Loading...
08-08-1940 HUCM7 1 Special Meeting - August 81 1940 129 Upon notice duly given a special meeting of the Light & Power Commission was held at 8 :00 A. M. in the offices of Dr. R. I. Sheppard, President. All members of the Commission were present. Superintendent R. W. Strohmeier was also present. Motion was made, seconded an unanimously carried that the proposal of the Busch- Sulzer Bros. - Diesel Engine Co. for an engine, generator, and accessories, which proposal was duly submitted and filed an the 31st day of July, 1940, be accepted, all subject to the terms and conditions contained in the plans and specifications` as prepared by the Buell & Winter Engineering Company, and in the Notice to Contractors on file with the Secretary of the Commission and the Commission hereby exercises its option as to material and equipment as hereinafter specified: Engine: 3060 BHP, 240 RPM, 9 cy linder, 201" x 272 ", 61.81# BMEF Generator: Allis Chalmers, 267 KVA, 2140 KW @ .80 PF arranged for 2300 volt delta or 2300/3980 Volt Y connection, 60 cycles, with temperature detectors in stator Lif available -- at no extra cost Exciter: Allis Chalmers 30 KW, 1450 RPM, silent chain driven. The price agreed upon shall be $179,775.00 in strict conformity to the requirements of the plans and specifications and for all of the work shown and specified therein, with payments therefor to be made as called for under paragraph 41 of the General Specifications. Motion was made, seconded and unanimously carried that the President and Secretary be and they hereby are authorized and directed to enter into and execute on behalf of the Light & Power Commission of the City of Hutchinson, Minnesota, the necessary contract with the Busch - Sulzer Bros.- Diesel Engine Co. to whom above work has been awarded. There being no further business the meeting adjourned. Attest: Gtr acre ary