Loading...
01-26-1979 HUCMSpecial Meeting January 26, 1979 All Commissioners were present, also Mgr. Alexander. The meeting was called to order at 9:30 a.m. by President Quade. Mgr. Alexander gave a full report on anticipated costs and time elements in the repairing, rebuilding and upgrading the switchgear equipment and building. The Harold K. Scholz Company out of Omaha, Nebraska, is offering consultation in this matter. After discussion, a motion was made by Commissioner Filk, seconded by Commissioner Tracy that in the emergency that exists, we should engage the Harold Scholz Company to furnish labor and material as needed to replace the switchgear and associated items. The motion carried unanimously. Discussion was held concerning a flood control berm to protect switchgear building, transformers and the main building. Mgr. Alexander was instructed to proceed with the plan. Dave Schmidt of Associated Consultants appeared and discussed the electrical problems in general. He stated that a letter was forthcoming spelling out the details. There being no further business, the meeting adjourned at 10:30 a.m. Clinton Tracy, Secretary ATTEST= - -- H. P. Quade, President 1