12-16-2009 HUCMSpecial Meeting December 16, 2009 Members present: President Dwight Bordson; Vice President Robert Hantge; Secretary David Wetterling; Commissioner Donald H. Walser; Attorney Marc Sebora; General Manager Michael Kumm Member absent: Commissioner Craig Lenz President Bordson called the meeting to order at 3:00 p.m. GM Kumm presented the 2010 Budget. After discussion a motion was made by Secretary Wetterling, seconded by Vice President Hantge to approve the 2010 Budget as presented. Motion was unanimously carried. Steve Lancaster presented the bid tabulation for the plant 1 transformer. After discussion a motion was made by Secretary Wetterling, seconded by Commissioner Walser to approve the bid tabulation for plant 1 transformer from ABB and Kuhlman. Motion was unanimously carried. John Webster presented the bid tabulation for automated metering infrastructure. After discussion a motion was made by Commissioner Walser, seconded by Secretary Wetterling to approve the bid tabulation and authorized staff to prepare a contract agreement with Sensus — HD Supply Waterworks. Motion was unanimously carried. Unfinished Business GM Kumm met with Senator Dille and Representative Shimanski regarding changing legislation for the CIP funding by using some of the CIP funding to help low income residents pay their utility bills. New Business GM Kumm presented spreadsheets as it relates to transportation charges for Hutchinson Technology Inc. A meeting has been scheduled with HUC, HTI and HTI's supplier U.S. Energy Services, Inc. An agreement will be prepared, reviewed and will be presented to the Board for approval. There being no further business, a motion was made by Vice President Hantge, seconded by Secretary Wetterling to adjourn the meeting at 4:12 p.m. Motion was unanimously carried. ATTEST: Dwight Bordson, President David Wetterling, Secretary Special Meeting December 16, 2009 Members present: President Dwight Bordson; Vice President Robert Hantge; Secretary David Wetterling; Commissioner Donald H. Walser; Attorney Marc Sebora; General Manager Michael Kumm Member absent: Commissioner Craig Lenz President Bordson called the meeting to order at 3:00 p.m. GM Kumm presented the 2010 Budget. After discussion a motion was made by Secretary Wetterling, seconded by Vice President Hantge to approve the 2010 Budget as presented. Motion was unanimously carried. Steve Lancaster presented the bid tabulation for the plant 1 transformer. After discussion a motion was made by Secretary Wetterling, seconded by Commissioner Walser to approve the bid tabulation for plant 1 transformer from ABB and Kuhlman. Motion was unanimously carried. John Webster presented the bid tabulation for automated metering infrastructure. After discussion a motion was made by Commissioner Walser, seconded by Secretary Wetterling to approve the bid tabulation and authorized staff to prepare a contract agreement with Sensus — HD Supply Waterworks. Motion was unanimously carried. Unfinished Business GM Kumm met with Senator Dille and Representative Shimanski regarding changing legislation for the CIP funding by using some of the CIP funding to help low income residents pay their utility bills. New Business GM Kumm presented spreadsheets as it relates to transportation charges for Hutchinson Technology Inc. A meeting has been scheduled with HUC, HTI and HTI's supplier U.S. Energy Services, Inc. An agreement will be prepared, reviewed and will be presented to the Board for approval. There being no further business, a motion was made/ bi Vice President Hantge, seconded by Secretary Wetterling to adjourn the meeting at 4:12 "p.m. Motion was unanimously carried.' Da)Od Wetterling, Secretary ATTEST: iA s 1-- Dw' rdson, President C O .co O U cn a) C O N c t U c O cu ca H me w �W LL O U- U) Z H H Z Q J 0) O O N O N E a) U a) rj, U cc a a) a rY W D i z W O V W m () a) a) a) a) m _0 >• } >- >- >- } Fn O O M Cl O O I� N Cl) V r �r O (0 0) LO 4- O O to I- r r- � r O H> Ef? U> Ef> Ef? ER Q .O m O L U a) E 0) It r w m >. co Q L U co Z C N cu d' /�� A � N �� � U LO C'4 L O `' � _ O O �� E > �O Q LO N U �N ��N 0 �•L W COz �i� c oo p Y Q- co L c�Ii oo L a) Z O O p L N oU w E Z U -p O a°° cli O i c cu)v) > p � N L N p -.� �— -O ccn a) mom) �— U �m� cU c Co a) EO c m� O QN(/J0N(n a) r,- CU C:) CU >NW O.�N >0-0 C14 0 04 W a) C) 0r--> L C� G U a) co O O L cu � I- C O L U y0.. 'L U U cu U a) c6 W J O a) ".- > N a) L �N 0 m cn a) C: a) c a) Q M Utilities Plus Energy Services, Inc. 16864 Highway 10 NW Elk River, MN 55330 Phone: 763 - 441 -1200 Fax: 763 - 441 -7500' December 16, 2009 Mr. Dan Lang, Technical Services Director Hutchinson Utilities Commission 225 Michigan Street S.E. Hutchinson, Minnesota 55350 Dear Mr. Lang, We have reviewed the 6 bids received December 10`", 2009 from different transformer manufacturers. The two low bids after evaluation are ABB Kuhlman and Virginia transformer. ABB Kuhlman has the lowest evaluated price and Virginia Transformer has the shortest delivery time. Attached is the tabulation of the bids received showing the cost of the transformer, the operating cost of transformer losses, and sales tax. Below each bidders name is the evaluated cost of that transformer. We have called the low bidders to get clarifications on what the bid included because of conflicting answers within their proposal. The bid form indicates adherence to the Specifications and the attached information does not coincide. We have attached the Emails we have received in clarification of the bid documents for your reference. We believe either manufacturer will provide a satisfactory product. Please advise if we may be of further assistance. Sincerely, Michael Thielen Utilities Plus Energy Services Inc. Bid Evaluation Hutchinson Utilities Commission Project No. N171 Prepared by Utilities Plus Energy Services Inc. Manufacturer/ Bid Amount No Load Loss Load Loss Extended Payment Sales Tax Delivery Addenda Remarks Evaluated Cost Warrantee Schedule Time Acknowledged ABB Kuhlman $1,063,323.00 Delta Star $1,182,947.33 Siemens $1,129,979.80 Virginia Transformer $1,076,677.81 Waukesha $1,252,868.44 WEG $1,119,221.32 Reinhausen tap changer used, quote only no bid form used Quote only bid form not used, Reinhausen tap changer used Notes: *Sales tax included in original bid amount. (6.875 %) Tax amount deducted from bid amount and shown in tax column. No load loss evaluated at $7000.00 per KW per specification Load loss evaluated at $3200.00 per KW per specification Extended warrantee specified for 5 years to include in and out costs and transportation Payment schedule 90 percent payment upon arrival of equipment on pad, the remainder to be paid upon dress out and assembly of transformer, receipt of instruction manuals and drawings 17.81 KW 78.18 KW included Accepted 168 days 1 $648,101.00* $124,670.00 $250,176.00 $40,376.00 18.4 KW 84.6 KW Included Accepted 168 days None $733,032.00 $128,800.00 $270,720.00 $50,395.33 23.8 KW 61.9 KW Adder Accepted 280 days 1 $708,570.00 $166,600.00 $198,080.00 $7,500.00 $49,229.80 20.0 KW 90.0 KW Included Accepted 112 days 1 $606,950.00 $140,000.00 $288,000.00 $41,727.81 18.0 KW 78.2 KW Exc Noted Exc Noted 196 days None $797,670.00 $126,000.00 $250,240.00 $7500.00 $16,103.00 $55,355.44 20.67 KW 83.0 KW In /Out excluded Accepted 224 days 1 $656,310.00* $144,690.00 $265,600.00 $7500.00 Accepted $45,121.32 Reinhausen tap changer used, quote only no bid form used Quote only bid form not used, Reinhausen tap changer used Notes: *Sales tax included in original bid amount. (6.875 %) Tax amount deducted from bid amount and shown in tax column. No load loss evaluated at $7000.00 per KW per specification Load loss evaluated at $3200.00 per KW per specification Extended warrantee specified for 5 years to include in and out costs and transportation Payment schedule 90 percent payment upon arrival of equipment on pad, the remainder to be paid upon dress out and assembly of transformer, receipt of instruction manuals and drawings C- 0 (7 E E O U cn N 'O V/ U C O c� co M 0) O O N M N N 0 ^ W W U) C �O 75 O W/ WJ .O CL v N J m c m Q Le, Z O H Q Z Q J d X W W -Y L U Q C � Q� Q.' w W N 1 D cr- Q 3 0 z w O U w O W MO W ' = E'^ N � m Y / -0 i E o Lo (n co O O N N OO LO O O ti 69 69 O � co — (n Z cl co C: � O o (B Q. ❑ t ❑ O L ' cn � cu C� v N J m c m Q Le, c 0 E E O U cn N C O U) C U Z) O co Q c6 i- u O O N co N N O N t N N co N c m Qi Q r1 L Cco C N� N m m o � LO � O O C) co ECl Q Tl- m (f} N co Z c co 0 U L W N co N c m Qi Q r1 THE AMI TASK FORCE, COMPRISED OF JOHN WEBSTER, STEVE LANCASTER, DAVID HUNSTAD, DAN LANG, JAN SIFFERATH, ROBERTA YATES AND TOM KLOSS, RECOMMEND AWARDING THE BID FOR "AUTOMATED METERING INFRASTRUCTURE (ADVANCED METERING INFRASTRUCTURE) TO SENSUS -- HD SUPPLY WATERWORKS DUE TO: • REDUNDANCY/ RELIABILITY BUILT INTO THE SYSTEM WITH TWO TGB'S (TOWER GATEWAY BASE STATION) • CONSIDERABLY REDUCED ANNUAL WAN BACKHAUL COSTS • EASE OF INSTALLATION OF TGBS • ALL STYLES OF METERS (ELECTRIC, NATURAL GAS, WATER, ETC) COMMUNICATE INDEPENDENTLY OF EACH OTHER • EASE OF FUTURE EXPANSIONS TO SYSTEM • TRUE TWO -WAY COMMUNICATION TO ALL METERS IN FIRST QUARTER OF 2010 • SENSUS IS FAMILIAR, AND HAS WORKED PREVIOUSLY WITH CIS INFINITY (HUC BILLING SOFTWARE) AND LOGIS • POTENTIAL PARTNERSHIP WITH CITY OF HUTCHINSON FOR READING WATER METERS, SYSTEM DIRECTLY COMPATIBLE. a �o I o0 i� O 00 r- O O 00 I t P` T- O ti M 0) O ti Co Np N O O CO %- 01 dr' O 0) ti � p p 07 t0 M cv N H 60- 6R 6% 69 69 (9 6% 60. 61). 03 0% � G? 00 < (h CO. Lo to D S4S. ' r O tt M O O V) L�o 1` a) (3) 0) N O O M N 't. � N (Y) M co M O t0 r O LO OD N 00 d co N � 69 6f$ 69- 66. 619 0 1 64 64 69- E4 EA 69 M O � �' i O i M N O O T' O co d' O O N r- LO to 00 N r N Co O O d' r N N O M r- O d &6 tC to M Cfl CO CO r- d M r O qr: 00 r L W 69 69 69 61), 69 69 6f? 69 69 Ef> 6f} w n w H w V V O m d O R 7 Z V m V W O d w ~ d Q Q Q d W (n h h " U 0 0i CO) �' w a Z ~ d a a c R� OL D w LLI F- O t0 CL _O 2 W Ea. O U j U w O0 O w: w CO U aCi O W Z p 4 i- N J U C W 3 _ N m off. _W a W � °r W O? W W H Q v Z m U Z t- ? r° N 0 Q it W (3 1-- � H U a LU r N M to 1� 0 ol