Loading...
02-27-1984 HUCMRegular Meeting February 27, 1984 Commissioner Filk and Commissioner Lyke were present; also present were Counsel Peterson, Mgr. Alexander and Ruth Hakel. President Filk called the meeting to order at 1:00 p.m. The minutes of the January 26, 1984 meeting were reviewed. Motion was made by Commissioner Lyke, seconded by Commissioner Filk to accept the minutes as presented. Motion was unanimously carried. Motion was made by Commissioner Lyke, seconded by Commissioner Filk to accept the January gas and electric payables. Motion was unanimously carried. Ruth Hake1 commented on the financial statements for both entities. After discussion, a motion was made by Commissioner Lyke, seconded by Commissioner Filk to accept both reports. Motion was unanimously carried. Mgr. Alexander reviewed the 1984 projected gas and electric budgets. Motion was made by Commissioner Lyke, seconded by Commissioner Filk to accept the budgets. Motion was unanimously carried. At 1:55 p.m. the meeting was recessed. President Filk reconvened the meeting at 2:00 p.m. for the purpose of opening bids for 11Furnishing and Delivery of 15KV Underground Conductor and Voltage Regulator." Secretary Lyke was asked to open the bids, Counsel Peterson to identify the bid bond, "Butch" Wentworth to read the bids with Ivan Larson tabulating the bids. The following companies presented bids: 1. Lanick & Liljegren Company 715 Hampshire Avenue South Minneapolis, MN 55426 2. Graybar Electric Company 2300 East 25th Street P.O. Box 160 Minneapolis, MN 55406 3. Petersen - Wisdorf, Inc. 12011 Riverwood Drive Burnsville, MN 55337 "y 4. H & C Electric Supply 1600 North Front Street Mankato, MN 56001 5. Border States Electric Supply 2001 First Avenue North Box 2767 Fargo, ND 58108 6. W E S C 0 2958 Yorkton Boulevard P.O. Box 17070 St. Paul, MN 55117 All bids having been opened and tabulated, President Filk instructed staff to evaluate the bids and come forth with a recommendation so that action could be taken on the required material. Commissioner Lyke made a motion, seconded by Commissioner Filk to accept the Interconnection and Interchange Agreement between Cooperative Power Association, a Minnesota corporation, and Hutchinson Utilities Commission, a municipal corporation, and instructed officials to sign the agreement. Copy attached to the face of these minutes. Motion was unanimously carried. Commissioner Lyke made a motion, seconded by Commissioner Filk to accept Connection Agreement No. 43 between Cooperative Power Association, a Minnesota corporation, Hutchinson Utilities Commission of City of Hutchinson, a municipal corporation and Northern States Power Company, a Minnesota corporation and instructed officials to sign the agreement. Copy attached to the face of these minutes. Motion was unanimously carried. Mgr. Alexander suggested Nate Smutka's hourly rate be increased to $11.98 per hour. Members of the Commission approved the recommendation. Motion was made by Commissioner Lyke, seconded by Commissioner Filk authorizing Mgr. Alexander to attend the managers' meeting (June 8 & 9, 1984) preceding the American Public Power Association's spring meeting. Motion was made by Commissioner Lyke, seconded by Commissioner Filk to purchase a GM Protection Plan - 36 months or 36,000 miles on 1984 4 -wheel drive in the amount of $565.00. Motion was unanimously carried. Mgr. Alexander outlined present and distribution system and as a result, was discussed with the Commission. The following are January payables: future work loads within the the need for another lineman 1 r INTERCONNECTION AND INTERCHANGE AGREEMENT between COOPERATIVE POWER ASSOCIATION and the HUTCHINSON UTILITIES COMMISSION of the CITY OF HUTCHINSON HUTCHINSON, MINNESOTA THIS AGREEMENT, made this 27th day of February 19 84 between Cooperative Power Association, a Minnesota corporation, hereinafter called "CPA ", and the Hutchinson Utilities Commission of the City of Hutchinson, a municipal corporation in the County of McLeod, State of Minnesota, hereinafter called "City ", such parties hereinafter referred to individually as "Party" or collectively as "Parties ", WITNESSETH: 0.01 WHEREAS CPA is an electric utility engaged in the business of generating and transmitting electric power and energy in the State of Minnesota; and 0.02 WHEREAS City owns and operates an electric utility which is engaged in the business of generating and distributing electric power and energy within its incorporated area and environs; and 0.03 WHEREAS CPA and Northern States Power Company "NSP" are parties to the Integrated Transmission Agreement, dated August 25, 1967, which provides for certain facilities to be designated as an Integrated Transmission System "ITS "; and 0.04 WHEREAS the ITS facilities are used by both CPA and NSP to serve their consumers; and 0.05 WHEREAS CPA owns a 69 kV transmission line that extends south from the Big Swan 115/69 kV Substation to the vicinity of the City of Winthrop where it connects to ITS facilities owned by NSP; and 0.06 WHEREAS the Big Swan - Winthrop 69 kV transmission line is an ITS facility; and 0.07 WHEREAS the Parties have established an interconnection between City's transmission lines and CPA's Big Swan - Winthrop 69 kV transmission line which is sometimes referred to hereinafter as "Interconnection "; and 0.08 WHEREAS NSP and City have an Interconnection and Interchange Agreement, dated March 28, 1983, which provide for the interchange of power and energy through the Interconnection; and BE 0.09 WHEREAS the Parties will use the Interconnection for the interchange of power and energy; NOW THEREFORE, the Parties agree as follows: ARTICLE I INTERCONNECTION 1.01 Location The Interconnection will be located approximately one mile east of City, where City's 69 kV transmission line connects to CPA's Big Swan- Winthrop 69 kV line, in the center of the south line of Section 33, T. 117 N., R. 29 W., McLeod County, Minnesota. 1.02 Installation City agrees to obtain the easements required for the installation of the connection structures including guying thereof. City will furnish all other materials required to make the Interconnection, including the structures, and any material required to change CPA's transmission line to accommodate the Interconnection. 1.03 Ownership The aforesaid equipment, as described in Section 1.02, shall at all times be and remain the property of City. CPA does hereby agree that it has no right, title, nor interest in and to the materials used in making the Interconnection. 1.04 Maintenance City agrees to furnish, without charge to CPA, the necessary maintenance to the aforesaid equipment described in Section 1.02. In the event additional maintenance is required, City may request CPA to perform the required maintenance. 1.05 Removal of Facilities If at any time the Interconnection is discontinued, Hutchinson will pay all costs associated with removing the aforesaid equipment from CPA's line and from the site of the connection, and for restoring said line to a condition satisfactory to CPA. Thereupon this Agreement shall terminate. ARTICLE II DEFINITIONS 2.01 "Point of Delivery" The Interconnection, which is the point at which the electric facilities of CPA and those provided by City are interconnected, shall hereinafter also be referred to as the Point of Delivery. 2.02 "Firm Power" shall mean power and the associated energy intended to be available at all times and shall include the required reserve capacity. -2- 2.03 "Economy Energy" shall mean energy available from a Party's system used to replace more expensive energy in the other Party's system. 2.04 "Incremental Cost" of a supplying Party for energy furnished to the other Party shall be determined from: a. The incremental cost of the fuel, operating labor, and maintenance required to generate the energy necessary to supply (1) the scheduled delivery to the receiving Party's system, plus (2) the incremental losses incurred in the delivery of such power and energy. (The maintenance cost shall be determined from maintenance costs and operating time for typical generating units over a five year period.); plus b. The incremental cost of starting and operating any generating units which must be started as a result of supplying such energy; plus c. The cost of purchased energy including losses incurred in the delivery of such power and energy. The Incremental Cost for any particular transaction shall be the total of such costs divided by the kilowatt -hours scheduled for delivery of the receiving party. 2.05 "Decremental Cost" of a receiving Party for avoiding the operation of generating facilities through the purchase of energy from the other party shall be determined from: a. The cost of fuel, operating labor, and maintenance which such Party avoided using by means of such purchase. (The maintenance cost shall be determined from maintenance costs and operating time for typical generating units over a five year period.); plus b. The Decremental Cost of avoiding the starting and operating of a generating unit or units. The Decremental Cost shall be the total of such costs divided by the number of kilowatt -hours scheduled for delivery to the receiving Party. 2.06 Average Production Cost per kilowatt -hour of a generating unit for a month shall be: a. The total cost of all fuel consumed by the unit in such month divided by the net kilowatt -hours produced by the unit in such month, plus b. An amount which shall represent the average monthly production cost, other than fuel, of the unit, plus C. An amount which shall represent the cost per kilowatt -hour of incremental losses incurred in the delivery of such power and energy. -3- ARTICLE III INTERCONNECTION OPERATION 3.01 Point of Delivery to NSP The Point of Delivery shall be deemed to be shown on Exhibit D to the CPA -NSP Integrated Transmission Agreement as a Point of Delivery to NSP. 3.02 Firm Power A Party may contract with the other Party for the purchase or sale of Firm Power under agreed upon terms and conditions. 3.03 Scheduling of Deliveries The Party purchasing power and energy shall be responsible for initiating scheduled deliveries hereunder. The schedule rate of delivery shall not exceed the amount being purchased. In the scheduling of deliveries, due consideration shall be given to the rate of change of delivery and the continuity of delivery so as not to cause undue hardship on the system of the supplying party. 3.04 Billing For billing purposes, all power and energy interchanged between the Parties or received by one Party from the other in the previous month at the Point of Delivery shall be billed on a scheduled basis at the rates and under the terms and conditions set forth herein. 3.05 Payment of Bills Bills shall be rendered monthly and shall be payable within 15 days from the date of bill. If such due date falls on a Sunday or holiday, the bill shall be due on the next day following such Sunday or holiday. 3.06 Metering City has the obligation to provide metering equipment at its substation as required by the City -NSP Interconnection and Interchange Agreement, dated March 28, 1983. ARTICLE IV GENERAL 4.01 Correction of Trouble If the operation of the systems interconnected pursuant to the provisions of this Agreement results in trouble on either Party's system, including but not limited to interruptions, grounds, radio or telephone interference, unreasonable surges, or objectionable voltage fluctuations, and such trouble is caused by the method of operation or the facilities employed by the other Party, its customers, or third party suppliers connected to its lines, such trouble shall be corrected by the Party on or through whose system it originates within a reasonable time after receipt of written notice. 10 4.02 _Limitation of Liability Neither Party shall be held responsible or liable for any loss or damage resulting from failure to perform its obligations hereunder as a result of any cause beyond its control, including but not limited to; acts of God, strikes, injunctions, or breakdown. Both Parties shall be prompt and diligent in removing the cause of such failure to perform, but nothing herein contained shall be construed as permitting either party to continue to fail to perform after said cause has been removed. 4.03 Indemnity Each Party agrees to defend, indemnify, and hold harmless the other Party against any and all claims, liability, loss, damage, or expense caused by or resulting from the negligent acts or omissions of the idemnifying Party, its employees or agents. 4.04 Successors and Assigns This Agreement shall be binding upon the respective parties, their successors and assigns, on and after the effective date hereof. 4.05 Disclaimer of Third Party Interest This Agreement is not intended to and shall not create rights of any character whatsoever in favor of any person, corporation, or entity other than the Parties, and the obligations herein assumed are solely for the use and benefit of the Parties. 4.06 Notices Any notices, demands, or requests, required or authorized by this Agreement, shall be deemed properly given if mailed, postage prepaid, to the General Manager, Cooperative Power Association, 14615 Lone Oak Road, Eden Prairie, Minnesota, 55344, on behalf of CPA, and to the President, Hutchinson Utilities Commission, 225 Michigan Street, Hutchinson, Minnesota, 55350 on behalf of City. The designation of the persons to be notified or the address of such person may be changed at any time by similar notice. 4.07 Term of Agreement This Agreement shall become effective on the date first written above, and shall continue in full force and effect until terminated by not less than forty -eight (48) months' prior written notice given by either Party to the other Party. 4.08 Regulation This Agreement is subject to the regulation of any regulatory body having jurisdiction thereof. -5- 4.09 Administrative Approval This Agreement shall be of no force and effect unless approved by the Administrator of the Rural Electrification Administration. IN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed as of the day of year first above written. ATTEST 1 COOPERATIVE POWER ASSOCIATION A Minnesota Corporation HUTCHINSON UTILITIES COMMISSION OF THE CITY OF HUTCHINSON A Municipal Corporation President CONNECTION AGREEMENT NO. 43 for the Hutchinson Point of Delivery 1984 THIS AGREEMENT, made this 27th day of February 1981, between Cooperative Power Association, a Minnesota corporation, hereinafter called "CPA ", the Hutchinson Utilities Commission of the City of Hutchinson, a municipal corporation, and Northern States Power Company, a Minnesota corporation, hereinafter called "NSP ", the parties hereinafter referred to individually as "Party ", or collectively as "Parties "; WITNESSETH: 0.01 WHEREAS NSP and CPA are parties to an Integrated Transmission Service Agreement, dated August 25, 1967, which provides for an Integrated Transmission System; and 0.02 WHEREAS NSP and the City of Hutchinson have an Interconnection and Interchange Agreement, dated March 28, 1983, which provides for interconnection with NSP through CPA's Big Swan - Winthrop 69 kV ITS transmission line for the purpose of interchanging power and energy; and 0.03 WHEREAS the Parties have agreed to establish the Hutchinson Point of Delivery, hereinafter called "Connection ", which will connect a Hutchinson transmission line to a section of the Integrated Transmission System owned by CPA; NOW THEREFORE, the Parties agree as follows: 1.01 Location The Connection will be located approximately one mile east of Hutchinson, where Hutchinson's 69 kV transmission line connects to CPA's Big Swan - Winthrop 69 kV line, in the center of the southern edge of Section 33, T. 117 N., R. 29 W., McLeod County, Minnesota. 1.02 Installation Hutchinson agrees to obtain the easements required for the installation of the connection structures ,including guying thereof. Hutchinson will furnish all other materials required to make the Connection, including the struc- tures, and any material required to change CPA's transmission line to accommodate the Connection. NSP shall be responsible for the necessary changes in CPA's 69 kV line, the installation of the connection structures, and the required final connections to CPA's line. Plan and profile of the Point of Connection is attached hereto as Exhibit A. 1.03 Ownership The aforesaid equipment, as described in Section 1.02, shall at all times be and remain the property of Hutchinson. CPA does hereby agree that it has no right, title, nor interest in and to the materials used in making the Connection. 1 - 2 - 1.04 Maintenance Hutchinson agrees to furnish, without charge to CPA, the necessary maintenance and repairs to the aforesaid equipment, as described in Section 1.02. In the event additional maintenance is required, Hutchinson may request NSP to perform the required maintenance. 1.05 Removal of Facilities If at any time the Connection is discontinued, Hutchinson will pay all costs associated with removing the aforesaid equipment from CPA's line and from the site of the connection, and for restoring said line to a con- dition satisfactory to CPA. Thereupon this Agreement shall ter- minate. 1.07 Delays Neither NSP nor Hutchinson be liable for delays not reasonably within including delays caused by inability to se materials or supplies necessary to perform herein, nor shall any such delay be deemed gation under this Agreement. nor their agents shall their control, cure or replace the work contemplated a breach of any obli -. IN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed as of the day of year first above written. ATTEST COOPERATIVE POWER ASSOCIATION A Minnesota Corporation i" � ecre ary v I i / NORTHERN STATES POWER COMPANY A Minnesota Corporation HUTCHINSON UTILITIES COMMISSION OF THE CITY OF HUTCHINSON A Municipal Corporation President I- 7� Q J n T m z 0 u W N H Y Q J w cc W < N N z r z W W Q J W d F- 4 Q W r Z W U Z H V I V � N a JANUARY PAYABLES - ELECTRIC American Payment Center Franklin Boller Border States Electric Citizens Bank & Trust Citizens Bank & Trust Colonial Life & Accident Hutch Utilities - UB I. B. M. Corporation McMaster -Carr Supply Natural Gas Division Paper Service Company Richard Peterson Jane Duncan Petty Cash Continental Assurance Security- Connecticut Ins. New York Life Insurance Postmaster State Treasurer Woodman Accident & Life State Treasurer State Treasurer Citizens Bank & Trust Putnam Fund Dist. ICMA Retirement National Assn. of Corrosion Eng. Petty Cash Amoco Oil Company MN Benefit Assn. Ivan Larson "GLECA" State Treasurer State Treasurer Connissioner of Revenue Citizens Bank & Trust Putnam Fund Dist. ICMA Retirement Hutchinson Utilities Emblom Bros. Construction Dey Appliance Parts Lakeland Engineering Graybar Electric Co. Ren t Daily paper Transformer maint. Deposit to Contribution acct. Deposit to Bond & Interest Payment Account Accident insurance withheld Employee utility bills withheld Lease Plant supplies Due to Natural Gas Division Accounts Receivable Plant supplies Legal retainer Meter refund & interest Meter refund & interest Life insurance Life insurance Medical insurance Postal permit Permit Medical insurance FICA withheld & expense PERA withheld & expense Federal tax withheld Employee deferred comp withheld Employee deferred comp withheld Registration for schooling Postage Gasoline Employee misc. insurance withheld Meeting expense Dues PERA withheld & expense FICA withheld & expense State tax withheld Federal tax withheld Employee deferred comp withheld Employee deferred comp withheld Collection expense Estimate #2 Mdse. Engine maint. #8, plant supplies inventory Inventory 53.00 16.80 19.73 20,900.00 55,687.50 88.00 1,157.50 428.00 241.42 659,877.80 53.13 400.00 8.04 318.76 46.75 4,879.25 6,177.41 40.00 15.00 800.00 3,633.56 3,948.96 4,482.78 50.00 480.00 23.00 747.55 8,813.65 10.00 43.47 469.50 3,711.82 3,308.62 5,052.04 3,956.53 50.00 859.00 104.87 104,251.59 8.96 53.51 14,292.50 T� JANUARY - ELECTRIC (cont.) I.B.M. Corp. Erickson Oil Co. Four Seasons Services Anderson Chemical Co. Minnesota Dept of Natural Resources Burlington Northern Dale Sturges H & C Electric R. H. Alexander Hutchinson Telephone Co. General Trading Co. Border States Electric Minnesota UC Fund Fireman's Fund Insurance Petty Cash Electronic Center Graybar Electric Apollo Piping Supply MMUA Becky Anderson Brad Burch John Dylla Eugene Heil Debra Kalenberg David Mollert Tammy Posusta Donald Trnka Gail Juncewski Abbott Electronics Albinson Inc. American Linen Supply American Welding Supplies Amoco Oil Co. Anderson Chemical Associated Consultants Automatic Garage Door Co. Brandon Tire Coast -To -Coast Commissioner of Revenue Credit Bureau of Hutch Crow River Glass Co. A. L. Crump & Company Culligan Water Condition Maint. service Gas Cup inserts Rent - tank Permit Lease Snow removal Inventory, mdse, meter Meeting expense Telephone Plant supplies, bldg. m truck maint. Underground wire, meter Unemployment expense Employee misc. insurance Meter refund & interest, supplies, gas Mdse. Overhead line maint. Water system maint. Safety classes Meter refund & interest 441.50 93.68 35.00 250.00 85.00 50.00 303.75 maint. 187.26 72.62 1,298.60 aint., 139.56 expense 376.03 1,031.00 withheld 98.08 office 338.95 Maint. engine #9 Engineering expense Laundry Plant supplies Gas Plant supplies, inventory Engineering fees Bldg. maint. Truck maint. Plant supplies, truck maint. , bldg. maint. Sales tax Collection expense Maint. Engine #8 Engine inventory #8 Plant supplies 7.71 146.13 10.19 170.80 21.20 21.30 42.40 42.40 21.30 21.30 21.20 42.60 21.30 12.50 36.09 48.17 80.00 23.20 777.30 7,411.50 55.00 138.86 74.91 26,738.14 52.23 15.40 110.58 18.90 1 JANUARY - ELECTRIC (cont.) Curtis 1000 Office supplies 353.06 Ditch Witch of MN Maint. power operated equip 21049.96 Ekstrom Industries Meter maint. 587.49 Fabricare Cleaners Laundry 87.30 Family Rexall Drug Office supplies 32.27 Farm & Home Dist. Plant supplies, engine maint. #8, 117.28 Truck maint. Fitzloff Hardware Meter expense 2.57 Floor Care Supply Plant supplies 129.35 General Electric Co. Engine inventory #8 548.08 Graybar Electric Co. Underground maint. 64.75 H & C Electric Plant supplies 9.53 Home Bakery Cookies 177.50 Holiday Inn - Omaha Meeting expense - Larson 40.92 Hutch Fire & Safety Extinguisher 148.70 Hutch Leader Advertising 10.00 Hutch Utilities Collection expense 10.00 Hutch Util Employee Fund Employees fund withheld 99.00 Hutch Utilities - UB Labor 4,468.52 124,458.52 Engines 112,546.79 Plant & Utility 7,443.21 Center Hutchinson Wholesale Plant supplies, mdse., truck 348.94 maint. Hydra -Powr Inc. Engine inventory #9 160.83 IBEW Local 949 Union dues withheld 451.25 Ink Spots Office supplies 56.50 Jahnke's Red Owl Coffee 189.90 Jerabek Machine Shop Plant :supplies 13.58 Junker Sanitation Refuse service 80.00 Lakes Gas Propane 190.72 Leef Bros Laundry 37.72 Mankato Business Products Office supplies 59.11 Moorhead Machinery Maint. engine #8 2,704.18 Northern States Supply Plant supplies 14.45 G. W. Peterson Company Engine inventory #9 209.57 Petersen- Wisdorf Underground maint, inventory 389.71 Plaza OK Hardware Bldg. maint., tools, 24.92 Quade's Vent. system maint. 133.40 Rutz Plumbing & Heating Substation 13.50 Sorenson Farm Supply Tool rental 28.02 The Standard Register Co Office supplies 1,122.00 T & R Service Transformer maint. 180.00 W. D. Specialties Truck maint. 9.90 W E S C 0 Meter inventory 3,648.00 Wigen Chevrolet Truck maint. 96.76 JANUARY - ELECTRIC (cont.) Erickson Oil Products Swanke Motors Allen Office Products Apollo Piping Supply Burmeister Electric Central MN Communications G. T. C. Auto Parts H & C Electric Hutchinson Co -op Hutchinson Iron & Metal Hutchinson Mfg. & Sales Mueller Sales Corp. Northern States Supply Petersen - Wisdorf Precision Castweld Sears, Roebuck & Company Simonson Lumber United Power Association Velvet Coach Orvis Wahl Welders Supply Company West Central Industries Medical Insurance Gas 164.84 Truck maint. 536.14 Office supplies 75.63 Plant supplies, engine maint. #8, 462.22 engine inventory #8 Line maint. 78.32 Radio repair 97.00 Plant supplies 29.81 Plant supplies 405.25 Plant supplies 28.40 Bldg. maint. 25.20 Engine maint. #8 15.00 Engine maint. #7 28.34 Plant supplies 46.12 Distribution inventory 18,844.71 Engine inventory #3 1,000.00 Plant supplies 22.27 Plant supplies 8.82 Purchased power 405,509.95 Meeting expense 26.09 Water system maint., power 191.00 operated equip. maint. Plant supplies 31.47 Supplies 18.70 1,192.76 JANUARY PAYABLES - GAS Colonial Life & Accident First National Bank First State Federal Hutch Utilities - UB Midwest Gas Association Continental Assurance State Treasurer State Treasurer Citizens Bank & Trust Putnam Fund Dist. National Assn. of Corrosion Eng. Putnam Fund Dist. Ivan Larson State Treasurer State Treasurer Accident insurance withheld 24.50 Deposit to incremental pricing 593.41 account - interest Deposit to Contract for Deed 500.00 account Employees utility bills withheld 445.00 Membership investment 874.05 Life insurance 13.75 FICA withheld & expense 776.15 PERA withheld & expense 963.40 Federal tax withheld 1,020.98 Employee deferred comp withheld 200.00 Registration - Schooling 47.00 Employee Deferred comp withheld 200.00 Meeting expense 86.93 PERA withheld & expense 929.20 FICA withheld & expense 726.84 1 _i JANUARY - GAS (coot.) Commissioner of Revenue State tax withheld 1,218.29 Citizens Bank & Trust Federal tax withheld 933.18 R. G. Read & Company School - registration 70.00 Energy Publications Office supplies 15.70 Erickson Oil Products Gas 46.84 Hutchinson Co -op Plant supplies 7.50 Airborne Freight Corp. Freight 74.10 Northwest Airlines Freight 71.27 MMUA Gas Task Force Assessment 5,500.00 MMUA Safety classes 109.20 American Meter Division Meter maint. 157.43 American Welding Supplies Supplies 59.59 Arps Manufacturing Inc. Power operated equip. maint. 1,438.70 Brandon Tire Truck maint. 104.77 E. J. Brooks Meter expense 75.61 Circle -Hutch Utility Purchased gas 244.81 Coast -To -Coast Supplies 23.59 Graphic Controls Supplies 50.79 Lioliday Inn - Old Mill Meeting expense - I. Larson 81.83 Hutch Util Employees Fund Employee fund withheld 24.00 Hutch Utilities - UB Labor, Peak Shaving, Gas, Mdse. 2,521.58 Hutchinson Wholesale Truck maint. 26.66 IBEW Local 949 Union dues withheld 113.50 Lakes Gas Company Gas 233.22 North Star Waterworks Inventory 354.90 Northern States Supply Supplies 14.45 Redeye Main t. - probeye 508.00 W. D. Specialties Truck maint. 102.37 Wigen Chevrolet Truck maint. 48.39 Apollo Piping Supply Inventory 31.32 Bailey Controls Supplies 9.04 Northern States Supply Supplies 22.05 Welders Supply Supplies 41.25 West Central Industries Supplies 18.70 Hutchinson Utilities Due to Municipal Electric Plant 6,697.43 January expenses Erickson Oil Products Gas 94.19 Swanke Motors Truck maint. 268.06 Circle -Hutch Utility Purchased gas 696,461.72 Medical Insurance 14.40 There being no further business, a motion was made by Commissioner Lyke, seconded by Commissioner Filk to adjourn at 3:10 p.m. 1f> thornas , . Lyke, Sec etary ATTEST Ls 2 k H. W. Mk, President Special Meeting February 28, 1984 Commissioner Filk and Commissioner Lyke were present; also present were Mgr. Alexander, "Butch" Wentworth, Distribution Supt. and Ruth Hakel. President Filk called the meeting to order at 12:30 p.m. for the purpose of evaluating bids for Underground Conductor and Voltage Regulator. After the bid tabulation was passed to all in attendance (copy attached to the face of these minutes), "Butch" Wentworth evaluated in detail each bid and gave staff's recommendation. A motion was made by Commissioner Lyke, seconded by Commissioner Filk to accept the bid of Lanick & Liljegren for bid item B in the amount of $58,560.00, also to accept the bid of Petersen- Wisdorf for bid item A -2 in the amount of $85,995.90. Motion was unanimously carried. There being no further business, motion was made by Commissioner Lyke, seconded by Commissioner Filk to adjourn the meeting at 12:55 p.m. 1/ Thomas B. Lyke, &ecretary ATTEST H. W. Filk, President z 0 H H a Q H W r- 0 U N U rn N .r-i r-i .lq G O G U D >4 O ro .-a 7 tP a 41 ro a� �o G ro O U G G O V r0 C 7 0 0) v' N co 'C7 Ln � G r1 � 7 r J4 N E b 0. $4 O C A o O G N 1J 0. 4-) E m A h .ar AM u �41 ro 0 U b I I a I �w ro u ro a s4 a 0 x 0 4J 0 X 4 I x 0 ro u G 4 w � .- i ro V +�-) ro ro a U a En U 0--i 2s ro u s4 Ts > 4 G 0 a 0 In 0.4 ro sq to O a) o° a) a a x sA (a a�-4 a) ro 0. r-1 s4 Cl -q fn G a 0. U In�m�G G 0 a) :j u) O U C +) :3 C) 0 U r•i 1-I u 11 •ri Q) •ri ro 3-4 0) •-1 O O E oV ,'O (0 � a a) O o rd o� C) 0 o �4 Ea a) ::1 o k �4 a) 4) rd a) o r-I a) o :3 a) 41 O o ::1 +) >4 •r+ a) +) C) W O .-I U 0. U) t7 r-I U M +) C.0 to r-i +I to x +t W M In S4 N N a) > 3 3 ^� co o N fn N N U U a) _ H 4J 4-) O C) J-) Cl O G 'O O O O I • ri l0 tD U) A W Ln Ln a) 0 l ° n° z Q L rn m cn •� O 0) N i Q N r-1 N N H * d O O CO l0 Ol M In L(1 l!1 N Ql r r C M •ri O to Ol G. r cv �D � I I to m rn m i 1 _ � N 14Q1 as O N ULn Ln d N a) f H M 0 ! O d' .--I r- 10 i r rn V %,0 :D r- o "r iD U o V N O ^ c1 ^ to co O N 1p M co C) 01 Oo o vi am i u O O O O O C 0 G oa w U O a) a) s U) a) •14 �4 'o m r., 10 ro U a] J-) a) I CO U) � � b N � •ri I fa d1 +) ro G m m a a m° x .ar AM