04-27-1987 HUCMRegular Meeting
April 27, 1987
Commissioner Daggett and Commissioner Lyke were present; also present
were Mgr. Hakel, Jane Hodgins, Hutchinson Leader staff writer, Lon
Roach from KDUZ and Sue Winter.
President Daggett called the meeting to order at 1:00 P.M.
The minutes of March 24, 1987 regular meeting were reviewed. Mgr.
Hakel informed the Commission that transportation and rigging charges
for the stator coils were included under warranty, payment was
negotiated and the above items were included on purchase order 410701)
sent to General Electric. Also in the future all budgets will be
reviewed during the months of May and June and new or revised budgets
will commence during the summer months. A motion was made by
Commissioner Lyke, seconded by Commissioner Daggett to accept the
minutes as written. Motion was unanimously carried.
The March payables for both entities were discussed. A motion was
made by Commissioner Lyke, seconded by Commissioner Daggett to accept
the payables as presented. Motion was unanimously carried.
At this time Commissioner Beatty arrived.
Commissioner Daggett updated the Commission on the status of the
Integrated Transmission Agreement. United Power Association has
received lien waivers and documents from REA. United Power Association
has to receive approval from SMMPA. Hutchinson Utilities would like
agreement signed and in effect by May 1, 1987.
Mgr. Hakel presented the March financial statements. Mgr. Hakel was
instructed to write a letter to Robins, Zelle, Larson & Kaplan
regarding the status of the Curtiss - Wright lawsuit and to report back
to the Commission at the next meeting. A motion was made by Commissioner
Beatty, seconded by Commissioner Lyke to accept the financial statements
as presented. Motion was unanimously carried.
Mgr. Hakel reviewed the first quarter electric and gas budgets.
Wally Hombach presented generating plant report. Wally discussed
installing crankshaft protective devices on units 2, 3, 4 and 7. It
was suggested to remove the two 20,000 gallon underground fuel tanks
located in front of the power plant. A motion was made by Commissioner
Beatty, seconded by Commissioner Lyke to install crankshaft protective
devices on either unit 3 or 4 this year. Motion was unanimously
carried.
t.j.
Dave Schmidt of Associated
discussed Hutchinson's loa
will review Dave Schmidt's
The study to include a ten
future system planning.
Consultants and "Butch" Wentworth
J growth. The Commission and Mgr. Hakel
fee proposal for a study (copy attached).
year load growth projection and overall
Manager's Report:
1. The Minnesota Municipal Utilities Association's summer meeting
will be held in Brainerd, MN on June 21 - 24, 1987.
2. The May regular meeting will be held on May 26, 1987 at 1:00 p.m.
and the June regular meeting will be held on June 24, 1987 at
1:00 P.M.
3. Purchased M -470 Vermeer from McLeod Co -op in the amount of
$12,500.
4. Joan Limvere and Sue Winter will go to Litchfield Utilities on
May 6 to review Power Manager software documentation to decide if
Hutchinson Utilities should purchase Power Manager.
5. At a recent meeting with City Council and Utility members,
ornamental street lighting was discussed. It was the consensus
of opinion the City Council should set standards for future
ornamental street lighting.
Old Business: None
New Business: None
The following are March payables:
AVASSOCIATED
CONSULTANTS
.m.r=NGir-jEERS, INC.
REGISTERED PROFESSIONAL ENGINEERS
3131 FERNBROOK LANE NORTH
MINNEAPOLIS, MINNESOTA 55441
612/559 -5511
April 23, 1987
Hutchinson Utility Commission
225 Michigan Street
Hutchinson, MN 55350
Sbj: Electrical System Study
Gentlemen:
We wish to express our appreciation for the opportunity to prepare
a proposal to review, study and make a report regarding certain aspects
of your electrical system as requested by your Electrical Supt. Mr.
M.D. Wentworth in his letter addressed to us dated April 2nd, 1987.
We have prepared the attached proposal wherein we offer to review and
study the present interconnection facilities, the 13.8KV trunk feeders
and loop, changes to the distribution system such as converting overhead
to underground and the possibility of reducing purchased energy cost with
centralized load control.
This study will be quite comprehensive because of the size of the
improvements anticipated in Mr. Wentworth's letter. The studies will
address concerns in addition to those that are listed in Mr. Wentworth's
letter as our experience as shown in the past that all aspects of any
major expansion could be reviewed and considered. One such aspect
would be whether additional loops to bring large blocks of power around
and to remote areas of the city of Hutchinson should be 69KV, or 34.5KV.
Other considerations to other portions of the study will be considered
as outlined in the attached proposal.
We hope this proposal will provide you with the necessary informa-
tion such that you may make an intelligent decision as to whether or not
studies should be made for the concerns of your electrical superintendent.
If there are any questions, we will be present to discuss this proposal
at your next commission meeting.
DPS /da
Enclosure
Yours truly,
ASSOCIATED CONSULTANTS ENGINEERS, INC.
David Sc midt, v
PROPOSAL
FOR
STUDIES OF
HUTCHINSON MUNICIPAL ELECTRIC UTILITY SYSTEM
OF
HUTCHINSON, MINNESOTA
BY
ASSOCIATED CONSULTANTS ENGINEERS, INC.
REGISTERED PROFESSIONAL ENGINEERS
3131 FERNBROOK LANE NORTH
MINNEAPOLIS, MINNESOTA 55441
APRIL 23, 1987
CONTENTS
SUBJECT PAGE
System Capacity and Limitations 1
Looping Distribution System
0
Improvements of Existing Distribution System 3
Load Management 4
Summation 5
�1
SYSTEM CAPACITY AND LIMITATIONS
Bottlenecks
Our Study will review the existing interconnection substations where
transformation occurs. There are two such substations - one at plant one and
one at plant two. We will address the space limitations and costs of bringing
additional energy through the substation at Plant 1 and also at Plant 2. We
will investigate the necessities of either enlarging these substations or
adding an additional substation at another site. We will project future
requirements and list advantages and disadvantages of expansions at all
locations reviewed.
We will investigate the limitations of trunk lines between substations,
the limitations of the capacity of bustie transformations, such as the
transformation from 13.8 KV to 4.16 KV. We will review such things as
reliability, capacity, limitations of the largest block of power that can be
transferred for a given voltage and maximum practical trunk line. This study
will address item no. 1 in Mr. Wentworth's letter dated 4/2/87.
Estimated Cost . . . . . . . . . . . . . . . . . . . . . . . .$10,000.00
- 1 -
0
LOOPING DISTRIBUTION SYSTEM
This Study will review the limitations of your present loop system along
with improvements suggested between Plant 1 and the western area of Hutchinson
near the bridge by the Happy Chef Cafe. We will review the esthetics
considerations of the different voltages available for future loops of your
system. These voltages will be restricted to 69 KV, 34.5 KV and 13.8 KV. We
will discuss and list costs of underground versus overhead for the voltages
considered along with costs. We will also discuss the cost and esthetics of
future distribution lines and the possibility of integrating present loop
lines into the distribution system in the future with larger future loops.
This study will cover item no. 2 of Mr. Wentworth's letter dated 412187.
The Estimated Price of this Study will be . . . . . . . . $1,000.00
- 2 -
IMPROVEMENTS OF EXISTING DISTRIBUTION SYSTEM
This Study will review conversions of the areas essentially limited to
the downtown business area from the existing voltage to a higher voltage, that
is from 4.16 KV to 13.8 KV. We will review the existing facilities and any
limitations that might require upgrading or enlarging transformers serving
customers and their associated enclosures. All facilities that can be
utilized with a higher voltage will be listed and reviewed. Any conversion in
one specific area will be affecting other areas and this inter - relation
between one voltage system and another voltage system will be discussed. In
particular the limitations as to backfeeding from one feeder to another or
looping two feeders together to add reliability will be reviewed and
discussed. We will discuss overhead versus underground for the different
voltages and will list costs for each type of construction reviewed and
discussed.
This portion of the Study will cover the two items numbered 3 and 4 in
Mr. Wentworth's letter dated 4/2/87 Studying River Crossings . . . $1,000.00
For Item No. 4 Feasibility of Converting East and West side of Main Street
to a
higher voltage . . . . . . . . . . . . . . . . . . . .
. . . . $1,000.00
Total
Estimated Cost for this portion of the Study . . . .
. . . . $2,000.00
LOAD MANAGEMENT
The fifth item in Mr. Wentworth's letter was the estimated amount of
summer peak load which could be shed by controlling the air conditioning load.
This much information could be furnished at no cost utilizing information
obtained in the Studies listed above. If you are to proceed with this item
alone it would be somewhere in the neighborhood of $1,000.00.
A load management study should be more complete than the estimation of
the amount that could be shed by controlling the air conditioning units. If
an accurate estimate was to be made, a survey would have to be taken of all air
conditioning and other interruptible units within the city. This has been
done in other cities, and one way is accomplished with drafting a
questionnaire that is included with all the bills sent out at several monthly
billings. It takes several interrogations, as people fail to respond to them
if only one month has mailings. A questionnaire should explain something
about load management and ask the customers if they would be interested in a
more economical rate if you chose to purchase power for interruptible loads at
a lower rate or if they would be interested in helping the City on a voluntary
basis keeping all their rates low by volunteering to have their air
conditioner and other interruptible loads controlled. Along with a statement
of this kind, a questionnaire would include whether or not they have a unit,
the size of the unit and what they estimate this unit runs per year. Some
units run many hours and some only run a few hours a year. By getting customer
input a more accurate estimate can be made.
A load management report would look into the financial advantages of
having load management and the different types of load management available,
both centrally controlled and voluntarily controlled. A report of this type
also discusses rates and the effect of rates in encouraging people to
participate in a load management program.
A Study of this type would cost approximately . . . . . . . . $5,000.00
- 4 -
SUMMATION
The costs as listed above are broken down per Mr. Wentworth's letter.
You might choose to have only one study made and each cost reflects the cost of
conducting each study individually. If all of the studies are combined or one
or two are combined the cost will be less. As an example, if all the studies
were made there would be considerable savings.
The total Estimated Cost would be . . . . . . . . . . . . . $13,500.00
- 5 -
f
MARCH PAYABLES - ELECTRIC
Jerome J. Hoikka Refund - Overpayment 21.18
Dan Lyons Meter deposit & interest 50.44
Tom Case 81.02
Dawn Rauch 62.66
John Booth 133.95
Nick Stoiaken 69.73
Petty Cash Meeting expense - S utka, Krueger 158.80
Continental Assurance Co. Life insurance 47.60
Citizens Bank & Trust Co. Payroll deposit plan 7,051.69
Firstate Federal Savings Payroll deposit plan 4,360.79
First National Bank Payroll deposit plan 644.68
Citizens Bank & Trust Co. Federal tax, FICA withheld & exp. 8,770.38
PERA PERA withheld & expense 3,965.50
ICMA Retirement Corp. Employee deferred comp withheld 956.00
Putnam Fund Dist. Employee deferred comp withheld 25.00
A C X Corporation Truck maintenance 62.89
American Family Life Employee insurance withheld 128.40
American Payment Centers Rent 66.00
Citizens Bank & Trust Deposit to Contribution Account 25,000.00
City of Hutchinson Contribution to City 75,000.00
Colonial Life & Accident Employee insurance withheld 156.10
Electronic Center, Inc. Plant supplies 2.80
Graybar Electric Co. Supplies 121.20
Hillyard Floor Care Supply Building maint. 163.32
Hutchinson Utilities Employee utility bills withheld 675.00
IBM Corp. Maint. service 257.58
MN Electric Supply Co. Mdse. 24.01
Natural Gas Division Due to Natural Gas Division 428,939.18
Account Receivable
Richard Peterson Legal retainer 400.00
Petty Cash Postage 858.40
PERA Employee insurance withheld 18.00
Scientific Columbus, Inc. Meter expense 1,565.72
U.S. Postal Service Stamps 110.00
United Electric Co. Plant supplies 158.80
Warner Industrial Supply Plant supplies 40.75
Burmeister Electric Co. Supplies 30.02
American Test Center Test & inspection of equipment 1,700.00
Hillyard Floor Care Supply Coffee filters 15.95
MN Pollution Control Agency Annual Fee 175.00
Putnam Fund Dist. Employee deferred comp withheld 25.00
ICMA Retirement Corp. Employee deferred comp withheld 956.00
CNA Life insurance 216.36
Graybar Electric Co. Meter inventory 3,161.28
Woodmen Accident & Life Medical insurance 5,293.49
Lincoln National Life Employee insurance withheld 26.00
UPA Station equipment maint. 163.00
Michael Wegscheid Meter deposit & interst 61.28
City of Hutchinson Insurance premium 7,507.00
First Trust Co., Inc. 1986 Bond Issue - initial fee 885.50
PERA PERA withheld & expense 3,947.12
MARCH - ELECTRIC
Commissioner of Revenue
Citizens Bank & Trust Co.
Firstate Federal Savings
Citizens Bank & Trust Co.
First National Bank
MN Electric Supply Co.
Graybar Electric Co.
Scientific Columbus
Petersen - Wisdorf, Inc.
MN Electric Supply
Graybar Electric Co.
Abbott Electronics
Allen Office Products
American Linen Supply
American Welding Supply
Associated Consultants
Charles Bailly & Co.
Border States Electric
Brandon Tire
Brooklyn Center Welding
Burmeister Electric Co.
Cash Wise
Central Eyewear Dist.
Central MN Communications
Commissioner of Revenue
Connie's Custom Paint
Copy Equipment, Inc.
County Market
Crow River Press, Inc.
Culligan Water Conditioning
Ditch Witch of MN
Dostal & Oleson Oil
Electronic Center, Inc.
Erickson Oil Products
Fabricare Cleaners
Family Rexall Drug
Farm & Home Distributing
Forbes Auto Stores
G. T. C. Auto Parts
Gobal Equipment Co.
H & C Electric Supply
Hillyard Floor Care Supply
Hutchinson Co -op
Hutchinson Fire & Safety
Hutch Util - Emp. Fund
Hutch Utilities
Hutch Wholesale Supply
IBM Corp.
State tax withheld
Federal tax, FICA withheld &
Payroll deposit plan
Payroll deposit plan
Payroll deposit plan
Dist. inv., supplies, mdse.
Dist. inv.
Meter inv.
Dist. inv., box inv.
Dist. inv.
Supplies, truck maint.
Dispatch center exp.
Office supplies
Laundry
Plant supplies, supplies
Engineering fees
Audit
Supplies
Truck maint.
Maint. of plant equip.
Supplies
Rolls
Safety Glasses
Radio maint.
Sales tax
Truck maint.
Office supplies
Coffee & cookies
Office supplies
Plant supplies
Power operated equip. maint.
Plant supplies
Supplies
Plant supplies
Laundry
Office supplies
Supplies
Truck maint.
Plant supplies, truck & power
operated equipment maint.
Supplies - safety
Station equip., tools
Plant supplies
Plant supplies
Extinguisher recharge
Employee fund withheld
Usage, plant & center
Plant supplies, truck & power
operated equip. maint., mdse
paint
Office supplies
exp
4,433.74
8,699.22
4,227.94
6,938.97
746.71
524.93
1,527.11
23,079.77
15,682.88
119.07
486.00
86.26
83.72
64.92
275.84
630.50
6,235.62
95.42
249.19
676.00
126.57
48.99
77.15
180.33
18,458.49
175.00
175.17
245.95
288.25
12.15
228.44
107.17
17.23
8.00
66.50
4.43
26.81
44.80
171.21
522.69
93.33
97.25
12.50
38.10
96.00
3,245.52
2,733.24
165.00
r-
I
[1
I
I
MARCH - ELECTRIC
IBEW Local 949 Union dues withheld 492.28
Ideal Shoe Shop Building maint. 67.50
Ink Spots, Inc. Office supplies 130.00
Junker Sanitation Refuse service 84.40
Lakes Gas Co. Gas 105.20
Leef Bros., Inc. Laundry 43.41
Joan Limvere Consulting services 771.25
MMUA Safety instruction 450.00
Plaza Hardware & Gifts Supplies, bldg. maint., truck exp. 92.03
Plowman's, Inc. Truck maint. 9.56
Quade Electric Plant supplies, bldg. maint. 47.35
Quill Corporation Office supplies 170.44
Road Machinery & Supplies Power operated equip. maint. 16.21
Sam's Tire Service Truck maint. 25.00
Simonson Lumber Bldg. maint., supplies 14.06
Sorenson Farm Supply Power operated equip. maint. 15.18
T & R Electric Supply Station equipment 520.00
The Texwipe Co. Office supplies 29.83
Tippecanoe Press, Inc. Office supplies 89.99
Twin City Testing Turbine Oil Testing 2,025.00
Welders Supply Co. Plant supplies 25.38
Yale cordage, Inc. Supplies 133.47
Petty Cash Meter deposit & interest 1,115.43
Mike Beasley I 159.00
Dave Bentz 21.10
Erickson Auto Sales 159.00
Eugene Gudmundson 106.50
Jeff Hartwig 22.40
Hemmah Freight 159.00
Gary Kotlarz 42.60
Mr. Movies 159.00
Katherine Quast 159.00
Heidi Sachs 21.20
Jean Zelinka s 159.00
i
Hutch Utilities Due to Natural Gas Division 2,271.92
Labor
UPS Freight charges 68.20
Hutchinson Telephone Co. Telephone 1,362.93
Great Plains Supply Bldg. maint., fuel oil system 854.41
maint.
AMEX Life Assurance Employee insurance withheld 98.08
MN Benefit Assn. Employee insurance withheld 10.00
Honda of Hutchinson Equipment maint. 798.00
Petty Cash Supplies, meeting exp., truck maint 69.45
General Trading Co. Plant supplies, bldg. maint. 653.75
Sterling Electric Co. Plant supplies 116.31
Midwest Asphalt Corp. Fuel oil system maint. 88.29
Dakota Rail Lease 40.00
UPA Purchased Power 484,906.43
Coast to Coast Plant supplies, bldg. maint., 85.47
equip. maint.
Medical Insurance
MARCH - ELECTRIC
MARCH PAYABLES - GAS
1,549.69
Putnam Fund Dist.
Employee deferred comp withheld
150.00
ICMA Retirement Corp.
Employee deferred comp withheld
100.00
PERA
PERA withheld & expense
763.11
Citizens Bank & Trust Co.
Federal tax, FICA withheld & exp
1,711.64
Continental Assurance Co.
Life insurance
14.00
American Family Life
Employee insurance withheld
22.10
Apollo Piping Supply
Meter expense
34.91
Colonial Life & Accident
Employee insurance withheld
36.50
Firstate Federal Savings
Due to C/D Account
500.00
Hutch Utilities
Employee utility bills withheld
445.00
PERA
Employee insurance withheld
9.00
Hutch Utilities
Payroll deposit plan
2,925.40
PERA
PERA withheld & expense
761.17
Commissioner of Revenue
State tax withheld
874.58
Citizens Bank & Trust
Federal tax, FICA withheld & exp
1,704.89
Putnam Fund Dist.
Employee deferred comp withheld
150.00
ICMA Retirement Corp.
Employee deferred comp withheld
100.00
CNA
Life insurance
63.64
Apollo Piping Supply
Inv., mains
72.25
First National Bank
Transfer to savings
100,000.00
Hutch Utilities
Payroll deposit plan
2,840.87
Apollo Piping Supply
Inv.
380.81
Perfection Corp.
Inv.
1,930.50
Plexco - Fairfield
Inv.
258.87
Phillips Driscopipe, Inc.
Inv.
132.00
Ogston's, Inc.
Inv.
4,700.10
North Star Gas Products
Inv.
4,140.28
M.V. Markin & Co.
Inv.
1,374.11
Apollo Piping Supply
Inv.
86.97
American Meter Co.
Meter inv.
73.51
Charles Bailly & Co.
Audit
3,585.06
Hutch Util - Emp. Fund
Employee fund withheld
15.00
Hutch Utilities
Usage peak shaving plant
111.14
IBEW Local 949
Union dues withheld
128.00
Lakes Gas Co.
Gas
130.32
MN Student Section Asnt.
Mains & service exp
120.00
Norton McMurray Mfg.
Maint. of mains
78.22
Vermeer Sales & Service
Power operated equip. maint.
23.80
Hutch Utilities
Due to Municipal Electric Plant
1,952.43
Labor
MARCH - GAS
Hutch Utilities Due to Municipal Electric Plant 15,246.89
March expense
Circle Hutch Utility Purchased gas 279,012.03
Medical Insurance 344.96
There being no further business, a motion was made by Commissioner
Beatty, seconded by Commissioner Lyke to adjourn the meeting at
3:30 p.m.
ATTEST
1
E. Daggett, r sident
Thomas B. Lyke, Secretary