Loading...
12-13-2012 HUCMMINUTES Special Meeting — Hutchinson Utilities Commission Thursday, December 13, 2012 Called to order at Noon. Members present: President Dwight Bordson; Vice President Craig Lenz; Secretary Leon Johnson; Commissioner Monty Morrow; Commissioner Anthony Hanson; Attorney Marc Sebora; General Manager Michael Kumm. GM Kumm presented the 2013 budget. After discussion, a motion was made by Vice President Lenz, seconded by Commissioner Hanson to approve the 2013 budget. Motion was unanimously carried. Steve Lancaster presented the Compliance Extension Request explaining this is a formality to get an emissions air permit extension. After discussion, a motion was made by Commissioner Morrow, seconded by Vice President Lenz to approve the Compliance Extension Request. Motion was unanimously carried. (Compliance Extension attached.) There being no further business, a motion was made by Commissioner Hanson, seconded by Vice President Lenz to adjourn the meeting at 12:37 p.m. Motion was unanimously carried. ATTEST: Dwight Bordson, President Leon Johnson, Secretary MINUTES Special Meeting — Hutchinson Utilities Commission Thursday, December 13, 2012 Called to order at Noon. Members present: President Dwight Bordson; Vice President Craig Lenz; Secretary Leon Johnson; Commissioner Monty Morrow; Commissioner Anthony Hanson; Attorney Marc Sebora; General Manager Michael Kumm. GM Kumm presented the 2013 budget. After discussion, a motion was made by Vice President Lenz, seconded by Commissioner Hanson to approve the 2013 budget. Motion was unanimously carried. Steve Lancaster presented the Compliance Extension Request explaining this is a formality to get an emissions air permit extension. After discussion, a motion was made by Commissioner Morrow, seconded by Vice President Lenz to approve the Compliance Extension Request. Motion was unanimously carried. (Compliance Extension attached.) There being no further business, a motion was made by Commissioner Hanson, seconded by Vice President Lenz to adjourn the meeting at 12:37 p.m. Motion was unanimously carried. ATTEST: I � fight ordson, President ✓!F- FMI PO Box 1748 COMPLIANCE EXTENSION REQUEST National Emission Standards for Hazardous Air Pollutants: Hickman NE 68372 -1748 Stationary Reciprocating Internal Combustion Engines Phone: (402) 792 -2612 40 CFR part 63, subpart ZZZZ Fax: (402) 792 -2712 Applicable Rule: 40 CFR Part 63, Subpart A - National Emission Standards for Hazardous Air Pollutants (NESHAP) — General Provisions This form fulfills the requirements necessary to request an extension of compliance under 112(d) of the Clean Air Act (CAA) as specified in §63.6(i) and §63.9(c) of the Code of Federal Regulations (CFR). The deadline by which a request for an extension of compliance with a relevant standard must be received is no later than 120 days before the compliance dare of tfte standard* fas specified in §63.6(b) and (c)J. The amount of time requested for the extension request cannot exceed one (1) year. *Please note that emissions standards established under this part may specify an alternative date (e.g., other than 120 days) for the submittal of requests for an extension of compliance if alternatives are appropriate for the source categories affected by those standards. Please check the relevant standard for alternative submittal dates ( §63.6(i)(4)(i)(B)). Company Name Hutchinson Utilities Commission Facility ID# Air Emission Permit No. 08500002 -004 Owner /Operator/Title Dwight Bordson, President Mailing Address 225 Michigan St. City1State Hutchinson, MN Zip 55350 Plant Address (if different than owner /operator's mailing address): Street 44 Fourth Ave. NE City, State Hutchinson, MN Zip 55350 Plant Phone Number (320) 234 -0551 Plant Contact/Title Randy Blake, Production Manager This form must be completed, signed and submitted to the appropriate air pollution control agency no later than 120 days prior to the compliance date of the standard. 1. What is the relevant standard from which you are requesting a compliance extension and its compliance date (For example, NESHAP Subpart ZZZZ for Reciprocating Internal Combustion Engines etc.) NESHAP Subpart 2ZZZ for Reciprocating Internal Combustion Engines Compliance Date of the Standard: May 03, 2013 Page 1 of 3 2. Identify the reasons why additional time is needed to comply with the stand a Provide the date (mm /dd /yy) when you first learned of the issue, which led to this compliance extension request. November 30, 2012 3. What controls are being installed at your facility to ensure compliance with the relevant standard (§ Hutc�hinsion Utilities Commission will have NSCR Silencer /Catalvst Combination units 4. Provide a compliance schedule identifying which of the following activities will be initiated and/or completed and the expected dates of completion as a part of the process of achieving compliance with the applicable standard ( §63.6(i)(6)(i)(B)(1) -(2)): Activities Part of your Expected date of Comments compliance process completion (mm /dd /yy) (Optional) On -site Yes ❑ construction No Rl N/A Installation of Yes FZ emission control No ❑ May 20, 2013 equipment 1 Process change Nos EZ N/A 5. Specify the date by which final compliance with the applicable standard is to be achieved ( §63.6(i)(6)(i)(B)(2)): July 20, 2013 6. Has your facility been issued an Air Quality Operating Permit? Yes Rf No ❑ • If yes, what type of permit were you issued and what was the most recent date of issuance? Type of Air Permit Date Issued -Irf4f e, V acOe �J4i✓ /-,>j aey'Z Page 2 of 3 Source Classification - Check the boxes that apply: Ll Facility is a major source of hazardous air pollutants (HAPs).* El Facility is an area source of HAPs.* *Note: A major source is a facility that has a potential to emit greater than 90 tons per year of any single HAP or 25 tons per year of all HAPs combined. All other sources are area sources. The major /area source determination is based on all HAP emission points inside the facility fence line. R1 Affected unit/source is classified as an existing source under the relevant standard. ** ❑ Affected unit/source is classified as a new source under the relevant standard. ** Certification Print or type the name and title of the Responsible Official* for the facility: Name, Title: Dwight Bordson, President I CERTIFY THAT INFORMATION CONTAINED IN THIS REPORT IS ACCURATE AND TRUE TO THE BEST OF MY KNOWLEDGE. By signing this form, I am providing official notification that I am unable to comply with the relevant standard and require additional time for the reasons specified in this form ( §63.6(i)(4)(i)(A)). I-Sigmtor"T Res e ida a *A Responsible Official can be: • The president, vice president, secretary, or treasurer of the company that owns the plant; • An owner of the plant; A plant engineer or supervisor of the plant; • A government official, if the plant is owned by the Federal, State, City, or County government; or • A ranking military officer, if the plant is located at a military base. Page 3 of 3