Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
cp06-26-2009 c• AGENDA
HUTCHINSON CITY COUNCIL
SPECIAL MEETING
FRIDAY, JUNE 26, 2009 - 4:30 P.M.
1. CALL TO ORDER -4:30 P.M.
2. NEW BUSINESS
(a) CONSIDERATION FOR APPROVAL OF AWARDING CONTRACT FOR AIRPORT
HANGAR PROJECT (LETTING NO. 10, PROJECT NO. 09 -11)
Action — Motion to reject — Motion to approve
3. ADJOURN
U
TKDA
$274,680.88
Ebert Construction
444 Cedar Street Suite 1500
ALM Builders
Saint Paul, MN 55101
The right time. The rigid per. The rigbt
$308,979.75
Eagle Construction Inc.
(651) 292 -4400
Greystone Construction Co.
(651) 292-0083 Fax
Ideal Steel Structures
www.tkda.com
June 22, 2009
Mr. John Olson
Public Works Manager
Hutchinson Area Transportation Facility
1400 Adams Street SE
Hutchinson, Minnesota 55350
Re: Hutchinson Municipal Airport
2009 Capital Improvement Program — New Aircraft Hangar
AIP 3 -27- 0042 -09 -09
SP No. 4304 -24
TKDA Project No. 14264
Recommendation of Contract Award
Dear Mr. Olson:
Bids on the above referenced project were received and opened at the Hutchinson City Center at
2:00 PM on June 18, 2009. Thirteen bids were received as follows.
KUE Contractors Inc.
$274,680.88
Ebert Construction
$299,916.13
ALM Builders
$300,571.50
Project One Construction Inc.
$308,979.75
Eagle Construction Inc.
$314,398.00
Greystone Construction Co.
$316,892.13
Ideal Steel Structures
$317,891.00
RAM General Contracting Inc.
$321,670.76
Vos Construction Inc.
$345,851.88
Prestige Builders, LLC
$362,701.00
Everstrong Construction
$376,227.10
KC Companies Inc.
$380,040.80
Structural Buildings Inc.
$395,253.38
4 0
The Engineer's Estimate for this construction was $420,372.
We have reviewed the bids and found no improprieties in them. The bids vary by 39.1% from
low to high. The Engineer's Estimate is 53.0% above the low bid.
An Employee Owned Company Promoting Affirmative Action and Equal Opportunity
6P
Mr. John Olson
Recommendation of Contract Award
June 22, 2009
Page 2
Copies of the bid tabulation generated by the City of Hutchinson are enclosed for your review
We have reviewed references of KUE Contractors, Inc. and have found their previous project
performance to be satisfactory.
KUE Contractors, Inc. is in the process of submitting their DBE information. Once received, we
will review that information for compliance with project requirements.
We recommend award of the construction contract to KUE Contractors, Inc. of Watkins,
Minnesota. The resolution for award should be subject to state and federal concurrence and
availability of funding.
Please contact us at your convenience with any related questions or comments
Sincerely,
Mark C. Pursell
Project Engineer
MCP:Iw
Enclosure
cc: Harris Baker - MnDOT - w /encl.
Don Berre - MnDOT — w /encl.
Jesse Carriger - FAA -ADO - w /encl.
RESOLUTION NO. 13593
RESOLUTION ACCEPTING BID AND AWARDING CONTRACT
LETTING NOAO /PROJECT NO. 09 -11
Whereas, pursuant to an advertisement for bids for the furnishing of all labor and material for
the following improvement:
This project consists of a new 8 -Unit Pre- manufactured Metal T- Hangar and associated work,
all constructed on a site previously prepared for this hangar and Associated piping & electrical
construction.
Bids were received, opened and tabulated according to law, and the following bids were received
complying with the advertisement:
Bidder
KUE Contractors Inc of Watkins MN
Ebert Construction of Corcoran MN
ALM Builders of Waseca MN
Project One Construction Inc of Cold Spring MN
Eagle Construction Co. Inc of Little Falls MN
Greystone Construction Company of Shakopee MN
RAM General Contracting Inc of Winsted MN
Ideal Steel Structures of Buffalo MN
Vos Construction Inc of Green Isle MN
Prestige Builders of Minnesota, LLC of Maple Grove MN
Everstrong Construction of Redwood Falls MN
KC Companies Inc of Waite Park MN
Structural Buildings Inc of Becker MN
Base Bid
$274,680.88
$299,916.13
$300,571.50
$308,979.75
$314,398.00
$316,892.13
$321,670.76
$317,891.00
$345,851.88
$362,701.00
$376,227.10
$380,040.80
$395,253.38
and whereas, it appears that KUE Contractors Inc of Watkins MN is the lowest responsible bidder.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
HUTCHINSON, MINNESOTA:
1. The mayor and city administrator are hereby authorized and directed to enter into a contract
with KUE Contractors Inc of Watkins MN in the amount of $274,680.88 in the name of the City of
Hutchinson, for the improvement contained herein, according to the plans and specifications therefor
approved by the City Council and on file in the office of the Director of Engineering. Said approval is
contingent upon the City receiving State and Federal Funding, State and Federal review /approval and
award of grant.
2. The Director of Engineering is hereby authorized and directed to return forthwith to all
bidders the deposits made with their bids, except that the deposits of the successful bidder and the
next lowest bidder shall be retained until a contract has been signed, and the deposit of the successful
bidder shall be retained until satisfactory completion of the contract.
Adopted by the Hutchinson City Council this 23rd day of June 2009.
Mayor
City Administrator
�T
CITY OF HUTCHINSON, 111 HASSAN ST SE, HUTCHINSON MN 55350 320 - 234-4209
BID TABULATION
L11 T Vr nU I UR1RiVR LC I I IpV RV. IUIrISUJCL I PIV. VD=I I (TRDA PROJECT NO. 132[1
2009 CIP - HUTCHINSON MUNICIPAL AIRPORT - AIRCRAFT HANGAR
BID OPENING: 0811812009 AT 2:00 PM ENGINEER'S ESTIMATE $420,372.00
1
2
i
4
E
1
}
o
I
10
11
ID
1a
K11EC....Xe
I.. N!
W1.
yo /N.1B5
F S61BL]BTS
.vfO ^kWR
FW COntlMSn
NIWCORCIO
C -.1539
1-1.
F -Xa4 I
MMVDk8u1<Y'X x00
ALMBNNw,
210080000An
PCB -161
W.
P -W MAM1
F. SYd335b1
hwmDWm mn
PrcRaIOm CO'Yllu m
Iro
]1LpP5WXxWp
Cod"M Slow
I -XV wo)
F -wDl LMI
If^pgXwYnn mm
pMCmkbuxm Celm
l'e.A-.
MrfYlaW 8il5
F�>.d}8110
orDxlxmntw
wrykMkCen4rJM
CY ,
WpW1110.
DMxxW 60t,
p.B4 =?
F. p3.oPP
xab pryslurmx
RIN GwY<entlxtip
POBm6W
YmYeeW 55
P. y0.Yw]
[.310JDS%}f
g 0oll"P nwvm
IyYSM1YBNVMI
Mr 9nW 1'�1
fDM1nAJMXYI
1 MMW W1!
P- ]@LH{M
F -WYSMb
Fpb
tlW1xIDINS mn
VxCY14Pwl-
12NOWIXAn
w�11,YW -u'Tb
P.tlxd l
F -607 ] 1
Y1B,avwN.Salxm
Pnbp,BuX,rkX
IIXnXW, LLt
[o RU51 Ltlr
0µP WU�{0
W1-- Y1Y�a/
A"IMi9Y
f Ib -1gi]N6
OXn
Ew,11wO Z`Y
W }p Xry >1
RWad FYYW fwd
m)Lx I.
F�bldxdlb
uwlBxwwwlpNluv
mmn
ticw ..
IN FIrX &9
WPxLW 5601
I.Sp }Ix96tl
F- 3Nf1}3N'I
l- egpar[X,11MX
7- ruxyriw
IN}41a41
BYYn MN 63308
1.161]Blgib
I.Ip. -I.
JyrmWePY..1b19RUrle
rM.[nT
_
RBI DRBCRY11CIN
UNIT
t
B®
'k
BNTOTLL
Btl
PRKt
BID
TOTLL
BID
MK[
BM
91TRL
BID
PRICE
BID
TOTAL
BID
PRKf
BIOTM
Etl
R11C[
BID
TOTAL
MI
X.
BID
TOTµ
BIO
PRICE
[ID
TOM
{ID
BID
TO{µ
BIO
PgIC!
BID
TOTµ
BID
PgICE
BID
TOTLL
BID
PgICE
BID
TOTLL
[10
PRlfl
&O
TOTµ
Ail
Mw.vOSr
18
1
..
Wp
Ib..
636)}}]6
519891.
516,tl1
.
SINW
181X0]
,0000
awl.
0"'.
b
b
110.40
"woa
N)b
8'..
u," u,"A
NNo W
"socom
polowwo
wmwl
s0.1W
It .
61 R5
sN
9awY81'Wml,mm!
LF
Ib
Er}
ulaq
W
Wo
am
s1ww
low
8300
N0
1»6
Cif
"A
tlI
W W1
N6
N
ibt.
N0
t]80
N.
W'sm
ON
sl ""l
�
.
111
p
100
0
mim
.Y'
.
,lb
Sa m
..
!'1D
N,
NIaw
Nm
.1.
N
Il .A
Cd
NO }01
eCw1Y,11 Cat aN AMa
LF
3
!R0
"am
110
SNm
110.
1..
IIDM
0.X00
S11.
"1.
3100
310
11060
010
Ma
I11
Woo
110.
M.
".wl
IN.
iNY
U+P-.
l,nl pole
FA
SN6,.
0160
3103
3103 C0
a""
53..
tl.m
N..
S3]0..
.0o
(1100
511660
61mm
ii.Vm
i'..
}It
111
Plow
=a
..
slow
II.O
WW0
IOP.m
611
Gampn EllurNm
CI
118
1111
II 11o.
1&.1
61-1
9.
1100130
C.
WPI.
N.00
3610
..
59.0
1850
036
...
1361
C
.1.
81.
11015.
C.
110.0
111.
.1.W
CI
NRIm
NI
N9m
..
0.
N.9
bd
N.Iffim
N }b.
N61
K
..
Nm
..
Yb4
moo
5.6,11300
51!
Wpnur Nlwl
CY
WB
ffl
{FINN
Sol
NBID
siom
Ip.mw
X00
30.]N
9�
310359.
IOb
11.0
39,2000
04
CWI
811
-
�
110.
W.0
N0.
59,]0.
II
110.!18
815
31,.118
SI -]
NNS
mm
0
im
Nm0
I10
..o
COI..
p10
C
5]622
110
WN
310.
>m)
W.
moll
110.0
mml
33X.
W.
NwwI
Now
C) wl
61d
CXwm CNmOP6xPm
dLL
!0
50.00
1900
"m
5910
If.
W]0
101
130
$2.
3100.
.11
51)0
1451
aw.
5963
31 R3.
9r
vNI
f'xY
Wb
.11
wW
Po
w,l.m
Wl5
X50
I, I.W
NID
9O
wnee wan
SV
'R
36 ]0
NN7.0
NI
NIN
Wm
N,.em
{9000
N
9 95.
1"..
N510
Sri .
3EVO m
W.
}59 99
{5}0
51..
X 15
N,W090
{8805
9
W
Rl,6r�
F }
S eeum
S
133
Cm
WIN
NC
C3C
.610
C}!
6913W
W0
a
51,X9.
,0]
0 10
C.0
1610.0
C.
S10b0
C0
" 0
$i
31,300
RS
1 q1, TUEWV
SY
5X615
bC
Nd
S
011
0
513
598.9
SW
..11
.1
.11
WI®
Nm
019
1111
WW71
H TA
31 1115 0
5140059
1] W
959319
.6
W 'm
.19
No0
CRP .
596
3108x
.b
.1..
WN
511 Bfx ]]
Wt
CexrY Cuewq Cuex, tl1t
IF
3p
I9
1101}
W.
V}R
I6^
59159.
No
w5
5916
Wll]
WSK
II UMC
313.
1W
Cld
WN
{Im
813
OW
N}
{1.200
Wo
111 -IS
Cox'
PC
0
Womm
mmm
11,IPom
9f AN.
{5➢31
31,00
8]0]
IIM
N00.m
SXID..
i11x
!2g
boom
fi .
{1110
1.15
W,S..
111..
1101W
11A.
!].50.
17 0.
iNbO
112
WIFan ®.Xx OW
V
].
bb.
11.
Cm
SM.O
11
N.
I]m
.m.
{659.00
W"
.xo
f)IO
SIW
33pm
.659
Cm
Nmm
C]0
NCC.
EP
.Do
P8 S]
I'll.
Poo.
.S
Vf
3150.00
BVp
3".0.00
IN.
1{8!59
51811
11.1
9W..
!],.
X50
t13.
1]10.
1]1000
P50 p]
{15000
0061
Nvgw EennuoCmuluYw
LB
NOMm
W.
110"1
IIO)IOm
$10,5900
f10b..
110.3..
Vo.
NO]71.
!10111.
111[,181
8118/016
i11 N3.m
t1W3.
C1]0m
9]8,100
f181N..
116 @59
311,5000
81154]0
118.bpm
itp,lm.
111.[0000
111000.
107159..
W!�sm
yAl
NVq- AxwwulCmgvRm
LB
1
MAB
W MW
90 N80103la
WWT.m
WW.
WSAtl
X]00.
@BQ.
wZ..
3N
W1]W}9
X16600
am.159.
iIowow
N1.00
lwJ.W
bitlB58
ClM.
WEtl
10.17}
BY.IR
tY m].
IY Cm.
1103]600
ItO.ib
K61P1/tlwI
.
F/i
1
1iS 595
3209, %03'Bp.N6C
S1X CO
8191gU
11580].
B}plll
060.811
SC].m001ll30.tl0..iW
C.tl }5919
f]316tl03}]]M}
C1x416N
W191}3191L
5000
WE1.�
LYB.OAO
Vi5®
3yV,x,
GVV11
IImyH
S7NYt 01591
b}
803593.
LeTlMN0.1MIOJBCTM04R
NI W
bI9An.
b4xN
{us¢91.k
05[.00100
ffx9'11n
u6lsna
C118.0 9}X.61301 9]00.3110 ..IN 011359.. ."No. . 03!98100
IDm m. ..m I i r 1
9bf.nlm SYI {0100 319x.1xm 93YI.wOm fR11N.
g. n , A 7�-)