HomeMy WebLinkAbout9-30-2026 HUCCPHUTCHINSON UTILITIES COMMISSION AGENDA REGULAR MEETING September 30, 2026 3:00 p.m. Swearing in of Commissioner Josh Wendland 1. CONFLICT OF INTEREST 2. APPROVE CONSENT AGENDA a. Approve Minutes b. Ratify Payment of Bills 3. APPROVE FINANCIAL STATEMENTS 4. OPEN FORUM 5. COMMUNICATION a. City Administrator b. Divisions C. Human Resources d. Legal e. General Manager 6. POLICIES a. Review Policies i. Electric Service Requirements and Charges ii. Temporary Service iii. Temporary Service in Case of Underground Failure iv. Electric Meter Placement v. Sealing of Meters vi. Meter Testing vii. Right -of -Way Clearing viii.Tree Removal or Trimming ix. Locating Customer's Underground Utilities b. Approve Changes 7. UNFINISHED BUSINESS 8. NEW BUSINESS a. Discussion about extending the term of the MRES Power Sale Agreement. b. Discussion on the 2-year rate track provided by UFS. 9. ADJOURN MINUTES Regular Meeting — Hutchinson Utilities Commission Wednesday, August 26, 2026 Call to order — 3:00 p.m. President Don Martinez called the meeting to order. Members present: President Don Martinez; Secretary Matt Cheney; Vice President Tom Lambert; Commissioner Kathy Silvernale; GM Jeremy Carter; Attorney Marc Sebora Conflict of Interest 2. Approve Consent Agenda a. Approve Minutes b. Ratify Payment of Bills Motion by Commissioner Cheney, second by Commissioner Lambert to Approve the Consent Agenda. Motion carried unanimously. 3. Approve Financial Statements Mr. Martig presented the Financial Statements. Transmission was overestimated by $30K, making net profit $250K not $220K. The increase in misc. revenue was due to reimbursement on the rooftop solar projects. GM Carter reviewed the Electric Usage and the Power Cost Adjustment dollars compared to previous years and the expectation of August PCA. GM Carter noted the gas sales are behind from 2025; last year credits were given, this year building back reserves from the January storm. Overall trending consistent. Balance sheet was also reviewed. Motion by Commissioner Silvernale, second by Commissioner Lambert to Approve the Financial Statements. Motion carried unanimously. 4. Open Forum 5. Communication a. City Administrator— Matthew Jaunich — i. Wrapping up street projects ii. Landing apartment project should be opening up in about 90 days. iii. Budget season '7=big0"017 Dan Lang, Engineering Services Manager —Absent Dave Hunstad, Electric Transmission/Distribution Manager — 1. Solar project update 2. Hutch Sub update iii. Mike Gabrielson, Production Manager- 1. Unit 1 update- GE will cover part of the repair that is under warranty. Trying to get confirmation on warranty amount and timeline 2. Plant 1 finished up contracted summer gas for the year 3. Cooling tower repair to start in October iv. Byron Bettenhausen, Natural Gas Manager - Absent v. Jared Martig, Financial Manager 1. Wrapping up Bond material and Rate Study c. Human Resources — Angie Radke - i. Continuing to work on Compensation Study ii. Working with Broker on Benefits iii. Union Negotiations starting soon d. Legal — Marc Sebora — i. Charter Commission will be meeting next week to discuss HUC Commission and ways to enlarge the pool of potential applicants for utilities commissioners. e. General Manager — Jeremy Carter i. Cost of Service Update — looking to have special meeting in September ii. Bond Proceeds Update did keep and A- rating iii. Union Negotiations iv. Cap X and Budget 6. Policies a. Review Policies i. Hutchinson Utilities Commission ii. Establishing a New Electric/Natural Gas Account iii. Deposit Requirement — Residential iv. Deposit Requirement — Commercial/Industrial v. Terminating Electric/Natural Gas Service by Customer vi. Definition of Your Bill vii. Errors in Billing viii. Payment of Your Bill ix. Automatic Bill Payment Plan x. Budget Payment Plan xi. Explanation of Billing Procedure xii. Disconnection of Residential Services by HUC xiii. Disconnection of Commercial Services by HUC xiv. After Hours Reconnection Policy xv. Landlord Acknowledgment xvi. Inserts with Utility Bills xvii. Identity Theft — "Red Flag Program" xviii. Minnesota Cold Weather Rule xix. Minnesota Government Data Practices Act and Public Records Request No changes recommended at this time. 7. Unfinished Business 8. New Business 2 a. Approve Req#010690 — Power Gate and Camera Install Electrical work at Plant#2 Mr. Gabrielson presented Approval of Req#010690 — Power Gate and Camera Install Electrical work at Plant#2. Requisition is for the installation of electric wire to the power gate and two cameras at the plant that will be pointed towards both entrances of the plant and is part of Req#010691. GM Carter added cyber security is important along with physical security. Motion by Commissioner Cheney, second by Commissioner Silvernale to Approve Req#010690 — Power Gate and Camera Install Electrical work at Plant#2. Motion carried unanimously. b. Approve Req#010691 - Install Automated Pivot Gate Mr. Gabrielson presented Approval of Req#010691 — Install Automated Pivot Gate. HUC is looking to purchase an Automated Pivot gate at Plant 2 as part of the continual efforts to secure HUC's critical infrastructure. Plant 2 has critical natural gas infrastructure housed on site along with generation equipment that should have greater security measures in place. Motion by Commissioner Lambert, second by Commissioner Cheney to Approve Req#010691 — Install Automated Pivot Gate. Motion carried unanimously. 9. Adjourn There being no further business, a motion by Commissioner Lambert, second by Commissioner Cheney to adjourn the meeting at 3:21 p.m. Motion carried unanimously. ATTEST: Don Martinez, President 3 Matt Cheney, Secretary MINUTES Special Meeting — Hutchinson Utilities Commission Wednesday, September 9, 2026 Call to order — 7:00 a.m. President Don Martinez called the meeting to order. Members present: President Don Martinez; Vice President Tom Lambert; Secretary Matt Cheney; Commissioner Kathy Silvernale; GM Jeremy Carter Others Present: Jared Martig, Dave Hunstad, Mike Gabrielson, Angie Radke Others Present Online: Dan Kasbohm from Utility Financial Solutions, LLC (UFS) The purpose of the special meeting is to have a Cost -of -Service Study presentation by Utility Financial Solutions. Dan Kasbohm from UFS, thanked everyone for attending. Mr. Kasbohm reviewed the Cost of Service (COS) process, projection assumptions, summaries, targets and results. Discussion topics will be Financial Projection 1) Meet revenue requirements and 2) Measure to key financial targets; Cost of Service 1) Monthly meter charge and 2) Identify if one rate subsidizes another; and Guidance from Utility Commission 1) 2027 revenue adjustment and bandwidth and 2) Rate component adjustments towards cost of service. Project Assumption is based on 1) Using HUC 5-Year Budget Forecasted expenses for operations and supply, 2) Using HUC 5-Year Budget Forecasted growth projections, 3) Included bond 2026B issued in 2026 for $4.295M, 4) Includes data center load in 2027 and 5) PCA passes through purchase power changes. First Projection Summary is without revenue adjustments with current rates. Years 2027-2031 shows HUC running at a loss and identifies need for rate adjustment. 2 Options with Rate adjustments were presented; A) 2027 rate adjustment of 6% and 2028 rate adjustment of 5%, 0% rate adjustment years 2029, 2030 and 2031, this shows positive cash position in 2028; B) Rate adjustment of 4.1 % for years 2027, 2028 and 2029 which will take 3 years to have a positive cash position. Next Projection Summary slide shows projection with current rates without Data Center, along with Projection with proposed revenue adjustments without Data Center. Three Projection Targets were reviewed along with the Cost -of -Service Summary. Cost of Service Summary showed percent change required to move current rates to cost of service for each customer rate class along with the Customer Charge per customer class. GM Carter noted past glide paths have done its job. Mr. Kasbohm reviewed the Gas Financial projection and COS summary. Assumptions are the same for inflation and growth. Projection Summary includes Projection with current rates and Projection with optional rate track. Projection with optional rate track shows a proposed revenue adjustment of 1 % for years 2030 and 2031. Cost of Service Summary showed percent change required to move current rates to cost of service for each customer rate class along with the Customer Charge per customer class. Both rate designs will be developed using input from the Utility Commission. Discussions were held on cash balances, transmission rate/costs, depreciation, cost of projects, and the impacts to all classes for Electric and Gas divisions along with the fundamental decisions that were made in the past with glide paths and the impact of how those glide paths helped with decisions going forward. Mr. Kasbohm left meeting at 7:40a.m GM Carter is looking to have guidance from the Commission on rate track options to be modeled by the UFS. Commissioners agree to look at 6%, 5% rate adjustment for years 2027 and 2028 for the Electric Division and rate adjustments based on UFS recommendation while staying relatively neutral on revenues within the gas division. Mr. Kasbohm would have a 2-week turnaround from the Commissions input. Looking to have more discussion at the September Regular scheduled Commission meeting, take formal action in September/ October which allows time to bring any changes to the City Council in October. Implementation is expected November 1st but can change based on board preference. GM Carter noted that the Council has the right to veto any rate changes. There being no further business, a motion by Commissioner Cheney, second by Commissioner Silvernale to adjourn the meeting at 7:59a.m. Motion carried unanimously. ATTEST: Don Martinez, President 2 Matt Cheney, Secretary w H E� H H N D Fo � N z\ O� � N z\ H � x � U �D o a N w a o\o .H w �4 N F U \ cn a ro Q a 0 a z w w w N w � u� Q a �D x m U w Q U ro a ZH- 14 U U � CD M � oo b O O -li (r) - ' r +� O U Q N f7 J-) M • • �" U O,DQ Ln m O M O Ln m O h N m m 6 , N 01 Ln N ,i' Ln H H O i' Ln 6 of N H H Ln 01 M O 3' O 3' 3' O 3' O O N M N M N H H O M O of H 1' O Ln N H H Ln H Ln M -o of h O h O h h N h N N N �n N �n N 61 O Ln H CD H of to to to M of i' i' of i' of Ln O N N H OJ N OJ N O �' N �' N M to N Q0 M of Ln H H H H O H H H of of N N O O O O O O O O O O I I I I I I I I I O Ln Ln Ln M M 61 01 O O Ln Ln Ln 61 61 Ln Ln O I I N I N I N I H I H I N I N I N Ln O O O O O O O x a H Q Q �D �D W rt rt rt w w O O rt � H co U1 H H H H H H O rt rt O U1 l) l-) l-) N N N l� l� N O O O +� +� O rt rt O 04 Ln H O H a u u Q H 'H a O� O� rt rt rt x N N x > 0. 0 0 U > > U O a Ci c W N O LO oo U z H W a o H U W QQ W N O H N H O w O N O LO OD z W 0 QQ N O N O O Oo N O LO OD z W 0 QQ N O N O O a a a O x a O Q x a a H a m N O LO OD z W 0 QQ N O N O O Q0 Ln H M H of O O O O O O O O O O O O N N O O O O O O O O O O O O O O O I I I O I O I O I O I O I O I O I O I O I O I O I O I m I m M h h O O O O O O O O O O of of 01 M M O O O O O O O O O O Ln Ln I I I I I I I I I I I I I I I O O O Ln Ln Ln Ln Ln m m of of of O O z a � a o H Q Q a o U a W w cn �l a W 3 w cn x O H W N a U H cn M C4 U P z O H M Ot w W rG a U cn FG Oo cn x °-1 x o H Q a w_ H +) +) +) +) 5 H x 3' i/i i/i of is is is is 'rl H cn Q \ H Ot \ �5 �5 �5 �5 N M H M M �3: Ln O O O O U O �D 0-) H U U U U N Ln O Qp 9 9 9 9 a , W w 1U-1 z H a x a a Z:7) rt w U) a W H C7 Q C can Q �D ,SZ W W H rt rt rt rt N U O H Fl 04 O H 0 W W W W -1 w a i O 9 x H a H H H H (o x C7 H a H a �4 0 U U U U cn H H U x H W w 9 W a w W Q x U a m O co O LO OD z W 0 QQ N O N O O x a a a U H H U W a w w H a w Q a 0 m M O LO OD z W 0 QQ N O N O O w H E� H H N D Fo � N z\ O � N z\ H � x � U 1 N � �D o O H N C7 w\ � s4 N U N \ �' m a ro Q a O a z w w w N w � � Q a �D x W U w Q U a) a ZH- 14 U U � CD M � oo b O O -li (r) +-) O U Q N fo J-) O,DQ U f� � O f� � H CSl CSl h N N un Ln Ln i, O O r M M 0 h h un N N H H H 61 O N 3' Q0 H l0 oo Q0 M M un h O N H H N l0 61 f� O O O l0 h Ln O un H rn Ln rn oo31* l0 CD M N M M ,3' � �M f� O O O H un O O 00 O O Ln M O O h H 3' O N ,3' O M f� M Ln o0 O oo h 61 M N in N h H C H h l0 l0 oo l0 un N N M M h H oo N O o0 61 M M H H H N N N H N Oo O Oo Oo Oo Oo Oo O O O O M M O O O O O O O O O O O O O O O O O O O O O I O I O I O I OJ I OJ I OJ I O I OJ I � I O I H I H I H I H I l0 I O I O I O I O I u� I h un un un oo oo oo un oo M O N N N N N O O O O l0 l0 in in in in in in in in 61 O m m m m 61 O O O O in in I I I I I I I I I I I I I I I I I I I I I O O O O O O O O O 3' O O O O O un oo 3' 3' O O Q W a Ln \ r1 Ln r1 x Ln H w Q w w a w w a a 3 a O W a a a a) a a O P, I 1 O O 7 O O a a un aw �G �D w w aw aw O H a) aw a) aw w � o H H o o H a-Q o o S-1 S-I S-I a a a H H H H H Q rt H a) H Q Q Q W W cn 5 �a4 (r) M U1 U1 U1 m Ln C'J .11 Oo x a) H M Pa Pa M a) a) a) a) M O a) M W U 3' on on on .> on a a a a � � Ln r -1 -1 W c� N � r �D a a oo H a a a a M a a oo H H o�-4 oo w w w w w w a w w � Q Q Q Q \ Z Z a) z W\\ z W �5 �5 �5 �5 z x H x z w w n z U1 U1 U1 U1 U1 U1 W C7 \ W U1 W U1 W W C7 x m m m m W C7 O O U �D H C7 rl a) C7 O O O O O O x U U U x a U U U U x a� x a a .� x 4-1 4-4 4-4 w w w U H H H U a .1 .l .l .li U w a) U a a U H H H H H H W x x x W W W W W W W W H r1 W W W (0 +) W rl rl r z z z x w w w x> w w w w x a z (0 x > > �4 �5 x �D �D �D �D �D �D U > > > U O O O O O U P H U) U O O H O U z O U) Q Q � U W H O I--W U1 pa H z z a o �-1 0 o a w 0 o H a z z ° W O u w W a Q x a W Wo u cn " a o a W w °a a H H o U U U U w w OD 61 Cl H O O O O O O O O O Lr oo Lr oo Lr oo Lr oo Lr oo Lr oo Lr oo Lr oo Lr oo U W W W W W W W W W H U W a Q0 Q0 Q0 �.0 �.0 �.0 �.0 �.0 W N N N N N N N N N O O O O O O O O O H N N N N N N N N N O O O O O O O O O 61 61 61 61 61 61 61 G) 0) w O O O O O O O O O +-) is N un O O O O f� 3' O of l0 h O 61 un N O 61 Ln O M 0) O O O O O O m 0) un 0) un 61 H 61 O of O N O H 0 O O of of O 61 h 61 h Ln* O O O N (1 of Ln* h Ln* M 3' Ln O l0 h N M H M (3) O O 61 un O un 61 l0 m H \ Q W Q W M M 0 M Q Q H O H O � K K a as Q O O f� O � O O O O O O O H O N O N O H O N O M O H O H O H O H O f 00 O O a-1 I I I I I I I I of I of I I I I I l0 I I I I I I I I I I l0 O 0 O O H 61 H 61 O O O O O O un un of un of un un un un un un un un un un un un un Ln Ln H M 61 61 U N H H N N N H H H N H H N N N N H H 3' O O 3' 3' 3' O O O O O O O O O O O O a a O a O a a a H H H H H H Ga Ga Ga H a a Q (0 (0 (0 N FD O cn cn O w O w N +) N +) N +) O w z \ �C �C w O \ H x C7 x C7 O s- w O a O z H 0rirl H H rt rt H N Cia H Sa Sa Sa H H Ul U +) +) N N W W Ln z u) Ln S-I +) +) +) Ln +) as p I U)N r N +) rt +) rt U) U) U) U) U) U) U) O Ln H w W W w O Ln 00 04 S-4 0 N 0 N 0 N 0 �n oo x N W N U U Url O Z a N W 1) a, W ul N ul N W W W C7 w i7 z W Sa O W C7 z W 3 O C rt C (0 C (0 z W N bi o \ (J W .H s4 p; a (n ul � � � � H H x � H C7 +� (0 � � U) C7 04 Pa a S; S; 04 a 04 a 04 a W Cia C'J H W Cia .4 U f-I . .'�. J-) J-) J-) J-) a o W > a, .1i a, .1i O �-4 O �-4 W > W > W > 9 W a n w x w x rt .� rt .� rt .� rt w x a, rt .1 pa O (0 Q O U U C7 0 O O O CL4 U C7 H H U U U E a x Q O a z w w w w a Q H �D x U W U u z U a H w a H U n Q u U .4 W U) z O W H H O H xR9 o U) 04 a o w U H ° Q H H �-' 9 H H H w x w �D � w Q c a z Q o ° z Q w � w cn o x a a ro a w W w W a H H H 0 H U W HFA w o h h h a a z u N J' LO l.0 f" oo Cl H N M J' LO f" q) CDCDO III O III O III O LO O LO O LO O LO O LO O LO LO O O u LO OD LO OD LO OD LO OD LO OD LO OD LO oo LO oo LO oo LO oo LO oo LO LO oo oo O U Z W z W z W z W z W z W z W z W z W z W z W z z W W oo b O H O -li (n N U +-) a CD 0 N f7 J-) Q H O N O N O N O N O N O N O N O N O N O N O N O O N N M •• �" � H H H H H H H H H H H H H N f-I '� CD CD CD CD CD CD CD CD CD CD CD CD CD 61 Ul O ,D Q U Cia 61 O 61 O 61 O 61 O 61 O 61 O 61 O 61 O 0) O 0) O 0) O 0) 0) O O w H E� H H N D EO � N z\ O � N z\ H � x � U x�p O o z a N w as O\� .H w s4 N F U \ m a H Q a O a z w w w N w � u� Q a �D x CQ U w Q u x u W x U ro a ZH- 14 u U � CD M � oo b O O -li (r) Q0 � li +-) O O Q N f7 J-) O,DQ U ,3' 61 l0 O O O O O N O 01 01 N l0 Ln O O O O O 61 O 61 l0 M l0 O O O O O H 3' N O O un N O 3' 3' l0 H l0 O l0 . 61 h. . O . u� . O . h . H . . O -y . Ln . oo . . � 61 . N . O . h . O . H . 61 . h . O . h . h l0 O l0 N O H 3' Ln 0-) oo H 0-) O 3' 1-- CD oo � Ln Ln3' H un 61 H �' O (10) H M �' N O N M H Ln O u� H O O M O �1' un H H N l0 N N N M l0 O H O � O O O O O O N O O O O O O O N O O O O O O O O O O O O O O O O O O O I H I O I u� I l0 I M I M I M I O I O I O I OJ I O I O I O I O I O I O I I O OJ N Ln M H Ln Ln Ln O O O 61 M O O O O O O O 61 un 61 61 M M M O O O un 61 O O O O O O un I I I I I I I I I I I I I I I I I I I O O O O O O O 3' 3' 3' O O un un Ln un O ,3' 3' 3' 3' H H H N N N 3' 3' H H H H N H 3' rn Q0 rn Q0 rn Q0 rl z �D w rl z �D w a w �' � O a rl z w a � z rl H � z Z7 z w U1 N W x -1 H W x -1 H W x - H ow a F(', a 60 o 60 N U N ow rn ow u H z ow ca r1 rt rlri Ul l),,, -P �,' -- +) N as -- +) N as -- +) N as H O H M l0 O 00 00 w w w U U U �y �y �y FC; FC; FC; H O H �' l0 O H ro N l) Pa N C7 asl0 x N Pa a FC w a H H O N H O H O O 60 O 0 W u a H 1 O w H a W N U1 h O N O rl w rl b" w ri b" w r1 b" w Ln oo z � � � U1 U1 U1 z z z Ln � z I W c/1 \ H H I z w N \ H W w Ln � z z z ffa�'� un l z z o a x 11 a -1 1 W as O H J-) O .H J-) O .H J-) w x U H H H a a 7 9 O H H H W x U U r1 U .1i a a 11 H a a�-q a Q W z Q a O pa 0 Pa W x U r z H w —1 W (0 H a�-q x w N U a a, O as W � f-I .11 H cn 0 U rt J-) cn rt J-) cn rt J-) cn w x U z z cn W W H Q Q 5 W x U ,1 a)S-I 5 rt w O > a H O a O s a a ,'D H w x U w P� +- w U U W w z a H H O W cn O cn H a w w cn a oa O z W O H H q H H H x H W z FzG a W �l w tHj f cHn u H H H U > a O H a a W w z w a a z z' H o a a a a a r� x a a a 61 Cl H N co W Cl N O O O O O O O O O O O O Lr OD Lr OD Lr OD Lr OD Lr OD Lr OD Lr OD Lr OD Lr OD Lr oo Lr oo Lr oo U Z z z z z z z z z z z z H W W W W W W W W W W W W H U W W N N N N N N N N N N N N O O O O O O O O O O O O H N N N N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O O O O w O O O O O O O O O O O O O H Ln a) a a ZH- 14 U U � CD M � oo b O O -li Uz Q0 � li +-) O O Q N f7 J-) O q Q U ,3' O O t` Ln i' l0 6 O un oo of H H O M O M f� un of 3' O 3' O un 61 Ln h M M h O of N 6 6 Ln m q N H H H W H q K K O O N l0 O O O O O O O O O O I I H O I OJ I M I H I O I H N O O O N O N of O un of of O of I I H I H I H I H I N I H O un O O O 3' O ,3' H �1' W x U C7 H H W q q U1 O w w z z O O U H w w W w qcn Po °o x � � O cn a H a) H Oo 1 a J-) If) wn I -- � w a Ln I a Ln u Uz � r H � x o U N U H �a a H U r1 H U a) fx w H x O w x Q a) > O O H U U O U a H O z U H z a H z O H u z H H C7 H z z a x o O Q �7 w U a H Q H W q q w W x O x cn cn cn H H H W of O C" C" W O O O O O O LO LO LO LO LO LO oo oo OD OD OD OD O W W W W W W H U W a Q0 Q0 Q0 W N N N N N N O O O O O O H N N N N N N O O O O O O w O O O O O O O l0 N O 1-0 m O 3' 3' 1-0 f� 1-0 m m H O O Ln M N oo i, O to N of M O of h un h l0 M H of H 61 M 61 61 O l0 N 61 O Ln* N O Ln C` O C` Ln oo i' M O Ln f H f Oo N N H H N O Ln CD oo to O � O N N M M l0 un H N Ln N l0 O O O O O O O O O O O O N N O O O O O O O O O O O O O O O I I M O I O I O I O I O I O I O I O I O I O I O I O I m I m O O O O O O O O O O O O O O O of O O O O O O O O O O O O un un I I I I I I I I I I I I I I I O un un un un un un un un un un O O O O W 0. N a � QQ H Ln FC N O >CD> H O Ln O 3' O 0) rl N W W N 31 O H 0. 31 H H 04 N a) a) Q U1 —1rt � a rt �D > w of U X M 3' IDQa Qa • 1 a O M O Ln w w a n w O U o Ln w fx fx O fx P: r1 * 31 H w U) O Pa H l0 O I I 31 oo-1 C —1 • fx O W O W I a) a) H O O r1 U PQ Ln N . H U r1 —1 H w W o fx cn 5 3 ro ro l l w � cn U Ln Ln W M > a w> i O � U U o 1 a Ln w Ln U O • O a a Oo O H H 04 w z rt rt W O O H H C7 U 0 U)a p; � j x w z w W O z z H H U) U) a H a M H H H H a) a) H H U a fx H z a a m r1 —1 W W W O 1 H W W 1 O E (0 (0 P a x U O .'�. U) U) O O a H M M w w U U z H U z H � U H U a a w Uz z O H H a O z O o H (C a Q H W U1 H H w -k H M OD OD O O LO LO OD OD W W QQ QQ N N O O N N H H O O O O l0 O un M M f� � M H O f� � M O O O O O M un N i' H m m m lfl m lfl CSl un H CSl H H OJ Ln N N i' i' N h O O O O O 3' M M 61 oo H l0 l0 61 O l0 un 0 l0 OJ N h O 3' OJ CSl M 10 OJ 3' M O Ln* O u� O l0 H �' � l0 H CSl CSl OJ N f� 3' M m H m l0 OJ H H rl l0 un 0) M N CD-1 _i N N �o �o N Ln N m Ln N CDN �' H H M H \ H M N H M N Q0 H H a) a Q O O O O O O N O N O H O H O H O H O Oo O Oo O H O H O N O N O O O O O O O O O O O O O O O O O O O O O N O N O a-1 I I I I I I I I I I I I I I I I I I I I I I I I I I I 1-0 1-0 O O 3' m 3' m 1' un 1' un 1' un 1' un un M un M 3' Ln 3' Ln OO OO OO OO O O O O O O O O O O O O O O O O O O O O OO OO OO OO 0 M M O un un un un un Ln CSl CSl un un un un O O O O O O O O O O un un u O O OO O O O O O O O O O O O O 3' un un un un un OO OO OO OO O O H H H H H P7 Y U z a Q Q 1 rl rl rl pa z w O H PQ H (\j .ti- Cia m m m H .ti- Cia [. Cia O CJ H H a) '7-, a rt rt rt a �° a Q g w C) N ED O a l0 O Ga H Sa H Sa H Sa a) J-) O Ga Q x J-) (0 O Ga Q0 �D Q W N M I a) a) a) (0 ,T, J-) M O ,T, M U I I \ O 1 +) +) +- z rf) a x a H x N U) H A H O Ul H Ul H H O a a) H O \ H a W ,'D U \ -1 Pa r1 r1 \ 'z, 1--1 0 l0 of Ul Ul H S-I a) r1 ri H Ul H Q a M I �rl H H �' J-� l� l� ,S,' S-I S-I Ln a) l0 I ,7 I �', �', �H �H U a) (0 rt oo � +) a) a) 0 H v) oc) a o a x w w p I cn 0 U .H .H o rt rt (00 +) +) CDv) CD 9 CD U 0 0 U U � 0 a) a � a) � a) Ln oo H 04 H 04 r1 04 a) (0 (0 Ln O � H a) r1 Ln oo U) H w CD O Ln w O F4 U U U U W a W a 'ii N ''-I � � l) l) U �/-� �5 a) �/-� 'Z, ,D U) N ,D ,D U) 0. g g CD'Z' w (0 x (0x (0 (0 w Ste. rt w �I .� w W + M CD � M + M I -a b b x (0(0r1 x U) o (J .H H Z:7) H 0 0 0 M\ M w H Sa �Ei I I U) Ul Ul a) '� '� U �." �." a'31 E-1 N m U C 7 H U -P m N N N ;i. U m a) m a) m a) -P r is is .Y. U w Q f� H C.7 H C 7 H .Y. U 04 a W W H x S-I (0 f-I (0N U1 U1 N S4 a) a 3 H rt rl� .' .' w x U U U U U U .li rt�� 0 0 w x x U W W a W s W x W > 04 9 a a� 0 w g a W w H w H r1 (o r1 rt� +) (0 o o (0Q 04 Ga U1 U1 a a U r� i'J 0 U 0. Q Ga Ga U O H w F4 H H U U m m H � a x m O a z w FT� w N a w a Q w D4 z ' Uz U U1 w a H H H Q U OU z H O U W W U a U O > O Q (0U Uz w z04 a a 0 0.i U OD O W O W O W O W O 0) O Lr oo Lr oo Lr oo Lr oo Lr oo CD � w w w w w oo b 0 H O -li (r) a) U 1-0 +-) a N CD U Q O O O O O N 17 -P H N N N N N M •• ,T, H l0 l0 l0 l0 N f-I �' '� O H H H H CSl Ul P� O ,D Q U � Cia CSl O CSl O CSl O CSl O CSl O w H N H H N D EO � N z\ O � N z\ H � x � U 1 x o o z T) N C7 � O \ H w �4 N F U \ U) a ro Q a 0 a z w w w FX Elw g co Q a z x CQ U w Q U ro a ZH- 14 U U � CD oo b O O -li (r) +5 O O Q N f7 J-) � •• x � O,DQ U m O O m � � � O O H m M N N N in h h Ln O O f� N CSl M M h h l0 of N N H H H H � m � � Ln O � M H M N 1-0 O N h m m �' of CSl M CSl H l0 H �' h m O h 3' l0 M H of un N l0 H l0 H 3' l0 ,3' H M O o 31 O O O O O O N O un un O O O O O O N O O h Ln CSl CSl O l0 O un O H 61 N M H O N 3' in in H N l0 N 61 1' Ln �M O O f O H H N N H H H H H N m m m l0 O O H H H N N N O O O O O O O O O O O O O O O O O O O O O O O O I I I I I I I I I I I I I I I I I I I I I I I I H O in in m m i, i' in in in m N M M O O O in in in m m m 61 O in in in in in in in in in in CSl CSl 61 61 O O in in in in in in I H I N I H I H I H I H I H I H I H I H I H I N I H I H I H I H I l0 I N I H I H I H I H I H I H O 3' O O O O O O O O O O O O O O of �1' O O O O O O 31 z z w cn w a z z 4-)4-) z g w q z w z Q w w (0 w Q Q Q Y H w s-I s-I � W W U1 Q a a a a N\\ a z Q z a W U1 a O O 3 3 \ O H W H W z a O w w a a in a) a) w a z a W H W w U) U1 h J-) J-) U1 H C) a W H of a of Q H H H a H 1 oc) 31 > m� H O � O � � O O Q Ln m Ln � > O H H � a a H a) a) D4 H a) W , n Ln � H J-) J-) U1 Pa M M J-) H in n CD Ln H ,7 a) a) l0 m J-) ,7 ,7 61 (0 U) co co 61 Pa x - x a a O O O r1 �,' �,' O al M F4 N x x. H n cn a s Ln m m m �-4 Q a) a) Ln cn Ln 00 H oo 0 0 0 a) as as oo \ H w w w w w w oo rl z W W W W as as as J-) x x (r) (r) c�-n+ c�-n+ w 0 0 .� .� .� � z w � �D cn cn cn cn cn w J-) J-) Q Q Q w C 7 (0 (0 U W 1 Pa O O O O f-1 S-I a) a) a) -H -H �'`�, a) a Pa W W W W W W U a 4-4 4-4 w w U a) a) J--) l) l) a) H H U r1 a > > > > > > U W a , W H .H H H W C C C W r1 P, W O O O O O O W U u 0 � � U U U � a H � � U U Q 0 0 0 0 0 0 U O z O H H a � �a w Q O z � a O Q z H W Uz H U H a a H 0. pa U O O O LO LO LO OD OD oo W W W 0 0 0 QQ Q N N N O O O (\j (\j N Q0 Q0 Q0 H H H G) G) G) O O O z O Uz z x U H x x w O x H H U O LO 00 z W 0 QQ N O N H CSl O z z x H w x cn W x Pa U W H N Q O W a W U Q w w (5) O co 0) 0) O O O O H H LO LO LO LO OD OD OD OD W W W W 0 0 0 0 QQ N N N N O O O O N N N N H H H H CSl CSl CSl CSl O O O O w H E� H H N D EO � N z\ O� � N z\ H � x � U x�p O o z +) a N w as O\C7 .H w �4 N F U \ m a ro Q a Q 0 a z w w w N w � � Q a �D x W U w Q U u w x u ro a ZH- 14 u u � CD oo b O O -li (r) +-) O O Q N f7 J-) � •• x � O,DQ ,i, Ln rn O O oo Ln rn r Q0 Ln O rn oo l0 61 l0 O O N 3' H oo CD CD3' N N OJ 6 ,3' Ln H N N N l0 H M M 00 H 00 M H 00 un of Q0 (3) of ,3' rn 31 O rn H r 1 Ln Ln ,3' OJ O N N h 3' N O M OJ Ln M l0 N OJ 3' �3' N l0 3' 0-) H N OJ 3' O N O H O M N H H M H H H 03 o 0 o t� � H t� 03 00 H 03 00 00 0 O O O O O O O O O O O O O O O O O I I I I I I I I I I I I I I I I I in in N l0 l0 l0 H H in H M M in N M M O in in 61 M M M 61 61 in 61 61 61 in 61 61 61 O I I N N I H I h I h I h I H I H I N I H I H I H I N I H I H I I H N O O O O O O O O O O O O O O O O �1' �1' 3' H H H 3' 3' 3' 3' 3' 3' 3' 3' 3' 3' H H ,SZ Q H H H ww w w U u w w rt w a -P H +) W a o x x a) o o U o w Q .o w w w s� a ° o w ° a H H H N H U1 U1 I U1 U1 H O H (r) rz b O O H H H O H H H C H H rt N S-1 rt rt H '11 H f-I O 00 N H f-1 '11, Ul o O O �4 a N O I CDrt a) ul -P a)O N N H O r1 r1 U a)W l) r1 1 r1 .11 .11 l) l) O .11 l) l) H H X in W in N in > O �5 r1 (0 (0 in i/) °' H o x a) � U au 0 0 'Z, �" ,SZ 'z, �' � '7-, U1 I I S; �5 I I z W w 03 W o Q w H w � rt cn w ,31 u�7 0 z n �7 H �7 ocr) �7 O w a rt x U Ln H x x a C7 C C + U a I Q0 u FG N W U U l) H U U1 U a 3 Ln W W X +- w O w w +) a, O O w O O w W a r1 x a H H �5 x �5 a x �5 ri f-1 f-1 4-1 f-1 f-1 x > Z7 a, u Q H H x u a w U O u o o O o o u O 0 u z O H N Z a H #I- W U) U Q cn W W1-�� O > cn FC z O W FG W H Q C 7 H H U cn u cn w cn H W U P, O W O i7 1� H a w z � z x a o w o W wn oQ H W 9 a Q H o w w H w w a x Q z w w H U)H 0 U a W w rw� H rf) Hn W a w H u u o a a w o a a a H H z a W H a a Q W H .D '.D z a w w o o x x x x x H h W O H N cn LO W O O O O H H H H H H H H LO LO 00 00 00 00 00 00 00 00 00 00 00 00 U z z z z z z z z z z z z H W W W W W W W W W W W W a o 0 0 0 0 0 0 0 0 0 0 0 H U W W N N N N N N N N N N N N O O O O O O O O O O O O H N N N N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ Q0 Q0 Q0 w O O O O O O O O O O O O +-) O 61 O l0 � l0 Ln M H N 61 l0 f� oo 61 M l0 N l0 M l0 0) 3' 3' O N l0 61 f� oo O O N un l0 oo O un N i' O O oo h H O l0 O 0 O un oo H Ln un f-- Ln M l0 O H f h H Ln* 3' M oo 31 un 3' O 3' CSl un M 3' H oo O 3' N CDo0 0) l0 H un Ln l0 H H H M u� H O H N un 3' O H H Q0 N Q0 3' Ln N H a) a as Q N O O O N O O O Oo O O O O O H O H O Oo O Oo O f O H O N O H O H O H O H O O O O O a-1 I oo 61 I O O I oo O I O O I H N I O O I O O I O un I I un I I M I 1 M I l0 H I O Ln I 1 Ln I O Ln I O Ln I O Ln I O Ln I I O M O un 0 un O un O 61 O O un un 61 61 61 un un un un un un O M u O un O 3' O 3' 3' O O O O O O O O O O O 3' O H H H H H z z Ul z z CSl H Ul CD CD CD CD F o ow a ow � ow ow x N a) W FC -1 z O 60 c +� a H i/1 N M H O N oo O U H O Ul H Ul H H O C a) H O z I r H 1 H rt rt H H +) x�G +� rl Ln CD N u) N U U � N J-) � N � N Ln N N N sa N M a) r. 1 0 f1 H H Ln U)H H n O +) rt +) rt H v) a 3 O r1 n as n .1i �a4 W zi c z Q �� 00 U co FC a o o z O 'Z' a N W 1) as t3' H x W i7 z W W cn z H z H z W U1 C f� z Wrl as a) U1 U1 U1 U1 W,' O-1 C7 .�4 W n rx� C7 N x x C7 H N C7 U 4-) N N N N C7 O N m a W u u a a U H a H s u r1 as +) r U 1 11 rl s U r1 as r1 as r1 as —1 as U a rl a +) a 3 0 0� a W x W > w w 9 W 9 w W x a, .H rt�� 0 o w x U o �-4 a) a, a, a, a, W x W (0o > +) 04 Q a H n U O O x x U n i7 i7 U Q a a n n n n U O n a m O a z w W a w a wFX Q co O H r' z cQ u a 0 Q H H a co w H a a Q U z O �4 u z H W H o x H a °W O u Q x 04 W a H W H w 0 W H Pa (� H FC W H U) H O z Q u w z ro 04z o a a U 61 Cl H N J' LO LO l.0 H N N N N N N N M M M M u ur oo ur oo ur oo ur oo ur oo ur oo ur oo ur oo ur oo ur oo ur ur oo oo O U Z W z W z W z W z W z W z W z W z W z W z z W W oo b o H O -li (r) a) U +� a QQ N QQ N QQ N QQ N QQ N QQ N QQ N QQ N QQ QQ N N CD U N 17 J-) Q H O N O N O N O N O N O N O N O N O N O N O O N N M •• ,T, l0 l0 l0 l0 l0 l0 l0 l0 l0 l0 l0 l0 �' CSl Ul P� O ,D Q U � Cia CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl CSl O O +-) O O O O 3' O O O O M uO oo uO H l0 H M M 61 3' m H N uO O i' O O H H O O O 3' uO uO l0 M O l0 O O O l0 l0 OJ 0 O N M �' CSl H H h CSl l0 l0 O of N O M M of of O of CSl CDOJ M OJ 61 N 0) N M l0 l0 H OJ CDh h h 0-) O 0-) N H O C H H H M H N H M N p H uO f H H H H N M a) a Q O O Oo O Oo O H O H O O O N O O O O O H O N O f O Oo O N O O O H O H O l0 O a-1 I Ln I N I N I I uO I I uO I O O I oo oo I O O I O O I I uO I m m I l0 H I H N I I 61 I M uO I I uO I I uO I M O 0 M 61 61 uO uO O uO O O uO uO 61 61 uO M uO Ln CSl u O O O O O uO O uO uO O O O O O O O O O a a � i) uO H Q0 �D H �D �D x �7 �D �D aH W w w w H w w CDx N x w Q Caaa Caaa Caaa Ul Caaa a E E E E N O rt Z\ H 0 4-) ice. H 0. .ri H U H Cn w a) 4-) H H 4-) +) H W a) l0 M H If)Ul W a) O -i rt a) +) rt 0-)H M H O H P: W U) rt M 1 H J-) U a) a) rl a) U a) U 61 3, H P, 1i Ln H a rl H a Ln U) Ln W H r u0 S; a) ri H Pa4 Ln 0 O H tr oo Pa a Pa P, oc) H oc) H 00 Pa P, �-4 a) tr a) �-4 a) 00 z o Z HN C 4-) Q W W �D U) �5 U) U1 U1 W Ln N w Z W P: Pa pa O W v) a) �5 U) r S-1 W U) U) W O H FT\ H �4 r O W a) a) H a) H C7 H H x C7 z +� (0x H C7 a a) O w O �7 H u U .1 J-) x U u H U rl U ri U r1 x U P: O H x U O PQ a�4 W a) 0 H x U 1 U rl v) is .1i 4-) .1 Ul .l Ul x U W a a rt J-) W x w w 44 44 a) ,� a) w x a x W P: W x Pa H a) w P: w x P �r1 44 4-1 rt f-1 rt O 4-)� 4 4 � w x a O Q 0 Q U) u O O u U w U P: a w U u O H U) O O u u a x m O a z w P: u H w H u wN Q a �D x W rz Z H O O Z > o o Hw Q x o � a � �a H a H H a z O H W x U1 Z H U H H U) U x 04 o H H a H a ^� " H a P: P: H O P: N O H W Q a W 0 9 H H H U1 9 ro a a ° ° ° x z W Pa Pa a Pa a Pa U) P: U) H U) H H x H ,D U f` OD 0) Cl M uO l.0 OD 0) Cl M M M J' J' J' J' J' J' J' uO u uO oo uO oo uO oo uO oo uO oo uO oo uO oo uO oo uO oo uO oo uO oo O U W W W W W W W W W W W oo b O H O -li (r) a) U +-) a CD U N f7 4-O Q H O N O N O N O N O N O N O N O N O N O N O N M •• ,T, l0 l0 l0 l0 l0 l0 l0 l0 l0 l0 l0 N f-I '� H H H H H H H H H H H G) ul O ,D Q U w 61 O 61 O 61 O 0) O 0) O 0) O 0) O 0) O 0) O 0) O 0) O w H N H H N D EO � N z\ O � N z\ H � x � U N � �D o a N w a O\C7 .H Ga �4 N U N \ �' m a ro Q a 0 a z w w w N w � � Q a z x m U w Q U ro a ZH- 14 U U � CD M � oo b O O -li (r) - r +� O O Q N f7 J-) O,DQ � O O rn 31 h O O 3' h H O O M l0 M n un OJ N M f� N M N Ln i, � oc) Ln r O M M H M M H N M N H 0 h O h h 3' M N C H 10 00 h C h N l0 M un 61 H Q0 O H 00 H H H oo H H 03 o 0 O O O O O O O O O O I I I I I I I I I I N in in in M i' in M O O CSl in in in CSl in in 61 O O I I H N I N I N I H I H I H I H I N I N O O O O O O O O 31 H a H x Ln Ln .D .7 rt rt rt w Ln w w a a a O H O O H rt rt rt w c/1 W p aw aw H a x W H H W +) +) +) a) Ln a Ln Ln O O O +) H I H H Ln o o a o H H oo w a C C C Z a W 7 W W 7 f rt rt rt W O H W W O O u� C7 Q C7 C7 w rH� Q J�-) 4-) 4-) W H a a H �-i �5 U w H a U a s U rt .li O W � c/1 H W W W W +) rt rt rt x W H x >> x O H �7 U 0 x U O O U H rf) U W H a a w H a w 3 w z O 0 N 'z, H H a x W H N M �r �r �r �r oo oo O W W H o 0 H U W W N N O O H N N � CSl CSl w O O U z H o H W H H H a H W w � °a a w a w z o W a U w H Q � a W H �r �r �r �r oo oo W W 0 0 QQ QQ N N O O N N H H CSl CSl O O +-) un oo H N to N H 0) un 0) oo H O O N �11 m of N � Ln of N of i' N O O O un N of m � Ln Ln lfl N N h O i' O i' H Ln H M l0 M O h l0 O 0 Ln l0 un Ln N l0 O l0 O O Ln* M M oo M M N 31 H O 61 Ln l0 N M l0 N H H O O H H un oo O l0 l0 rl H N N l0 H M M H N a Q 131 O O 31 O m O m O o0 O o0 O 0 O 0 O 0 O 0 O 0 O O O O O O Ln O 31 O 31 O 31 O 31 O o0 O a-1 I I I I I I I I I I I I I I I I I I I I I I I h h h M M N M O O O O O h h h h h l0 Oo Oo Oo 03 M 0 Oo Oo Oo 61 61 61 01 O O O O O Oo Oo Oo Oo 00 03 Oo Oo Oo 00 01 u O O O O O O O un un un un un O O O O O O O O O O O W � H W n x Ln N C7 a O U1 3 N N Ln N U1 W W q Ln U1 H a W 61 H W W Q W H N F O U C1 W �1 W H O O i�7 O o N W H W Q�-1 a a x Q H H H W W a a w W z\ O N w o H H rn w x � w z\ H U) W a Q H o H o C H E O H orlrl rt rt H ul w q �7 a W rt H rx q rx �1 rx �1 H H z W H rf) N J-) N J-) N O U .rl U) H H U1 'z, H H H U1 H M O ,7 ,7 ,7 M O 04 Pa H M O in .moo '.D H a Ln Ln H '.D in x O W W W W U) co 16 16 16 co �D a a w co a0 N p H rt H rt H rt w �7 n H x a a U) s w n n n w \ n w [� Ul N �4 N �4 N �5 �5 x U Ul z .ti- C7 N x U O W O W O W x U U H U H x U o x +++ o o w + O a a a H H x a a a� a o x z z z x w w x a ro Q �7 �7 U o �7 W x a W U H H H H H Ln U x x x U U a O z W a FT� W E� a a W Q a 04 a � U o x C7 H � U CD h U� W H x a W H H 31 Q 9 x O U) U) U w z O z O U W H W a H U) u a w O W W a a � Q H a n 0 x w Q H Q U H O H H w pa pa pa U U l.0 01 Cl H N M N O N O M O M O M O M O Lr oo Lr oo Lr oo Lr oo Lr oo Lr oo CD � M w w w w w w CQ C7 C7 C7 C7 C7 C7 oo b o O -li (r) N 1-0 U +� O o N fo J-) q N o N 0 N 0 N 0 N 0 N 0 N N f-I '� CD CD CD CD CD CD 0-) Ul p� O ,D f1 U W 01 O 01 O 01 O 01 O 61 O 61 O +-) i M 61 O O O un O 61 M M O M O un N l0 Ln un O O un un H l0 O 61 H Ln l0 M m of m M l0 un O of N N N H O O 0 CSl CSl H h O � O CSl O (1 OJ H O OJ CSl H H M Ln* H N N M N H H un l0 M H Ln N N N un H h M M 3' M N N l0 H O M H N H 6) 'ZI' \ Q Q H Q Q N H O H O a a Q m O m O m O m O oc) O oc) O o O 31 O 31 O 31 O 31 O o O o O i, O Ln O Ln O oc) O 31 O a-1 I N I N I N I H N I oo N I 1, N I O OJ I O OJ I O OJ I 1 � I O 00 I m h I O O I I h I M 1-0 I M 1-0 I O M I N 61 O C C C C C C M OJ OJ OJ OJ M O of of of 61 O u O O O O O O O O O O O O un H O O O O O a H x 0 a o � H N N H N Q N O H Ga � W Ga Ga C7 -� Ga ul H N O zOt rz O crz 9 O O I c O � O N Ci4 Q O Q a C7 Cia crz Cia J-) H H H N \ Cia J-) O N f� Q C O U1 W H H Ul H Ul H� O C7 O .� Q O N � rt H o Q Q t7 W a) U x ul ul ul ul in W C 7 11 S-I l0 a) a) U F 1 a) H a) .H a) .H a) .H M CD a O U a) +) a) +) CD w U) Ln CD U) a) Ln CD a s-4 Q 0 H a H a H a H a Ln OJ W W a (0 x (0 x Ln oc)H U) Ln oo O .� a H Ln oc w 'T' N CD 'H +) a � a � a � a � a \ I 1 w w Z w O J-) (0 U) w +) I a N G] O\ (7 W p, .� m m m m W �7 O H O O v) a) '� '� U) U) W �7 H W �7 +) n c H —1 O W �7 b b H E-i N Ul U U .11 U ri U r1 U ri .Y. U a ,'D au > �5 0 Ci4 0 Ci4 .Y. U Cx7 H W Cia .Y. U a N ix7 H Q '� .Y. U rl 'rl .4-) Ul a 44 w 4-1 w 4-1 w 4-1 w W x 0 W W a Sa a) O � O � H z H z W x W a 9 U) W x w 04 9 W a � +) W x rt � rt r1 H CD H Q O O O O U a Q Uz o o x x U w U U w H M U H sz a x Q O a z w w O a W H W U U1 w� 0 Q w o � a z u a Q U 04 H a W 04 w H H W w H Q U W a n U n o ° w o o a a H w x U O w U a OQ 04 w cD H H a � H z W W a Gal o z o � N a U iJ z a O H ( (0a O H 04a UHi H a w U z U H a w U w Q H w .�J x a h H a O a W a z O z u} l.0l.0 61 H l.0 C" OD O O O O O O O O O O O u oo oo oo oo oo oo oo oo oo oo oo .. � C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 oo b O O -li (r) +) U) +-) CD U N f7 J-) Q CD N N CD N CD N CD N CD N CD N CD N CD N CD N CD N CD N M •• x � H H H H H H H H H H H N f-I '� CD CD CD CD CD CD CD CD CD CD CD 61 Ul O ,D Q U 61 Cia O 61 O 61 O 0) O 0) O 0) O 0) O 0) O 0) O 0) O 0) O +-) 31 un O O Q0 un l0 un H 61 l0 un N 61 O 3' Q0 un O O O M O O O 61 O 61 l0 h O h O O un H 61 O O 3' un 0 0 Q0 N NC; CSl un un O h un M l0 OJ Ln M un O un Q0 h Q0 3' H O CD H OJ M CD N 3' N N H 1-- �' 3' N H un OJ � H H H a) a Q oc) O 31 O 31 O oc) O o O 0 O 0c) O � O o O o O 31 O o O 31 O 31 O oo O Ln O O a-1 I I I I I I I I I I I I I I I I I 0 N 61 h Oo h Oo M 61 O O O O M 61 H 61 O O O O h oo OJ M � O O N 0) in oo O 0) O O O O 3' 3' O O 3' un O O O O O O O Ui N N N l0 N N CJ H H Cia Cia H Cia Cia U1 I q H N O 0 O O O N O Cia .11 Ci4 M Ci4 Ci4 H Z ow 0O 60 oo a FG rG C) Q H a FG a FG Q W rl rt O N U1 H O n H H H O N 60 a Pa H O H O a x u H s Z\ H D H a) w w H (r) r H rt o N x H H cn I a H a) +) x U pD 1 O Q0 on .1i v U U 31 o� a) Q, .1i +) I W ,5 O H h CD M h CDa U) W U W rt 0 0 0o � O �D �D oo w z� a oO oo 04 w o Z H U) U) 1 .� f�' w 04 ON E +- Q4 w 'Z, v) H v H W I H H W bi v) a) U) v H W Ul v) r1 v) —1 � W �:) U) U) W O .11 \ �r+ H H Sa O x rt rl rt ri C 7 Ul '� a '7-, C7 C rl a H a rt ri C 7 a) U r� rl r� ri C7 W H H +� 0 a W s4 a) s� a) U FC H O H 1 w s� a) U 5 a) a) U U H H a a) r1 a p F1 a W J-) rt J-) rt W x O S Z W U) H W x S Ra 11 Ci4 H J-) rt W x f-1 a) J-) rt J-) (0 W x w Ga H H H O D4 CD ro Q H u 7 Q 5 u H u a u U) u O x u w x m a 0 w a z w w FX w N w co Q 'Z aD � H H Fa I O H H U1 H co U H W Z H Ga W H Q u FG a w a o z H H Uz1 a 04 H U W w o o H Q a W x z04 H H a x W �7 H x �D x H a W U1 w H a FG U U) W cn - i7 H W Q a rG U i7 a U z ' w z z H (0 H W a z o D4 a a a a a zH- u 61 Cl H J' l.O 0) Cl H M C" O O O O O O O O O O O O u oo oo oo oo oo oo oo oo oo oo oo oo M .. �QQC7 W W C7 W C7 W C7 W C7 W C7 W C7 W C7 W C7 W C7 W C7 W C7 oo b O O -li v) +) F! N U) CD 0 N f7 J-) Q N O N O N O N O N O N O N O N O N O N O N O N O N M •• x � H H H H H H H H H H H H �' O O O O O O O O O O O O CSl Ul P� O ,D Q U � Cia CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O +-) O o 3' un N o 61 o M un o 61 m o m M m to � N M M o o o o f� N 3' o o r1 o 61 r1 H o M N � o o Oo r1 o M l0 N oo 0 M r1 l0 0) Ln rl 1-- o 0) N rl 0 Ln 61 o un M l0 h l0 o M h f M rl oo o Ln 0 un 0 oo 61 rl N M H M of M NM 61 M rl 3, H of M rl H Ln H H Q0 Q0 H N a Q o0 o 0 0 QQ 0 Ln 0 o 0 0 0 0 0 0 0 o0 0 oo 0 t� 0 o 0 0 0 0 0 0 0 31 0 31 0 t� 0 Ln 0 Ln 0 1 0 0 a-1 I I I I I I I I I I I I I I I I I I I I I I 0 N 61 o 0 o 61 Ln Oo h M h M h M h M M 61 M 61 rl 61 M o o o 0 O 0 h of h of rl 61 un Oo un Oo Oo Oo Oo Oo O �3' o 0 0 0 0 0 0 0 0 o un H un H un H o 0 0 0 0 0 0 W r� x a N U1 N H N � w Q I w Q cn � a Q H N N ,D �5 a x H 'z, ,D J-) J-) H a w a a C> C7 w (\j U) a w rl H H H H N FD o a O w n W E-i a O w Q U1 a O N +) U1 N +) U1 O N �. W H U� E O olo O U R, R, ul r1 E O R, x Q PQ � w E O U U H H t7' t7' 'rl rt .D a rt J-) J-) a s Q Q CDH h f� CJ w w S-I un �a 'rl o - E-i CDrl U U u p I w H r o W N +) oo o -r1 ,�Il l) C a i7 M U W 6 CD l) C N H N H 9 0 'H a 04 Ln oo 'Z, w o ., o .'1 (0 X Ln oo v �-4 x a W Ln oo w w O 'Z' a W � 04 .D U) �/-� W � O H U) W l) f0 J-) l) f0 J-) 1 '7, W N 'ri Ul N O a W H C7 �/-� W .11 Ul N Ul N Ul N w w N O \ C7 Q� .H 0 Z � H U) U) � 0 a) a a w H C7 a � � U) U) N U W U ,4 H W H Ul Ul a a rl .4 \ I U1 I a a .Y. 'ri 'ri O O E Ul a H w U W Q a a a H S S i �5 O U W U N Ra S ri W D4 Pa 04 Pa .D x x U W Ra r H w w H H a CD (0Q C O x u FA au O FA rt rt sa �7 x u � Q 11 u (09 H H z O u FG H FG H x u r1 u +) �D +) �D �D �D a x m 0 Z w H w N a w co Q cn u a 04 t� a a' H U) E CD f]Qu W a wn wu W 1 H Q x a u x z O W a z O u w H H U1 w a W a H x w a w a w Q a O a w z H z x H x O a O H Q 0 Q O w H Uz 0 x a � Q 0 U a �-1 a Uz W N W W E-i � �D (0x W H a W a GE-1 O z z W H �D W > U 04 U) O PQ a 0. a PQ W U H U u OD C" H W N W u7 W C" W 61 W Cl 61 rl 61 N 61 d" 61 u7 61 u o Lr OD 0 Lr oo 0 Lr oo 0 Lr oo 0 Lr oo 0 Lr oo 0 Lr oo 0 Lr oo 0 Lr oo 0 Lr oo 0 Lr oo .. � C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 oo b o o -li v) +) F U) +-) CD 0 N fo J-) Q N o N 0 N 0 N 0 N 0 N 0 N 0 N 0 N 0 N 0 N 0 N M •• ,T, r1 H H l0 l0 l0 l0 l0 l0 l0 l0 N f-I \ N •• �' �,' o \ 0 \ o \ r1 \ H \ H \ H \ H \ H \ H \ H \ 61 Ul P� o ,D Q U � w 61 o 61 0 61 0 61 0 61 0 61 0 61 0 61 0 61 0 61 0 61 0 +-) 00 in Ln N i, oo O rn � in o in 31 M O 3' m H O O H h M l0 M O O O O O O O o in 31 l0 O O Ln O Ln l0 oo O M O 0 H h h O 61 O 31 F- Ln 61 61 O M M M 3' Ln H h H M �H l0 N OJ i, O un H O O O H un 61 l0 O H h l0 h l0 in h H 3' un O H N f� M H h O un 3' M 3' O N H Ln N a Q 00 O 00 O 00 O 0 O 0 O 0 O 0 O i, O Ln O Ln O o O 31 O 31 O 00 O 0 O 0 O 31 O o 0 O O a-1 I H I CD I CDQ0 I I CD I H I CD I 31 I Q0 I �0 I 10 I 0 I 0 I 10 I 0 I 0 I I I 10 10 0 N 61 M 61 M 61 h M O O of M O O h O un O Ln O h M O 00 O 00 N 01 O O O O h 00 h h M M U U I Q0 I � I 3' I H I H I H I H I H I 1 I 1 I H O O O O O O un O O O O O O O un un O O O N � Q Ln x a a N N a N N H N w H Q ) Q a Q z H Q Z H z O Q M Q v)W w H a w w z PQ w x a w a w x l0 H N a O N \ \ \ a O H a O a W O a oc) O O N w Ln h N J-) N J-) w a) bi O 04 a w W W Q w 0. PQ \ M w a a a U a O N H O a O 1 H O Q J-) +) 0 H U) w O > Ln O H H > a H O H 04 a M M H W rl x H H aT n H H z O h H p x Ln x W W'-0 a a H a M F o m m �,' m �,' m CD a a H H i7 O H H CD H a X N CD H U W a a O H x Ln Q z N �a4 N p, Ln 00 FC \ FC FC a 7 x i7 Ln 00 W W Ln 00 W a H 04 H in 00 O FT' w z x W x W �. w Q �/-i x H Ui z H W a �. w N H U)U)W N H \ O Q Q w w oN \ � H 0 H >, >, C 7 w H w C7 C7 O ' 7. H H C7 4+ H y 1 x +) li + ) -li x W a v) �4 U) w H z x v) w w x a � O x n x �7 x v) v) U is N Q H U is > > U 04 .'�. H U is is a O w x H +) +� w x ro a w +) 0 z 1 w w x r1 ro O a O s w x w a x O u O W a W x .� ro ro w p Q H x x U z Q z H a H z a a w z z O a z w w w E, w wFX Y 7 H U W H W P� n H Q U Z w H O Q U U W n H a n H a O 0 U 0 H x . Ot w O x .D x H O Q H x W Q H w a x ° a H a w z z Q a O a w u u Q w w w w u OD 61 H N M LO l.0 OD 61 �. O 61 O (1) O O H O H O H O H O H O H O H Lr OD Lr OD Lr OD Lr oo Lr oo Lr OD Lr OD Lr OD Lr OD Lr OD O �D w w w w w w w w w w M � C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 00 b 0 O -li v) + cn CD 0 N 17 J-) Q N O N O N O N O N O N O N O N O N O N O N M •• x l0 l0 l0 l0 l0 l0 l0 l0 l0 l0 �' 61 Ul P� O ,D Q U w 61 O 61 O 0) O 0) O 0) O 0) O 0) O 0) O 0) O 0) O +-) 31 M O O O O un H 61 O 3' �1' O O N H M 61 un un O Q0 OJ 61 M O H O f� H OJ l0 0 h O un N M M M M M N h 3' i' N un h h h 3' 3' N OJ M oo l0 O N 31CSl un H M M M h m H m M 3' 3' OJ 61 61 M 3' OJ O oo H O un OJ l0 Ln Ln � �H H N M un M N H H N OJ M H N H 31 H H � H M H a) a Q o O 0 O 0 O 0 O 0 O 31 O oc) O oc) O 31 O o O 31 O oc) O oc) O oc) O 31 O oc) O -i, O Ln O Ln O a-1 I I I I I I I I I I I I I I I I I I I h h h h h h M M h h h N M M CSl N oo Ln Ln 0 M M M M M oo 61 61 Oo M O 0) 0) 0) Oo 0) Oo OJ OJ u O O O O O O O O O O O O O O O O O O O W Q o H a w a w a � I L14 I N H a) �D w �J w '.7 w '.7 w H H �J w H 1O a a a) a a H ro a a w a w a N FD CD+) � O w O w 0 1i O w O w a H H O WW H O N z Q E-i a1 E-i O cn E-i O u1 H S-I E-i O a U H U H p O H H rt H H rt 'H J-) H U) a H s H H O x W 61 S-I N 'ri Ln U) Sa rt l) U1 U O a) H v) H a) a) H C W 0 W W N N o H Ln +- rt H Ln +) �5 H Ln 11 r1 +) rt 1 Ha) Ln rl H a I w a w a w H Ln O T) o oo O oo a oo a a U) CD ao N � p, (0 +) � W r1 � W I v) r1 v r1 z W � U) w tr � U) w 04 U) W U) W W U) C7 r� Ul C 7 Ul rt rt C 7 v) J-) C7 W x H H C7 � � a) 10 O W W H H .Y. u f4 a) is �5 .Y. U is f4 a) v) rl S4 a) .Y. U 0 'ri is �5 U .4 U f4 a) u H U a s U rt rt 'ri rt 'ri rt lzi W x J-) rt O S W x O f J-) rt 'H rt J-) rt W x 4-1 W O f4 U) 'H w x O Cia Ga U) H H H H H W x a CD ro Q 0 0 0 0 � �� 0 O 0 x 0 a O x x 0 a x m O z w O w 0 z U) a Q a 0 H �D uU) a H � a x w o u a °a H x Q u z U) w U) > a .�+ O U x W UW) aW W H x x a o w o a o H x o °Q o w �D x Q o o > z u a 00 ffQ H z z H a H a) x x x i7 N O O U U U U W a x H a .�. U u oo oo oo oo oo oo oo oo oo CD � w w w w w w w w w M � C7 C7 C7 C7 C7 C7 C7 C7 C7 oo b O O -li u) +) U) CD 0 Q O O O O O O O O O N f7 J-) N N N N N N N N N N M •• x l0 l0 l0 l0 l0 l0 l0 l0 l0 �' CSl U) P� O ,D Q U � Cia CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O +-) i N O O 61 61 H f� H M O O O M h O O 3' to 3' to H O O O O O M M O Ln O h O O O N N O O O 3' O h O 0 h i' N un un O h N �' Ln* O O CSl CSl MC; M H of lfl Ln H O I-- of l0 0-)M 3' Q0 M I-- LnCDl0 un i' 1' 3' H N Ln N H H H �' O 3, un M O H H N 3' H O H H a) a Q o O 0 O oo O O O o O 0 O 0 O 31 O t� O Ln O o O 31 O 31 O 31 O o0 O oo O 31 O O a-1 I I I I I I I I I I I I I I I I I I I � 0 CD O I--M M M 61 —1 61 h oo of M of M O O h Oo H 61 un Oo h M h Oo h Oo h Oo N 0) N 0) CSl CSl Oo Oo u 3' O O O O O O un O O O O O O O O O O O H x H 1 o � � w N Q N O N x FA H a a H a Ga -� Q Ga H Ga H H N E1 U1 a O c H a O H a O O F Ga oo H Ga U1 Ga Q \ olo a FG l� Ln H Cia U. a FG a H N - 0 3 Q 0 a 0 0 rt U S-1 Ln Ul a) U ,5 U1 Ul a) W N a) J-) (0Ln N H a) Ul U1 pa x U) U) a N H J-) is a) W Q M H W H a a rl J-) U ( H x 0 �D co FC W H Q (0 x H Ln co H U) in 0o D4 H Rao a O W .H 4-) U) � I U U) 'ri H 04 ,D Ra �5 U) o (7 .� H W '11 U bi H '� rt c\ H W �7 a) a O H rt H rt H rt W �7 U) U) Ul a) w FT+ H Sa x H Ul '� S: .Y. 1 'ri S: x C.7 a) x C.7 .Y. 1 Ul S4 S4 S4 .Y. U a) U H Q U H [� U) P' ,�" a �, S-, 'ri O U W U 'ri rt H W x 04 H W U W Ra W z rl .11 a) l) a) l) a) l) U W H Cia '11 4-4 . i U1 co O ' a ro Q x o x U 0 Q f-I H a w a) x g U a w x U 'r1 U H a x u w O 4--I O a) .D > O w � m a o 0 a z w w a H a w w Wu C u wE, Q O ° 0 U a w a a U C w H a a n CQ U O rz H W O O U1 W H W a U H H U1 Q W H H a x U a H Q U H H a .4 OU x x a a W a a 0 fx Q u H W w H H W o cQ w w lzi w H U a a z U1 N O W �C U� Q� O U) H z O a O a w a O z H H H � H FG U H C) C7 > W (0W Q W � H 'Z U a Px O H .D x W a H a O P: W w z z O O a a a rx zH- U u} OD 0) Cl N M J' C" OD 61 H u ur ur ur ur ur ur ur ur ur ur ur ur ur O .. � C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 oo b 0 O -li (r) +) U) +-) CD U N fo J-) Q N O N O N O N O N O N O N O N O N O N O N O N O O N N M •• x U l0 to to to to to to to l0 l0 l0 l0 l0 �' CSl Ul P� O ,D Q U � Cia CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl O CSl CSl O O W H E� H H N D EO � N z\ O � N z\ H � x � U N � �D o a N W a O\� .H w �4 N U \ m m a co x a ro Q a O a z w w w w � u� Q a z x m u u� W Q u u w x u a ZH- 14 U N u H -) CD M � oo b O O -li (r) +-) O O Q N fo J-) O,DQ 00 rn � O Ln H H M O O O Ln O H o0 in N O 6 M n N O ooLn L Q0 Ln H N M Ln M O O O Q0 O O 6 0 O N N M h M 'I' N in H Q0 M M 00 Ln O Q0 O o 31 l0 O H O N l0 l0 O O H h O h O M O M 31 61 Ln O l0 61 61 H un M N N 10 h O l0 Q0 Q0 H O H ,i, Ln o 31 31 31 31 oo Q0 o0 o0 o0 O O O O O O O O O O O O I I I I I I I I I I I I H un O h h h O N O N (\j M H O O O O O O 61 61 61 61 61 I I I I I I I I I I I I H O in O O O O O O O O O H W �n Ln z Q z z rf) \ cn �D �D W Ln W W W W U P; H a 0 0 0 H ul W O W W W cn H w 0 0 0 a w a a�5 a H x x (0 w w a co oo � � Q Z a w f�� P; Q W W O W W bi bi ul W H O C C Fi 0 w x P' Cx7 r � o U W Ra H H N U W H U H H 4-4 U .1i a C7 N a Pa w w (0 ( ri W 4-4 a ,'D H H J-) u .� x w Px x ���-! x w O a H O N x a u W U H H �D U O u Q H �D H z w u H a Z w z Q z w H z O H U H W W a 0 0 0 0 lzi z Q H H 0 O H cn E-i E-i � 0 0 �D z z H a QF-D z � o 0 Q Q Q a rf)u a H p p H �D H z H W W O CQ CQ a a rf) x x H H H N N O H H H H H H H U U oo oo oo oo oo oo oo W W U U w w w w w w w co co C7 C7 C7 C7 C7 C7 C7 F, N U U H H C7 N N N N N N N z z N O N O N O N O N O N O N O N H H l0 l0 l0 l0 l0 l0 l0 W O O O O O O O HUTCHINSON UTILITIES COMMISSION COMBINED DIVISIONS FINANCIAL REPORT FOR AUGUST, 2026 Combined Division Customer Revenue Sales for Resale NG Transportation Electric Division Transfer Other Revenues Interest Income TOTAL REVENUES Salaries & Benefits Purchased Commodities Transmission Generator Fuel/Chem. Depreciation Transfers (Elect./City) Operating Expense Debt Interest TOTAL EXPENSES NET PROFIT/(LOSS) Ilrtrt�������������� Yfmmml��������l�lll����������� 66.7%of YearComp. 2026 2025 Di %Chng 2026 2025 Di %Chng Full Yr Bud %of Bud $ 3,586,920 $ 2,470,875 $ 1,116,045 45.2% $ 28,226,276 $ 23,854,938 $ 4,371,338 18.3% $ 40,209,447 70.2% $ 331,568 $ 1,005,359 $ (673,791) (67.0%) $ 2,665,074 $ 5,234,985 $ (2,569,910) (49.1%) $ 4,339,200 61.4% $ 176,970 $ 174,451 $ 2,518 1.4% $ 1,384,044 $ 1,378,361 $ 5,683 0.4% $ 2,037,588 67.9% $ 60,667 $ 60,639 $ 28 0.0% $ 485,333 $ 485,111 $ 223 0.0% $ 728,000 66.7% $ 139,210 $ 71,164 $ 68,046 95.6% $ 746,465 $ 428,337 $ 318,128 74.3% $ 573,955 130.1% $ 51,655 $ 74,900 $ (23,245) (31.0%) $ 331,029 $ 527,463 $ (196,434) (37.2%) $ 583,457 56.7% $ 4,346,989 $ 3,857,388 $ 489,601 12.7% $ 33,838,221 $ 31,909,194 $ 1,929,027 6.0% $ 48,471,647 69.8% $ 625,404 $ 607,977 $ 17,427 2.87% $ 5,387,923 $ 5,127,917 $ 260,006 5.1% $ 8,524,717 63.2% $ 1,834,126 $ 1,574,185 $ 259,941 16.5% $ 15,260,564 $ 13,549,856 $ 1,710,708 12.6% $ 20,816,157 73.3% $ 443,884 $ 294,620 $ 149,264 50.7% $ 2,956,096 $ 1,809,042 $ 1,147,054 63.4% $ 4,200,000 70.4% $ 179,891 $ 387,714 $ (207,823) (53.6%) $ 923,398 $ 1,764,486 $ (841,088) (47.7%) $ 2,008,656 46.0% $ 352,419 $ 351,932 $ 488 0.1% $ 2,827,048 $ 2,821,694 $ 5,353 0.2% $ 4,190,000 67.5% $ 222,552 $ 222,524 $ 28 0.0% $ 1,780,417 $ 1,780,195 $ 223 0.0% $ 2,670,626 66.7% $ 326,173 $ 308,309 $ 17,864 5.8% $ 2,544,514 $ 2,542,172 $ 2,341 0.1% $ 3,791,274 67.1% $ 38,805 $ 49,688 $ (10,883) (21.9%) $ 310,438 $ 397,504 $ (87,067) 21.9% $ 465,657 66.7% $ 4,023,253 $ 3,796,948 $ 226,305 6.0% $ 31,990,397 $ 29,792,867 $ 2,197,530 7.4% $ 46,667,087 68.6% $ 323,735 $ 60,440 $ 263,296 435.6%1 1,847,824 $ 2,116,327 $ (268,503) (12.7%) $ 1,804,560 102.4% August August YTD YTD 2026 2025 Change 2026 2025 Change Gross Margin %: 29.9% 27.8% 2.1% 30.6% 33.8% -3.2% Operating Income Per Revenue $ (%): 4.6% -0.5% 5.1% 3.7% 5.5% -1.8% Net Income Per Revenue $ (%): 7.4% 1.6% 5.9% 5.5% 6.6% -1.2% 2026 HUC Budget Target 32.2% 2.8% 3.7% HUTCHINSON UTILITIES COMMISSION ELECTRIC DIVISION FINANCIAL REPORT FOR AUGUST, 2026 i� ,��(��, f , ��� f�i,�� � 1111 Il �X#Wli(i�((((III(���rrrrrrrr�����IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I ��((((r�I(flltttitf������IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII (fir ����rr�(� � �[������ (oltllW(r"gt f�ff�ll�rrrrc���������l�lllllllllllllllllllllllllllllllllllllllllllllllllllllllllll , 66.7%gfYearComp. 2026 2025 Di . %Chna 2026 2025 Di %Chna FullYrBud %of Bud Electric Division Customer Revenue $ 2,950,855 $ 1,923,794 $ 1,027,061 53.4% $ 18,958,163 $ 16,105,818 $ 2,852,345 17.7% $ 27,471,918 69.0% Sales for Resale $ 331,568 $ 1,005,359 $ (673,791) (67.0%) $ 2,665,074 $ 5,234,985 $ (2,569,910) (49.1%) $ 4,339,200 61.4% Other Revenues $ 106,957 $ 47,496 $ 59,461 125.2% $ 454,683 $ 208,026 $ 246,657 118.6% $ 202,862 224.1% Interest Income $ 27,221 $ 38,844 $ (11,623) (29.9%) $ 176,667 $ 274,884 $ (98,217) (35.7%) $ 308,457 57.3% TOTAL REVENUES $ 3,416,601 $ 3,015,493 $ 401,108 13.3% $ 22,254,588 $ 21,823,713 $ 430,875 2.0% $ 32,322,437 68.9% Salaries & Benefits $ 449,043 $ 442,161 $ 6,882 Purchased Power $ 1,506,839 $ 1,253,097 $ 253,742 Transmission $ 443,884 $ 294,620 $ 149,264 Generator Fuel/Chem. $ 179,891 $ 387,714 $ (207,823) Depreciation $ 253,399 $ 254,095 $ (696) Transfers (Elect./City) $ 172,817 $ 172,789 $ 28 Operating Expense $ 213,215 $ 208,032 $ 5,183 Debt Interest $ 30,138 $ 32,771 $ (2,633) TOTAL EXPENSES $ 3,249,225 $ 3,045,279 $ 203,946 NET PROFIT/(LOSS) $ 167,376 $ (29,786) $ 197,162 1.6% $ 3,928,928 $ 3,837,492 $ 91,436 2.4% $ 6,178,442 20.2% $ 9,311,618 $ 8,656,793 $ 654,825 7.6% $ 13,035,315 50.7% $ 2,956,096 $ 1,809,042 $ 1,147,054 63.4% $ 4,200,000 (53.6%) $ 923,398 $ 1,764,486 $ (841,088) (47.7%) $ 2,008,656 (0.3%) $ 2,033,775 $ 2,038,499 $ (4,724) (0.2%) $ 3,060,000 0.0% $ 1,382,534 $ 1,382,312 $ 222 0.0% $ 2,073,802 2.5% $ 1,746,161 $ 1,729,883 $ 16,278 0.9% $ 2,553,967 (8.0%) $ 241,104 $ 262,171 $ (21,067) jLgL $ 361,657 6.7% $ 22,523,615 $ 21,480,679 $ 1,042,936 4.9% $ 33,471,839 661.9%) $ (269,027) $ 343,034 $ (612,061) (178.4%) $ (1,149,402 63.6% 71.4% 70.4% 46.0% 66.5% 66.7% 68.4% 66.7% 67.3% 23.4% �i ������Il������������������fm�l�������llflltttitf������l����lllmmi�l�fm�ff�ll������������������� , 66.7�6ofYear Comp. 2026 2025 Di . %Chna 2026 2025 Di %Chna FullYrBud %of Bud Electric Division Residential 5,735,211 5,644,396 90,815 1.61% 38,148,726 37,446,731 701,995 1.87% 54,016,284 70.6% All Electric 161,527 157,829 3,698 2.34% 1,666,546 1,690,187 (23,641) (1.40%) 2,281,979 73.0% Small General 1,712,093 1,706,734 5,359 0.31% 12,105,183 12,264,740 (159,557) (1.30%) 17,753,235 68.2% Large General 9,794,450 9,152,550 641,900 7.01% 68,142,200 61,454,430 6,687,770 10.88% 92,221,607 73.9% Industrial 9,231,000 8,748,000 483,000 5.52% 66,152,000 66,743,000 (591,000) (0.89%) 97,880,814 67.6% Total KWH Sold 26,634,281 25,409,509 1,224,772 4.82% 186,214,655 179,599,088 6,615,567 3.68%1 264,153,919 70.5% August August YTD YTD 2026 HUC 2026 2025 Change 2026 2025 Change Budget Target Gross Margin %: 22.2% 20.6% 1.6% 23.5% 28.0% -4.6% 24.7% 24%-28% Operating Income Per Revenue $ (%): 2.4% -2.4% 4.8% -2.5% 1.1% -3.6% -3.6% IIIIIIIIIIIIIIIII Net Income Per Revenue $ (%): 4.9% -1.0% 5.9% -1.2% 1.6% -2.8% -3.6% IIIIIIIIIIIIIIIII Customer Revenue per KWH: $0.1108 $0.0757 $0.0351 $0.1018 $0.0897 $0.0121 $0.1040 $0.1040 Total Power Supply Exp. per KWH: $0.0964 $0.0920 $0.0044 $0.0893 $0.0860 $0.0033 $0.0911 Net Income increased by $197,162 over August 2025. Customer revenue and usage was up with increased temperatures but offset by lower sales for resale. Generator fuels were down with the decrease in sales for resale and transmission expenses continue to be much higher which was budgeted for. Sales for Resale of $331,568 consisted of $100,568 in market sales, $98,000 in capacity sales to Rice Lake, $70,000 in capacity sales to AEP, and $63,000 in capacity sales to Nextera. August 2025 Sales for Resale of $1,005,359 included $774,359 in market sales, $98,000 in capacity sales to Rice Lake, $70,000 in capacity sales to AEP, and $63,000 in capacity sales to Nextera. August 2024 Sales for Resale of $278,802 consisted of $72,577 in market sales, $98,000 in capacity sales to Rice Lake and $108,225 in capacity sales to AEP. Overall Purchased Power increased by $253,742. MRES purchases increased by $53,384 and market purchases/MISO costs increased by $200,358. The average cost of MISO power was $41.46/mwh (4,180 mwh's purchased), compared to $29.05/mwh (2,160 mwh's purchased) in August 2025. 2026 PCA was $.02146/kwhr bringing in an additional $566,526 for the month and $1,842,014 YTD. The 8 month average PCA is $.00972. 2025 PCA was a credit of $.01339 crediting customers $337,226 for the month and $185,428 YTD. Gas Division Customer Revenue Transportation Electric Div. Transfer Other Revenues Interest Income TOTAL REVENUES Salaries & Benefits Purchased Gas Operating Expense Depreciation Transfers (City) Debt Interest TOTAL EXPENSES NET PROFIT/(LOSS) HUTCHINSON UTILITIES COMMISSION GAS DIVISION FINANCIAL REPORT FOR AUGUST, 2026 66.7% of Year Comp. 2026 2025 2 %Chna 2026 2025 2 . %Chna Full YrBud %of Bud $ 636,065 $ 547,081 $ 88,984 16.3% $ 9,268,112 $ 7,749,120 $ 1,518,992 19.6% $ 12,737,529 72.8% $ 176,970 $ 174,451 $ 2,518 1.4% $ 1,384,044 $ 1,378,361 $ 5,683 0.4% $ 2,037,588 67.9% $ 60,667 $ 60,639 $ 28 0.0% $ 485,333 $ 485,111 $ 223 0.0% $ 728,000 66.7% $ 32,253 $ 23,668 $ 8,586 36.3% $ 291,782 $ 220,311 $ 71,471 32.4% $ 371,093 78.6% $ 24,433 $ 36,056 $ (11,623) (32.2%) $ 154,362 $ 252,579 $ (98,217) (38.9%) $ 275,000 56.1% $ 930,388 $ 841,895 $ 88,493 10.5% $ 11,583,633 $ 10,085,481 $ 1,498,153 14.9% $ 16,149,210 71.7% $ 176,361 $ 165,816 $ 10,545 6.4% $ 1,458,995 $ 1,290,424 $ 168,570 13.1% $ 2,346,275 62.2% $ 327,287 $ 321,087 $ 6,199 1.9% $ 5,948,946 $ 4,893,063 $ 1,055,883 21.6% $ 7,780,842 76.5% $ 112,958 $ 100,277 $ 12,681 12.6% $ 798,353 $ 812,290 $ (13,937) (1.7%) $ 1,237,307 64.5% $ 99,020 $ 97,837 $ 1,184 1.2% $ 793,273 $ 783,195 $ 10,077 1.3% $ 1,130,000 70.2% $ 49,735 $ 49,735 $ - 0.0% $ 397,883 $ 397,883 $ 0 0.0% $ 596,824 66.7% $ 8,667 $ 16,917 $ (8,250) 0.0% $ 69,334 $ 135,333 $ (66,000) 48.8% $ 104,000 66.7% $ 774,028 $ 751,670 $ 22,359 3.0% $ 9,466,782 $ 8,312,188 $ 1,154,594 13.9% $ 13,195,248 71.7% $ 156,359 $ 90,226 $ 66,134 73.3%1 2,116,851 $ 1,773,293 $ 343,558 19.4% $ 2,953,962 71.7% 1 66.7% of Year Comp. 2026 2025 2 %Chnq 2026 2025 p %Chnq Full YrBud %of Bud Gas Division Residential 6,046,345 6,215,838 (169,493) (2.73%) 261,417,495 272,485,096 (11,067,601) (4.06%) 410,283,000 63.7% Commercial 8,913,470 8,834,599 78,871 0.89% 204,075,407 208,237,670 (4,162,263) (2.00%) 317,957,000 64.2% Industrial 48,884,097 46,928,547 1,955,550 4.17% 538,029,990 547,112,311 (9,082,321) (1.66%) 820,578,000 65.6% Total CF Sold 63,843,912 61,978,984 1,864,928 3.01%1 1,003,522,892 1,027,835,077 (24,312,185) (2.37%)l 1,548,818,000 64.8% August August YTD YTD 2026 HUC 2026 2025 Change 2026 2025 Change Budget Target Gross Margin %: 59.1% 55.1% 4.0% 44.5% 46.6% -2.0% 47.7% Operating Income Per Revenue $ (%): 12.9% 6.6% 6.4% 15.9% 15.3% 0.6% 15.9% Net Income Per Revenue $ (%): 16.8% 10.7% 6.1% 18.3% 17.6% 0.7% 18.3% Contracted Customer Rev. per CF: $0.0070 $0.0068 $0.0002 $0.0075 $0.0067 $0.0008 $0.0069 Customer Revenue per CF: $0.0167 $0.0142 $0.0025 $0.0111 $0.0084 $0.0026 $0.0095 Total N.G. Supply Exp. per CF: $0.0056 $0.0057 ($0.0001) $0.0062 $0.0050 $0.0012 $0.0053 Notes/Graphs: August Net Income increased by $66,134. Usage and revenue were up. A large part of the revenue increase was due to a fuel cost adjustment in 2026 while there was a credit in 2025. Fuel Cost Adjustment for August 2026 was $1.30/MCF bringing in an additional $25,356 for the month and $660,651 YTD. August 2025 Fuel Cost "Credit" Adjustment was $1.78998/MCF crediting customers $30,712 for the month and $626,763 YTD. HUTCHINSON UTILITIES COMMISSION BALANCE SHEET - CONSOLIDATED AUGUST 31, 2026 Electric Gas Total Total Net Change Division Division 2026 2025 Total (YTD) Current Assets UnrestrictedlUndesignated Cash Cash (10,512,041.15) 16,210,587.49 5,698,546.34 11,568,910.42 (5,870,364.08) Petty Cash 680.00 170.00 850.00 850.00 - Designated Cash Capital Expenditures - Five Yr. CIP 2,750,000.00 700,000.00 3,450,000.00 3,450,000.00 - Payment in Lieu of Taxes 1,345,802.00 596,824.00 1,942,626.00 1,942,626.00 - Rate Stabilization - Electric 1,301,838.58 - 1,301,838.58 1,443,969.35 (142,130.77) Rate Stabilization - Gas - 517,291.75 517,291.75 615,294.19 (98,002.44) Catastrophic Funds 800,000.00 200,000.00 1,000,000.00 1,000,000.00 - Restticted Cash Bond & Interest Payment 2017 834,242.24 - 834,242.24 691,214.06 143,028.18 Bond & Interest Payment 2012 - 1,456,000.00 1,456,000.00 1,535,749.99 (79,749.99) Debt Service Reserve Funds 1,175,000.00 2,072,000.00 3,247,000.00 3,255,256.00 (8,256.00) Total Current Assets (2,304,478.33) 21,752,873.24 19,448,394.91 25,503,870.01 (6,055,475.10) Receivables Accounts (net of uncollectible allowances) 3,277,172.88 564,211.62 3,841,384.50 2,438,441.74 1,402,942.76 Interest 49,785.32 49,785.33 99,570.65 148,628.57 (49,057.92) Total Receivables 3,326,958.20 613,996.95 3,940,955.15 2,587,070.31 1,353,884.84 Other Assets Inventory 2,292,385.43 505,802.07 2,798,187.50 2,634,114.93 164,072.57 Prepaid Expenses 265,394.29 109,066.71 374,461.00 679,494.46 (305,033.46) Sales Tax Receivable 153,684.06 - 153,684.06 454,261.70 (300,577.64) Deferred Outflows- Electric 371,991.00 - 371,991.00 342,759.00 29,232.00 Deferred Outflows - Gas - 123,997.00 123,997.00 114,253.00 9,744.00 Total Other Assets 3,083,454.78 738,865.78 3,822,320.56 4,224,883.09 (402,562.53) Total Current Assets 4,105,934.65 23,105,735.97 27,211,670.62 32,315,823.41 (5,104,152.79) Capital Assets Land & Land Rights 690,368.40 3,899,918.60 4,590,287.00 4,590,287.00 - Depreciable Capital Assets 95,284,258.02 45,149,321.56 140,433,579.58 139,438,732.65 994,846.93 Accumulated Depreciation (53,090,024.87) (24,174,669.39) (77,264,694.26) (73,077,737.85) (4,186,956.41) Construction - Work in Progress 13,464,944.23 264,336.73 13,729,280.96 4,331,052.87 9,398,228.09 Total Net Capital Assets 56,349,545.78 25,138,907.50 81,488,453.28 75,282,334.67 6,206,118.61 Total Assets 60,455,480.43 48,244,643.47 108,700,123.90 107,598,158.08 1,101,965.82 Current Liabilities Current Portion of Long-term Debt Bonds Payable Bond Premium Lease Liability - Solar Array Accounts Payable Accrued Expenses Accrued Interest Accrued Payroll Total Current Liabilities Long -Term Liabilities Noncurrent Portion of Long-term Debt 2017 Bonds 2012 Bonds Bond Premium 2012 Pension Liability- Electric Pension Liability - Electric OPEB Pension Liability - Nat Gas Pension Liability - Nat Gas OPEB Accrued Vacation Payable Accrued Severance Deferred Outflows - Electric Deferred Outflows - Nat Gas Total Long -Term Liabilities Net Position Retained Earnings Total Net Position HUTCHINSON UTILITIES COMMISSION BALANCE SHEET - CONSOLIDATED AUGUST 31, 2026 Electric Gas Total Division Division 2026 820,000.00 19, 546.00 4,099,377.70 90,413.94 74,296.36 5,103,634.00 10,930,000.00 376,390.80 1, 585, 328.00 42,211.00 635,863.89 224,153.38 1,087,158.00 14,881,105.07 2,080,000.00 185,608.32 641,426.74 26,000.25 31,269.20 2,964,304.51 (139,206.61) 528,443.00 14,071.00 224,492.28 44,404.41 362,386.00 1,034,590.08 2,900,000.00 185,608.32 19, 546.00 4,740,804.44 116,414.19 105, 565.56 8,067,938.51 10,930,000.00 237,184.19 1, 585, 328.00 42,211.00 528,443.00 14,071.00 860,356.17 268,557.79 1,087,158.00 362,386.00 15,915,695.15 Total Net Change 2025 Total (YTD) 2, 770, 000.00 130, 000.00 185,608.32 - - 19,546.00 3,426,057.61 1,314,746.83 149,064.09 (32,649.90) 85,883.21 19,682.35 6, 616, 613.23 1, 451, 325.28 11,750,000.00 (820,000.00) 2,080,000.00 (2,080,000.00) 456,249.47 (219,065.28) 1,832,248.00 (246,920.00) 39,880.00 2,331.00 610,749.00 (82,306.00) 13,293.00 778.00 739,330.02 121,026.15 245,721.73 22,836.06 1,294,449.00 (207,291.00) 431,483.00 (69,097.00) 19,493,403.22 (3,577,708.07) 40,470,741.36 44,245,748.88 84,716,490.24 81,488,141.63 3,228,348.61 40,470,741.36 44,245,748.88 84,716,490.24 81,488,141.63 3,228,348.61 Total Liabilities and Net Position 60,455,480.43 48,244,643.47 108,700,123.90 107,598,158.08 1,101,965.82 Hutchinson Utilities Commission Cash -Designations Report, Combined 8/31/2026 Financial Institution Current Interest Rate Annual Interest Balance, August 2026 Balance, July 2026 Change in Cash/Reserve Position Savings, Checking, Investments varies varies varies 19,448,394.91 19,300,329.76 148,065.15 Total Operating Funds 19,448,394.91 19,300,329.76 148,065.15 Debt Reserve Requirements Bond Covenants - sinking fund Debt Reserve Requirements Bond Covenants -1 year Max. P & I Total Restricted Funds Operating Reserve Rate Stabalization Funds PILOT Funds Catastrophic Funds Capital Reserves Total Designated Funds Min 60 days of 2026 Operating Bud. Charter (Formula Only) Risk Mitigation Amount 5 Year CIP (2026-2030 Fleet & Infrastructure Maintenance) 2,290,242.24 2,009,770.88 280,471.36 3,247,000.00 3,247,000.00 - 5,537,242.24 5,256,770.88 280,471.36 7,079,514.50 7,079,514.50 - 1,819,130.33 1,793,774.36 25,355.97 1,942,626.00 1,942,626.00 - 1, 000, 000.00 1, 000, 000.00 3,450,000.00 3,450,000.00 - 15,291,270.83 15,265,914.86 25,355.97 YE YE YE YE YTD HUC 2022 2023 2024 2025 2026 Target Debt to Asset 31.4% 28.6% 26.0% 22.3% 22.1% Current Ratio 4.47 4.48 3.67 3.10 2.63 RONA -1.38% 1.96% 2.63% 3.23% 1.95% Historical Change in Cash Balance Month End Electric Elec. Change Natural Gas Gas Change Total Total Change 8/31/2026 (2,304,478) 21,752,873 19,448,395 12/31/2025 (416,323) (1,888,155) 18,975,091 2,777,782 18,558,768 889,627 12/31/2024 6,134,710 (6,551,033) 17,717,453 1,257,638 23,852,164 (5,293,396) 12/31/2023 12,158,338 (6,023,628) 15,622,242 2,095,211 27,780,580 (3,928,416) 12/31/2022 11,633,212 525,126 15,450,554 171,688 27,083,766 696,815 12/31/2021 12,870,253 (1,237,041) 15,086,000 364,554 27,956,253 (872,487) 12/31/2020 14,239,233 (1,368,981) 15,019,173 66,827 29,258,406 (1,302,153) 12/31/2019 12,124,142 2,115,092 13,837,040 1,182,133 25,961,181 3,297,225 12/31/2018 15,559,867 (3,435,725) 12,335,998 1,501,042 27,895,864 (1,934,683) 12/31/2017 23,213,245 (7,653,378) 10,702,689 1,633,309 33,915,934 (6,020,070) 12/31/2016 8,612,801 14,600,444 9,500,074 1,202,615 18,112,875 15,803,059 12/31/2015 6,170,790 2,442,011 9,037,373 462,701 15,208,163 2,904,712 12/31/2014 3,598,821 2,571,969 6,765,165 2,272,208 10,363,986 4,844,177 * 2017's Significant increase in cash balance is due to issuing bonds for the generator project. Hutchinson Utilities Commission Cash -Designations Report, Electric 8/31/2026 Change in Financial Annual Balance, Balance, Cash/Reserve Institution Current Interest Rate Interest August 2026 July 2026 Position �' Rr Savings, Checking, Investments varies varies varies 19,448,394.91 19,300,329.76 148,065.15 Total HUC Operating Funds 19,448,394.91 19,300,329.76 148,065.15 Debt Restricted Requirements Debt Restricted Requirements Total Restricted Funds Bond Covenants - sinking fund Bond Covenants -1 year Max. P & 1 834,242.24 1,175,000.00 2,009,242.24 735,770.88 1,175,000.00 1,910,770.88 98,471.36 - 98,471.36 Excess Reserves Less Restrictions, Electric (4,313,720.57) 0. i 11J! !!1 1 !1 J J Operating Reserve Min 60 days of 2026 Operating Bud. 5,068,639.83 5,068,639.83 Rate Stabalization Funds $400K-$1.2K 1,301,838.58 1,301,838.58 PILOT Funds Charter (Formula Only) 1,345,802.00 1,345,802.00 Catastrophic Funds Risk Mitigation Amount 800,000.00 800,000.00 Capital Reserves 5 Year CIP (2026-2030 Fleet & Infrastructure Maintenance) 2,750,000.00 2,750,000.00 Total Designated Funds 11,266,280.41 11,266,280.41 Excess Reserves Less Restrictions & Designations, Electric (15,580,000.98) YE YE YE YE YTD APPA Ratio HUC 2022 2023 2024 2025 2026 5K-10K Cust. Target Debt to Asset Ratio (* w/Gen.) 34.8% 34.0% 33.9% 31.6% 33.1% 39.8% pp ppppp ryry NNNNNNNNNNNN Current Ratio 4.96 4.35 2.38 0.80 0.34 3.75 >2.0 RONA -4.2% -0.9% -2.1% 0.4% -0.5% NA >0% Hutchinson Utilities Commission Cash -Designations Report, Gas 8/31/2026 Change in Financial Annual Balance, Balance, Cash/Reserve Institution Current Interest Rate Interest August 2026 July 2026 Position 51' Rr Savings, Checking, Investments varies varies varies 19,448,394.91 19,300,329.76 148,065.15 Total HUC Operating Funds 19,448,394.91 19,300,329.76 148,065.15 Debt Restricted Requirements Bond Covenants - sinking fund 1,456,000.00 1,274,000.00 182,000.00 Debt Restricted Requirements Bond Covenants -1 year Max. P & 1 2,072,000.00 2,072,000.00 - Total Restricted Funds 3,528,000.00 3,346,000.00 182,000.00 Excess Reserves Less Restrictions, Gas 18,224,873.24 18,105,797.32 119,075.92 1 1 JJJ1 111 1 11 J J Operating Reserve Min 60 days of 2026 Operating Bud. 2,010,874.67 2,010,874.67 - Rate Stabalization Funds $200K-$600K 517,291.75 491,935.78 25,355.97 PILOT Funds Charter (Formula Only) 596,824.00 596,824.00 - Catastrophic Funds Risk Mitigation Amount 200,000.00 200,000.00 Capital Reserves 5 Year CIP (2026-2030 Fleet & Infrastructure Maintenance) 700,000.00 700,000.00 - Total Designated Funds 4,024,990.42 3,999,634.45 25,355.97 YE YE YE YE YTD HUC 2022 2023 2024 2025 2026 AGA Ratio Target Debt to Asset 26.5% 21.0% 15.5% 10.6% 8.3% 35%-50% Current Ratio 4.06 4.61 5.08 5.18 6.56 1.0-3.0 RONA 3.0% 6.2% 9.1% 7% 5.1% 2%-5% Notes/Graphs: ELECTRIC DIVISION Operating Revenue August 2026 CLASS AMOUNT KWH /KWH Street Lights 21.42 393 $0.0545 Electric Residential Service $752,950.02 5,735,211 $0.1313 All Electric Residential Service $23,816.82 161,527 $0.1474 Electric Small General Service $221,536.70 1,712,093 $0.1294 Electric Large General Service $1,054,497.62 9,794,450 $0.1077 Electric Large Industrial Service $898,032.71 9,231,000 $0.0973 Total $2,950,855.29 26,634,674 $0.1108 Power Adjustment $0.02146 Rate Without Power Adjustment $0.08933 Electric Division Year -to -Date ® 2026 $ Amount ❑ 2025 $ Amount ® 2026 KWH110 ❑ 2025 KWH110 25,000,000 20,000,000 15,000,000 10,000,000 5,000,000 0 Residential All Elec. Resid. Small Gen. Srv. Large Gen. Srv. Large Industrial Sales For Resale Total NOTE: This graph includes sales for resale (capacity and energy sales) but excludes street lights and security lights NATURAL GAS DIVISION Operating Revenue August 2026 CLASS AMOUNT MCF /MCF Residential $150,280.95 6,046 $24.8548 Commercial $132,099.03 8,913 $14.8202 Large Industrial $43,490.42 4,544 $9.5708 Large Industrial Contracts $310,194.53 44,340 $6.9958 Total $636,064.93 63,844 $9.9628 Fuel Adjustment $1.30000 Rate Without Fuel Adjustment $8.66281 Natural Gas Division Year -to -Date ❑ 2026 $ Amount ❑ 2025 $ Amount m 2026 MCF ❑ 2025 MCF 10,000,000 9,000,000 8,000,000 7,000,000 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 0 Gas Residential Gas Commercial Large Industrial Large Industrial Total Contracts x z E 7 E a` N N_ (6 W C N R u 7 a R a O O O a� Z 0M N C Z Z Z Z Z Z Z Z Z �2 Z Z O � � rnrnvorn— o (naoo(nv o d'mo oo o aO n v f� 61 61 a0(O a0 � N(O o646 O d m N N v N N O a0 N O dt , 2 O O2 d' (O 6) 61 rr (o (o ao r2 0 0 of v r v r 0 (ri r f� 0 M 61 M O O O (O Oc)m f� W O 0 N f- 61 O � 61 M d' f- M n n ro rn "oono n � ""ov N 0,; � W Od'd' 0000000 O a0 a0 N 61 a0 0 0 0 0 0 0 0 0 0 O N O O a0 N 0 0 0 0 0 0 0 o(o(n rovo(n(n(noo(no N (n 0 (n M M 00 N N N N N N N (nO0o0o0o(no0o0(n0 ro(n(novorno�o�(ovorn N N d' (n d2 (D N a0 0 (D rl-(n N_ M N rl rl 01 01 - N r� 01 dM N N 01 li N 0) (O N a0 a0 N N N (O N N N O N d' M f� N N N N N N N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . . . . . . . . . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O N O O O N O N N N O O N N N N N d' M 00 N N N N N N N U n rl- 00 00 00 rn a� ZZZZZZZZZZZZZZ?:ZZZZ'nZZZOZZOZZZZOZOZZO N 61 a0 M N 61 d' R ao vov00000vov�(o�ro(nrnrno(o(000(ovnoorooMMnvrn n coo(nnoon(nrnvoMvn(nvc0000�oroNornro(ncovNvnvco a0 oo: f� N 61N mm Nf� M a001 (ON d'M a0M �O (nLO 000� o a) mo oc) rl- mrl � V �(ONMM(nN� f�f�d' W d'M �061 a0 N(n��d'a0O�61�MO W 61 f� Mf�i 6ni (O M N M r-- O) I� (O (n (n M N dt ryN (4 � o "P-- 6 aO N v V 4, 00 d' Od' 00000 d'O d'(O (O� MN mod' O(O �O (n d' V f� 00 MO a0M a0 d'61 N O(O�NOONN MaO Nf�(n d'd'a0 M(OM�610 f�MMONf�61 (ONMN W Oi 00 N 0)O M0000 n0 corn �N (O� OM Mfg NN d'� d'(n 0)r-�M (n dt g N� 01 - (ON 000100N a0 (ON a001 M01 NM NOOK N(O �N d'N Niro� oMM O -- -N a0 vNO i o rinri o0 ovivi o0 ovvi� 0 v ovi0 �0 0 ovivvial N M N dT OdT 00000 d'0) N (O ON r--00r--N 0)dt OM dt NN M000 O a0 r--00) a0(n (O(O Nd' N dt(O o(O(n Nao Mao ao r r(o o of ao N M N� N� oo oo r� N a0� of 6i d' oM: N N61N 61 a0 Nf�M W 61 (ON d'M a0 (O a00(nN000aO V f�(00 d'O d'�N 0)r-� N -(ON MM (nN � r�r� d'a0 d'M-01 Oa0 N(n - d'� q 61� Q oc 6 N Mr-i N 0 �0 MN Mr-0) r-(000 MN 0)r-a0o r- (O r-N 0) r- Nr-(O a0 MN 00)ON (n r- 0 ON N� (O(O )Md' � (ON 0)f� Md' 0)r: (Nn f� NN a0(0d'0N(ON 0 NN ai (O N� N � � � � �N � N �� mo N (nO(n(n4o4no0 N N M(oo0o0o0 (n0o0 N0N0oo O 0o0610� fO� Wo�ao0o0N(NO0 N(on O d'NOoO(nOao0o0 f(n�a00a0(n0d' N(O(n i (O M6)000 M(n O(O(O O O N O (O r- N a00) M co N d'(n Nr(O W0 d' a(O(O a0 NMI f� d' OOON (O a0 N0 M �(I O(n Mao �a0 a0(O �N f�a0 Nr ON (ON N(06) f- f- (o (o N' N 00000 Nd' f�0 M �(O a0 N W �M 61f-NM a0 d' N(O (0(31 (00 Nf� d' M OO (n 00)r-0)0) r-� d'M d'� d'M (n� M(n O r-d'0) r- LO ON a0 f� f�610 61 f� l M Md' NO oo a) dt 0) 0)N Lod' 00 (OM 0)N r-- Na0 (O a0 d' N� (n v 0 00000000000000000000000000000000000� o � o0000000000000000000000000000000000� 0 00000000000000000000000000000000000� 0 00000000000000000000000000000000000� N O N O O O O O O O O N N O O N N O N N O N O N O O N N O N O N O N 0 0 d'N 02m00f 2 O N(nd' o,(O M O(n r-�NO(Oa0N0�Nf� W 61 (Ow 00 N N L O M d' � � � N N N � � mo d' � N LO rn 0 N O O N N O 00 N M M N 61 0 O rr LO 0 0 v N 01 rl- LO 0 O O O N V (O rl- rl- rl- rl- w m (O rl- w w ww ww (O (O(O (O(O rl- rl- rl- rl- rl- rl- rl- rl- rl- rl- rl- 00000000000000000) m mm mm ON N MdT N ............... .............................. 000000 o 0000000000000000 0000000000000000000000000000000000000 Q N N N N N N N N N N N N N N N N Q Q N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0 O Z O (O a0 (n N O N (M OON (n ZZNN N2 L2 L2 N2 N����� O M N M N N M N N N N t) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O 61 N (n W � M N (O (n Nr r� 61610 NN NN M d'(n (nN (Or 610 MM d'(O I�aO a00 Md' (O (OON 6161 N NO N � ...... (O M. N 0 0�00 61Od'616161 d'61 61M 6161��061�6161��61 Ord'. N....N N N N N N N N N N N N N N N N N N � � � N � � N � � N N N � N � � N N � N N N N � N N N N N N N N N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Q N N N N N N N N N N N N N N N Q Q N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Z O O N (W dt 0 O O O r-W N ZZ�I� W d'�61 a061 a006161 M1�a0 (n M611�M06161 d'O(n 610 a0 (OMOM MMM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o 0M a0 � W M O V O O N N O OONO O V ON6m1�6161�0 N� W N�N0�md'ro V om rl-o V V (MO W N61� moo M N 00 N (O N 0) N O ON NO N MN �(O w -R 0- m -m N00 r-N-w r- -N O) N0-w 0)� 0)r-M dt LOOM (OM dt M � d' M d' d' d' d' d' d' d' d' d'-d'd' OMNd'-N�d'N Md'N- - -MN-NN- -NN-Md'-d'd'd'd'd'd' NNN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O N O O O O O O O O O O O O O M N 0 0 0 N 0 N 0) N O 0(nN0 NM�(O(nMM00� m LO(14 a)a00a0 d'N 0)� N� O(O rl- OO(14 O)dt o LO M N - 0 0 dt dt dt dt dt dt dt - dt d' oo" - d' N N M (n M M (n M M -- M N M N N N M M- dt dt M (O (n M (n M dt M M M D_ O_ N R R 0 (n (n Z N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N h C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C h Y �• �• �• W Y Y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m W _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R p C C C 2 LLrLrL»rLZ)UUUUUUUU 2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i2i N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N O O O O O 00 O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w o 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J (p (p (p (p (p (p (p (p (p (p (p (p (p (p (p C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C L �LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N CO) H Z W 2 W Z J H p m v > rl + a u+ rn r a)'o > rn r a 0 0 0 0 0 0 0 O M M O N O O 00 M N O a a,N L^ a a W, ........ v LO o rn r- LO 0oo rn o '� m M ON Ni m o v rn rn W, > V O 'IT0) (0 I- N mIIIIIImIIIIIImIIIIIImIIIIIImIIIIIImIIIIIImIIIIIImIIIIIImIIIIIImIIIIIImIIIIIImIIIIIImIIIIIImIIIIIImIIIIIImIIII M O V m M� f0 Cn 911111111111111111111111111111111111111111111111 Ln N N O O i N a 7 C F w T T T T 0 cn rl co N M V lf') >. N J N M V U7 cn W N C ` N o yL. W 0 o � J. 0 o 0 o 0 o � 0 0 o o W J 0 o O o O N O o O O O o O Go O o O O O o o O O 0o o in o (M (M N (O r� N w — v v � o')ao N lf') 00 00 N N c N (') N U7 'It m m U (M V In ER N ER y o0 o\° £ N E y Q oo .2 M 0 0 0 0 0 > 0 7 p N V o in -7 O (D o F N V O V O M 0 U7 0 O I- O U7 oo N (O N 7 00 r- 0 O � M O O ''.... N i U7 O V U7 h M N N U7 V O In Lo N N W (M V G O �; VT o 0 o 0 0 � 00 N 00 M 00 � O o! o F N N M O Z� G 0 0 0 m N O V N N O: O N N 00 I� oC) O N N > U7 (`") I� V t I� V N N T VER M (O (O F VT a. uml000m r, IiBpp N Q n -a ��11��V1V-0�Yia� ~ ' J m'o Q U N 0 co 2M i ILA i U C 00 U1 O O D N 2 U (7 .2 0 Monthly Statistics Report Search Criteria Used Year: 2026; Starting Month: August; Organization: Hutchinson Utilities Commission; Is an Annual Report: Unchecked; IEEE 1366 STATISTICS 2025 ( 08/01/2025 - 08/31/2025) 2026 ( 08/01/2026 - 08/31/2026 ) SAIDI 0 0.8434058 SAIFI 0 0.005372012 CAIDI 0 157 ASAI 0 99.99811 Momentary Interruptions 0 0 Sustained Interruptions 0 1 MONTHLY SAIDI CHART A-I.Se SAI®1 °°. Mrnnthly SAIDI MONTHLY SAIFI CHART Aveirage SAIFI °°- Monthly SAIFI � P!ufi-0 ;—a muse � musl u p!ua5 o L WD32 N OA2fi O o" � O.bi3 O.o. Month Month PRIMARY OUTAGE CAUSES (COUNT) INon Utillity Exeavatirsm M%' (� Primary Outage Causes (Count) Non -Utility Excavation PRIMARY OUTAGE CAUSES (DURATION) Non-UtiVity Excvatic r:: HtlG'.-'� Primary Outage Causes (Duration) Non -Utility Excavation 6280 CIRCUIT RANKING - WORST PERFORMING Ranked by Outage Count Circuit Substation Fdr#14 Plant 1 1 Number of Outages Ranked by Customer Interruptions Customer Circuit Substation Interruptions Fdr#14 Plant 1 40 Ranked by Customer Minutes of Duration Circuit Substation Fdr#14 Plant 1 Customer Minutes of Duration 6,280 TOP 10 OUTAGES FOR THE MONTH +/- Customer Customers Minutes of Address Interrupted Duration Interruption Start Date Ivy Lane (/n/esams/reliability- 40 157 6280 8/31/2026 tracker/d ash board/outages/1 087349/details) 9:38:00 AM Total Customers Affected for the Month: 40 Average Customers Affected per Outage: 40 Work Order Descrigtion 12402 Plant 1 Combustible Gas Detection System 1.2502 Rubber Roof Repair West Portion of Plant 1 12503 Plant 1 Pump Room Ventilation 12504 Plant 1 Control Panel Upgrade 12505 Unit 1 CO2 System Update Code Compliance 12506 Cooling Tower Recirc and Chem Injection 12507 Plant 1 North Ground Fans 12601 Power Gates Plant 2 12602 Plant 1 and 2 Cooling Tower VFD's 12603 Unit 5 HUG Upgrade 12604 Plant 1 Web Master Upgrade 12605 Rooftop Solar 12606 Unit 1 LPT Stage 2 Blade Replacement Electric Production Total Materials Labor Budgeted 60,000.00 60,000.00 50,000.00 5,000.00 55,000.00 148,067.00 148,067.00 35,000.00 35,000.00 130,000.00 130,000,00 50,000.00 50,000.00 80,000.00 - 80,000.00 40,000.00 5,000.00 45,000.00 351,000.00 - 351,000.00 7,870.00 7,870.00 $ 951,937.00 $ 10,000.00 $ 961,937.00 $ Total Actual 46,384.67 24,391.67 22,519.95 20,699.10 310,619.80 424,615.19 $ Different 46,394.67 (60,000.00) (55,000.00) (123,675.33) (35,000.00) (107,480.05) (50,000.00) (80,000.00) (24,300.90) (351,000.00) (7,870.00) 310,619.80 (537,321.81) Work order Descriotion 22301 Hutch Sub Transformer Upgrade Engineering 22401 Hutch Substation Transformer 22402 McLeod Sub Relay Replacement 22405 3M Sub SCADA Phase 22503 Plant 1 Sub Circuit Breakers 22504 Plant 1 Sub Rebuild Distribution 22522 Data Center 22601 Willmar Line Rebuild 22602 Plant 1 Sub Rebuild Transmission 22603 Pole Repair and Replacement 22604 Station Equipment 22605 Plant 1 Batteries 22606 Install Duct 22607 Reconductor Feeder 19 22608 New Developments 22609 Then Landing Apartments 22610 Burns Manor Apartments 22611 The Farmhouse Memory Care 22612 Scooters Coffee 22613 Plant 1 Sub Rebuild XFMR 22614 Transformer Replacements 22615 Transformer New Developments 22616 The Landing Apartments 22617 Burns Manor Apartments 22618 The Farmhouse Memory Care 22619 Scooters Coffee 22620 Meters 22621 LED Street Light Conversion Electric Distribution Total Total Materials Labor Budgmete,d, Actual Difference 9,103,969.59 9,103,969.59 2,677,239.93 2,677,239.93 400,000.00 400,000.00 22,993.00 (377,007.00) - 90,068.66 90,068.66 112,497.00 112,497.00 - - 84,231.10 84,231.10 20,000.00 5,000.00 25,000.00 201,798.02 176,798.02 15,000.00 - 15,000.00 - (15,000.00) 10,000.00 - 10,000.00 - (10,000.00) 15,000.00 2,500.00 17,500.00 - (17,500.00) 18,000.00 65,000.00 83,000.00 24,627.07 (58,372.93) 80,000.00 20,000.00 100,000.00 131,897.50 31,897.50 60,000.00 15,000.00 75,000.00 37,155.63 (37,844.37) 15,000.00 5,000.00 20,000.00 27.17 (19,972.83) 15,000.00 5,000.00 20,000.00 - (20,000.00) 7,000.00 2,000.00 9,000.00 - (9,000.00) 7,000.00 2,000.00 9,000.00 - (9,000.00) - - - 165.74 165.74 50,000.00 15,000.00 65,000.00 2,119.26 (62,880.74) 60,000.00 15,000.00 75,000.00 923.78 (74,076.22) 20,000.00 2,000.00 22,000.00 2,523.53 (19,476.47) 20,000.00 2,000.00 22,000.00 - (22,000.00) 20,000.00 2,000.00 22,000.00 - (22,000.00) 15,000.00 2,000.00 17,000.00 - (17,000.00) 36,000.00 - 36,000.00 35,421.54 (578.46) 175,000.00 - 175,000.00 - 175,000.00 $ 1,058,000.00 $ 159,500.00 $ 1,217,500.00 $ 12,527,658.52 11,310,158.52 Natural Gas Work Total Total Order Description Materials Labor Bu,de,ted Actual Difference 62511 DRS #5 Upgrades 23,500.00 2,000.00 25,500.00 3,746.24 (21,753.76) 62601 Misc Developments & System Improvements 25,000.00 5,000.00 30,000.00 9,152.75 (20,847.25) 62602 City Projects 10,000.00 4,000.00 14,000.00 2,297.25 (11,702.75) 62603 Install 6" Line from Plant 1 to School Road 370,000.00 12,000.00 382,000.00 131,489.93 (250,510.07) 62604 Improvements to Regulator Stations 10,000.00 3,500.00 13,500.00 7,997.52 (5,502.48) 62605 Make DRS#11 at Plant 1 14,000.00 2,000.00 16,000.00 6,051.93 (9,948.07) 62606 Service Lines, The Landing, Burns Manor 65,000.00 15,000.00 80,000.00 21,890.35 (58,109.65) 62607 Service lines to Hjerpe - - - 19,265.76 19,265.76 62608 Meters, AMI, and All Fittings 250,000.00 10,000.00 260,000.00 31,587.84 (228,412.16) 62609 Residential Regulators - - - 1,066.70 1,066.70 62610 Industrial Metering and Regulation 25,000.00 3,500.00 28,500.00 144.72 (28,355.28) 62611 3m Boiler Bypass Rund 3,000.00 3,000.00 6,000.00 4,684.56 (1,315.44) 62612 Fairfax Micro Motion Elite Coriolis Meter - - - 24,961.18 24,961.18 $ 795,500.00 $ 60,000.00 $ 855,500.00 $ 264,336.73 $ (591,163.27) HUTCHINSON UTILITIES COMMISSION Board Action Form �rre tit' Agenda Item: Review Policies Presenter: Angie Radke Agenda Item Type: Time Requested (Minutes): 5 Review Policies Attachments: Yes BACKGROUND/EXPLANATION OFAGENDA ITEM: As part of HUC's standard operating procedures, a continual policy review is practiced. This month, the following policies were reviewed and no changes are recommended on these policies at this time: i. Electric Service Requirements & Charges ii. Temporary Service- Electric iii. Temporary Service in Case of Underground Failure iv. Electric Meter Placement v. Sealing of Meters — Electric vi. Meter Testing - Electric vii. Right -of -Way Clearing viii. Tree Removal of Trimming ix. Locating Customer's Underground Utilities — Electric BOARD ACTION REQUESTED: None Fiscal Impact: Included in current budget: Budget Change: PROJECT SECTION: Total Project Cost: Remaining Cost: SERVICE POLICIES - ELECTRIC Electric Service Requirements and Charges HUC will require a 24-hour notice, a copy of the State Board of Electricity Certificate of Inspection, and an established account prior to installing a meter and making the final connection. HUC shall not install any facilities until all affected properties are within 6 inches of final grade. Installation of Any Electric Services — November 1 Through March 31 The final determination on installation of electric services shall be made by HUC. New Single -Family Dwelling — Service Size: 200 Amperes or less Single-family dwelling customers will be 240/120 volt single-phase service. HUC shall furnish and install the underground conductors to serve the single-family home with a one-year warranty after installation date. The underground service is the property of the homeowner at date of installation. (4/0-2/0-4/0 URD): Minimum $300.00 Installation Charge up to 100 ft.; additional $2.00/ft. in excess of 100 ft. The customer or their contractor shall provide and install a 200A, ringless meter socket with lever bypass (See meter requirement/placement section). New Single -Family Dwelling — Service Size: Greater than 200 Amperes Single-family dwelling customers will be 240/120 volt single-phase service. Current transformer metering is required. HUC shall furnish the current transformers, meter socket and meter (See meter requirement/placement section). The customer or their contractor shall provide the current transformer housing and facilities, install the current transformers, mount the meter socket and provide an empty 1-'/4 inch conduit to the meter socket. HUC shall install the meter wiring and meter. No current transformer metering will be allowed in the power transformer secondary compartment. Bar type current transformers will be used. Provisions for voltage connections for the meter must also be provided. The customer will be responsible for installing the service to the utility transformer or pedestal location. HUC will be responsible to make all secondary connections in the transformer. Transformer secondary connections will be limited to a maximum of four conductors per phase with a maximum size of 750 MCM per conductor. If additional conductors are required per phase, the owner or contractor must provide an approved secondary transition cabinet. HUC's Electric Division may be contacted for further details. New Multi-Familv Dwellina. Commercial. or Industrial The customer will be responsible for installing the service to the utility transformer or pedestal location. For any services that require current transformer metering, the customer will be responsible to install the conductor from the metering cabinet to the transformer. For any three-phase services, the customer shall furnish the transformer pad and ground grid. The transformer location shall be determined by HUC. HUC will provide the following voltages: 120/208 volts three phase, not to exceed 3,000 amperes without prior approval. 277/480 volts three phase, not to exceed 3,000 amperes without prior approval. 7,970/13,800 volts three phase, with prior arrangements with HUC. HUC will be responsible to make all secondary connections in the transformer. Transformer secondary connections will be limited to a maximum of four conductors per phase with a maximum size of 750 MCM per conductor. If additional conductors are required per phase, the owner or contractor must provide an approved secondary transition cabinet. HUC's Electric Division may be contacted for further details. On services greater than 200 amperes at 240/120volts, current transformer metering is required. HUC shall furnish the current transformers, meter socket and meter. The customer or their contractor shall provide the current transformer housing and facilities, install the current transformers, mount the meter socket and provide an empty 1-'/4 inch conduit to the meter socket. HUC shall install the meter wiring and meter. No current transformer metering will be allowed in the power transformer secondary compartment. Any service greater than 240 volts, shall require current transformer metering. Bar type current transformers will be used. Provisions for voltage connections for the meter must also be provided. Approved multi -family dwelling meter stacks will be provided by the customer or their contractor. Primary metering at 7,970/13,800 volts will be by special arrangement and approval of HUC. Temporary Service For temporary service, please contact HUC's Customer Service Department. HUC shall bill the customer or their contractor for all related expenses. Temporary Service in Case of Underground Failure When an underground service fails, HUC will furnish a temporary service to the customer at no charge. The customer will have ten working days to repair or replace the service. In the event the work can't be completed within ten working days the customer may contact HUC to perform the required maintenance at HUC's current time and material rates. If after ten working days, the required maintenance has not been completed or the customer has not contacted HUC to make arrangements to have the service repaired, HUC will remove the temporary service. In the event of frost, the customer will need to contact HUC to make arrangements to have the repair done at a later date. Electric Meter Placement HUC reserves the right to specify the electric meter location on all installations. Electric service lines and meter housing are the property of the home/business owner. No customer owned device or equipment is allowed to be connected to the meter socket. Meters may be relocated to a location agreed upon by HUC and the customer (or location approved by HUC.). The customer will be responsible for all costs involved in relocating these facilities. All meters must be located on an external wall. New construction electric meters must be located within 10 feet of the natural gas meter if HUC is providing both services. Electric meters shall be accessible at all times for disconnection, examination, reading, replacement or necessary maintenance. Electric meters not accessible are subject to disconnection and will need to be moved to a location approved by HUC, at the home/business owner's expense. HUC requires a minimum of a 3-foot clear zone in front of the electric meter. Reasonable care must be taken to protect all metering facilities when remodeling, residing, roofing, painting, etc. In the event of damage to the electric facilities, the customer shall be responsible for the cost of repairing or replacing the electric facilities. Conditions may exist which may require other restrictions or distances (e.g. multiple meters or commercial/industrial). Any exceptions require the approval of HUC prior to the start of construction. If violations or deviations are determined, the customer will be responsible for the cost of the correction. Single Family Dwellings All residential electric metering facilities shall be located on the side of the home within 6 feet of the front building wall and 60 inches from finished grade. Front building wall is defined as the wall nearest the street of the resident's living space. Multi -Family Dwellings/Multiple Business Establishments All HUC electric meters must be located on the exterior wall of the building. Individual metering is required for each single-family private residence contained in a multi -family dwelling and each separately owned and/or operated business. In addition, if required, a "house meter" shall also be installed in these establishments. Commercial or Industrial All commercial and industrial electric meters must be located outside. If remodeling is done on the premises, which would cause the meter to be located inside, the owner, at owner's expense, must relocate the meter to the outside to a location agreed upon (or approved by) by HUC. Sealing of Meters Electric meters and current transformer housings, which have been sealed by HUC, shall not be broken or tampered with without the consent of HUC except in emergency cases. HUC shall be notified immediately after a seal has been broken. If HUC is not notified and HUC personnel discover a broken seal, a $10 broken seal charge may be assessed to the customer. Seals will be assigned to each meter/account by color according to the following: Gray Seal Regular Account Red Seal Meter Disconnected for Non -Payment Blue Seal Meter Disconnected by Customer Request Yellow Seal Life Support Equipment Meter Testing HUC will test all meters periodically for accuracy and mechanical condition. All electric meters must be accurate to within 2%, plus or minus, at full and light load. Upon request of the customer, HUC will test the accuracy of an electric meter. If the meter is found to be registering more than 2% fast, there will be no testing charge to the customer. If the meter is found to be accurate within the 2% limit, a $40 trip charge will be billed to the customer. HUC has the right to place special meters on the premises of a customer for the purpose of testing all or part of the customer's load at no expense to the customer. Right -of -Way Clearing HUC shall maintain right-of-way clearance on all overhead and underground facilities. Tree Removal or Trimming Tree removal or trimming for other than right-of-way clearance is the responsibility of the property owner. Please notify HUC with any questions concerning tree removal or trimming. Any repair of damage to the HUC electrical distribution system caused by tree removal or trimming, by the property owner or their representatives will be billed to the property owner. Locating Customer's Underground Utilities HUC will locate all underground electric distribution and transmission facilities up to the meter at no charge to the customer or landowner. 3724 West Avera Drive PO Box 88920 Sioux Falls, SD 57109-8920 Telephone: 605.338.4042 Fax: 605.978.9360 www.mrenergy.com November 21, 2025 Jeremy Carter Hutchinson Utilities Commission 225 Michigan St SE Hutchinson, MN 55350 RE: Official Notice of January 1, 2026 S-1 Rates Dear Jeremy Carter: Rate Schedules B and C to the S-1 Power Sale Agreement (S-1 Agreement) between Missouri River Energy Services (MRES), Western Minnesota Municipal Power Agency, and your utility are enclosed. Schedule B includes power supply rates for all members, and Schedule C reflects transmission rates for the various transmission groups. The changes to the 2026 Supplemental Power Demand and Energy rates in Schedule B compared to the 2025 rates are as follows: • Summer demand rates will increase to $20.00/kW from $19.50/kW. • Winter demand rates will increase to $16.00/kW from $15.50/kW. • Spring/Fall demand rates will increase to $10.25/kW from $10.00/kW. • Time -Of -Use (TOU) energy rates will increase as follows: 2025 2026 n Peak `cents per kWh' $0.049 $0.053 Mid Peak ',cents firermkWh"i $0 035 $0.037 Off Peak $0 025 $0.027 The average power supply rate for all members is projected to be approximately 6.2 cents per kWh in 2026, an increase from the budgeted 2025 average power supply rate of 6.0 cents per kWh. The average MRES power supply rate for your utility will depend on the seasonal and annual load factor of your utility. The Supplemental Power Demand and Energy rates will be effective January 1, 2026, and the current rates are: ......... Power Su 1,, Rates: Suivlemental Power Demand durin r June, July, and Au a1!st (>er kW) Supplemental Power Demand during January, February, and December (per kW) Rates Effective 01/01/2026 $20.00 $16.00 Current Rates $19.50 $15.50 Sup:elemental Power Demand durin ., all other months !Per kW' $10.25 $10.00 Energy for Supplemental Power (per kWh) (TOU implemented in 2023) On Peak $0.053 $0.049 Mid Peak $0.037 $0.035 Off Peak $0.027 $0.025 Production Cost Adjustment Base (per kWh) $0.030 $0.030 Green Energy Rate adders, i.e., in addition to the energy for supplemental power noted above: Renewable Energy Certificate REC) not specifically associated with an MRES- (Standard $0.001 $0.001 contracted renewable resource REC) ,per kWh REC specifically associated with an MRES-contracted renewable resource (MRES $0.002 $0.002 Resource REC) (per kWh) REC specifically associated with WAPA hydroelectric renewable resources (WA -PA $0.001 N/A Resource REC) Since Hutchinson Utilities Commission (HUC) does not take transmission service from MRES, the transmission rates in the enclosed Schedule C are not applicable to HUC. We have enclosed Schedule C since the rates are included in a rate schedule to the S-1 Agreement. The attached Schedules B and C fulfill the requirements of Section 7 of the S-1 Agreement and supersede any previously issued rate schedules. If you have any questions regarding the enclosed information, please call Chris Olson at 800-678-4042. Sincerely, 0 / 0 Matthew E. Schull President and Chief Executive Officer Enclosures MISSOURI BASIN MUNICIPAL POWER AGENCY d/b/a MISSOURI RIVER ENERGY SERVICES POWER SALE AGREEMENT (S-1) SCHEDULE B S-1 SUPPLEMENTAL POWER RATES L APPLICABILITY This Schedule B is applicable to the purchase of Supplemental Power by any Municipality pursuant to the terms of the Power Sale Agreement (S-1 Agreement) with Missouri River Energy Services (MRES). This Schedule B is also applicable to the purchase of the Power Requirements pursuant to the terms of the Pella Power Sale Agreement, the purchase of the Supplemental Power pursuant to the terms of the Atlantic Municipal Utilities Power Sale Agreement, and the purchase of the Contract Quantity pursuant to the terms of the HUC Power Sale Agreement (collectively, the Other Power Sale Agreements). The term Power Supply in this Schedule B includes all power and energy subject to this rate schedule, pursuant to the various power sale agreements identified in this Section. All capitalized terms shall have the meaning defined in the S-1 Agreement, unless otherwise provided in this Schedule B. 2. CHARACTER OF SERVICE Electric power and energy furnished under this Schedule B shall be alternating current, 60 hertz, 3-phase. 3. MONTHLY RATES FOR POWER SUPPLY For electric power and energy furnished under the S-1 Agreement and Other Power Sale Agreements subject to this rate schedule, the monthly charges shall be determined as follows: Demand Rate: a. Summer Season (June, July, and August): $20.00 per kilowatt (kW) of Demand as determined in Section 11 below. b. Winter Season (January, February, and December): $16.00 per kW of Demand as determined in Section 11 below. C. All Other Months (March, April, May, September, October, and November): $10.25 per kW of Demand as determined in Section 11 below. Energy Rate: Time Of Use (TOU) rate per Kilowatt-hour (kWh) (see table below) as determined in Section 11 below. ........ _ TOU Ener.... gy Blocks Summer: _ Winter: Sprin/Fall: — _ .— _ March-Maylye. bb ... June —Au rest December-Februaa° � Se stember-November Weekday Mid Peak — 6AM —12PM AM 1 OAM _ .... 6�8 _..... — 1 OAM — 4PM PM On Pea � 12PM — 8PM 6 — 4PM 8PM None Off Peak 8PM — 6AM S-1 Agreement, Schedule C, effective January 1, 2026 1 Page 1 B id PedlHohdaM Mee en .... ..... k _ 6AM - 8PM w� Off Peak 8PM — 6AM are the 6 standard No rth American Electric Reliability Corporation holidays: New Years Day, Memorial , DayIndepen deuce *Holidays Day, Labor Day, Thanksgiving Day and Christmas Day. Green Energy Rate Adder. If Municipality is purchasing Green Energy pursuant to Section 3(a)(ii) of the S-1 Agreement or pursuant to the terms of any Other Power Sale Agreement with a Green Energy option, MRES shall charge for Green Energy at the applicable TOU rate per kWh plus: $0.001 per kWh for Renewable Energy Certificates (REC) not specifically associated with an MRES- contracted renewable resource (Standard REC); or $0.002 per kWh for RECs specifically associated with an MRES-contracted renewable resource (MRES Resource REC). The applicable Demand Rate identified in this Section 3, above, also applies to the Green Energy Rate Adder. WAPA REC Rate: If Muni.....................1.......ww..v cipality elects to sell to MRES any RECs allocated to Municipality by Western Area Power Administration (WAPA) associated with power purchased from WAPA in 2026 (WAPA RECs), MRES shall purchase and pay Municipality for such WAPA RECs at the following rate: $0.001 per kWh for RECs specifically associated with WAPA hydroelectric renewable resources (WAPA Resource REC). 4. POWER COST ADJUSTMENT The base variable production and purchased power cost (VC) included in the Energy Rate is $0.030 per kWh. Six -Month VC (SMVC), for the purposes of this Section, is defined as the actual average VC of energy produced and purchased by MRES for the preceding 6-month period. If the SMVC is greater than $0.032, MRES shall charge Municipality an amount equal to the product of the SMVC less $0.032, multiplied by the number of kWh for the most recent month. The VC, for purposes of this adjustment, shall include, as determined by MRES: a. The variable production costs of the generating plants owned by Western Minnesota Municipal Power Agency (WMMPA) to meet MRES Power Supply obligations to Members under the S-1 Agreement and Other Power Sale Agreements; and b. The cost of power and energy purchased by MRES or WMMPA from other power suppliers or markets to meet Member Power Supply needs. 5. MEMBER -OWNED RENEWABLE RESOURCE GENERATION If MRES has executed a Member Renewable Resource Agreement with Municipality requiring MRES to purchase the output from Municipality's renewable resource generator(s) and to resell the output to Municipality under the S-1 Agreement or Other Power Sale Agreement as part of Municipality's Power Supply, the charges for that generation shall be based on the rates established in the Member Renewable Resource Agreement. 6. RETAIL CUSTOMER -OWNED GENERATION Standb,^�Rates: a. Applicability: This rate is available and applicable to each Municipality which has a retail customer with internal generation from a generating unit exceeding five megawatts (MW). If a Municipality has a retail customer with internal generation from a unit exceeding five MW, such generation shall be separately metered. Municipality is responsible for installing and maintaining all such metering equipment. S-1 Agreement, Schedule C, effective January 1, 2026 1 Page 2B b. Standby Demand: If a Municipality so chooses, it may nominate, in writing to MRES, all or a portion of the qualifying retail generation for the Nominated Standby Demand Rate (as defined farther in this Section, below). In such event, MRES shall charge Municipality the product of the amount of generation nominated multiplied by the Nominated Standby Demand Rate, on a monthly basis. Municipality may make such nomination at or before the time the generation of the retail customer goes online. Subsequently, Municipality is allowed to nominate or change its nomination one time each year by providing written notice of any such action no later than November 30 for the following year. If notice is properly given, any changes to the nomination will be effective on December 31, hour ending 24:00; provided however that if a nomination change is made during an Excess Standby Demand Rate period as described in this Section 6 below, the revised nomination shall not take effect until the expiration of the Excess Standby Demand Rate period. If the generation of a retail customer's internal generating unit exceeding five MW is not in service, whether planned or unplanned (Out -of -Service Event), MRES shall charge Municipality the following demand charge to replace such customer's generation measured as of the time of Municipality's peak supplemental demand: (i) If Municipality nominated internal customer generation as described above, and such nomination level exceeds the demand required as a result of the Out -of -Service Event, MRES shall not charge Municipality for any amount in addition to the Nominated Standby Demand Rate. (ii) If Municipality elected not to nominate internal customer generation, or nominated an amount less than the demand required due to the Out -of -Service Event, MRES shall charge Municipality the Excess Standby Demand Rate (as defined further below in this Section 6) on demand exceeding the nominated generation or, if Municipality made no nomination of generation, on all demand for the month of the Out -of -Service Event and each of the succeeding 11 months (the Excess Standby Demand Rate period). Nominated Standby Demand Rate: $5.00 per kW -month. This rate shall be multiplied by the amount of retail customer qualifying generation nominated by Municipality. Excess Stand_ by Demand Rate: The rate shall be the Power Supply demand rate in effect under Section 3 for the month of the Out -of -Service Event. MRES will assess a charge based on the product of the Power Supply Demand Rate multiplied by the retail customer monthly 30-minute coincident peak to the member monthly system 30-minute peak. If there is another Out -of - Service Event during the Excess Standby Demand Rate period, MRES shall charge Municipality the higher of the Excess Standby Demand Rate applicable to the initial Out -of -Service Event and the Excess Standby Demand Rate applicable to the subsequent Out -of -Service Event. Each retail generation Out -of -Service Event begins a new 12-month Excess Standby Demand Rate period, commencing the month of the Out -of -Service Event. C. Standby Energy: The Standby Energy Rate shall be the higher of the energy rate under Sections 3 and 4 of this rate schedule or 125 percent of the day -ahead Locational Marginal Price on the dates of such purchases. MRES shall charge for energy purchased by Municipality during an Out -of -Service Event to replace retail customer generation meeting the applicability requirements of this Section 6 times the Standby Energy Rate, S-1 Agreement, Schedule C, effective January 1, 2026 1 Page 3B Other Retail Customer Generation Rates: If MRES .. � ..�w..._w�w.............-.......ww.. � .. incurs a transmission charge from Midcontinent Independent System Operator, Inc. (MISO) or Southwest Power Pool, Inc. (SPP) for generation of any retail customer (irrespective of size) of a Municipality and Municipality has not been charged the Excess Standby Demand Rate, MRES shall charge Municipality the cost incurred by MRES from MISO or SPP for that retail customer generation. 7. LARGE CUSTOMER RETENTION INCENTIVE a. Eligibility: MRES shall make available the Large Customer Retention Incentive (Retention Incentive) described in this section to any Municipality that: (i) MRES has the obligation to provide Supplemental Power or all Power Requirements, (ii) has a retail customer with a coincident peak demand (the customer's peak coincident to the Municipality's peak) of at least 30 MW and a load factor of at least 80 percent, each as determined on a 12-month rolling monthly average (Eligible Customer), (iii) enters into a Large Customer Retention Incentive Agreement with MRES and the Eligible Customer as described in subsection e below (Customer Agreement), and (iv) provides a corollary rate Retention Incentive to the Eligible Customer as described in subsection c below. A customer will not be considered an Eligible Customer under this Section 7 if that customer is a beneficiary, through the Municipality, of the Economic Development Incentive described in Section 8 below. In the event a Municipality has more than one Eligible Customer as described in this Section 7, the Retention Incentive shall be available to the Municipality with respect to each such Eligible Customer, subject to the terms and conditions of this section and the Customer Agreement entered into with each Eligible Customer. The terms of this Section 7 shall apply independently with respect to each Eligible Customer. b. Retention Incentive: Subject to the terms and conditions of this Section 7 and the Customer Agreement, MRES shall provide a Retention Incentive to the Municipality in the amounts described below, which Retention Incentive shall be applied to all kWh purchased from the Municipality by the Eligible Customer during the term of the Retention Incentive, as set forth in the Customer Agreement. The Retention Incentive shall be a rate discount of $0.0057 per kWh for the first two years of the Retention Incentive, $0.0053 per kWh for the next five years of the Retention Incentive, and $0.0020 per kWh for the remaining term of the Retention Incentive. The Retention Incentive must be passed on to the Eligible Customer by the Municipality, be a separate line item on the bill, and identify MRES as the provider of the credit. C. Municipality Participation: The Municipality shall provide a corollary Retention Incentive to the Eligible Customer of at least $0.0005 per kWh during the first seven years that the Retention Incentive described in subsection b is provided by MRES and at least $0.0002 per kWh for any additional years that the Retention Incentive described in subsection b is provided by MRES. This corollary Retention Incentive shall be applied to all kWh purchased from the Municipality by the Eligible Customer during the term of the Retention Incentive, as set forth in the Customer Agreement. d. Duration: The Retention Incentive shall be provided for a term of up to ten years. The Retention Incentive shall terminate immediately in the event: (i) the Municipality or the Eligible Customer ceases to satisfy the eligibility requirements described in subsection a above, (h) the Eligible Customer, either directly or indirectly, engages in any activity to secure or develop any resource other than the Municipality to serve any of the Eligible Customer's power or energy requirements, or S-1 Agreement, Schedule C, effective January 1, 2026 1 Page 4B (iii) the Customer Agreement is terminated pursuant to the terms thereof. Customer Agreement: The Municipality, the Eligible Customer, and MRES shall enter into an agreement in a form and substance acceptable to MRES to further memorialize all terms and conditions associated with the Retention Incentive, including without limitation the duration of the Retention Incentive, the obligations of the Municipality and the Eligible Customer to receive the Retention Incentive, and other terms as agreed by the parties. In the event a Municipality, Eligible Customer, and MRES enter into a Customer Agreement, such Customer Agreement and associated Retention Incentive shall remain in effect for the term set forth in the Customer Agreement, subject to the terms and conditions of the Customer Agreement. ECONOMIC DEVELOPMENT INCENTIVE a. Eligibility: MRES shall make available the Economic Development Incentive described in this section to any Municipality that: (i) Is a party to an S-1 Agreement or an Other Power Sale Agreement that is dated prior to January 1, 2018, and pursuant to which the Municipality purchases from MRES all Supplemental Power or Power Requirements; (ii) (A) Has a new retail commercial or industrial customer that: (1) commenced operation of a new commercial or industrial facility on or after January 1, 2026 (for purposes of this subsection, the term "new commercial or industrial facility" shall mean a newly constructed facility or an existing facility that had not been in active commercial operation for at least 12 months prior to its commencement of operation on or after January 1, 2026), (2) has electric requirements meeting the criteria set forth in subsection b of this Section 8, and (3) has not installed internal generation to self -supply any of its electric requirements; or (B) Has an existing retail commercial or industrial customer that: (1) expanded its commercial or industrial facility and such expansion will enter commercial operation on or after January 1, 2026, (2) has electric requirements meeting the criteria set forth in subsection b of this Section 8, and (3) has not installed internal generation to self -supply any of its electric requirements (a retail commercial or industrial customer that satisfies the requirements of subsection (A) or (B) above constitutes a "Qualifying Customer" for purposes of this section, except as otherwise provided below). (iii) Requests the incentive from MRES and supplies adequate information to support the requirements of this Section 8 as determined by MRES; (iv) Provides at least 50 percent of this incentive to the Qualifying Customer; and (v) Supports economic development locally and has provided to MRES documentation of the local development efforts. A customer will not be considered a Qualifying Customer under this Section 8 if such customer is a beneficiary, through the Municipality, of the Large Customer Retention Incentive described in Section 7 above. In the event a Municipality has more than one Qualifying Customer as described in this Section 8, the Economic Development Incentive shall be available to the Municipality with respect to each such Qualifying Customer, subject to the terms and conditions of this section. The terms of this Section 8 shall apply independently with respect to each Qualifying Customer. b. Rate Discount: The incentive provided pursuant to this Section 8 is in the form of a rate discount provided by MRES to the Municipality. The amount of the rate discount shall be based on the S-1 Agreement, Schedule C, effective January 1, 2026 1 Page 5B application of the following table to the eligible customer of the Municipality. To be eligible for this incentive, a customer must satisfy at least two of the three criteria noted in columns 1 through 3 of the table, and the applicable rate discount will be based on the level of qualification under columns 1 through 3. For a new customer as described in subsection (a)(ii)(A) above, columns 1 through 3 will be applied to the new load. For an existing customer with an added load as described in subsection (a)(ii)(B), columns 1 and 2 will apply to the added load and column 3 will apply to the total load at the customer's facility. 1 2 3 4 E5 6 _I 7 . ... .......... Load must meet at least 2 of the followin criteria Rate Discount ` )er kWh Minimum Minimum Monthl kWh, Monthlsr Peak Monthl Years 1 Usage Demand Load Factor and 2 Year 3 Year 4 Year 5 1,000,000 and higher 2 MW 60% $0.0150 $0.0125 $0.0100 $0.0000 500,000 and higher 1 MW 60% $0.0100 $0.0075 $0.0050 $0.0000 250,000 and higher 500 kW 60% $0.0075 $0.0050 $0.0025 $0.0000 125,000 and higher 250 kW 50% $0.0050 $0.0025 $0.0025 $0.0000 9. TAX ADJUSTMENT CLAUSE In the event that any lawful authority imposes on MRES any tax, or charge for payment in lieu of tax, on the production, transmission, or sale of electric power and energy sold by MIRES, MRES may charge the Municipality the cost incurred for its share of such tax or payment in lieu thereof. 10. LATE PAYMENT CHARGE A charge of 5 percent may be imposed on the unpaid balance of any amount due and owing after the date when such amount is due. 11. BILLING MEASUREMENT The metered demand in kW shall be the highest 30-minute integrated demand (or corrected to a 30-minute basis in the event 15-minute demand registers are installed) measured during the billing period (with meter reading adjustments, if any, as provided for in Schedule A of the S-1 Agreement or any Other Power Sale Agreement subject to this rate schedule). The billing measurements for Power Supply shall be determined as follows: a. S-1 Agreement: Demand = TD-WD Energy = TE-WE TD — The total demand for the current billing period determined on a basis in accordance with the contract in effect between Municipality and WAPA pursuant to which WAPA sells the Municipality electric power and energy (WAPA Power). TE — The total energy delivered during the billing period determined on a basis in accordance with the WAPA Power. S-1 Agreement, Schedule C, effective January 1, 2026 Page 66 WD — The amount of demand delivered to Municipality by WAPA for the current billing period. WE — The amount of energy delivered to Municipality by WAPA for the current billing period. b. Other Power Sale Agreements: Pella Power Sale Agreement: The maximum amount of all power, energy, and related products and services required by Municipality to meet the needs of all of its consumers. Atlantic Municipal Utilities Power Sale Agreement: The Supplemental Power as established in such agreement. HUC Power Sales Agreement: The Contract Quantity as established in such agreement. C. Losses: Losses charged by a third party transmission provider, if any, will be added to the respective Municipality's demand and energy purchases from MRES and WAPA. 12. BILLING PERIOD The MRES billing period shall be established to coincide with the meter reading schedules of WAPA for all services provided pursuant to the S-1 Agreement and shall be established by MRES, Municipality, and third party transmission provider, if necessary, for Other Power Sale Agreements. Effective: The first day of the January 2026 billing period Approved September 11, 2025: Board of Directors Missouri Basin Municipal Power Agency d/b/a Missouri River Energy Services Issued by: Matthew E. Schull, President and Chief Executive Officer Missouri Basin Municipal Power Agency d/b/a Missouri River Energy Service S-1 Agreement, Schedule C, effective January 1, 2026 1 Page 7B MISSOURI BASIN MUNICIPAL POWER AGENCY d/b/a MISSOURI RIVER ENERGY SERVICES POWER SALE AGREEMENT (S-1) SCHEDULE C S-1 TRANSMISSION RATES I , APPLICABILITY This Schedule C is applicable to Transmission Service provided by Missouri River Energy Services (MRES) pursuant to the terms of the Power Sale Agreement (S-1 Agreement). This Schedule C is also applicable to Transmission Service provided by MRES pursuant to the terms of the Pella Power Sale Agreement and the Atlantic Municipal Utilities Power Sale Agreement (collectively, the Other Power Sale Agreements). MRES shall charge for Transmission Service based on the costs incurred by MRES from Midcontinent Independent System Operator, Inc. (MISO) or Southwest Power Pool, Inc. (SPP), or others, for providing Transmission Service to the Point of Delivery (POD) at or over those transmission facilities to which Municipality is interconnected. The transmission facilities to which the various Municipalities are interconnected shall be referred to as Transmission Service Groups, as follows: a. Great River Energy (GRE) Group, includes the Municipality listed on page 3c of this Schedule C; b. L&O Power Cooperative (L&O) Group, includes the three Municipalities listed on page 3c of this Schedule C; c. MidAmerican Group, includes the two Municipalities listed on page 3c of this Schedule C; d. Northern Cities Group (NCG), includes the 12 Municipalities listed on page 3c of this Schedule C; e. Split Rock Group (SRG), includes the five Municipalities listed on page 3c of this Schedule C; f. Upper Missouri Zone (UMZ) Group, includes the 32 Municipalities listed on page 3c of this Schedule C; and g. Xcel Group, includes the five Municipalities listed on page 3c of this Schedule C. All capitalized terms shall have the meaning defined in the S-1 Agreement or Other Power Sale Agreements, unless otherwise provided in this Schedule C. 2. CHARACTER OF SERVICE Transmission Service furnished or made available under this Schedule C shall be that service at POD shown on Schedule A for 3-phase, 60-hertz alternating current at the voltages shown. 3. MONTHLY RATE For Transmission Service funnished or made available pursuant to Section 6 of the S-1 Agreement, or the Other Power Sale Agreements, MRES shall charge each Municipality for all costs incurred by MRES which may be required to effect Transmission Service, including those costs and charges included in Section 6 and Section 7 of the S-1 Agreement, or the Other Power Sale Agreements, and all costs and charges under provisions of any Tariff of MISO or SPP (as such Tariffs may be supplemented or amended by MISO or SPP or their respective successor), pursuant to which MRES has acquired transmission capacity or service for the purpose of supplying Transmission Service to Municipality. The rates for each Transmission Service Group shall be as follows: a. GRE Group: The monthly demand rate shall be $10.00 per kilowatt ^). This rate will be multiplied by Municipality's Monthly Peak Demand as determined in Section 7 below. b. L&O Group: The monthly demand rate shall be: (i) the UMZ Group rate as set forth below ($7.46 per kW), plus (ii) $2.12 per kW. Each component of this rate will be multiplied by Municipality's applicable Monthly Peak Demand as determined in Section 7 below. c. MidAmerican Group: The monthly transmission charges assessed to Municipality by MidAmerican Energy Company and MISO. d. NCG: The monthly demand rate shall be $4.85 per kW. This rate will be multiplied by Municipality's S-1 Agreement, Schedule C, effective January 1, 2026 1 Page 1C Monthly Peak Demand as determined in Section 7 below. e. SRG: The monthly demand rate shall be $16.22 per kW. This rate will be multiplied by Municipality's Monthly Peak Demand as determined in Section 7 below. f. UMZ Group: The monthly demand rate shall be $7.46 per kW. This rate will be multiplied by Municipality's Billing Demand as determined in Section 7 below. g. Xcel Group: The monthly demand rate shall be $9.05 per kW. This rate will be multiplied by Municipality's Monthly Peak Demand as determined in Section 7 below. 4. TRANSMISSION COST ADJUSTMENT MRES shall adjust the charges to Municipality monthly based on the difference between the total charges based on the Monthly Rates in Section 3, above, and the actual costs incurred by MRES for Transmission Service provided to Municipality. This adjustment shall not be made to Municipalities in the NCG. Reserves accumulated by the NCG will absorb the variances between costs incurred and the rate charged until such time as these reserves are exhausted, which is not expected to occur in 2026. 5. TAX ADJUSTMENT CLAUSE In the event any lawful authority imposes on MRES any tax, or charge for payment in lieu of tax, on the production, transmission, or sale of electric power and energy sold by MRES, MRES may charge the Municipality the costs incurred for its share of such tax or payment in lieu thereof. 6. LATE PAYMENT CHARGE A charge of 5 percent may be imposed on the unpaid balance of any amount due and owing after the date when such amount is due. 7. BILLING MEASUREMENT For the GRE Group, MidAmerican Group, SRG, and Xcel Group, the Monthly Peak Demand in kW shall be the highest 30-minute integrated demand for Municipality's total electric requirements measured during the billing period. When electricity is measured at more than one POD, the total demand shall be the sum of the maximum recorded integrated demand at each Point of Measurement during the same 30-minute interval. For the L&O Group, the Billing Demand for each month shall be: (a) for the portion of the L&O Group rate described in subsection (i) of Section 3(b) above, the average monthly peak of the demand purchases by Municipality from MRES for the preceding calendar year, calculated by taking the total demand purchases of Municipality for the preceding year (in kW) and dividing this sum by 12 months; and (b) for the portion of the L&O Group rate described in subsection (ii) of Section 3(b) above, the average monthly peak of the demand purchases by Municipality from MRES and Western Area Power Administration (WAPA) for the preceding calendar year, calculated by taking the total demand purchases of Municipality for the preceding year (in kW) and dividing this sum by 12 months. For the NCG, the Monthly Billing Demand for each month sliall be the greater of the highest 30-minute integrated demand for the Municipality's total electric requirements measured during the billing period or 90 percent of the Municipality's Monthly Peak Demand during the preceding 11 months. When electricity is measured at more than one POD, the total demand shall be the sum of the maximum recorded integrated demand at each Point of Measurement during the same 30-minute interval. For the UMZ Group, the Billing Demand for each month shall be the average monthly peak of the demand purchases by Municipality from MRES for the preceding calendar year, calculated by taking the total demand purchases of Municipality for the preceding year (in kW) and dividing this sum by 12 months. S-1 Agreement, Schedule C, effective January 1, 2026 1 Page 2B 8. BILLING PERIOD The MRES billing period shall be established to coincide with the meter reading schedules of WAPA for all services provided pursuant to the S - 1 Agreement, and shall be established by MRES, Municipality, and third party transmission provider, if necessary, for the Other Power Sale Agreements. Effective: The first day of the January 2026 billing period Approved September 11, 2025: Board of Directors Missouri Basin Municipal Power Agency d/b/a Missouri River Energy Services Issued by: Matthew E. Schull, President and Chief Executive Officer Missouri Basin Municipal Power Agency d/b/a Missouri River Energy Services S-9 Agreement, Schedule C, effective January 9, 2026 1 Page 3B Munici �alities taldn � service under Schedule C are: Upper Missouri Zone Group: Alton, Iowa Denison, Iowa Hartley, Iowa Hawarden, Iowa Kimballton, Iowa Manilla, Iowa Orange City, Iowa Paullina, Iowa Primghar, Iowa Remsen, Iowa Sanborn, Iowa Shelby, Iowa Sioux Center, Iowa Woodbine, Iowa Madison, Minnesota Moorhead, Minnesota Cavalier, North Dakota Lakota, North Dakota Northwood, North Dakota Riverdale, North Dakota Valley City, North Dakota Beresford, South Dakota Brookings, South Dakota Burke, South Dakota Faith, South Dakota Fort Pierre, South Dakota Flandreau, South Dakota Pickstown, South Dakota Pierre, South Dakota Vermillion, South Dakota Watertown, South Dakota Winner, South Dakota L&O Group: Lake Park, Iowa Rock Rapids, Iowa Luverne, Minnesota Northern Cities Group: Alexandria, Minnesota Barnesville, Minnesota Benson, Minnesota Breckenridge, Minnesota Detroit Lakes, Minnesota Elbow Lake, Minnesota Henning, Minnesota Lake Park, Minnesota Ortonville, Minnesota Staples, Minnesota Wadena, Minnesota Big Stone City, South Dakota Split Rock Group: Adrian, Minnesota Jackson, Minnesota Lakefield, Minnesota Westbrook, Minnesota Worthington, Minnesota Xcel Group: Marshall, Minnesota Melrose, Minnesota Saint James, Minnesota Sauk Centre, Minnesota Hillsboro, North Dakota MidAmerican Group: Atlantic, Iowa Pella, Iowa GRE Group: Willmar, Minnesota S-1 Agreement, Schedule C, effective January 1, 2026 1 Page 4C HUC POWER SALE AGREEMENT This Power Sale Agreement ("Agreement") is entered into on _ m 3 2010, by and between Missouri Basin Municipal Power Agency, a body corpora nd politic organized under Chapter 28E of the Code of Iowa, doing business as Missouri River Energy Services ("MRES"), the Hutchinson Utilities Commission, a municipal corporation and political subdivision of the State of Minnesota ("HUC"), and Western Minnesota Municipal Power Agency, a municipal corporation and political subdivision of the State of Minnesota ("Western Minnesota"). MRES, HUC and Western Minnesota are individually referred to as "Party" and collectively as "Parties." Article 1. ESSENTIAL TERMS OF THE TRANSACTION 1.1 Seller: The Seller is MRES. 1.2 Buyer: The Buyer is HUC. 1.3 Contract Term: The Contract Term is from hour beginning 00:01, September 1, 2010 through hour ending 24:00 January 1, 2046. Upon expiration of the Contract Term, the Agreement shall remain in effect as permitted by law unless and until terminated by a Party upon not less than one year's written notice. 1.4 Commodity: The Commodity is must -take energy of the Contract Quantity specified below. MRES will provide HUC the same ancillary services associated with the Contract Quantity that it provides to members ("Members") under the Power Sale Agreement (S-1) ("S-1 Agreement") for delivery of power and energy to the Western Area Power Administration Integrated System outlet. 1.5 Contract Quantity: The Contract Quantity is 15 megawatts (MW) on a 100% load factor basis (15 megawatt -hours (MWh) per hour) from hour beginning 00:01 on September 1, 2010 through hour ending 24:00 on December 31, 2012 ("Period I") and increasing on hour beginning 00:01 on January 1, 2013 to 25 MW on a 100% load factor basis (25 MWh per hour) continuing through the end of the Contract Term ("Period II"). The Contract Quantity includes both demand and energy components. 1.6 Financial Firmness: MRES will provide the Contract Quantity from electric energy available in the Midwest Independent Transmission System Operator ("MISO") energy market or from any of its generation resources. 1.7 Delivery Point: The Delivery Point shall be GRE.HUC, a node for delivery of energy by MISO that is designated under the MISO Transmission, Energy and Operating Reserve Markets Tariff ("TEMT"), as currently in effect and as may be modified during the term of this Agreement, or any successor point of delivery if the MISO node concept ceases to exist during the Contract Term. 1 1.8 Energy Scheduling: All schedules for energy under this Agreement shall be governed by the TEMT. All schedules shall be made in the MISO energy market. A financial bilateral transaction will be submitted by MRES in the MISO Financial Scheduling System ("fmSched"). HUC will approve the finSched. HUC will continue its energy scheduling in the ordinary course. 1.9 Planning Resource Credits (PRC): MRES will each month make available to HUC Planning Resource Credits ("PRCs") (as defined in the TEMT) to meet HUC's Resource Adequacy Requirements ("RAR") in MISO to cover the Contract Quantity. MRES will also provide such additional PRC amounts as are required to cover losses and MISO Resource Planning Reserve Margin on the Contract Quantity as required to meet the RAR. HUC will apply the PRCs provided to meet the foregoing purposes. The PRCs shall either be locally deliverable or aggregately deliverable. The cost of the PRCs is included in the Charges. 1.10 Transmission: HUC will be responsible for all costs and making all arrangements required to deliver energy from the Delivery Point to its distribution system. During the Contract Term, HUC will pay the same Supplemental Power Delivery charge as other MRES Members under the S-1 Agreement. 1.10.1 HUC currently acquires and pays for transmission service for energy deliveries to the GRE.HUC node over the MISO system via a MISO transmission tariff. If the transmission tariff arrangements allowing HUC to receive energy via the MISO energy market cease to exist without a substitute with substantially similar or comparable terms and conditions for both the purchase and delivery of electric energy, MRES, Western Minnesota and HUC will develop and agree upon alternative arrangements for the delivery from sources determined by MRES to the Delivery Point of the Contract Quantity at no additional transmission service expense to MRES or Western Minnesota. 1.11 Renewable Energy Credits (REC): Each year, MRES will provide HUC with the same proportion of RECs to energy delivered as MRES provides to its Members located in Minnesota who are served under the S-1 Agreement in order to satisfy applicable state and/or federal renewable energy standards. The cost of RECs is included in the Charges -with no additional cost to HUC. As an example, in 2010, if MRES retired RECs to meet renewable energy standards equivalent to seven percent of Minnesota S-1 Members' energy purchases from MRES, HUC will receive RECs equal to seven percent of HUC's energy purchases from MRES under this Agreement. 1.12 The charges for the Commodity ("Charges") shall be as follows: 2 1.12.1 For calendar year 2010, the Charges for the Commodity shall be comprised of the following monthly charges: a. Demand charge: $12.45/kW-month b. Supplemental Power Delivery charge: $ 2.85/kW-month C. Energy charge: $.0265 per kWh d. Rate Adder: $.003 per kWh e. Supplemental Power Cost Adjustment $/kWh which is defined in the 2010 S-1 Agreement Schedule C. 1.12.2 Subsequent to 2010, the Charges for the Commodity shall be the applicable rates in Schedule C to the S-1 Agreement that are in effect from time to time or that are in any successor rate schedule to Schedule C plus the Rate Adder as defined below. The Charges for the Commodity shall be adjusted each time that the rates in Schedule C are adjusted. MRES shall, in the fall of 2010, provide to HUC a copy of the Schedule C that will be effective January 1, 2011, and MRES shall provide updated versions of Schedule C to HUC as soon as practicable after each rate adjustment. The Charges for the Commodity for each calendar year from 2011 through the end of the Contract Term, including any adjustments during a calendar year, shall be the following components of the charges included on Schedule C to the S-1 Agreement for each applicable calendar year plus the Rate Adder, to wit: a. Demand charge: $/kW -month charge which is the S-1 Agreement Schedule C Supplemental Power Demand charge, whether on an annual or seasonal basis. b. Supplemental Power Delivery charge: $/kW -month charge which is the S- 1 Agreement Schedule C Supplemental Power Delivery charge as adjusted for the IS factor, as defined in the S-1 Agreement Schedule C. c. Energy charge: $/kWh charge which is the S-1 Agreement Schedule C energy charge. d. Supplemental Power Cost Adjustment: $/kWh charge which is the S-1 Agreement Schedule C Supplemental Power Cost Adjustment charge. e. Rate Adder: The rate adder ("Rate Adder") is $.003 per kWh for all energy delivered through 8/31/2020. The Rate Adder shall automatically expire on 8/31 /2020. 1.12.3 The energy charge encompasses the energy portion of the locational marginal price ("LMP") at the GRE.HUC node but does not include the congestion and loss components of the LMP. 1.12.4 To the extent that Schedule C to the S-1 Agreement is restructured so that the rate elements in the Schedule C effective on January 1, 2011 cease to exist or are changed, the Parties will discuss whether and how to revise the Charges under this Agreement to accord with the restructuring of Schedule C so that, except for the Rate Adder, HUC is treated comparably under this Agreement to MRES Members under the S-1 Agreement. 3 1.12.5 MRES will calculate the MISO charges for regulation, spinning and supplemental services associated with the Contract Quantity under this Agreement and provide a credit to HUC on the monthly bill. 1.13 MISO Charges: MRES shall pay to MISO the MISO congestion and losses on the Contract Quantity and in exchange HUC shall pay the MISO MIA rate and losses as defined below. The MIA rate and losses shall be the same as the charges that all MRES Members serviced under the S-1 Agreement in the MISO footprint are assessed according to the MISO Market Implementation Agreement ("MIA"): 1.13.1 For calendar year 2010, HUC shall pay MRES a rate to recover congestion costs associated with the Contract Quantity at the Delivery Point. The rate for 2010 is identified in Exhibit A. 1.13.2 For calendar year 2010, HUC Contract Quantity shall be adjusted according to the MISO Market Loss percentage as defined in Exhibit A. The loss rate for 2010 is identified in Exhibit A. HUC shall pay MRES for such losses according to the Charges for the Commodity identified above in this Agreement. 1.13.3 For each calendar year from 2011 through the end of the Contract Term, HUC rate and losses shall be the same as the MIA rate and losses. The MIA rate and losses are subject to change from time to time as determined by the Board of Directors of MRES and any changes to the MIA Exhibit B ("Rate for Market Service Charge Types") and MIA Exhibit C ("Loss Percentages") will be provided to HUC as soon as practicable after each rate adjustment. Article 2. GENERAL TERMS AND CONDITIONS 2.1 Additional Rate Provisions: 2.1.1 Payments made under this Agreement shall be made as an operating expense from the revenues of the HUC electric utility system and from other funds thereof legally available therefore and shall be in addition to and not in substitution for any other payments whether on account of dues or otherwise owed by HUC to MRES. The obligation of HUC to make such payments for electric power and energy and furnished pursuant to this Agreement shall not be subject to any rights of setoff, recoupment or counterclaim which HUC shall otherwise have against MRES; provided, however, that nothing contained herein shall be construed to prevent or restrict HUC from asserting any rights which it may have against MRES under this Agreement or under any provision of law, including the institution of legal proceedings for specific performance or recovery of damages. 2.1.2 As soon as practicable after any revision of any of the charges or rates in Article 1, MRES shall cause written notice to be provided to HUC with the effective date thereof not less than thirty days after the date of the notice. 4 2.2 HUC Covenants: 2.2.1 HUC agrees to maintain rates for electric power and energy to its consumers which shall provide to HUC revenues sufficient to meet its obligations to MRES under this Agreement and to pay all other obligations payable from, or constituting a charge or lien on, such revenues. 2.2.2 HUC shall not contract to sell at wholesale any of the electric power and energy delivered to it hereunder to any of its customers for resale by those customers, unless such resale is specifically approved in writing by MRES and Western Minnesota which approval shall not unreasonably be withheld; provided, however, that if HUC's native load is less than the Contract Quantity, then HUC may sell that difference between its native load and the Contract Quantity into the MISO real-time or day -ahead market or their equivalent. 2.2.3 HUC shall not take any action to transfer either its distribution facilities or control over its electric distribution functions or take any other action having the same effect without (a) notifying MRES at least 90 days before formally committing to the action, and (b) taking such action strictly in conformance with the provisions of the Assignments section below. 2.2.4 HUC shall remain a Market Participant member, or its equivalent, of MISO throughout the duration of this Agreement. 2.3 Billing and Payment: 2.3.1 MRES shall bill HUC by the fifth working day of each month for electric power and energy, and MISO Charges furnished hereunder. Such bill shall be paid for at the office of MRES in Sioux Falls, South Dakota, or at such other location that MRES may designate, monthly, within fifteen days after the postmark of the bill, such bill to be provided to HUC monthly on a prompt and timely basis. If said fifteenth day is a Sunday or a legal holiday in the state in which HUC is located, the next following business day shall be the last day on which payment may be made without the addition of the delayed payment charge. A delayed payment charge of five percent may be imposed on the unpaid balance of any amount due and owing after the date when such amount is due. All payments shall be made by Automated Clearing House (ACH) as initiated by MRES. MRES may, whenever any amount due remains unpaid after the due date and after giving 15 days advance notice in writing of its intention to do so, discontinue service hereunder or take all steps available to it under applicable law to collect such amount and all subsequent payments which shall have become due or both. MRES may, whenever any amount due remains unpaid for 120 or more days after the due date and after giving 30 days' advance notice in writing of its intention to do so, terminate this Agreement. No such discontinuance or termination shall relieve HUC from liability for payment for the commodity or services furnished. 2.3.2 Upon request from HUC, MRES shall provide reasonable back-up information to support the monthly bill. In the event HUC desires to dispute all or any part of a bill, it shall nevertheless pay the full amount of the bill when due and, within 60 days from the date of the bill, notify MRES in writing of the grounds on which any charges in the bill are disputed and the amount in dispute. HUC will not 10 be entitled to any adjustment on account of any disputed charges which are not brought to the attention of MRES within the time and in the manner herein specified. 2.4 Uncontrollable Forces: Neither MRES nor HUC shall be considered to be in default in respect to any obligation (other than the obligation of HUC to pay for Contract Quantity) if prevented from fulfilling such obligations by reason of uncontrollable forces, the term uncontrollable forces being deemed for the purposes of this Agreement to mean any cause beyond the control of the Party affected, including but not limited to, failure of facilities, flood, earthquake, storm, lightning, fire, epidemic, pestilence, war, riot, civil disturbance, labor disturbance sabotage, and restraint by court or public authority, which by due diligence and foresight such Party could not reasonably have been expected to avoid. Either Party rendered unable to fulfill any obligation by reason of uncontrollable forces shall exercise due diligence to remove such inability with all reasonable dispatch 2.5 Assignments: All covenants and agreements contained in this Agreement shall inure to the benefit of the Parties and their respective successors and assigns; provided, however, that, except as provided below, no Party may transfer or assign its interests or rights under this Agreement except that: 2.5.1 A Party may transfer or assign its interests or rights or the assignment of the security interest therein to any trustee or secured party, as security for bonds or other indebtedness, present or future, and such trustee or secured party may, if so empowered, sell or otherwise realize upon such security in foreclosure or other suitable proceedings, possess or take control thereof or cause a receiver to be appointed with respect thereto and otherwise succeed to all interests and rights of the Party making the assignment; and 2.5.2 In the case of a proposed transfer either to any entity acquiring all or substantially all of the property of the Party making the transfer, or to any entity into which or with which the Party making the transfer may be merged or consolidated, the Party proposing the transfer shall give all other Parties written notice at least ninety (90) days prior to the date such transfer or assignment is scheduled to occur and must obtain the prior written consent of the other Parties hereto, which consent shall not be unreasonably withheld, it being understood that it would be reasonable for a Party to withhold such consent if such transfer or assignment would (a) reduce the total amount of electric power or energy being sold hereunder; (b) be to a party with senior debt, if any, not rated in one of three highest whole rating categories by at least one nationally recognized bond rating agency; (c) adversely affect the value of this Agreement as security for the payment of bonds and interest thereon; or (d) affect (either alone or in conjunction with any other actions by any other municipality to which MRES sells power and energy under a long term arrangement such as the S-1 Agreement) the eligibility of interest on bonds of MRES or Western Minnesota (whether then outstanding or thereafter to be issued) for Federal tax- exempt status. In making the determination required by clause (d) above, MRES and Western Minnesota may rely upon an opinion of a nationally recognized bond counsel as to the effect of any such transfer or assignment on the Federal tax-exempt status of any bonds (whether then outstanding or thereafter to be issued), as that 0 status is governed by the Federal income tax laws, as amended from time to time, including but not limited to, Section 141 of the Internal Revenue Code of 1986, as amended, and the Treasury Regulations or any rulings promulgated there under or as affected by a decision of any court of competent jurisdiction (collectively, the "Tax Laws"). Within sixty (60) days after receipt of a notice from HUC requesting a transfer or assignment, MRES and Western Minnesota shall advise HUC as to whether, in the opinion of a nationally recognized bond counsel, the transfer or assignment would affect the eligibility of interest on bonds for Federal tax-exempt status as described in clause (d) above. In the event that allocations (including, but not limited to allocations relating to private use issues) are necessary under the Tax Laws to determine whether entering into any such transfer or assignment affects the eligibility of interest on bonds for Federal tax-exempt status as described in clause (d) above, MRES and Western Minnesota shall make such allocations, in their sole discretion, after receipt of an opinion of a nationally recognized bond counsel. 2.5.3 Notwithstanding anything in this Section to the contrary, HUC may transfer or assign this Agreement if it affects the eligibility of interest on bonds for Federal tax-exempt status as described in clause (d) if, but only if, the transferee enters into an agreement in form and substance satisfactory to MRES and Western Minnesota providing that the transferee will bear and pay any and all increased costs allocated to it resulting from the use by MRES or Western Minnesota of borrowed or other funds that are not derived from the proceeds of tax-exempt debt ("Non -Tax Exempt Funds"). MRES and Western Minnesota, in their sole discretion, after receipt of an opinion of a nationally recognized bond counsel, shall allocate on a reasonable basis the increased costs associated with the use of such Non -Tax Exempt Funds to any such transferee and shall determine the terms and conditions upon which the transferee shall pay such increased costs. Any such agreement shall contain such other terms and provisions as MRES and Western Minnesota reasonably deem necessary in order to preserve the Federal tax-exempt status of any borrowed funds not intended by MRES or Western Minnesota to be issued as debt which is not excludable from gross income for Federal income tax purposes. 2.5.4 In connection with any such proposed transfer or assignment under this Section, various opinions are required to be delivered by a nationally recognized bond counsel. Such counsel or counsels shall be chosen by MRES and Western Minnesota and the cost of such counsel or counsels shall be borne by the Parry requesting the transfer or assignment. Any of the opinions required under this Section may be delivered in one or more opinions. 2.5.5 No assignment or transfer of this Agreement shall relieve the Parties of any obligation hereunder, unless specifically agreed to in writing by the Parties. 2.6 Amendment: Except as provided for expressly herein, neither this Agreement nor any terms hereof may be terminated, amended, supplemented, waived or modified except by an instrument in writing executed by all Parties. 2.7 Representations and Warranties: Each Party represents and warrants, as of the date of this Agreement, the following: 2.7.1 It is, as applicable, an agency, municipal corporation and political subdivision, duly organized validly existing and in good standing under the laws of 7 the State of its formation and authorized to conduct business in its state of organization and the States in which it does business; 2.7.2 It has the power and authority to enter into, execute and perform this Agreement; 2.7.3 There are no bankruptcy, insolvency, reorganization, or receiverships pending or being contemplated by it or, to its knowledge, threatened against it; and 2.7.4 To its knowledge, there are no actions, proceedings, judgments, or rulings, issued by or pending before any court or other governmental body, with applicable jurisdiction, that would materially adversely affect its ability to perform its obligations under this Agreement. 2.8 Opinion: Upon the execution and delivery of this Agreement, HUC shall furnish MRES with an opinion by an attorney or firm of attorneys qualified to practice in the State of Minnesota to the effect that: 2.8.1 HUC is a municipal corporation duly created and validly existing pursuant to the Constitution and statutes of the State of Minnesota; 2.8.2 HUC has full legal right and authority to enter into this Agreement and to carry out its obligations hereunder; and 2.8.3 HUC has approved this Agreement and its execution and delivery, and this Agreement has been duly executed by the appropriate officer of HUC and constitutes the legal, valid, and binding obligation of HUC enforceable in accordance with its terms. 2.9 Notices: Any notice, demand or request required or authorized by this Agreement shall be deemed properly given if mailed, postage prepaid, to MRES at its principal place of business at P.O. Box 88920, Sioux Falls, SD 57109-8920, to HUC at 225 Michigan Street, SE, Hutchinson, Minnesota 55350-1940 and to Western Minnesota at 25 NW 2nd Street, Suite 102, Ortonville, Minnesota 56278-0357. The foregoing addresses may be changed at any time by similar notice. 2.10 Waivers: Any waiver at any time by any Party hereto of its rights with respect to a default or any other matter arising in connection with this Agreement shall not be deemed to be a waiver with respect to any subsequent default or matter. 2.11 Severability: In the event that any of the terms, covenants or conditions of this Agreement, or the application of any such term, covenant or condition, shall be held invalid as to any person or circumstance by any court having jurisdiction under the circumstances, the remainder of this Agreement, and the application of its terms, covenants or conditions to such persons or circumstances shall not be affected thereby. 2.12 Dispute Resolution: 2.12.1 The Parties shall attempt in good faith to resolve any dispute arising out of or relating to this Agreement through negotiation between representatives who have authority to resolve the matter. 2.12.2 Any Party may give written notice to the other Parties of any dispute not resolved in the normal course of business. Within fourteen (14) days following 8 delivery of the notice (or a date mutually agreed by the Parties), representatives of each Parry with settlement authority shall meet in person at a mutually acceptable time and place and confer in good faith to resolve the dispute, and thereafter as often as they reasonably deem necessary to attempt to resolve the dispute. All reasonable requests for information made by a Party to another Party will be honored. 2.12.3 If a dispute has not been resolved within thirty (30) days of the original dispute notice, then the Parties shall submit their dispute to mediation. If the dispute is not resolved by mediation within 60 days after the submission to mediation, the Parties may invoke their legal remedies available at law. The mediation may be continued beyond the original 60 days by agreement of the Parties. 2.13 Governing law: This Agreement shall be governed by the laws of the state of Minnesota. The Parties have caused this Agreement to be executed as of the day, month and year first written above. MISSOURI BASIN MUNICIPAL POWER AGENCY d/b/a MISSOURI RIVER ENERGY SERVICES B . Date: � '12 r�> Y Harold Schiebout Chairman of the Board HUTCHINSON UTILITIES COMMISSION By:_ Name: Title: 1�ti£ 5i Date: WESTERN MINNESOTA MUNICIPAL POWER AGENCY By:m �........._C� cal _ Date: Curt Punt President M HUC POWER SALE AGREEMENT EXHIBIT A HUC 2010 MISO CHARGES: CONGESTION AND LOSSES Section I. DEFINITIONS 1.1 "MIA" shall mean the MISO Market Implementation Agreement. 1.2 "Power Sale Agreement" shall mean the HUC Power Sale Agreement (PSA) entered into among MRES, HUC and WMMPA. Section 2. SERVICES PROVIDED BY MRES In exchange for MRES paying for the MISO Market congestion and losses on the Contract Quantity at the GRE.HUC Node, MRES shall bill HUC for Congestion -Charges and MISO Market Losses under the PSA according to the following method: 2.1 Congestion Charges: HUC shall pay MRES for congestion costs on the MRES energy portion of the Contract Quantity. The 2010 Congestion Charge is $0.0001 per kWh. In future years, this rate shall be equivalent to the rate for MISO market services as paid by any MRES Member under an S-1 Agreement that has executed an MIA and is located in the MISO footprint. 2.2 MISO Market Losses: HUC shall pay MRES for MISO Market Losses on MRES Contract Quantity by multiplying the MISO Market Loss percentage times the appropriate demand and energy quantities. For calendar year 2010, the MISO Market Losses are 3.3%. The MISO Market Loss percent in subsequent years will be that charged pursuant to the MIA and will be the same percentage as paid by any MRES Member under an S-1 Agreement that has executed an MIA and is located in the MISO footprint. Section 3. BILLING AND PAYMENT The MISO Charges for HUC are subject to the terms and conditions specified in the PSA. a a a a a a a a s . .� CD� .� U U U U U U V U U C C C C C C C C G fn N fn V1 N N fn a) O O CD O a) O O O O O O a a a a a a a a s D 0 >>> D D D 2 2 2 2 2 2 2 2 2 a a _Q N 2- N -2 a a a fn N ._ N N a) C N =v C fn a� C N ro N a) N m a N T a N a) a o_ a N . m N ai n a a a (A T N T ` _ m m m m m m C m C m L coCO L L CU _a _n _n _n _n L L . C C E E > > > `! > > > > > i > i > ` N N N ` ; a) N a) N Y Y N a) m I Y Y Y E E E7UC O O O O O O O O O O O O O O EN- EN- > E E E OO E E E E E E E E E E E E E E E E E EE E E E'E E EEE E E E E E EC O C Cmmm co mC C C C C Co aCUC7 aa a •�EUC- .a�UCE_ 0a .�E-UC .�EN_UC .�ENUc_ m m a a a a a p aaaaaa¢ 7UC LYmNN LYNN LN L}mN+ L+N.,, LY LY L!n LN Lfn LYNo LYoNN a m aaaa a a m a 0m mm a-0a a a a a a-o a�Ecu JEUC NNNNN NNN L(CaNn LfdNOn �EUC- �ENaUC-� ?ENaUC-� �ENmUC- LaNNEOOmam.•, UC7 UCE7 .•ECUC� -UCE NN U U U U U U U U U U U U U U U UcOmn U C 'p p tB a a •a a E' O O 'in O U' _N. U cn O U C O o co a Ca a1 N c L a c, c o 0 E cq a °' a O (D Y a) ,% � o c m Z *' c E a a) a) m E O C QOj w O C N cn N O C a *' (n m Y C m C a) cu •p a) L O a U b0 d o a O m � Q E O O E Z cn o UU a) C OC o N E > Zn 'Zn o N o U N N N N N O C ca a m ao LL C � C C UCq O C (nn CL c m E C N C m N O F- N ccn H C 12 H a) a is a a 0 c m 0 a� a U am., R C N a) co to N N N Q) a) m N L a)co Y U co _ m a c 0 m U -, f0 m O W caa O Z c 0 2,0 a bC w a � cu N 0 cu i6 0 c N m � E a U n O EN C N 0 a fa CNCcOC E E ` E` '2 Coo co () OmvO a) p co O Cc y N w O O a . O aU cuC Co b O E C p ` C C � L— >NaN E . _ C ` CU Ya 'w apcC >O mo m V7 a N 00 •a O C >11 W a> nE O cu m J E E aW CD o sa, c wE C U E a)o� E 2:1 (D U)' N w z N (3) U m 0 C O U V) a 0 Y C J Hutchinson Utilities Commission Electric Rate Design UFS 9/14/2026 UTILITY FINANCIAL SOLUTIONS, LLC Corporate location: Utility Financial SOILItions, LLC 185 Sian Meadow Court Holland, MI USA 49424 (616) 393-9722 Fax (888) 566-4430 Hutchinson Utilities Commission Table of Contents Page Rate Design Summary Projected Residential Rates 4 Projected Small General Service Rates 5 Projected Street Lighting Rates 6 Projected Security Lighting Rates 7 Projected Large General Service Rates 8 Projected Large Industrial Rates 9 'J A ti N C1LU'I'IS'aM:��. L(C. Rate Design for 2027 & 2028 Rate Design Summary Projected Projected Projected Projected Projected Revenues Under Revenues Under Percentage Percentage Revenues Under Proposed Rates Proposed Rates Change Change Customer Class Current Rates 2027 2028 2027 2028 COS Residential $ 7,092,942 $ 7,527,707 $ 7,915,324 6.1% 5.1% 18.0% Small General Service 2,145,586 2,270,030 2,378,992 5.8% 4.8% 13.3% Street Lighting 119,191 126,343 132,660 6.0% 5.0% 15.4% Security Lighting 10,229 10,894 11,493 6.5% 5.5% 17.9% Large General Service 9,285,410 9,828,283 10,301,357 5.8% 4.8% 14.2% Large Industrial 8,527,022 9,046,740 9,509,401 6.1% 5.1% 18.8% Totals $ 27,180,381 $ 28,809,997 $ 30,249,228 6.00% 5.00% 16.6% 3 !us�S Electric Rate Design Rates Current Year 1 Year 2 Monthly Facilities Charge: All Customers $ 17.20 17.30 17.40 Energy Charge: All Energy $ 0.09040 $ 0.09773 $ 0.10425 Power Cost Adjustment: All Energy $ 0.00752 $ 0.00752 $ 0.00752 Revenue from Rate $ 7,092,942 $ 7,527,707 $ 7,915,324 Change from Previous 6.1% 5.1% Change by Monthly kWh Usage (%) 10.0% 9.0% 8.0% v 7.0% ao c fa 6.0% t IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII v 5.0% IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIInnIIIIIIInnIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIInnIIIIIIIIIInnIIIIIIIIIInnIIIIIIIIIInnIIIIIIIIIInnIIIIIIIIIInnIIIIIIIIIInn m 4.0% IIIIIIIIIIInnIInnllnnlllllllllllllnnllnnllnnlllllllllllllnnllnnllnnlllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll Y v 3.0% V v 2.0% d 1.0% Year 1 IIIIIIIIIIIIIIIIIII Year 2 0.0% 300 400 500 600 700 800 900 1000 1100 Energy (kWh) Monthlv $ Change by Energy Usage All Energy Year 1 Year 2 300 $ 2.30 $ 2.06 400 $ 3.03 $ 2.71 500 $ 3.77 $ 3.36 600 $ 4.50 $ 4.01 700 $ 5.23 $ 4.66 800 $ 5.96 $ 5.32 900 $ 6.70 $ 5.97 1000 $ 7.43 $ 6.62 1100 $ 8.16 $ 7.27 Electric Rate Design 4 of 9 UIILOIY f"NAh AL ti O[U'llo"S L(C. Hutchinson Utilities Commission Electric Rate Design Small General Service Rates Current Year 1 Year 2 Monthly Facilities Charge: All Customers $ 28.50 28.50 28.50 Energy Charge: Block 1 (0 - 2,000 kWh) $ 0.09780 $ 0.10497 $ 0.11124 Block 2 (Excess) $ 0.08784 $ 0.09428 $ 0.09991 Power Cost Adjustment: All Energy $ 0.00752 $ 0.00752 $ 0.00752 Revenue from Rate $ 2,145,586 $ 2,270,030 $ 2,378,992 Change from Previous 5.8% 4.8% Change by Monthly kWh Usage (%) 10.0% 9.0% 8.0% ao 7.0% c fa 6.0 ° ° IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII t � v 5.0°° III � IIIIIIIIIIIIIIInnIIIIIIIIIIIIIIIIIInnIIIIIIIIIIIIIIIIIInnIIIIIIIIIIIIIIIIIInnIIIIIIIIIIIIIIIIIInnIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 00 4.0% IInnIIIInnIIIIIIIIIIIIIIIIIIIIIIIIIIInnIIIInnIIIIIIIIIIIIIIIIIIInnIIIInnIIIInnIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIInnIIIIIIIInnIIIIIIIInnIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIInnIIIIIIIIIIIIIInnIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIInnIIIIIIIIIIIIIInnI Y v 3.0% V v 2.0% 1.0% Year 1 Year 2 0.0% 700 950 1200 1450 1700 1950 2200 2450 2700 Energy (kWh) Monthly $ Change by Energy Usage Energy Year 1 Year 2 700 $ 5.02 $ 4.39 950 $ 6.81 $ 5.96 1200 $ 8.60 $ 7.53 1450 $ 10.39 $ 9.10 1700 $ 12.18 $ 10.67 1950 $ 13.98 $ 12.24 2200 $ 15.62 $ 13.68 2450 $ 17.23 $ 15.09 2700 $ 18.84 $ 16.50 Electric Rate Design 5 of 9 us�Is LOIV f"YNAN AL tiUIIO[U'I'ICaMS L(C. Hutchinson Utilities Commission Electric Rate Design Street Lights Rates Current Year 1 Year 2 Monthly Facilities Charge: StrL 100 Rate StrL 150 Rate StrL 175 Rate StrL 200 Rate StrL 250 Rate StrL 400 Rate New LED 70W Rate Energy Charge: All Energy Power Cost Adjustment: All Energy Revenue from Rate $ Change from Previous 3.99 6.18 $ 6.67 $ 8.83 $ 8.17 $ 11.33 $ 4.81 $ 119,191 $ 4.23 $ 6.56 $ 7.07 $ 9.36 $ 8.66 $ 12.01 $ 5.09 $ 126,343 $ 6.0% 132,660 5.0% Electric Rate Design 6 of 9 pJo3 501.UiICMS., I..I.C' Hutchinson Utilities Commission Electric Rate Design Security Lights Rates Current Year 1 Year 2 Monthly Facilities Charge: SecL 70 LED Rate $ 3.42 3.64 3.84 SecL 250 Rate $ - $ $ SecL 400 Rate $ - $ $ SecL 70 LED Unmetered Rate Rate $ 7.99 $ 8.51 $ 8.98 SecL 250 Unmetered Rate Rate $ - $ $ SecL 400 Unmetered Rate Rate $ - $ $ Revenue from Rate $ 10,229 $ 10,894 $ 11,493 Change from Previous 6.5% 5.5% Electric Rate Design 7 of 9 pJo3 501.UiICMS., I..I.C' Hutchinson Utilities Commission Electric Rate Design Large General Service Rates Current Year 1 Year 2 Monthly Facilities Charge: All Customers $ 152.30 152.30 152.30 Energy Charge: All Energy $ 0.05832 $ 0.06276 $ 0.06645 Demand Charge All Demand (w/ 75% ratchet) $ 11.50 $ 12.00 $ 12.50 Power Cost Adjustment: All Energy $ 0.00752 $ 0.00752 $ 0.00752 Revenue from Rate $ 9,285,410 $ 9,828,283 $ 10,301,357 Change from Previous 5.8% 4.8% Change by Percent Load Factor with average load 185kW (%) 10.0% 9.0% 8.0% v 7.0% ao c fa 6.0 o IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII t /IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII v 5.0% / IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII - IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIInnIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIInnIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIInnIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIInn IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIInn IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIInn 00 4.0% Y a) 3.0% a 2.0% 1.0% Year 1 IIIIIIIIIIIIIIIIIII Year 2 0.0% 30% 35% 40% 45% 50% 55% 60% 65% 70% Load Factor (%) Monthly $ Change by Customer Load Factor Load Factor Year 1 Year 2 30% $ 265.58 $ 236.33 35% $ 294.80 $ 260.67 40% $ 324.03 $ 285.02 45% $ 353.25 $ 309.37 50% $ 382.47 $ 333.71 55% $ 411.69 $ 358.06 60% $ 440.91 $ 382.40 65% $ 470.13 $ 406.75 70% $ 499.35 $ 431.09 Electric Rate Design 8 of 9 us�Is LOIY f"YNAN AL tiUIIO[U'I'ICaMS L(C. Hutchinson Utilities Commission Electric Rate Design Large Industrial Rates Current Year 1 Year 2 Monthly Facilities Charge: All Customers $ 432.50 475.00 525.00 Energy Charge: All Energy $ 0.05445 $ 0.05925 $ 0.06347 Demand Charge All Demand $ 12.50 $ 12.75 $ 13.00 Power Cost Adjustment: All Energy $ 0.00752 $ 0.00752 $ 0.00752 Revenue from Rate $ 8,527,022 $ 9,046,740 $ 9,509,401 Change from Previous 6.1% 5.1% Change by Percent Load Factor with average load 185kW(%) 10.0% 78- 8.0% v bJO L 6,0% II — IIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII� 00 4.0% Y V v 2.0% d Year 1 IIIIIIIIIIIIIIIIIII Year 2 0.0 % 50% 55% 60% 65% 70% 75% 80% 85% 90% Load Factor (%) Monthly $ Change by Customer Load Factor Load Factor Year 1 Year 2 50% $ 16,413.02 $ 14,674.51 55% $ 17,845.65 $ 15,932.53 60% $ 19,278.27 $ 17,190.56 65% $ 20,710.90 $ 18,448.58 70% $ 22,143.52 $ 19,706.60 75% $ 23,576.15 $ 20,964.63 80% $ 25,008.77 $ 22,222.65 85% $ 26,441.40 $ 23,480.68 90% $ 27,874.02 $ 24,738.70 Electric Rate Design 9 of 9 us�Is LOIV f"YNAN AL tiUIIO[U'I'ICaMS L(C. Hutchinson Utilities Commission Gas Cost of Service for CY2027 Rate Design for 2027 FJFS 9/21/2026 UTILITY FINANCIAL SOLUTIONS, LLC Corporate location: Utility Financial SOILItions, LLC 185 Sian Meadow Court Holland, MI USA 49424 (616) 393-9722 Fax (888) 566-4430 Hutchinson Utilities Commission Rate Design Rate Design Summary Projected Residential (60) Rates Projected Commercial (65) Rates Projected Large Industrial Rates Projected Large Industrial 2 Rates Projected Large Industrial 3 Rates Page 3 4 5 6 7 8 Rate Design Hutchinson Utilities Commission ate Design Summary Projected Projected Projected Projected Projected Revenues Under Revenues Under Percentage Percentage Revenues Under Proposed Rates Proposed Rates Change Change Customer Class Current Rates 2027 2028 2027 2028 COS Residential (60) $ 3,872,500 $ 3,864,491 $ 3,856,694 -0.2% -0.2% -3.8% Commercial (65) 2,757,862 2,749,589 2,740,274 -0.3% -0.3% -5.7% Large Industrial 5,495,340 5,511,826 5,528,362 0.3% 0.3% -29.6% Totals $ 12,125,702 $ 12,125,906 $ 12,125,329 0.00% 0.00% -1.9% 3 Rates Current Year 1 Year 2 Monthly Facilities Charge: All Customers $ 17.90 18.15 18.4 Commodity Charge: All Gas (MCF) $ 7.1000 7.0425 6.9855 Gas Cost Adjustment: All Gas (MCF) $ (0.77252) $ (0.77252) $ (0.77252) Revenue from Rate $ 3,872,500 $ 3,864,491 $ 3,856,694 Change tram Previous ®uacia ®uacia Change by Monthly MCF Usage (%) 3.0% 2.0% 1.0% 0.0% 3 4 5 6 7IIIIIIIIIIIIIIIIIIIIII11 -1.0% -2.0% Year 1IIIIIIIIIIIIIIIIIII Year 2 -3.0% Gas (MCF) Monthly $ Change by Gas Usage All Gas (MCF) Year 1 Year 2 2 $ 0.14 $ 0.14 3 $ 0.08 $ 0.08 4 $ 0.02 $ 0.02 5 $ (0.04) $ (0.04) 6 $ (0.09) $ (0.09) 7 $ (0.15) $ (0.15) 8 $ (0.21) $ (0.21) 9 $ (0.27) $ (0.26) 10 $ (0.32) $ (0.32) 11 $ (0.38) $ (0.38) Electric Rate Design 4 of 8 us�Is LOIV NNAN—L tiUIIO[U'I'ICaMS L(C. Hutchinson Utilities - Gas Natural Gas Rate Design Commercial (65) Rates Current Year 1 Year 2 Monthly Facilities Charge: All Customers $ 100.70 101.00 101.50 Commodity Charge: All Gas (MCF) $ 7.1447 7.1127 7.0733 Gas Cost Adjustment: All Gas (MCF) $ (0.77252) $ (0.77252) $ (0.77252) Revenue from Rate $ 2,757,862 $ 2,749,589 $ 2,740,274 Monthly $ Change by Gas Usage All Gas (MCF) Year 1 Year 2 25 $ (0.50) $ (0.49) 30 $ (0.66) $ (0.68) 35 $ (0.82) $ (0.88) 40 $ (0.98) $ (1.08) 45 $ (1.14) $ (1.28) 50 $ (1.30) $ (1.47) 55 $ (1.46) $ (1.67) 60 $ (1.62) $ (1.87) 65 $ (1.78) $ (2.07) 70 $ (1.94) $ (2.26) Electric Rate Design 5of8 'Js�s U'I'IL9'I'Y NNAN—L ti O[U'I'ICaMS L(C. Hutchinson Utilities - Gas Gas Rate Design Industrial 1 Rates Current Year 1 Year 2 Monthly Facilities Charge: Monthly Charge $ 363.00 368.50 374.00 Commodity Charge: All Gas (MCF) $ 7.54000 7.56363 7.58733 Demand Charge Peak Day Demand (max daily MCF/mth) $ 8.00 8.00 8.00 Gas Cost Adjustment: All Gas (MCF) $ - $ - $ - Revenue from Rate $ 333,813 $ 334,814 $ 335,819 Change from Previous 0.3% 0.3% Monthly $ Change by Gas Usage All Gas (MCF) Year 1 Year 2 2200 $ 57.48 $ 57.65 2700 $ 69.29 $ 69.50 3200 $ 81.11 $ 81.35 3700 $ 92.92 $ 93.20 4200 $ 104.74 $ 105.06 4700 $ 116.55 $ 116.91 5200 $ 128.36 $ 128.76 5700 $ 140.18 $ 140.61 6200 $ 151.99 $ 152.46 Electric Rate Design 6 of 8 L I U ,1 1k; o YF11kANLoJ>„ LA.c L Hutchinson Utilities - Gas Gas Rate Design Industrial 2 Rates Current Year 1 Year 2 Monthly Facilities Charge: Monthly Charge $ 536.00 555,00 575,00 Commodity Charge: All MCF -Summer Gas $ 2.96380 $ 2.96380 $ 2.96380 All MCF -Winter Gas $ 4.61180 $ 4.61180 $ 4.61180 HUC Transportation (MCF) $ 1.00000 $ 1.00701 $ 1.01229 Demand Charge Peak Day Demand (max daily MCF/mth) $ 10.33 $ 10,40 $ 10,50 Gas Cost Adjustment: All Gas (MCF) $ - $ - $ - Revenue from Rate $ 208,569 $ 209,195 $ 209,823 Change from Previous 0,3% 0,3% Change by Monthly Gas (MCF) Usage (%) 3.0% 2.0% 1.0% IIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 0.0% uuuuuumo 1,E 00 2,300 2,800 3,300 3,800 4,300 4,800 5,300 5,800 -1.0% -2.0% Year 1 IIIIIIIIIIIIIIIIIII Year 2 -3.0% Gas (MCF) Monthly $ Change by Gas Usage All Gas (MCF) Year 1 Year 2 1800 $ 42.57 $ 45.14 2300 $ 46.07 $ 47.77 2800 $ 49.58 $ 50.41 3300 $ 53.09 $ 53.05 3800 $ 56.59 $ 55.68 4300 $ 60.10 $ 58.32 4800 $ 63.60 $ 60.96 5300 $ 67.11 $ 63.60 5800 $ 70.61 $ 66.23 Electric Rate Design 7 of 8 �J3 501.UiICMS., I..I.C' Hutchinson Utilities - Gas Gas Rate Design Industrial 3 Rates Current Year 1 Year 2 Monthly Facilities Charge: Monthly Charge $ 1,034.00 1,060.00 1,085.00 Commodity Charge: All MCF -Summer Gas $ 5.73000 $ 5.73000 $ 5.73000 All MCF -Winter Gas $ 5.89000 $ 5.89000 $ 5.89000 HUC Transportation (MCF) $ 0.47000 $ 0.47862 $ 0.48738 Demand Charge Peak Day Demand (max daily MCF/mth) $ 9.00 $ 9,20 $ 9,40 Gas Cost Adjustment: All Gas (MCF) $ - $ - $ - Revenue from Rate $ 4,952,958 $ 4,967,817 $ 4,982,720 Change from Previous 0,3% 0,3% Change by Monthly Gas (MCF) Usage (%) 3.0% 2.0% 1.0% IIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII, 0.0 7,(00 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 -1.0% -2.0% Year 1 IIIIIIIIIIIIIIIIIII Year 2 -3.0% Gas (MCF) Monthly $ Change by Gas Usage All Gas (MCF) Year 1 Year 2 7000 $ 172.47 $ 172.50 8000 $ 181.09 $ 181.27 9000 $ 189.71 $ 190.03 10000 $ 198.32 $ 198.79 11000 $ 206.94 $ 207.56 12000 $ 215.56 $ 216.32 13000 $ 224.18 $ 225.09 14000 $ 232.79 $ 233.85 15000 $ 241.41 $ 242.62 Electric Rate Design 8 of 8 �J3 501.UiICMS., I..I.C' HUTCHINSON UTILITIES COMMISSIONCONSIDERATION f APR a ELECTRIC RATES Current Rates Residential Monthly Charge $ 17.20 Energy Charge (per Kwh) $ 0.09040 Small General Monthly Charge $ 28.50 Energy Charge (per Kwh) "Block 1" $ 0.09780 Energy Charge (per Kwh) "Block 2" $ 0.08784 Large General Monthly Charge $ 152.30 Energy Charge (per Kwh) $ 0.05832 Demand Charge (per KW) $ 11.50 Industrial Monthly Charge $ 432.50 Energy Charge (per Kwh) $ 0.05445 Demand Charge (per KW) $ 12.50 NATURAL GAS RATES Current Rates Residential Monthly Charge $ 17.90 Gas Commodity Charge (per MCF) $ 7.1000 Commercial Monthly Charge $ 100.70 Gas Commodity Charge (per MCF) $ 7.1447 Large Industrial Monthly Charge $ 363.00 Gas Commodity Charge (per MCF) $ 7.5400 Demand Charge (Max Daily MCF per/month) $ 8.00 Contract Industrial Customers Customer #1 Monthly Charge $ 536.00 Transportation Charge $ 1.00 Demand Charge (Max Daily MCF per/month) $ 10.33 Customer #2 Monthly Charge $ 1,034.00 Transportation Charge $ 0.4700 Demand Charge (Max Daily MCF per/month) $ 9.00 PROPOSED RATE SCHEDULE 2027 Annual % Inc. 2028 Annual % Inc. 12/1/2026 12/1/2027 $ 17.30 $ 17.40 6.10% 5.10% $ 0.09773 $ 0.10425 $ 28.50 $ 28.50 5.80% 4.80% $ 0.10497 $ 0.11124 $ 0.09428 $ 0.09991 $ 152.30 $ 152.30 5.80% 4.80% $ 0.06276 $ 0.06645 $ 12.00 $ 12.50 $ 475.00 $ 525.00 6.10% 5.10% $ 0.05925 $ 0.06347 $ 12.75 $ 13.00 PROPOSED RATE SCHEDULE 2027 Annual % Inc. 2028 Annual % Inc. 12/1/2026 12/1/2027 $ 18.15 $ 18.40 -0.20% -0.20% $ 7.0425 $ 6.9855 $ 101.00 $ 101.50 -0.30% -0.30% $ 7.1127 $ 7.0733 $ 368.50 $ 374.00 0.30% 0.30% $ 7.56363 $ 7.58733 $ 8.00 $ 8.00 $ 555.00 $ 575.00 0.30% 0.30% $ 1.00701 $ 1.01229 $ 10.40 $ 10.50 $ 1,060.00 $ 1,085.00 0.30% 0.30% $ 0.47862 $ 0.48738 $ 9.20 $ 9.40 VT 00 N O N Vl n N NO M N D to N i C :3 W u L N m u O L m c O 2 u O m ac N C W U a W Q Q W oC Z CJ Uj � J ~ J V Q W J W VT 00 N O N N VT a0 n m N O N N w O m � L U C O 2 N W a U a LnS W Q ►1 Y� 111 W W cc O 1, 00 m O cH N l0 d' N O rq c-1 Cl 00 10 d: Cl Cl Cl M to d' rl Oi f^. '. Ln O Lff O I� O rcl l0 00 1. d' n Ol N rl rl rl rl N < N N N M VT VT VT VT VT {/}i VT VT VT VT 0) 00 N l0 rl Lfl Ol O n d' d' Cl N d; 1l Cn rl rq 00 d; o0 r, ON Lrr) 00 .:0.': M Lrr) W 0 rl rl rl rl N: N N N M VT VT VT VT VT i/}.: VT VT VT VT N l0 i l0 rl w rl 1- M Ol l0 Cl d. 00 rq I'^; N l0 l0 Ln 1l w 11 Lf1 O ' t : Ol rl M Ln l0 Ol N d' 1, 01 rl d' W 00 rl rl rl rI N N N N VT VT VT VT VT '4/};: VT VT VT VT O O O O � O 0 0 0 U .0. U) 0 0 0 O O U) O U '. U) O U) OO N d' n rl rl ci rl N N N w0 � O Ln Ol M ` 00 N l0 O lq 00 M M M O. O c-1 c-I N N O rl N M d' rl rl rl rl rl VT VT VT VT V}..: VT VT VT VT VT N 0) 1l d' cl 00 l0 M O 00 l0 M rl Cl r-+ d' N O 00 Ln l0 l0 l0 Ln N:: Ln Ln Lf1 d' d' d' Ln l0 1, 00 Ol O rl N M rl rl rl rl VT VT VT VT i/}..: VT VT VT VT VT N l0 O d' 00 N l0 O d' 00 M M Ct Itct b' Ln Ln l0 l0 l0 d' M N rl 0::: 0) 00 1, <D Lf1 d' Ln l0 1, 00 00 rn O rl N c-I c-I c-I V. V. V. V. Ln V. V. V. V. V. O O O O O O O O O O O O O O O O O O O O M d' Ln l0 I*. W Ol O rl N rl rl rl ec C n N r m C D N LU L N a0 � � a m L 4 U c Q LL _> a L O r iaaaaa�aaaa l0 rq l0 Cl O N N rq d' d' m d' d' d' Ln Ln Ln Ln Ln Ln tN N l0 Ol rl M d: Ln Ln l0 d' Ln Ln Ln to w ; l0 l0 l0 l0 O O O 4 O� o rl rl ci rl N N N 0 0 0 0 0 o 0 0 0 0 d: 00 rl fn 't l0 1� 00 00 Cl d' d' Ln Ln Ln :: Ln Ln Ln Ln Ln N I� O rq Ln 1l 00 Ol O Ln Ln l0 l0 l0 l0 l0 l0 1, n vI OM 0 O0 l00 0 00 0 0 0 0 O r r W a N r rN m C D a0 � a L O 2 —1 m <o N m w M 1, n 00 Ln rq Cl Ln O l0 N l0 O d N O N M Ln l0 rl.: rl rl rl rl VT VT VT VT VT l(}:: VT VT VT VT 1, N rl O O 0) 00 M d' Ln 00 O 00 l0 d' rl Cl l0 N o0 N Lf1 l0 00 O N M Ln 1- 00 c-I r: c-I ri ri ri VT VT VT VT VT .-v,}.: VT VT VT VT 'I O O O O O O O O O O O O Ln O Ln O Ln O Ln O N d' n rl rl ci : rl N N N l0 —1 O 1l l0 rl M O l0 N LDi rq 1, N n N Ol l0 N Ol N N M d' CF. Ln Ln l0 I� n VT VT VT VT V}..: VT VT VT VT VT O M 1- O M: l0 O M l0 O rq O 1l Ln N Cl 1l d; T--1 Cl N M M d' Ln Lf1 l0 1, 00 00 t)O1 O O O O O O O O O O O O O O O O O O O O N M d' Ln l0 r, 00 m O rl N O r r W a Vl 00 N O N N 0O � VT D >' N 29 O Ili N LU L N W D CU G In Ln U W Q � a oac � U Q W OC Z OU VT 00 N O N N 0O VT 0O N O O LU m � _? v L � C U O N co m D CU G WU a a oc � Ln — Q J Q o5u���y�0�„, J I► �$ � I= 0 Z OC I, M O I, m O' I, M O to m o aaaaao000 0 0l of 00 00 00 nS n n of rq I� O d' OR -i Lf1 0l N to -! N N rq rq M rq rq d' d' d' N d' lq 00 O N :. d' lq 00 O N N 00 M rn'tT C) : Ln O Ln c-1 �o W O O O O O O O O O O O W d' I, c-I d' 00 cA Lf) o) N to o) N N N N M M M J'::. d' d' Lf) Lf) Lf) O O N N N V? V? V? V? V? V}. V. V. V. V. V? � toV? V? V? V? V? V), V. V. V. V. V. y Lf1 N 00 d' rl r, ZT O to M (3) D _ _ d' O to N _ _ _ _ _ 00 e* O to N 00 d' N 00 rq of Lq O to rq 00 ? r- N N N rq M : rq rq rq rq rq rq Lq lq 00 Cl li :. rq d' to Il o> M 00 -tT rn Ln rl �o N M W 02 - 0 0 0 0 0 0 O O O O O E9 - 0 0 0 0 0: -I cc-I c-I c-I c-I d' r, c-I d' 00 N : Lf) o) N to o) N N V V V V V N NM M M CF d' d' Lf) Lf) Lf) C O O LU N LU N (3) N d' to (3) w 1 d' lD 00 c-I M c 0O Lf1 rq O I� d' N :: of to rq T--I 00 M �0 M (3) Lf) O to N I, M o> U) O L d' I, c-I Lf) 00 N Lf) (3) N to O U U N N M M M J' d' d' Lf) Lf) to a VT L L O O O Lr) O Lr) O Ln O Lf1 O Lf1 O O Lf1 O Lf1 O Ln O Lf1 O Ln O O Lf1 O Lf1 O Ln O Lf1 O Lf1 O N N M M d' J' Lf) Lf) to to I- m N N M M d' It Lf) Lf) to to I- m N N M M d' It U) U) to to Il D D u u C G CC G I, to d' M rH O 00 I, to d' o 0 0 0 0 o 0 0 0 o d' 00 N d' Ol Lf) c-I to N W M rq rq rq In rq N N N N d: N O rl N '. N rq rq -I 0 0 0 0: c-I N N M M N rn�o M O I, 4 c 1 o0 Ln 00 0 0 0 0 0 O O O O O 00 O O O O O O O O O O M M d' Lf) w to I- 00 00 Ol N N V V O O N N N N to to d' W N to ci U) of M 00 N o 0 0 0 o 0 0 0 0 d' 00 N N N M M Rh d' d' Lq Lq to >' d; N O rl N N rq rq 0 0 0 4 c-I N N M M N rn w M O I, 4 c 1 o0 Ln I� 0 0 0 0 0 O O O O O to I� 0 0 0 0 0 O O O O O M M d' Lf) w: to I- 00 00 Ol aj N 41 N C O C O N LU N O 000 O 0O 0 0 0 0 4 W O m o0i m N o) to M O : I, d' cH 00 to U -C U M M d' Lf) to : to I- 00 00 Ol o � L L V? V? V? V? V). V? V? V? V? i^ O NM d' U) tor- 00 Ol O rH 2i a N M d' Lf) wI, 00 0) O c1 ccO G N M d' Lf) tor, 00 Ol O c1 �--I �--I m D D u u C G CC G \I 2i LIJ ('A mom Q � — wool y.NNAMMOM C) \ 11) `MM § mom . . .: � � �, i b i u 3 LO LO LO N as az �a�sa ass t N o .CJ-f- � E d E (� � }r N Q a� y 3 W c a� 3 Ja U n %�/� o S8 �' �$ G = (14 N o y a ° k co G°� > o a a asp O > U E90' �$ y tZ6$ �6 ell /I �i t06$ r,° °'L'/ sG 0 0 0 0 0 0 0 0 ti (O N O � � NER EA EA EA EA II!8 Ienuud W LNO Lo 01 E � IIIIIIIIIIIIII@ e o � IIIIIIIIIIIIIIIII ON � � IIIIIIIIIIIIIIIII rvlsaIea o ise.o=��6��yuea i sa N � a� 'i Y LO o Q M � M �a d. 2s -, U *D s d� a'L LO S6b'S$ �J C� �j LO asG L 09E'S$ Ii Ja/a01� Q Ja/J� o � a LO N co S$ °+ Y E 0 9S8'b$ G LO Q- s�6 O U 0 > asp a o 0 Ln 69L'b$ GG U Zip 6 �9'b$ �Go y 80 �'b$ Go SZL'E$ 0 sG 01> 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o y �» 0 0 0 0 0 0 0 I- (O EA EA L co N 6q EA EA 6q EA 1118 Ienuuy LO U t (0 U � >+ N U E a) c U a) 0 W N z cis cis ii X z U U W o c y o Q C O c 0) U c c c O t t N U � U O _ N 3 O ON 3 N u i N U N O N N� A� N N N li y V + v 'i V _ W N 3 v N U N o � N N N � (6 UN i C 3 O VI 7 M N U � li IS I NMI N O ON O N M N C 7 O N N 7 N O 00 (O N O (SOIBN ISOMO- _ �) BU!AUBN E. s° �JO OE6'89b$ o� o a) p M +J U) C co � a CL EZES'6Zb$ �J ELO O o co GD > ESE'60b$ s � � Q y v �L6'SOb$ Ts L � J-1- W ° 6 N Lo a 41 =609't6C$ = coo G > > Ln a Q 0 U 8Eb' LE$ t,° �i sG 0 0 0 0 0 0 0 0 0 0 0 0 o y c» 0 0 0 0 0 0 0 0 0 0 0 0 � � � II!e Ienuud r- psfLL �`LD a) III ON — III ■ a �IIII 3 IIIIIII ■ ON 1seIea Is%++oi = �I 6wAuea W 0 R o in 0 IN IIII � ON ON 3 III E E ON IIION O (SejeN use o = �I su. ue O r-i -1/101 �aa d' LL a�a O LO u' 0 o. E O U LO Z88$ (D > d Kati � Q 6�Z$ (D m '� N c Kati �b c� Lo U N .L Cl) 0) aS � U Q LO �o a � 99S$ o �`�;r a > O°ti sa k5. y 0 0 0 0 0 0 0 0 0 0 0 �» Lo o Lo o LO N N EA EA EA EA II!8 Ienuud IIIIIII ■ ON ON - IIII ■ ON III IIII ■ 3 IIIIIII ■ IIIIIII ■ ON ON IIIIIII■ o IIIIIII■ v CA (SejeN Asa o =LI emIuey N a S L y 0 o N C � o Q LP a o E �U V o � U L ° U Kati > Q 6b6'99$ a�a D N � ^ O-V 0 c� Lo Kati U Z60'Zb$ to o ° a C a) U) f6 J a Q 00 O � �66 y U > S� b sa O O O O O O O O O O O O O O O EA O O O O O O O O O O O O O O � 6 II!e Ienuud r-i { LO LO LO JIM LO JIM JIM JIM Jill 00 r.. �� •-4 v (sad BuiHuey U X b66$ w E o z C Q +• 0 c 0 Q o - 0 � SS6$ Q U �U U E C 00 °' U (D c� 9b6$ ° Q 000 ELL O V N O to c Ur- �CU CU a) U 606$ w V N a o-� 3 y OQ ES8$ 3 00 C. a DU) IL aD 0)cu O �� a'� U) 69L$ U 7 E L99$ 0 z O O O O O O O O O O O O O �» N O � � NER EA EA II!8 Ienuud Ln LO LO LO LO 11,11111111,77 ■ ■ O 00 r. .-�I 0 (saj B co r-1 U X ,n SEE'S$ � (D V- O OQ z C O N oc -- ca c 'o �L c LL � �bZ'S$ CL U E U� CU 2 U o O m rn (D �00 c c �_ QLL Ucu U D00 O to o LO N (� N _ (v u) > °� f a) U () o a EE6'b$ t W N 0 •L Q 3 E E O u) U >0 Q �CL a O c J O (6 M L8b'b$ C E z 0 0 0 0 0 0 0 0 C 0 0 0 (O LO EA EA M N EA EA EA EA II!8 Ienuud r- LU LO LO LO LO 0 (saIea Iw.,oi SUIrUea 00 r-1 0 O E Z6S'6LZ$ co c 0 �U C 00 O ( U) Ul 0) NU) .Q 9b6' �LZ$ W U 0 O-� Q O 00 00 r- I- O I- M U X N .20 9Z �'S9Z$ 0-U N 7 p (' CO U)? c z � 0 r- N to c U) > co c U ° Q ZbL'SEZ$ c o N 0 L 3 LO _ C 0? o 000 EZZ$ U) M N Q a N Q N (0 m Ln O C Q O c N(fl 86E'86 �$ C o C U E 0 z 0 0 0 0 0 0 � O O O O O O 0 0 0 0 O O O co Ln O Ln O Ln 61� - 1118 Ienuuy m