underground primary and secondary. 'One block. Install conduit and ' primary for West and Southwest Residence from First Avenue Northwest between Franklin and Glen Streets, south to Second Avenue Southwest (3 blocks.) Continue on south for two additional blocks to Pease Lutheran Church with Southwest Residence Feeder. Korngiebel plans to build 40 plex apartment between Third Avenue Southwest and Fourth Avenue Southwest. Area needs to have primary upgraded this year. Secondary can be installed later if schedule allows. Convert overhead to underground area west of Jefferson Street South, north of Century Avenue, east of Jorgenson Street, south of Sherwood Circle. Tree problems and two annual squirrel electrocutions. Install underground primary for 36 unit apartment to be built on Jefferson Street South, north of Century Avenue. Schmidtbauers six lot expansion on Century Avenue - first stage of primary and secondary installation to feed area south of Century Avenue and west of Jefferson Street South. Primary underground to be installed to serve 80 unit complex (5 each 16 plex) to be built north of School Road North and west of County Road 12. Area to be constructed to tie in with Bethke townhouses to be built west of this area. Primary to be installed north of Carolina Avenue, east of School Road North to serve 3 each 12 plex to be built by Larry Bethke for Hellends. One -half block. Install primary for 80 unit development to be built east of California Street and north of Texas Avenue. Three blocks, all electric units. Finish Westwood, west of Shady Ridge Road by Crow River Press, one and one -half blocks primary and secondary. Pull in new conductors - Plant #1 to Happy Chef. energized by mid July. McDonald Addition, Park blocks depending on how to be installed. splice to terminate new feeders from I want to have at least one circuit Island Drive, could be as much as three it's developed. Primary and secondary Casa Addition - John Miller, install security lights for mini storage. McClures 2nd Addition - nine lot expansion. Primary and secondary to be installed. Highway 15 South - 10 poles in the way of construction. I would like to bury these facilities before construction begins. Some poles such as street light and civil defense siren will have to be moved to new locations or replaced when construction is com- plete. Four block area. Larry Bethke townhouse project north of School Road North, primary and secondary underground to be installed. Two blocks. Wagner's Addition, south of Roberts Road. We have looked at a preliminary plot plan of Wagner's property. He talked of opening four or six lots this year. Nothing definite at this time. Last year we installed 246 individual house services. Many were conversions from overhead to underground. I would expect a similar amount this year. We have 12 on our list for this year already. Underground that feeds Main Street South street lights, failed this winter. We are feeding it temporarily overhead. I think it failed in the street due to sewer construction last summer. McDonald Trailer Park - One remaining section that is served overhead, is in need of converting to underground and upgrading service sizes due to much larger trailers now than when original facilities were installed 18 years ago. Twenty -two lots. , . a - Three poles east of Plant #1 must be replaced. Four major feeders on these poles and we should not try to get any more life from them. City would like street lights installed along Highway 7 from Highway 15 west to California Street. I'm sure we will get several more requests for street lights in area west of Shady Ridge Road. Twelve areas requiring splitting load and installing additional transformers. Four have been completed. We are waiting for special pole line hardware now to complete project. These are areas we experienced some type of problem during last years long hot spell. R r Natural Gas Division Summer Work 1. Relocate approximately 1,500 feet of existing gas main on old Golf Course Drive. Reason for relocation is because an apartment complex with 80 units is to be constructed at the intersection of County Road #12 and School Road North. 2. Main extension in new and existing subdivision. 3. Service line installation. 4. Leak Survey of system. 5. Cathodic Protection survey of system. 6. Test 24 large volume meters. 7. Continued electric and gas location for construction. 8. Installing and fabricating 15 barricades for meters in alleys and parking lots. 9. Pressure test relief valves and regulator stations. 10. Inspection and lubrication of all valves in system. 11. Installation of new telemetering equipment. r Power Plant Division 1988 Work Projections The following is a list of projects which are to be completed in 1988, above the power plant division's normal work assignments. - Install cooling fans on interconnect transformer, Plant #2. - Project #101362, west feeder. Much work involved in substation (breakers) and the installation of new equipment in dispatch. - Design, build & install new control boards for Units 3 & 4. - Write new procedures for dispatching, covering switching, outages, gas dispatching, service and general procedures. - Continue conducting monthly classes with plant personnel; such as, reviewing old procedures and discussing the new ones. - Improve the monitoring of hazardous waste disposal, fuel oil. and lube oil inventory. - Set up a better schedule for the exercising of the Utilities generating units. - Design and construct a loading ramp for purchasing department (behind the utility center.) - Redesign Unit #81s boiler layup system and rewrite the procedures. - Install either Unit 3 or 4 crankshaft protection devices. - Work with contractors on the remodeling of the Utility Center. - Replacement of roof above the Utility Center garage area. - Rebuild and repair trucks and equipment for the gas and electric division. 1 - Assist gas and electric departments with man power if needed. - One (1) employee to work with meter department 11 days each month. - Maintain the utilities buildings and properties (includes the mowing of approximately 9 acres.) 1 FEBRUARY PAYABLES - ELECTRIC Continental Assurance Co. Life insurance 42.42 ICMA Retirement Corp. Employee deferred comp withheld 1,217.00 Woodmen Accident & Life Medical insurance 5,412.76 Charles J. Kroeger Medical insurance 230.00 Firstate Federal Savings Payroll deposit plan 5,575.85 Citizens Bank & Trust Co. Payroll deposit plan 7,170.72 First National Bank Payroll deposit plan 688.14 Crow River Glass Refund - overpayment 221.06 Gordon Curtiss Meter refund & interest 13.68 Bruce Allenspach 40.10 Gerald Kill 89.37 Tifany Tithoefter 48.53 Putnam Fund Dist. Employee deferred comp withheld 25.00 Citizens Bank & Trust Co. Federal_ tax & FICA withheld & exp. 8,977.11 PERA PERA withheld & exp. 4,008.86 IBM Corp. Maint. agreement 315.50 Marco Business Products Office supplies 31.95 UPS Freight charges 38.09 ICMA Retirement Corp. Employee deferred comp withheld 1,217.00 Putnam Fund Dist. Employee deferred comp withheld 25.00 First National Bank Payroll deposit plan 720.45 Firstate Federal Savings Payroll deposit plan 6,502.27 Citizens Bank & Trust Co. Payroll deposit plan 6,645.32 PERA PERA withheld & exp 3,863.58 Commissioner of Revenue State tax withheld 4,653.49 Citizens Bank & Trust Co. Federa tax & FICA withheld & exp. 9,334.83 Zee Medical Service Supplies 131.65 U.S. Postal Service Stamps 110.00 PERA Employee insurance withheld. 18.00 Natural Gas Division Due to Natural Gas Division 581,986.26 Account's Receivable Richard Peterson Legal retainer 400.00 Petty Cash Postage 861.06 Lincoln National Corp. Emplcyee insurance withheld 26.00 Citizens Bank & Trust Co. Deposit to Contribution Account 25,000.00 Citizens Bank & Trust Co. Deposit to Bond & Int Pay't Acct 50,559.38 Colonial Life & Accident Employee insurance withheld 156.10 American Family Life Employee insurance withheld 128.40 Hutch Utilities Employee utility bills withheld 475.00 Quill Corp. Office supplies 109.53 Four Seasons Services Cup inserts 47.80 MN Benefit Assn. Employee insurance withheld 10.00 J.C. Penney Uniforms 68.00 CNA Life insurance 46.32 Family Rexall Drug Office supplies 1.58 Hutch Drug Supplies 43.53 Dale Sturges Snow removal 240.00 General Trading Co. Plant supplies, bldg. maint. 63.60 Hutch Utilities Due to Natural Gas Division February labor 2,008.09 AMEX Life Assurance Employee insurance withheld 72.08: Hutch Telephone Co. Telephone 1,376.63 Em FEBRUARY - ELECTRIC (cont) Reggie Prokosch Jeffrey Nohner Bradley Messner Lynette McCleary Whooley James Kysela Carol A. Iverson Carol Fransen Irma M. Ehrich Dungarvin Zephyr Petty Cash Allen Office Products American Linen Supply American Welding Supplies Cash Wise Central Eyewear Dist. Commissioner of Revenue County Market Fabricare Cleaners Farm & Home Dist. Hillyard Floor Care Supply Hutchinson Co -op Hutchinson Leader Hutch Util - Emp. Fund Hutch Utilities Hutch Wholesale Supply IBEW Local 949 Ink Spots Junker Sanitation Service Lakes Gas Co. Northern States Supply Otter Tail Power Co. Plowman's, Inc. Quade Electric Quill Corp. Ralph's Garage Raymark Office Supplies Simonson Lumber Standard Printing UPA Welders Supply Co. Dostal & Oleson Oil Forbes Auto Store Natural Gas Division Erickson Oil Products City of Hutchinson UPA Carquest Auto Parts Standard Printing Co. Meter deposit & interest Meter deposit & int., offic e supplies, gas, plant suppli Office supplies Laundry Plant supplies, supplies Rolls Safety glasses Sales tax Cookies & coffee Laundry Power operated equip. maint. Plant supplies, bldg. maint. Supplies Advertising Employee fund withheld Plant & UC usage Truck, power operated equip. accessory equip. maint. Union dues Office supplies Refuse charge Gas Meter maint., plant supplies Supplies Truck maint. Meter maint., street light mdse. Office supplies Truck maint. Office supplies Bldg. maint. Office supplies ITA Agreement Plant supplies Plant supplies Truck, power operated equip. Due to Natural Gas Division Accounts Receivable Plant supplies Water bill Purchased power Mdse. Office supplies es maint., 212.00 212.00 212.00 106.50 212.00 106.50 213.00 106.50 213.00 697.75 162.44 60.52 185.48 51.84 35.00 22,780.72 171.17 90.00 184.20 105.56 5.00 465.50 122.00 6,136.55 416.89 508.05 31.90 84.40 35.52 106.25 25.08 50.33 42.71 49.88 54.73 12.00 72.87 59.00 7,204.92 29.10 29.25 maint. 120.44 982.91 8.00 262.42 400,018.72 6.16 62.54 1 1 1 Coast to Coast Plaza Hardware & Gifts Leef Bros., Inc. Medical Insurance FEBRUARY - ELECTRIC. (cont) Plant supplies, bldg. maint., meter maint. Plant supplies, bldg. maint., Acc plant equip. maint., meter Laundry Expense /7 -7- 84.10 109.07 35.02 3,144.28 Apollo Piping Supply Engine maint. #3 & #4, water system 113.16 maint. Automatic Garage Door Co. Bldg. maint. 1,077.00 Graybar Electric Co. Plant supplies, mdse. 440.51 H & C Electric Supply Mdse. 26.92 MN Valve & Fitting Co. Engine maint. #3 & #4 88.44 Northland Electric Supply Engine maint. #3 & #4 986.20 Riverside Mfg. Co. Uniforms 733.04 Scientific Columbus, Inc. Meter inv. 4,736.45 Scientific Columbus, Inc. Meter inv. 2,275.81 Berg's Office Supply Office supplies 24.45 Copy Equipment, Inc. Office supplies 226.23 Electro Watchman, Inc. Annual charge 132.00 MN Pollution Control Agency Regulatory expense 450.00 Krenz & Company Station equipment switchgear 4,386.00 MN Pollution Control Agency Petersen - Wisdorf, Inc. Regulatory expense Dist. inv. 300.00 95.72 Aquatrol Corp. Substation maint. 350.00 Motor Vehicle Dept. Truck expense 240.75 Adult Extension TIH Registration 50.00 Apollo Piping Engine maint. #8, mdse. 100.13 Krenz & Company Station equipment switchgear 102.08 Quast Transfer, Inc. Freight charges 54.00 American Freight System Freight charges 49.95 MN Electric Supply Dist. inv., bldg. maint. 5,626.31 Graybar Electric Co. Dist. inv., mdse. 24,980.34 Dayton Freight Lines Freight charges 39.05 McMaster -Carr Supply Plant accessory equip. maint. 28.44 MMUA Assessment - Service Territory 1,120.00 Activities Apollo Piping Supply, Inc. Power operated equip. maint., eng. 121.54 maint. #8 MN Electric Supply Co. Mdse., dist. inv., line maint. 1,261.07 H & C Electric Supply Box inv., mdse. 378.10 Westburne Supply, Inc. Engine maint. #8 235.20 Graybar Electric Co. Mdse., dist. inv., plant supplies, 2,796.07 meter maint. Sterling Electric Co. Mdse. 32.92 verabek Machine Shop Plant supplies, bldg. maint., truck 264.30 & power operated equip. maint. Anderson Interiors Bldg. maint. 169.97 Border States Electric Trans. inv., dirt. inv. 992.35 Brandon Tire Truck expense 116.75 FEBRUARY - ELECTRIC (cont) Business & Legal Reports C & I Repair Carburetion & Turbo Sys. Contact East Co. Copy Equipment, Inc. Dey Appliance Parts Ekstrom Industries Goodway Tools Corp. Hometown Music Howard Industries Lakeland Engineering Equip. Paul Lemke & Son MN Valve & Fitting Co. Multi -Amp Corp. National Electric, Inc. National Fire Protection Nordic Fiberglass, Inc. Omega Engineering Petersen - Wisdorf, Inc. Share Corp. Sorensen Farm Supply W.D. Cooling Clinic WESCO Joan Limvere Snap -On Tools Apollo Piping Supply H & C Electric Supply Mississippi Tool Supply Myron Johnson L. Wilson Power Corp. Mississippi Tool Supply MN Electric Supply Officelsupplies Mdse. Truck maint. Meter maint. Office supplies Mdse. Box inv. Tools Dispatch equip. maint. Trans. inv. Maint. accessory plant Engine maint. #8 Maint. accessory plant Meter maint. Trans. maint. Office supplies Dist. inv. Maint. accessory plant Dist. inv. Mdse., truck expense Power operated equip. Truck maint. Supplies Consulting fees Tools equip equip equip. maint. Accessory plant equip. maint. Plant supplies, supplies Plant supplies, supplies CPR training Transformer maint. Plant supplies, supplies Dist. inv., mdse. FEBRUARY PAYABLES - GAS Hutch Utilities Hutch Utilities PERA Commissioner of Revenue Citizens Bank & Trust Co. Putnam Fund ICMA Retirement Corp. Hutch Utilities PERA Citizens Bank & Trust Co. Continental Assurance Co. Putnam Fund ICMA Retirement Corp. American Family Life Colonial Accident & Life PERA Employee utility bills withheld Payroll deposit plan PERA withheld & expense State tax withheld Federal tax & FICA withheld & exp Employee deferred comp withheld Employee deferred comp withheld Payroll deposit plan PERA withheld & expense Federal tax & FICA withheld & exp Life insurance Employee deferred comp withheld Employee deferred comp withheld Employee insurance withheld Employee insurance withheld Employee insurance withheld 35.94 15.75 28.40 147.34 66.70 9.62 2,603.28 173.11 13.17 937.0 60.66 225.00 218.80 422.86 600.00 58.35 1,036.00 891.64 79.03 226.40 1,750.00 80.95 101.51 808.35 147.00 22.00 125.89 29.03 24.00 50.60 81.03 217.57 265.00 3,949.62 834.22 961.30 1,967.20 250.00 100.00 3,674.91 812.03 1,907.15 12.48 250.00 100.00 22.10 36.50 9.00 1 n ,...y um or E71 Amociatei Maple Grove Executive Centre 7200 Hemlock Lane, Suite 323A Maple Grove. MN 55369 (612) 559 -6055 April 16, 1988 Municipal Utilities Commission City of Hutchinson Hutchinson, Minnesota 55350 Subject: Hutchinson Municipal Utilities Manager Gentlemen: I would be pleased to perform the search for the Utilities Commission concerning the above position..I would personally conduct every detail of the project. Jerry Cornell has provided me with a basic profile of the person we are seeking. Before we proceed with the search I will want to come to Hutchinson to visit with the Co mnissioners,the retiring Manager, and tour the facility. I am familiar with the Hutchinson area, I have sources in this industry, and am confident I can produce a selection of candidates closely matching the professional competence and image you require. 1 have enclosed a list of professional references; please feel free to contact any of these people regarding my capabilities. Financial Consideration: $4000.00 plus expenses -not to exceed $800.00 Expenses would be billed as actual, any expense in excess of $800.00 would be borne by Hamborg & Associates. Terms: $1000.00 at commencement of search, balance of $3000.00 plus expenses due 10 days after start date of new Manager. Guarantee: 90 day one -time position replacement at no fee. I look forward to working with you on this project. G1 S ufn o� Amodate-1 Maple Grove Executive Centre 7200 Hemlock Lane, Suite 323A Maple Grove, MN 55369 (612) 559 -6055 Con -Agra Minneapolis 5637 Brooklyn Blvd. Brooklyn Center, Minn. 55430 City of Maple Grove 9401 Fernbrook Ln. Maple Grove, Minn. 55369 Donohue & Associates 7200 Hemlock Ln. Maple Grove, Minn. 55369 HCI 555 Third Ave. NW Hutchinson, Minn. 55350 Northern States Power Co.. 4501 68th Ave. No. Brooklyn Center, Minn. 55429 Martrex, Inc. P.O.Box 1709 14525 Highway 7 Minnetonka, Minn. 55345 References Bill Howe Divisional Manager 612 - 536 -9818 Alan Madsen Director Economic Development 612- 420 -4000 Darrell Schneider Vice President 612 - 425 -2181 Jerry Cornell Partner 612 - 587 -2940 Larry Benson Manager 612 -566 -9120 Bradley Boote Vice President 612 -933 -5000 1 1 1 Firstate Federal Savings Hutch Utilities Petty Cash Hutch Util - Emp. Fund Hutch Utilities IBEW Local 949 Hutch Utilities Circle Hutch Utility ENRON Gas Marketing Medical Insurance North Star Gas Products Dos ter North Star Gas Products Wayne Mfg., Inc. Jerome Ebert American Meter Co. Distran Sales Co. Graphic Controls Corp. Minneapolis Spring & Body Pest Elimination Services Doster Vibra King, Inc. w FEBRUARY - GAS (cont) Deposit to C/D Account 500.00 Due to Municipal Electric Plant 2,375.46 February labor 49.00 Meeting expense 12.71 Employee fund withheld 24.00 Usage - Peak Shaving Plant 202.53 Union dues withheld 131.50 Due to Municipal Electric Plant 17,999.24 February expense 311.95 Purchased gas 378,017.41 Purchased gas 99,625.10 Expense 1,332.16 Fittings inv. 450.10 Supplies 158.48 Fittings inv. 49.00 Fittings inv. 1,347.17 Power operated equip. maint. 45.00 Meter expense 64.54 Fittings inv. 454.77 Supplies 26.35 Truck maint. 311.95 Peak Shaving expense 33.00 Tools 185.26 Power operated equipment 91000.00 There being no further business, a motion was made by Commissioner Cornell, seconded by Commissioner Lyke to adjourn the meeting at 4:15 p.m. Motion was unanimously carried. C ATTEST , E. Daggett, 664ident Special Meeting April 21, 1988 All Commissioners were present; also present were Mgr. Hakel, Counsel Peterson, Verne Meyer of Delacore Personnel, Jane Hodgins, Hutchinson Leader staff writer and Sue Winter. President Daggett called the meeting to order at 7:00 a.m. Verne Meyer of Delacore Personnel presented a proposal to perform an executive search. A second proposal was presented from Hamborg & Associates (letter attached). The Commission decided to have Steve Hamborg of Hamborg & Associates present his proposal at the April 25 regular meeting. After discussion, a motion was made by Commissioner Beatty, seconded by Commissioner Lyke to obtain the services of a consultant to perform the search for a general manager. Motion was unanimously carried. Wally Hombach was welcomed to the meeting. He presented various materials for the Hutchinson Utilities Commission logo. After discussion, a motion was made by Commissioner Beatty, seconded by Commissioner Richards to accept the logo made of bronze. Motion was unanimously carried. It was also decided to use brick for the northwest front of the building, providing the cost for additional brick would not be excessive. There being no further business, the meeting adjourned at 7:45 a.m. ATTEST E. Daggett, (6 sident