Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
cp04-12-2005 cAGENDA
REGULAR MEETING — HUTCHINSON CITY COUNCIL
TUESDAY, APRIL 12, 2005
1. CALL TO ORDER — 5:30 P.M.
2. INVOCATION -- Rev. Greg Nelson, Bethlehem United Methodist Church
3. PLEDGE OF ALLEGIANCE
4. MINUTES
(a) REGULAR MEETING OF MARCH 22, 2005
(b) BID OPENING MINUTES OF APRIL 8, 2005
Action - Motion to approve as presented
5. CONSENT AGENDA
(a) REPORTS OF OFFICERS, BOARDS AND COMMISSIONS
1. HUTCHINSON PUBLIC LIBRARY BOARD MINUTES FROM FEBRUARY 28, 2005
2. MOTOR VEHICLE MONTHLY REPORT FOR FEBRUARY 2005
3. FIRE DEPARTMENT MONTIILY REPORT FOR MARCH 2005
. 4. HUTCHINSON UTILITIES COMMISSION FINANCIAL REPORT FOR FEBRUARY 2005
5. BUILDING DEPARTMENT MONTHLY REPORT FOR MARCH 2005
6. PARKS, RECREATION, COMMUNITY EDUCATION BOARD MINUTES FROM FEBRUARY 7
AND MARCH 7, 2005
(b) RESOLUTIONS AND ORDINANCES
1. ORWANCE NO. 05 -0400 — ORDINANCE REVISING SEWER RATES RELATED TO BOD
SURCHARGE (SECOND READING AND ADOPTION)
2. ORDINANCE NO. 05 -0401 — ORDINANCE AUTHORIZING THE CONVEYANCE OF
MUNICIPALLY OWNED REAL PROPER'T'Y TO THE SOUTHWEST MINNESOTA FOUNDATION
(SECOND READING AND ADOPTION)
3. ORDINANCE NO. 05-0402 —ORDINANCE VACATING UTILITY AND DRAINAGE EASEMENTS
IN LOTS 1 — 6 AND LOTS 13 — 20, BLOCK 2, BLOCK 4 AND BLOCK 5, SOUT14FORK RIDGE
(SECOND READING AND ADOPTION)
4. RESOLUTION NO. 12668 — RESOLUTION APPROVING PRELIMINARY AND FINAL PLAT TO
BE KNOWN AS SWMF ADDITION SUBMITTED BY SOUTHWEST MINNESOTA FOUNDA'T'ION
LOCATED ON THE SOUTHWEST CORNER OF HIGHWAYS 7 AND 15
5. RESOLUTION NO. 12681 — RESOLUTION IN SUPPORT OF PLACING THE CITY OF
HUTCHINSON WASTEWATER FACILITY ON THE WATER POLLUTION 'CONTROL
REVOLVING FUND
It 6. RESOLUTION NO. 12682 — RESOLUTION FOR PURCHASE (UNLEADED GASOLINE)
7. RESOLUTION NO. 12690 — RESOLUTION APPROVING PLEDGED SECURITIES FOR
CITY COUNCIL AGENDA —APRIL 12, 2005
Affl @W:1N1a "ail aaIiS]85 ILIUI1L1u 01Iowa:)hRA
1 f .
• 8. RESOLUTION NO. 12691 — RESOLUTION APPROVING PLEDGED SECURITIES FOR
COLLATERAL FROM HOME STATE BANK
(c) CONSIDERATION FOR APPROVAL OF TRANSIENT MERCHANT LICENSE FOR THE COUNTRY
STOP TO SELL PRODUCE IN TIIE RUNNINGS FLF,ET & FARM PARKING LOT
(d) CONSIDERATION FOR APPROVAL OF TEMPORARY RECYCLING PERMIT FOR CAN MAN 2
(e) CONSIDERATION FOR APPROVALS AND PERMITS FOR THE 62nd ANNUAL HUTCHINSON
JAYCEE WATER CARNIVAL FOR JUNE 13 — 19, 2005
(fl CONSIDERATION FOR APPROVAL OF APPOINTING JOHN LOFDAHL TO THE PLANNING
COMMISSION UNTIL MARCH 2010
(g) CONSIDERATION FOR APPROVAL OF LEASE AGREEMENT WITII MARVIN WILLHITE
(h) LETTING NO. 16, PROJECT NO. 05 -18 (EMERGENCY GENERATOR UPGRADE) — ACCEPTING BID
& AWARDING CONTRACT
(i) LETTING NO. 6, PROJECT NO. 05-20 (2005 AIRPORT IMPROVEMENTS)
0) LETTING NO. 6, PROJECT NO. 01-19 (ROLLING MEADOWS) — CONSIDERATION OF ESTIMATE
NO. 4
(k) LETTING NO. 1, PROJECT NO. 03-01 (DALE STREET & 2NO AVENUE SW) — CHANGE ORDER NO,
6
• (1) LETTING NO. 3, PROJECT NOS. 03 -05, 03 -06, 03 -07, 03 -08, 03 -09, 03 -11, 03 -22 (2003 PAVING
IMPROVEMENTS) — CHANGE ORDER NO. 3 AND ESTIMATE NO. 5
(m)LETTING NO. 5, PROJECT NO. 03-12 (EDMONTON AVENUE) — CHANGE ORDER NO. 8
(n) CONSIDERATION FOR APPROVAL OF SHORT -TERM GAMBLING LICENSE FOR HUTCHINSON
FIRE RELIEF ASSOCIATION ON SEP'T'EMBER 11, 2005, AT THE HUTCHINSON FIRE STATION
(o) CONSIDERATION FOR APPROVAL OF OUT -OF -STATE TRAVEL FOR JOHN RODEBERG TO
WASHINGTON D.C. FROM JUNE 7 — 9, 2005
(p) RETAIL ON -SALE, NON - INTOXICA'T'ING MALT LIQUOR (3.2 BEER) LIQUOR LICENSE
RENEWALS
• LITTLE CROW BOWLING LANES (HUTCH BOWL)
• SKY VENTURES (PIZZA HUT)
• MEADOWLINKS GOLF CLUB
(q) RE'T'AIL OFF -SALE, NON- INTOXICATING MALT LIQUOR (3.2 BEER) LIQUOR LICENSE
RENEWALS
• COBORN'S INC — CASIIWISE
• SPEEDWAY SUPERAMERICA
• ERICKSON'S DIVERSIFIED CORPORATION (ECONO FOODS)
• PHILLIPS 66
• WALMART SUPERCENTER
• Action — Motion to approve consent agenda
6. PUBLIC IIEARINGS — 6:00 P.M.
!A
CITY COUNCIL AGENDA — APRIL 12, 2005
. (a) LETTING NO. 7, PROJECT NO. 05 -07 & 05 -08 (MICHIGAN AVENUE NE & SE AND RAILROAD
CROSSING /STREET MAINTENANCE) — ORDERING IMPROVEMENT AND PREPARATION OF
PLANS AND APPROVING PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT
FOR BIDS
Action — Motion to close public hearing
Action — Motion to reject — Motion to approve
7. COMMUNICATIONS, REQUESTS AND PETITIONS
8. UNFINISHED BUSINESS
9. NEW BUSINESS
(a) CONSIDERATION FOR APPROVAL OF PURCHASE AGREEMENT BETWEEN NASH FINCH AND
THE CITY OF HUTCHINSON FOR EXPANSION OF LIQUOR STORE
Action — Motion to reject — Motion to approve
(b) CONSIDERATION FOR APPROVAL OF RELOCATION AGREEMENT WITH MIDWEST TAE KWON
DO FOR RELOCATION FROM THE LIQUOR STORE EXPANSION SITE
Action — Motion to reject — Motion to approve
(c) DISCUSSION OF 2005 STREET PATCHING POLICY
Action —
. (d) DISCUSSION OF 2005 MOSQUITO CONTROL PROGRAM
Action —
(e) CONSIDERATION FOR APPROVAL OF APPROVING ENGINEERING SERVICES AGREEMENT
WITH SRF CONSULTING FOR FEASIBILITY REPORT FOR HIGHWAY 7 PEDESTRIAN
UNDERPASS AT SCHOOL ROAD
Action — Motion to reject — Motion to approve
(f) CONSIDERATION FOR APPROVAL OF SETTING A CITY COUNCIL WORKSHOP TO IDENTIFY
CORE/ESSENTIAL SERVICES
Action -
10. MISCELLANEOUS
(a) COMMUNICATIONS
11. CLAIMS, APPROPRIATIONS AND CONTRACT PAYMENTS
12. ADJOURN
•
MINUTES
REGULAR MEETING — HUTCHINSON CITY COUNCIL
TUESDAY, MARCH 22, 2005
1. CALL TO ORDER — 5:30 P.M.
Mayor Steve Cook called the meeting to order. Members present were Bill Arndt, Kay Peterson, Jim Haugen
and Casey Stotts. Others present were Gary Plotz, City Administrator, Marc Sebora, City Attorney and John
Rodeberg, Director of Public Works.
2. INVOCATION — Rev. Howard Anderson, Hunter's Ridge Community Church, delivered the invocation.
3. PLEDGE OF ALLEGIANCE
4. MINUTES
(a) REGULAR MEETING OF MARCH 8, 2005
Motion by Arndt, second by Haugen, to approve the minutes as presented. Motion carved unanimously.
5. CONSENT AGENDA
(a) REPORTS OF OFFICERS, BOARDS AND COMMISSIONS
1. PIONEERLAND LIBRARY SYSTEM BOARD MINUTES FROM JANUARY 20, 2005
2. HUTCHINSON PUBLIC LIBRARY BOARD MINUTES FROM JANUARY 24, 2005
3. HUTCHINSON HOUSING & REDEVELOPMENT AUTHORITY BOARD MINUTES FROM
FEBRUARY 15, 2005
• 4. PLANNING COMMISSION MINUTES FROM FEBRUARY 15, 2005
5. CITY OF 14UTCHINSON GENERAL FUND FINANCIAL REPORT FOR FEBRUARY 2005
6. CITY OF HUTCHINSON INVESTMENT REPORT FOR FEBRUARY 2005
7. HUTCHINSON AREA HEALTH CARE FINANCIAL REPORT FOR FEBRUARY 2005
(b) RESOLUTIONS AND ORDINANCES
RESOLUTION NO. 12676 — RESOLUTION CHANGING /CORRECTING THE NAME OF EAU
CLAIRE STREET SE TO EAU CLAIRE AVENUE SE
2. RESOLUTION NO. 12677 — RESOLUTION FOR PURCHASE (MOSQUITO CONTROL, FORD
TRUCK, CREEKSME PRODUCT PACKAGING, BAG FILM)
3. ORINANCE NO. 05 -0400 — ORDINANCE REVISING SEWER RATES RELATED TO BOA
SURCHARGE (SECOND READING AND ADOPTION)
(c) PLANNING COMMISSION ITEMS
I. CONSIDERATION OF VARIANCE REQUESTED BY HERBERT KRIENKE, 456 PROSPECT
STREET NE, TO REDUCE FRONT YARD SETBACK FROM 25 FEET TO 12 FEET FOR THE
REPLACEMENT OF EXISTING NONCONFORMING PORCH WITH STAFF
RECOMMENDATION AND FAVORABLE RECOMMENDATION (ADOPT RESOLUTION NO.
12663)
. 2. CONSIDERATION OF VARIANCE REQUESTED BY KENNETH BALLARD, 312 STONEY POINT
ROAD, TO REDUCE REAR YARD SETBACK FROM 30 FEET TO 28 FEET FOR THE
�0
CITY COUNCIL MINUTES — MARCH 22, 2005
CONSTRUCTION OF A 16 FOOT X 20 FOOT FAMILY ROOM ADDITION WITH STAFF
RECOMMENDATION AND FAVORABLE RECOMMENDATION (ADOPT RESOLUTION NO.
. 12664)
3. CONSIDERATION OF CONDITIONAL USE PERMIT TO AMEND THE PLANNED
DEVELOPMENT DISTRICT SUBMITTED BY CROW RIVER HABITAT FOR HUMANITY
LOCATED AT 560 AND 570 HILLTOP DRIVE NE AND LOT SPLIT AT 560 HILLTOP DRIVE NE
FOR CONSTRUCTION OF TWIN HOME WITH STAFF RECOMMENDATION AND FAVORABLE
RECOMMENDATION (ADOPT RESOLUTION NO. 12665 & 12666)
CONSIDERATION OF CONDITIONAL USE PERMIT TO AMEND THE PLANNED
DEVELOPMENT DISTRICT, VACATION OF EASEMENTS IN SOUTHFORK RIDGE AND 28 LOT
FINAL PLAT OF SOUTHFORK RIDGE THIRD ADDITION LOCATED IN THE SOUTHFORK
RIDGE PLAT WITH STAFF RECOMMENDATION AND FAVORABLE RECOMMENDATION
(ADOPT RESOLUTION NO. 12667 AND WAIVE FIRST READING AND SET SECOND READING
AND ADOPTION OF ORDINANCE NO. 05 -0402 FOR APRIL 12, 2005)
5. RECONFIRM PRELIMINARY PLAT AND CONSIDERATION OF THE 102 LOT FINAL PLAT OF
SUMMERSET THIRD ADDITION SUBMITTED BY ARNE ESTERBROOKS, DEVELOPERS
RESOURCE COMPANY, WITH STAFF . RECOMMENDATION AND FAVORABLE
RECOMMENDATION (ADOPT RESOLUTION NO. 12670)
6. CONSIDERATION OF REVISED 29 LOT FINAL PLAT OF BRIDGEWATER ESTATES THIRD
ADDITION SUBMITTED BY GPS DICKINSON WITH STAFF RECOMMENDATION AND
FAVORABLE RECOMMENDATION (ADOPT RESOLUTION NO. 1267 1)
(d) CONSIDERATION FOR APPROVAL OF ON -SALE INTOXICATING LIQUOR AND WINE LICENSES
FOR 2005
(e) CONSIDERATION FOR APPROVAL OF SHORT -TERM GAMBLING LICENSE FOR MCLEOD
COUNTY PHEASANTS FOREVER ON APRIL 9, 2005, AT MCLEOD COUNTY FAIRGROUNDS
(f) CONSIDERATION FOR APPROVAL OF TOBACCO LICENSE FOR HUTCHINSON COOP
(g) CONSIDERATION FOR APPROVAL OF REALLOCATING HOUSING FUNDS AND APPROVAL OF
HOUSING REHABILITATION REVOLVING LOAN FUND PROCEDURAL GUIDELINES
(h) CONSIDERATION FOR APPROVAL OF APPROVING REVISION OF ASSESSMENT ROLL FOR
CLARIFICATION ON DEFERRAL STATUS (SA -5029)
(i) CONSIDERATION FOR APPROVAL OF DELETING DEFERRED ASSESSMENT ON RUTZ
PLUMBING PROPERTY
(j) CONSIDERATION FOR APPROVAL OF 2005 IMPROVEMENT PROJECT TESTING AGREEMENT
WITH BRAUN INTERTEC
(k) CONSIDERATION FOR APPROVAL OF ENGINEERING SERVICES AGREEMENT WITH SEH
CONSULTING (DOWNTOWN STREETSCAPE AND DENVER AVENUE SE)
(1) LETTING NO. 7, PROJECT NO. 05 -07 & 05 -08 (MICHIGAN AVENUE NE & SE AND RAILRAOD
CROSSING /STREET MAINTENANCE) — ORDERING PREPARATION OF REPORT ON
IMPROVEMENT AND RECEIVING REPORT AND CALLING HEARING ON IMPROVEMENT
(m)CONSIDERATION FOR APPROVAL OF TRANSFER STATION COORDINATION CONTRACT
Item 5(b)2 and 5(b)3 were pulled for further discussion. Motion by Peterson, second by Stotts, to approve
. consent agenda with the exception of items 5(b)2 and 5(b)3. Motion carried unanimously.
Item 5(b)2 was discussed further. Council Member Haugen requested that staff explain what is being done
for mosquitoes control, John Olson, Public Works Superintendent, explained that the item that is being
y�a-1
CITY COUNCIL MINMS — MARCH 22, 2005
requested for purchase is a larvacide briquette that will be put in catch basins and stormwater detention
E that are owned by the city or of which the city has an easement to. These briquettes will be placed
• before the spring hatch. The public may purchase these kinds of briquettes for their own private use from
any mosquitoes control company. The i e of the briquettes should last 150 days. Mr. Olson reminded the
Council that spraying for mosquitoes was not included in the 2005 budget, therefore a funding mechanism
will need to be located if spraying should occur. Mayor Cook suggested that the subject matter for the next
Council workshop scheduled for April 12, 2005, be on mosquitoes spraying and mosquitoes control.
Information pertaining to the application and chemicals used will be on the City's web site and advertised
before application begins.
Motion by Peterson, second by Haugen to approve Item 5(b)2. Motion carried unanimously.
Item 5(b)3 was pulled for further discussion. Mayor Cook noted that at the last meeting it was suggested
that a rate study he completed prior to this ordinance being adopted. Kent Exner, City Engineer, stated that
the rate study has not been completed as of yet.
Motion by Stotts, second by Peterson, to continue action on this item until April 12, 2005. Motion carried
unanimously.
6. PUBLIC HEARINGS -- 6:00 P.M. - NONE
7. COMMUNICATIONS, REQUESTS AND PETITIONS
(a) PRESENTATION BY ERIC WILLETTTE, LEAGUE OF MINNESOTA CITIES, ON LOCAL
GOVERNMENT AID
Eric Willette, League of Minnesota Cities, presented before the Council. Mr. Willette described the Local
Government Aid (LGA) program and how it was created. One main point that Mr. Willette covered is that a
grandfather clause for cities was part of the program up until 2003. Mr, Willette further explained how the
2001 "Big Plan" Property tax reform affected Hutchinson (approx. loss of $300,000). Another reform
occurred in 2003 which eliminated the grandfather aid base except for greater Minnesota Cities with over
10,000 population, which includes Hutchinson.
Mr. Willette continued by explaining how the LGA formula is calculated for cities. The components of the
formula include measuring each city's revenue need and local ability to pay (capacity). Cities with more
need than capacity receive more LGA. The revenue need is determined by percentage of housing built pre -
1940; population decline in past 10 years; road accidents per capita; average household size; and
metro /greater Minnesota location. The local ability to pay is determined by two factors: City's net tax
capacity times the statewide average city tax rate and taconite aid.
Mr. Willette then compared Hutchinson to other cities (New Ulm and Willmar) as related to the components
of the formula. Hutchinson has the lower percentage of pre -1940 housing, lower accident per capita and is
very close in household size compared to the other cities. Hutchinson has the highest tax base of the three
cities compared. Overall, Hutchinson, based on the formula components, has more tax capacity and less
need than other regional centers.
Mr. Willette asked that the City consider any unique characteristics/needs that are not adequately captured by
the formula. If there are any, the budgetary impacts should be defined. Other issues to consider include that
many of past special increases were for smaller cities with concerns with grandfather and others granted in
time of increasing LGA.
8. UNFINISHED BUSINESS
9. NEW BUSINESS
(a) CONSIDERATION FOR APPROVAL OF. PRIVATE HANGAR CONSTRUCTION/LEASE
. AGREEMENTS
Marc Sebora, City Attorney, noted that he has a conflict of interest with one of the applicants, therefore Jody
Winters of the Gavin Law Office will be handling these issues.
CITY COUNCIL MINUTES— MARCH 22, 2005
John Olson, Public Works Superintendent, presented before the Council. Mr. Olson explained that two more
applicants have applied to build three private hangars at the airport. These hangars will be used for aircraft
• storage and no commercial activity will be authorized. The applicants include RAM Builders (two lots) and
Brandon Luthens (one lot). John Olson noted that,the hangars are required to have the same aesthetics as
required by the minimum standards.
Motion by Stotts, second by Peterson, to approve private hangar construction and lease agreements between
the Hutchinson Municipal Airport and RAM Buildings and Brandon Luthens. Motion earned unanimously.
(b) PRESENTATION ON LIQUOR STORE EXPANSION AND AUTHORIZATION TO PROCEED
Miles Seppelt, EDA Director, presented before the Council. Mr. Seppelt explained that the design work is
complete on the liquor store expansion, with the exterior and interior design simplified to cut costs, Staff is
working with Midwest Tae Kwon Do to facilitate their relocation (temporarily to Civic Arena). Staff is also
in process of putting together a purchase agreement with Nash Finch for areas of the expansion.
Dan Pellinen, Tushie Montgomery Architects, presented before the Council. Mr. Pellinen showed the
proposed site plan of the expansion which includes expanding into the current Tae Kwon Do section of the
Nash Finch building and expanding south to Washington Avenue. A portion of the current Tae Kwon Do
area will be demolished for a loading dock.
Miles Seppelt and Dan Pellinen reviewed the floor plan and interiors /exteriors of the building. The new
floor plan includes adding 17 beer coolers, a wine section, a general liquor sales floor, restrooms, and an
office/break room/counting room.
The proposed timeline for the project includes seeking and awar)ng bids for construction by April 26h,
beginning construction May 40, with the store opening October 28 .Construction estimates for the project
are projected at $1.3 million.
. No action taken.
(c) CONSIDERATION FOR APPROVAL OF ARCHITECTURAL SERVICES AGREEMENT WITH
TUSHIE MONTGOMERY ARCHITECTS FOR THE LIQUOR STORE EXPANSION
Miles Seppelt explained that the agreement has been reviewed by the City Attorney and the Finance
Director. The not to exceed number is $104,000.
Motion by Stotts, second by Peterson, to approve architectural services agreement with Tushie Montgomery
Architects for the liquor store expansion. Motion carried unanimously.
(d) CONSIDERATION FOR APPROVAL OF AUTHORIZATION TO SEEK BIDS FOR THE LIQUOR
STORE EXPANSION PROJECT
Motion by Haugen, second by Stotts, to approve city staff to seek bids for the liquor store expansion project.
Motion carried unanimously.
(e) CONSIDERATION OF CONDITIONAL USE PERMIT AND VARIANCE REQUESTED BY MARVIN
WILLHITE, 465 HIGH STREET NE, FOR CONSTRUCTION OF SECOND DETACHED GARAGE
OVER 1000 SQ. FEET WITH STAFF RECOMMENDATION AND FAVORABLE
RECOMMENDATION (4 -2 PLANNING COMMISSION VOTE) (ADOPT RESOLUTION NO. 12662)
Bonnie Baumetz, Planning Coordinator, presented before the Council. Ms. Baumetz explained that the
Planning Commission recommends approval with nine conditions placed on the permit and variance. The
two dissenting votes of the Planning Commission would have preferred that a current 16x16 garage be
removed from the lot.
Motion by Stotts, second by Peterson, to approve conditional use permit and variance to Marvin Willhite of
456 High Street NE for construction of a second detached garage. Motion carried unanimously.
4
qta)
CITY COUNCIL MINUTES — MARCH 22, 2005
(f) CONSIDERATION OF CONDITIONAL USE PERMIT REQUESTED BY SOUTHWEST MINNESOTA
FOUNDATION TO ALLOW FOR AN OFFICE BUILDING IN THE C5 DISTRICT WITH STAFF
. RECOMMENDATION AND FAVORABLE RECOMMENDATION (PLANNING COMMISSION 4 -1
VOTE) (ADOPT RESOLUTION NO. 12669)
Bonnie Baumetz, Planning Coordinator, explained that consideration of the preliminary and final plat will be
brought to the Council for consideration at the April 12' City Council meeting. This consideration is to
allow for an office building located in the C5 District. The Planning Commission voted 4 -1 to approve this
permit with five conditions, all of which have been taken care of.
Motion by Stotts, second by Peterson, to approve conditional use permit to allow for an office building in the
C5 District as requested by Southwest Minnesota Foundation. Discussion was held regarding road
construction and how it will affect the setbacks, which will affect the viewshed. Haugen abstained from the
vote. Motion carried unanimously
(g) CONSIDERATION FOR APPROVAL OF REQUEST FOR PROPOSALS OF JOB EVALUATION AND
COMPENSATION SYSTEM
Gary Plotz, City Administrator, explained that this item was budgeted for and staff recommends having the
pay plan evaluated every five years or so.
Motion by Peterson, second by Haugen, to approve city staff issuing a Request for Proposals for job
evaluation and compensation system. Motion tamed unanimously.
(h) CONSIDERATION FOR APPROVAL OF RESOLUTION NO. 12680 — RESOLUTION OF
APPLICATION TO MINNESOTA PUBLIC FACILITIES AUTHORITY FOR DRINKING WATER
REVOLVING FUND
Ken Merrill, Finance Director, and John Olson, Public Works Superintendent, presented before the Council.
• Mr. Olson explained that this is an application for staff to receive a revolving loan, with a very low interest
rate, for the water treatment plant project.
Motion by Haugen, second by Arndt, to approve Resolution No. 12680. Motion carried unanimously.
(i) CONSIDERATION FOR APPROVAL OF PURCHASE AGREEMENT WITH SOUTHWEST
MINNESOTA FOUNDATION FOR THE CONVEYANCE OF CITY -OWNED LAND (WAIVE FIRST
READING AND SET SECOND READING AND ADOPTION OF ORDINANCE NO. 05 -0401 FOR APRIL
12, 2005)
Marc Sebora, City Attorney, stated that a purchase agreement has been signed by the Southwest Minnesota
Foundation for a piece of city -owned property that runs adjacent to property they currently own. The terms
of the agreement encapsulate what was discussed at the closed session held at the last Council meeting
which include the City conveying the property to the SWMF at no cost. This is contingent upon SWMF
paying a sum of $40,ODD to the City i Iwhen any portion of the property is sold. This would not include
property being sold to an entity due to road construction. SWMF must also build on the proposed site,
which is located at the intersection of Hwy 7 and Hwy 15 in Hutchinson.
Motion by Peterson, second by Arndt, to approve purchase agreement with Southwest Minnesota Foundation
for the conveyance of city -owned land and setting second reading and adoption of Ordinance No. 05 -0401
for April 12, 2005. Motion carried unanimously.
(j) PRESENTATION BY CITY ADMINISTRATOR ON 2005 CITY COUNCIL OBJECTIVES (FROM 2005
VISIONING SESSIONS)
Gary Plotz, City Administrator, presented before the Council. Mr. Plotz delivered a presentation on the 2005
goals set by the City Council at a workshop held earlier this year. Mr. Plotz reviewed all of the short-term
. and long -term goals established by the Council.
Mr. Plotz then presented on four of the goals set by the Council. These goals included understanding Local
Government Aid, following through with the Downtown Development Plan, implementing a
CITY COUNCIL MINUTES — MARCH 22, 2005
program/performance budgeting system and improving communications. On each goal Mr. Plotz covered
who will be working on each goal, what information will be researched and the deadline to accomplish the
. goal.
Mr. Plotz requested that the Council approve the goal objectives as outlined.
Motion by Stotts, second by Haugen, to approve the four goal objectives as outlined. Motion carried
unanimously.
(k) CONSIDERATION FOR APPROVAI, OF MEMORANDUM OF AGREEMENT FOR THE MINNESOTA
UNIFIED CERTIFICATION PROGRAM FOR DISADVANTAGED BUSINESS ENTERPRISES
John Olson, Public Works Superintendent, stated that this is required for any construction completed that is
in excess of $250,000.
Motion by Arndt, second by Haugen, to approve memorandum of agreement for the Minnesota Unified
Certification Program for Disadvantaged Business Enterprises. Motion carried unanimously.
(1) CONSIDERATION FOR APPROVAL OF SUPPORTING THE HIGHWAY 15 COALITION
Kent Exner, City Engineer, stated that the Mid - Minnesota Development Commission is attempting to
establish a Hwy 15 Coalition. This group has determined that there is a need to assemble an organization
consisting of interested yarties along Hwy 15 to pay attention to the best interests of this roadway. Part of
this request is for the City to pay $200 in dues to be part of the Coalition.
Motion by Arndt, second by Haugen, to approve supporting the Highway 15 Coalition. Motion carried
unanimously.
(m)CONSIDERATION FOR APPROVAL OF SUPPORTING SPEED STUDY ON SOUTH GRADE ROAD
• (CSAH 115)
Kent Exner, City Engineer, stated that the County Engineer has requested of MNDOT to conduct a speed
study on South Grade Road, There has been public concerns of the speed on this stretch of the road west of
School Road, which is currently 55 mph.
Motion by Arndt, second by Stotts, to approve supporting speed study on South Grade Road (CSAH 115).
Motion carried unanimously.
(n) SUMMARY OF CLOSED MEETING PROCEEDINGS FOR CITY ADMINISTRATOR PERFORMANCE
APPRAISAL
Marc Sebora stated that historically this is an informational piece of information that is shared with the
public. Mr. Sebora noted that based upon the City Administrator's performance review, the Council
approved granting him exceptional service pay, which totaled $3005.60.
No action.
10. MISCELLANEOUS
(a) COMMUNICATIONS
Mayor Cook noted that the hospital had an emergency situation with the burners of the boilers that heat their
facility. Marc Sebora, City Attorney, stated that, among other things, carbon monoxide levels had risen due
to a malfunction of the boiler burners, Hospital staff had concerns for patient safety and purchased new
boiler burners. This action will be to ratify that purchase.
. Motion by Haugen, second by Peterson, to approve purchase of boiler burners for the hospital. Motion
carried unanimously.
Gary Plotz — Mr. Plotz noted that the Hospital Privatization Task Force met on March 21'i. Mr. Plotz
M
CITY COUNCIL MINUTES— MARCH 22, 2005
explained that a presentation was given on PERA. He also stated that he gave a presentation on issues that
have been received by staff. Council Member Stotts suggested holding a special meeting for city employees
• to hear how a privatization will affect their health insurance benefits.
Kay Peterson — Ms. Peterson stated that she and the mayor had attended a required training for the Board of
Equalization. They are now certified and she noted that a certified member must always serve on the board.
Mayor Cook — Mayor Cook noted that the elevation level of the SWMF property may appear to be
excessively high at first, but that is due to MNDOT raising the roadways seven feet.
11. CLAIMS APPROPRIATIONS AND CONTRACT PAYMENTS
Motion by Arndt, second by Haugen, to approve claims, appropriations and contract payments. Motion
carried unanimously.
12. ADJOURN
11
With no further business to discuss, a motion was made by Stotts, seconded by Peterson, to adjourn the
meeting at 8:15 p.m.
yL
•
11
MINUTES
BID OPENING
LETTING NO. I&PROJECT NO. 05-18
APRIL 8, 2005
Present: Ken Merrill, Finance Director and Melissa Starke, Recorder
Ken Merrill, Finance Director, called the bid opening to order at 10:02 a.m.
Mr. Merrill dispensed with the reading of Publication No. 7306, Advertisement for Bids,
Letting No. 16, Project No. 05 -18. Mr, Merrill noted that the City Council reserves the
right to reject all bids and to waive any informalities and irregularities as signed by Gary
D. Plotz, The following bids were opened and read:
Quade Electric
Hutchinson, Minnesota Bid Amount $121,700.00
Honda Electric
Loretto, Minnesota Bid Amount $123,600.00
The bids were referred to staff for review and a recommendation.
The bid opening adjourned at 10:07 a.m.
ATTEST:
Gary D. Plotz, City Administrator
Steven W. Cook, Mayor
Ll /i\
J
Minutes
• Hutchinson Public Library Board Meeting
Feb. 28, 2005
Members present: Julie Jensen, Larry Ladd, Connie Lambert, John
Hassinger, Newt Potter, Kay Peterson, Mary Henke, Librarian, and Jack
Sandberg, PLS Library system representative
Members absent: Kay Johnson
President Connie Lambert called the meeting to order. The minutes of the last
meeting on January 24, 2005 were reviewed and approved.
Reports
1. Jack Sandberg reporting: Pioneerland has began the process to
purchase a new automation system. Awards night will be held at
Willmar Ridgewater College on April 21.
2. Legislative Day, Feb, 24, 2005 Mary Henke reporting: Mary and
• Connie attended. Both felt is was a very worthwhile venture.
They were able to meet with Scott Newman and Steve Dille. They
heard discussions on library funding and also learned there is money
in the bonding bill for library construction.
Old Business
1. Portraits of librarians. The Friends of the Library will spend up to
six hundred dollars on preparing the picture display. The types of
frames to be used was discussed.
2. New Century Charter School computer classes. The classes held at the
library are up and running. One class of 12 students has been held and
another group of 18 are signed up. The classes emphasis library usage.
3. The new lights have been installed in the entryway.
4. Community Forum. The fine tuning for the forum continues. The topic
is Truth in Media. The forum most likely will be held either April 12
or 13. The presenter will be a reporter from the St. Cloud news paper.
5. Library board appointments. The terms of Connie Lambert and Newt
Potter will expire in April. The board will pick two names to forward
to the city council at the next board meeting on March 28.
s5b� I
MNew Business
1. National Library Week will be April 10 to 16. The topic for the week
is SOMETHING FOR EVERYONE.
2. A discussion was held about paint colors for the conference room.
The custodian will do the painting.
Next meeting: Monday, March 28 - 4:30
Meeting adjourned at 4:25.
Newt Potter, secretary
lJ
n
Motor Vehicle Monthly Summary
. For the month of Feb
2004 2005
Net Revenue: $16,739.21 $13,576.20
Payroll Hours: 577.35 557.80
Net Revenue per hours worked: $28.99 $24.34
Profits YTD: ($87.58) ($1035.40)
% Profit Margin YTD: -.003% -.036%
• Comments: Net Revenue Feb 2005 was down 18.9% from Feb 2004
YTD Revenues down only 1.4% from 2004
January- February Revenue flucuations clearly demonstate the
difficulities in scheduling the appropriate number of payroll hours.
Net Revenue per hours worked was kept fairly stable by closely
monitoring payroll hours.
0
is
Memo
To: Mayor and City Council Members
Frone Brad Emans, Fire Chief
Date: 04104/05
Re: Monthly Update on Activities of the Fire Department
The fire department responded to 23 general alarms in the month of March.
Example of a few of the calls:
1. We responder mutual aid to the Glencoe FD on a structure fire.
2. We responded to an out of control grass fire when a person left his recreational fire unattended.
This is the breakdown of the calls for the month:
City:
Commercial /Industrial 2 Mufti- family 1 Carbon Monoxide 5 Hazardous Material 2 Rescue 1 Grass 1
Mutual Aid 1
Rural:
Rescue 5 Medical 5 Vehicle 1
Drills ! Meetings ! Other Information
• We worked on our medical training in March. Our system is called the 44 - plan. This month we
worked on backboards and blood pressure readings.
• We completed our national incident management system requirement, The class is called NIMS
700 series.
• We worked on our" locate" an address in the city and then pump some water. As the city grows it
is important to keep our firefighters current on the city growth.
1
5 C�13
Fire Prevention / Public Relations
1. We participated in the all school health fair at the Hutchinson Middle School. We talked to about
• 150 employees of the school district.
2. We conducted an in -service safety class for all of the employees at Cedar Crest.
r-1
L �J
11
• Page 2
S ta-�3
BALANCE T
FEBRUARY 2fl W5
C'
r
r
f
f
E'
e
k
h
i
k
t
ASSETS
UTILITY PLANT — AT COST_
____ _ —
- -------- - - - - -- LAND & LAND RIGHT5 - - - - - --
-- i,990, 423.25
DEPRECIABLE UTILITY PLANT
98,792,9'71.22
FOTAL UTILITY PLANT
.__ _____- _- -__._- SU0,783,394.47
- -� -- -- -LESS
ACCUMULATED DEPRECIATION
(29,220,853.36)
TOTAL ACCUMU.ATED DEPRECIATION
-_ —_- —_ - --
CONSTRUCTION IN PROGRESS
2,836,189.69
TOTAL CONCTRIOCTION IN PROGRESS _- . - - -__
- - - - -- - --
_ _ —___._ - _ 2, 836, 189.69
TOTAL UTILITY PLANT DEPREC VALUE
74,398:730.80
RESTRICTED FUNDS & ACCOUNTS
FUTURE EXPANSION & DEVEL.OPHF.NT
659,772.46
MEDICAL INSURANCE —
_ --
i00,000.00
_- 561,426.64------
80iJD E INTEREST PAYMENT 2863
1,32i,i99.iO
'iO'fAL RESTRICTED FUNDS & ACCOUNTS
-- - - -- -- -
CURRENT K ACCRUED ASSETS
1,753,874.62
CA5N IN BANK
3,567,154.67
ACCOUNTS RECEIVABLE
INVENTORI
PREPAID INSURANCE
63,144.28
CLEARING ACCOUNT
1,594.96
-
SALES TAX RECEIVABLE
101AL CURRENT & ACCRUED ASSETS
6,024,3[]7.17
- --- ----- ➢EFERRED CHARGE --
621. 34T.45
BOND DISCOUNT: 2h103
TOTAL DEFERRPD CHARGE
- .621.347.45
TOTAL ASSETS
C'
r
r
f
f
E'
e
k
h
i
k
t
i
I
CE SHEET
FEUIR 2S, 2005
)
MUNICIPAL EQUM & LIABILITIES
]++'
MUNICIPAL EQUITY _
MUNICIPAL E(AJITY
1!
UNAPPROPRIATED RETAINED EARNINGS
s
TOTAL MUNICIPAL EQUITY
g-- --- -----'
LONG TERM LIABILITIES -HET OF
,I
CURRENT MATURITIES_____ _ -- --
`o'
2003 PONDS
TOTAL LONE, TERM LIABILITIES
+,
CONSTR CONTRACTS & ACCTS PAY kE.7AIN
]++'
ACCRUED EXPENSES - RETAINAGE
TOTAL CONSTRIJCT ION S ACCTS PAY
CURRENT & ACCRUED LIABILITIES
s
ACCOUNTS PAYABLE
g-- --- -----'
_. INTEREST ACCRUED
im
ACCTS PAYABLE TO CITY OF HUTCHINSON
ACCRUED VACA'iION PAYABLE
m - -� - - -- -- AECRYED MEDYCAL Fi1ND
] ACCRUED REC PAYMENT
ACCRUED SEVERANCE _
a CIUSTOWR TIEPOSITS
]< OTHER CURRENT & ACCRUED LIABILITIES
TOTAL CURRENT & ACCRUED LIAB
]3 TOTAL MUNICIPAL EQUITY & LIAD
]R
G
-1
1
C
d
n� z'
S
i
'TOTAL + '!
R9,756 , n :7.93
366.82'2.18
50,122:760.11
29, 750, 000, Qti --
29,75E1,00�.410
107,671.74
10'7,673..74
2,425,094.81
?95, 497.13
162, 22`:.00
198,061.77
-
0,360.97
30,614,82
- _73,595:00 ...- --
3,383.27
3,i85,152.67
63,i65,584,52
i l
S A LMENT NCOME 6 EXPENSES
FERRO 28, 2005
PRI_ f3 VI0hir CURRENT _ BUDGETED _ BUDGET
-- _ YEAR' TO HATE YEAR TO DAVE YEAR T DATE DEVIAT7:41I
'' -- - -' - -- ( 2'.47,SS--- 3Sf•'..,&i-- -' -Z33$; $ZS:357
i.. NON -RATING MME
r
NET _INCOME 366,522.1878,411_00
(� u
V I��
-' - (17,826.15)
288, 11f .18
• ANNUAL
BUDGET
20. Rea , 312e. 00
50C-, GOO - GG
125,750.00
12, 000.00
2,000.00
10,500,000.00
d30,040.00
32,658,078.00
2.045.,535_70
409,242.84
S 1,899, 515. 00
508,727_00
5. , 0(30.00
12,000.00 :!
3801373.00:
582,850.00-
6,60,000.00.
94, 706] 00 '
29, Geo.00
333.,20-32.00!
94,850.00'
289,984.00
i94,20fl.00
2;092,464.00'
2,983,446.62
30- 155.110, 161
2.582,417.84;
45,000.00
70,000.00•
5,000.00
120,000.00
100_00:
1.179,050.63
1,179,iSO.63_
973,395.00
473,3 °5.00
(21032,545.63
470,3'12.21
INCOME STATEMENT
-_
OPERATING REVENUE
-- '
_ 6 ___S_
3,537,065 0
5- - 22 - --
154
_31462,08M.27_ - -
75, 0o4.°5
•
SALES - EI_ECTkIC EflERGY
27,763.00
420.00
83,350.00
(P2, 930.00)
I
SALES FOR REGALE
24,219.65
26,669.02
20,962.53
5,'726.49
NET INCOME rkOM OTHER SOURCES
1,846.AO
i,8ii.00
2,000.4G
(189.40)
SECURITY LIGHTS
948.25
933.25
333.40
599.05
�s
POLE RENTAL
2,740,889.91_
3.088,416.03
1_,750,349.99_
1,338 '�4
_ SALES - GAS
ilEW ULM TRANaPOfiTATIOH
.00
iD7, 163.72
__.._
I05, 021.00
2,060-, i 42. 72
TOTAL OPERATING REVENUE
6,332,745.81
6,782,589.24
5.444,10i.59
1.338,497_h5
OPERATING EXPEN3E5
126,943.73
347,784.63
340,324.00
(7,460.33)
Iv
PRODUCTION OPERATION
10,982.01
43,408.23
68,220.74-
24,83.2.:6
_
PRODUCTION MAINTENANCE.
-- -- --
2,352,253_93
--_
2.055 98.42
--.. --
:k, 983, 649.35
--
(7.^..8151:7?
PURCHASED POWER
32,9(70.99
83,953.54
8A, 804_79
BSS.35
Ii
OTHER POWER SUPPLY
6'6.42
9.59
166.70
157.11
re
TRANSMISSION OPERATION
1,42
__..-
1.�i4`4.70
TRATISMI55I DN MAINTENANCE
37,062.91
35,168.37
83,409.18
28,239.01
la
ELECTRIC DISTRIBUTION OPERATION
MAINTENANCE
25,740.65
24, "470F:72
30,4BI.1.0
6,Oi0.38
- --
ELECTRIC DISTRIBUTION
- -PUFeCHASEU
R.�--
7A9.4�
1, 2M.-297. G0� --
(3.,096,462.+181
n
GAS EXPENSE
.437,61
1,3:8_30
11,995.78
15,786.49
3,790.71
I .-s
GAS TRANSMISSION OPERATION
] 11.53
1,838.'''5
4,fl34.30
3, Oi75. 55
�.
GAS TRANSMISSION MAINTENANCE
DI.T;YR�kJTI_0N OPERATION
_
.Si
._ _
, 2i�7i
.._ ,.
I•n
[;AS
GAS DISTRIBUTION MAINTENANCE
7,731.85
18,447.84
15,811.50
(2,636.34)
4.795.94
ACCOL3NTING 6 COLLECTIONS
42,228.57
43,544.50
48,340.34
---3�,'.37�'a�---
- - -26
_CUSTOMER - - --
SALE E3(FE -N
& GENERAL EXPENSES
. W---_-
30'.:1,046.59
5 ,3$.�.�S7L----
317,366.58
3433,813.76
-1'763..50
31.44'7. °_8
ADMINISTRATIVE
533,340.00
492,066,•38
497,343.89
5,2277.51
DEPRECIATION
DEPRECIATION
-.
- - -.'7T �
u � 56 -.__.
_S076�35. 24-
01.632.550:323
_..._.
Ta'i'DE
317,759_04_-
723,173.68
3954937.33
OPERATING INCOME
_417,236.35
1'.
OTHER INCOME
A,434.65
5, 28Z 18
7 501,51
(2,214.33)
OTHER - NET ._ -
-ice, 6d9-
- .- Z:i. 672. %,4i
_
_
It�TE,FE�'F -INC F3E
-
439.30
833.:x0
(394.20)
I ;F
MISC Ii�ACOME
.00
24,207.15
13,722.84
20,004.01
(6,281.17)
._.,
- _..._TOTAL OTHER INCOME
__-
n
7
OTHER EXPENSES
5,171.01
5.1,640_80
16.67
(11,6:4,331
MISC EXPENSES
- 3NTEI8:ST EXPM49E- - _ -- - - -- - -
-- .85$:54 --_.-
- -- 3rid. SU -8:v� -
146.:,47.74
39.. ^..0
223,429.55
208,149.34
196,564.41
(i1,584.93)
1�..
TOTAL OTHER EXPENSES
rr
5.035
- i-Z;27 -9ru _---
_. -___ 34.95
;�
... .. C(!N;•LITI{]N- 'Ci'P5�b
154,500.00
i62,225_00
162,264.95
34.45
TOTAL CONTRIBUTION TO CITY
'' -- - -' - -- ( 2'.47,SS--- 3Sf•'..,&i-- -' -Z33$; $ZS:357
i.. NON -RATING MME
r
NET _INCOME 366,522.1878,411_00
(� u
V I��
-' - (17,826.15)
288, 11f .18
• ANNUAL
BUDGET
20. Rea , 312e. 00
50C-, GOO - GG
125,750.00
12, 000.00
2,000.00
10,500,000.00
d30,040.00
32,658,078.00
2.045.,535_70
409,242.84
S 1,899, 515. 00
508,727_00
5. , 0(30.00
12,000.00 :!
3801373.00:
582,850.00-
6,60,000.00.
94, 706] 00 '
29, Geo.00
333.,20-32.00!
94,850.00'
289,984.00
i94,20fl.00
2;092,464.00'
2,983,446.62
30- 155.110, 161
2.582,417.84;
45,000.00
70,000.00•
5,000.00
120,000.00
100_00:
1.179,050.63
1,179,iSO.63_
973,395.00
473,3 °5.00
(21032,545.63
470,3'12.21
Building Permits, by Type
yf
For the Month of March, 200 5
010
i bEN�IAL REH'INGLE
..... .....
a
$0.00
15
RE 'NC7 NTIAL, -RESIDE
.........
3i
. ........ .. ... ..... ............
$0�00
REPLACEMENT
...... .. ....
4
0.00
03-0'
FENCE
1
$0.00
�CEMENT FLATWORK
055
SIGN
2.
$41.061
-DffdK-
... . .......
$0,00
675
"F)WEH -BAS646�i---
3
.... .. .... . . . ..... .....
. ... $0.00
101
. . . ...........................
SINGLE-FAMILY DETACHED
. ...... . ..
41
. ............. - . . ........
$394,000.00
326).. .
INDUSTRIAL
"0,00-.0-0-
�8
4�
$66200.00
329
STRUCTURES OTHER THAN BUILDINGS
$12,000,00
434
RESIDENTIAL HOME .. ADDITIONS
�IT
437
NONRESIDENTIAL & NON HOUSEKEEPING ADDITIONS
11
i
$183,000-00
ii
- .. ..... . . ...
39�
$689,800,00
---l- ........ .
. . ....... ................. ........
Number of Inspections for the month = 173
Number of Plumbing Permits for the month = 18
yf
131 MIAMI
• Parks, Recreation & Community Education Advisory Board
February 7, 2005
Members present were: Ralph Johnson, Mike Cannon and Lenore Flinn. Also present were Dolf
Moon, Lawrence Winter, Mark Schnobrich, Sara Wine and Karen McKay.
The meeting was called to order at 5:15 pm.
A motion made by Ralph Johnson and seconded by Mike Cannon approved the minutes dated
December 6, 2004. The board unanimously agreed.
OLD BUSINESS
150'" Celebration — The kick off was well received. Approximately 1,700 to 1,$00 people walked
through the history of Hutchinson display at the Event Center. Summer activities are being planned
with an emphasis on family friendly and affordable.
2005 Budget — The 2005 PRCE Budget will be reviewed at the next monthly meeting scheduled for
March 7th
NEW BUSINESS
• Introductions — Sara Witte was introduced to the board as the Natural Resource Coordinator. She
worked part -time in the Parks Division and part -time at Creekside compost facility prior to 2003
and is now full -time in the Parks Division. Some of her responsibilities in 2004 included pruning,
transplanting and re- mulching at the school properties, and organizing the Rolling Meadows
neighborhood residents for a planting project. She also worked on the prairie planting along the
Second Avenue extension.
Forestry Presentation — Mark Schnobrich, the City Forester, presented a slide show of projects from
2004 including:
- Boulevard plantings in large developments. Developers are now required to escrow money
for boulevard tree plantings.
- The Highway 15 South planting was completed. By a ratio of 3 to 1, more trees were
planted in 2004 than were removed due to disease and damage.
- Volunteer groups from Sentence To Serve, the Boy Scouts and the High School Ecology
class worked in Miller Woods eradicating foreign plant material from the Oak savannah.
Mark had a controlled burn at the Middle School near the water retention pond to promote
new growth.
When the Highway 7 project begins, there will be some boulevard trees lost due to the widening of
the highway. MNDOT generally will allocate money for landscaping on projects such as this. Dolf
. told the board that the city is responsible for the maintenance of water retention ponds and that
PRCE staff will be involved in the planning process.
5 (4 C
Minutes
•PRCE Advisory Board
February 7, 2005
Page two
Parks Presentation — Lawrence Winter, Park Resource Coordinator, summarized park projects from
2004 including the installation of a shelter and restroom in Rotary Park.
Community development long -range and short-range planning includes seeking sources for funding
development, such as grants and donations from service groups and individuals, and to continue to
utilize volunteers groups.
ADJOURNMENT
The meeting was adjourned at 6:30 pm by a motion made by Lenore Flinn and seconded by Ralph
Johnson. The board unanimously agreed.
klm
•
11
5(0' �
MINUTES
Parks, Recreation & Community Education Advisory Board
March 7, 2005
Members present were: Mike Schiesl, Mike Cannon, Beth Hepola, Lora Muilenburg, Kirk
Kosel, Lenore Flinn, and Bill Arndt. Also present were Dolf Moon, Sharon Armstrong, Mary
Haugen and Karen McKay.
The meeting was called to order at 5:15 pm.
A motion made by Kirk Kosel and seconded by Lora Muilenburg approved the minutes dated
February 5, 2005. The board unanimously agreed.
Introductions — New board member Beth Hepola was introduced to the board and staff. She has
accepted a three -year term on the board.
OLD BUSINESS
2005 Budget — Dolf distributed a budget worksheet that is used by staff and updated on a
monthly basis.
• NEW BUSINESS
Community Education — Sharon Armstrong, Community Education Programmer, presented a
slide show outlining the development of the Community Education Program in Hutchinson
beginning in 1984. Many of Community Education's adult classes were accredited until
Ridgewater College took that portion of programming over. Today's programs are geared
towards self-improvement, arts and crafts, aquatics, and healthy lifestyles.
The youth camps held during the summer months encourage the athletes to participate in sports
when they are in high school.
Finding instructors and staying current with the community's needs are always a challenge.
There are approximately 250 programs offered each year.
Burich Arena East & West — Mary Haugen, Facilities & Operations Manager, supervises the
skating program and the summer swimming program. New in 2004 was the naming of the
arenas. The Burich family made a $100,000 donation to the city to pay off the debt of the west
arena. The Youth Hockey Association now makes their ice time payment directly to the City
rather than 50% to the City and 50% to the bank. Citizens Bank has provided the City with an
ice resurfacer in 1990 and 2000. A new resurfacer will be needed by 2010. The main ice users
at the arena are the Hutchinson High School, Youth Hockey Association, Figure Skating
Association, tournament use, and private rentals. The ice will be removed from the arena after
the annual figure skating show and a circus and a wrestling meet are scheduled following. The
. six weeks of summer ice will be in the west arena this year.
s[a��
Minutes
. PRCE Advisory Board
March 7, 2005
Page two
Rec Center/Pool Report — The high school uses the Rec Center gym Monday through Friday
from 2:45 -6:00 pm for practice. Adult volleyball leagues use the gym Monday through
Thursday in the evenings. Some of the improvements in the Rec Center in 2004 included a new
gym floor, gym lighting, scoreboards, aluminum siding on the upper walls in the gym, and lobby
rugs.
Kirk Kosel, a volleyball league player, noticed that the noise level increased in the gym with the
replacement of the scoreboards.
Mary told the board that the summer swimming lesson program remains steady with 1,000
participants. He also showed the board a comparison of open swim participants from 1984 -2004.
The summer of 2004 was unusually cool. Mechanically the pool is okay, however with no
exciting amenities for swimmers to play on, the participation at open swim is greatly reduced.
A diagram for an improved outdoor pool has been done including an area for lap swimmers, drop
slides, spray features, shallow water play, zero depth beach area, sand volleyball and sand play.
This would be a $1.5 million project. The restrooms and bathhouse would need to be renovated
. to meet the state capacity mandates. The mechanical room would also be moved to a separate
area near the pool.
Mary is investigating funding options, including a'' /a cent sales tax referendum, bond issue
referendum, capital improvement project and revenue bonds. Willmar had a project that was
built with a % cent sales tax and was able to sunset the tax early. Dolf told the board that now is
the time to take a serious look at the situation with the pool being 20 years old and that there are
going to be maintenance issues coming. He will be watching to see what other communities are
doing to raise funds for other large projects.
Bill Arndt asked Mary about the reduction in open swim hours at the outdoor pool. Mary told
the board that the pool was operating on a shorter day than two years ago and the season was
also shortened by a week.
BOARD MEMBER ITEMS
Bill Arndt asked what the cost of outdoor ice rinks is. Dolf told the board that it cost $8,000-
$9,000 and that this year was a short season. Bill wondered if the PRCE Department considered
reducing the fee for indoor open skate and get rid of the outdoor ice rinks. Dolf told the board
that the full fee needed to be paid in order to operate the indoor ice rinks.
ADJOURNMENT
The meeting was adjourned at 6:20 pm by a motion made by Kirk Kosel and seconded by Lora
Muilenburg. The board unanimously agreed.
SCQj �
0
rIL
Ordinance No. 05 -0400
Publication No.
SECTION 53.103 SERVICE CHARGES; USER CATEGORIES
(C) Category B sewer services charges
(1) The charge for BOD in mg1I in the wastewater above 200 mg/l, based on the total
pounds of BOD, shall be revised from $0.43 per pound to $0.32 per pound.
(2) The charge noted shall be effective July 1, 2005.
Adopted by the City Council this 12'h day of April, 2005.
Attest:
Gary D. Plotz, City Administrator
Steven W. Cook, Mayor
56 ,6) 1
ORDINANCE NO. 05-0401
0 PUBLICATION NO.
AN ORDINANCE OF THE CITY OF HUTCHINSON, MINNESOTA, AUTHORIZING THE
CONVEYANCE OF MUNICIPALLY OWNED REAL PROPERTY
THE CITY OF HUTCHINSON ORDAINS:
Section 1. That the municipally owned real property legally described as follows:
That part of Lots 1, 2, 3, 4, 5, 6, 7 and 8, all in Block 21 NORTH HALF OF
HUTCHINSON, according to the recorded plat, and that part of the North 16.50 feet of
Fourth Street (now known as Third Avenue NW) as vacated by, resolution passed and
adopted by the City Council of the City of Hutchinson on the I4 day of October, 1915,
lying southerly of aline drawn parallel with and 8.50 feet northerly, measured at right
angles, from the centerline of the main track of the former Burlington Northern Inc, as
said track was located on February 12, 1991, and lying westerly o£ the east line of said
Lot 1 and its southerly prolongation and lying easterly of the east line of the West 20.00
feet of said Lot 8 and rts southerly prolongation.
for good and valuable consideration thereto, is hereby sold and conveyed to the Southwest
Minnesota Foundation, together with all hereditaments and appurtenances belonging thereto.
Section 2. This ordinance shall take effect upon its adoption and publication.
• Adopted by the City Council this 12'h day of April, 2005.
ATTEST:
Gary D. Plotz
City Administrator
Cl
Steven W. Cook
Mayor
5��
0
PUBLICATION NO.
ORDINANCE NO. 05-0402
AN ORDINANCE OF THE CITY OF HUTCHINSON, MINNESOTA
VACATING UTILITY AND DRAINAGE EASEMENTS IN LOTS 1— 6, AND LOTS 13 — 20,
BLOCK 2, BLOCK 4 AND BLOCK 5, SOUTHFORK RIDGE
THE CITY COUNCIL OF THE CITY OF HUTCHINSON, MINNESOTA ORDAINS:
Section 1. Notice of hearing was duly given and publication of said hearing was duly made and
was made to appear to the satisfaction of the City Council that it would be in the best interests of
the City to vacate utility and drainage easements located in Southfork Ridge, Lots 1 — 6 and 13-
20, Block 2, Block 4 and Block 5, for the purposes of a replat.
Section That the utility and drainage easements to be vacated are described as follows:
The drainage and utility easements as dedicated on Lot I through Lot 6, inclusive, Lot 13 through
Lot 20, inclusive, Block 2, Lot 1 through Lot 6, inclusive, Block 4 and Lot 1 through Lot 8,
inclusive, Block 5, all in the plat of Southfork Ridge, according to the recorded plat thereof,
Mcleod County, Minnesota.
Section 3. This ordinance shall take effect from and after passage and publication,
• Adopted by the City Council this 12* day of April, 2005.
ATTEST:
Gary D. Plotz
City Administrator
Cl
Steven W. Cook
Mayor
,5C M3
RESOLUTION NO. 12668
RESOLUTION APPROVING PRELIMINARY AND FINAL PLAT TO BE KNOWN AS
. SWMF ADDTION SUBMITTED BY SOUTHWEST MN FOUNDATION LOCATED ON THE
SW CORNER OF HWYS 7 AND 15
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUTCHINSON, MN:
FINDINGS
1. The applicant has submitted a two lot preliminary and final plat to be known as SWMF Addition. The
property is a combination of torrens and abstract lots.
Legal Description: All that part of Lots 1 and 2, Block 21 in the Townsite of Hutchinson, North One-
Half, according to the map or plat thereof on file and of record in the office of the
County Recorder in and for McLeod County, Minnesota, described as follows, to -wit:
Beginning at the Northeast corner of the above - described Lot 1, Block 21; thence
South along the East line of Lot I to a point which is 8 feet North measured at right
angles from the center line of Minnesota Western Railway spur track known as the
house track #ICC 38; thence Westerly parallel and distant 8 feet measured at right
angles from the center line of said spur track to the West line of the above- described
Lot 2; thence North to the Northwest corner of said Lot 2; thence Southeasterly along
the North boundary line of the said Lot 2 and the said Lot 1 to the point of beginning.
Also, Lots 3 and 4, Block 21, Townsite of Hutchinson, North One -Half, excepting
therefrom the South 75 feet thereof, according to the map or plat thereof on file and of
record in the office of the County Recorder in and for McLeod County, Minnesota.
Also, Lot 5, Block 21 in the North Half of the City of Hutchinson, except the South 75
feet thereof, according to the map or plat thereof on file and of record in the office of
the County Recorder in and for McLeod County, Minnesota.
ALSO,
That part of Lots One (1), Two (2), Three (3), Four (4) and Five (5), all in Block
Twenty-one (2 1) in the Townsite of Hutchinson, North Half, and the North 16.5 feet of
that part of Fourth Street (now known as Third Avenue Northwest) lying Southerly of
and adjoining said Block 21, lying Southerly of the following described line:
Commencing at a point on the Easterly line of Lot 1 of Block 21, lying 31.49 feet
Northerly of the Southeast comer thereof (which point is distant 8 feet Northeasterly,
measured at right angles or radially, from the center line of Minneapolis Industrial
Railway spur or house track I.C.C. #38, being the most Northerly side track Northerly
of the main track of said Railway Company, as said tracks were located on January 15,
1973; thence North 74 degrees 1 minutes 28 seconds West (parallel to said spur or
house track center line as the same was located on January 15, 1973) a distance of
50.00 feet; thence Northwesterly and Westerly along a tangential curve to the left
having a radius of 3,000 feet and a chord bearing North 80 degrees 24 minutes 54
seconds West (parallel to said spur or house track center line as the same was located
on January 15, 1973) a distance of 93.76 feet, more or less, to the West line of Lot 2,
• being also the East line of Lot 3, said Block 21; thence Northerly along the West line
of Lot 2, being also the East line of Lot 3, a distance of 14.89 feet, more or less to a
point on the North line of the South 75.00 feet of said Lot 3; thence North 89 degrees
41 minutes 40 seconds West along the North line of the South 75.00 feet of said Lot 3
5 L�6y
Resolution No. 12668
Preliminary and Final Plat -- SWMF Addition
Southwest MN Foundation
Page 2
and of hots 4 and 5 in said Block 21, a distance of 210.82 feet, more or less, to a point
on the West line of Lot 5, being also the Bast line of Lot 6, said Block 21; thence
Northerly along the West line of Lot 51 being also the East line of Lot 6, said Block 21,
a distance of 33.43 feet, more or less, to a point on the East line of Lot 6 lying 108.47
feet Northerly along said East line from the Southeast comer of said Lot 6; thence
North 89 degrees 41 minutes 40 seconds West a distance of 70.02 feet, more or less, to
the West line of Lot 6, being also the East line of Lot 7, said Block 21; thence
Northerly along the West line of Lot 6, being also the East line of Lot 7, said Block 21,
a distance of 23.45 feet, more or less, to the intersection with the Easterly extension of
the North line of the South half of Lots 9 and 10, as described in Book U of Deeds,
Page 354 (being also the North line of the South half of Lots 7 and 8); thence Westerly
along said Easterly extension of the North line of the South half of Lots 9 and 10
(being also the North line of the South half of Lots 7 and 8) to the Westerly line of Lot
8, said Block 21, and there terminating. And lying Northerly of aline drawn parallel
with and 8 '/2 feet Northerly, measured at right angles, from the centerline of the main
track of the Burlington Northern, Inc., as said main track is now laid out and located.
ALSO,
That part of Lots 6,7 and 8 of Block 21, NORTH HALF OF HUTCHINSON, lying
Northerly of a line described as follows:Commencing at a point on the east line of Lot
1 of said Block 21, a distance of 31.49 feet northerly from the southeast corner of said
. Lot 1, said point being 8 feet northeasterly as measured at a right angle, from the
centerline of Minneapolis Industrial Railway spur or house track I.C.C. No. 38, being
the most northerly side track northerly of the main track of said Railway Company, as
said tracks were located on January 15, 1973; thence North 74 degrees 01 minutes 28
seconds West, parallel with said spur track centerline as said tracks were located on
January 15, 1973 (the south line of said Block 21 is assumed to have a bearing of
South 89 degrees 41 minutes 40 seconds East) a distance of 50.00 feet; thence
westerly, parallel with said spur track centerline as said tracks were located on January
15, 1973, a distance of 93.76 feet along a non - tangential curve, said curve is concave
to the south, has a radius of 3,000.00 feet and a central angle of 1 degree 47 minutes
26 seconds and the chord of said curve bears North 80 degrees 24 minutes 54 seconds
West, to the East line of Lot 3 of said Block 21; thence northerly along the east line of
said Lot 3, a distance of 14.89 feet to the north line of the South 75.00 feet of said Lot
3 and Lots 4 and 5 of said Block 21, a distance of 210.82 feet to the east line of said
Lot 6; thence northerly along the east line of said Lot 6, a distance of 33,43 feet to a
point 108.47 feet northerly from the southeast comer of said Lot 6, as measured along
the east line of said Lot 6 to the beginning of the line to be described; thence westerly,
parallel with the south line of said Block 21, a distance of 70.02 feet to the west line of
said Lot 6; thence northerly, along said west line of Lot 6, a distance of 23.45 feet to
the intersection with the easterly extension of the north line of the South half of Lot
10 of said Block 21, as said north line is described in Book U of Deeds on Page 354 in
the office of the County Recorder of McLeod County, Minnesota; thence westerly,
. along said easterly extension, a distance of 138.76 feet to the west line of said Lot 8
and said line there terminating.
EXCEPT therefrom the West 20.00 feet of said Lot 8.
Resolution No. 12668
Preliminary and Final Plat - SWMF Addition
Southwest MN Foundation
Page 3
ALSO,
• That part of Lots Six (6), Seven (7), and Eight (8), in Block Twenty-one (21) in the
Townsite of Hutchinson, North Half, and the North 16.5 feet of that part of Fourth
Street (now known as Third Avenue Northwest) lying Southerly of and adjoining said
Block 21, lying Southerly of the following described line: Commencing at a point on
the Easterly line of Lot 1, said Block 21, lying 31.49 feet Northerly of the Southeast
corner thereof (which point is distant 8 feet Northeasterly, measured at right angles or
radially, from the center line of Minneapolis Industrial Railway spur or house track
LC.C. #38, being the most Northerly side track Northerly of the main track of said
Railway Company, as said tracks were located on January 15, 1973; thence North 74
degrees 1 minute 28 seconds West (parallel to said spur or house track center line as
the same was located on January 15, 1973) a distance of 50.00 feet; thence
Northwesterly and Westerly along a tangential curve to the left having a radius of 3000
feet and a chord bearing North 80 degrees 24 minutes 54 seconds West (parallel to
said spur or house track center line as the same was located on January 15, 1973) a
distance of 93.76 feet, more or less, to the West line of Lot 2, being also the East line
of Lot 3, said Block 21; thence Northerly along the West line of Lot 2, being also the
East line of Lot 3, a distance of 14.89 feet, more or less to a point on the North line of
the South 75.00 feet of said Lot 3; thence North 89 degrees 41 minutes 40 seconds
West along the North line of the South 75.00 feet of said Lot 3 and of Lots 4 and 5 in
said Block 21, a distance of 210.82 feet, more or less, to a point on the West line of
. Lot 5, being also the East line of Lot 6, said Block 21; thence Northerly along the West
line of Lot 5, being also the East line of Lot 6, said Block 21, a distance of 33.43 feet,
more or less, to a point on the East line of Lot 6 lying 108.47 feet Northerly along said
East line from the Southeast comer of said Lot 6; thence North 89 degrees 41 minutes
40 seconds West a distance of 70.02 feet, more or less, to the West line of Lot 6, being
also the East line of Lot 7, said Block 21; thence Northerly along the West line of Lot
6, being also the East line of Lot 7, said Block 21, a distance of 23.45 feet, more or
less, to the intersection with the Easterly extension of the North line of the South half
of Lots 9 and 10, as described in Book U of Deeds, Page 354 (being also the North line
of the South half of Lots 7 and 8); thence Westerly along said Easterly extension of the
North line of the South half of Lots 9 and 10 (being also the North line of the South
half of Lots 7 and 8) to the Westerly line of Lot 8, said Block 21, and there terminating
and lying Northerly of a line drawn parallel with and 8 '/x feet Northerly, measured at
right angles, from the centerline of the main track of the Burlington Northern, Inc., as
said main track is now laid out and located.
EXCEPT the West 20 feet of said Lot 8 and except the West 20 feet of the North 16.5
feet of that part of Fourth Street (now known as Third Avenue Northwest) lying
Southerly of and adjoining said Lot 8, Block 21.
ALSO,
That part of Lots 1, 2, 3, 4, 5, 6, 7 and 8, all in Block 21, NORTH HALF OF
• HUTCHINSON, according to the recorded plat, and that part of the North 16.50 feet
of Fourth Street (now known as Third Avenue NW) as vacated by resolution passed
and adopted by the City Council of the City of Hutchinson on the 10 day of October,
1915, lying southerly of a line drawn parallel with and 8.50 feet northerly, measured at
right angles, from the centerline of the main track of the former Burlington North
em Y
Resolution No. 12668
Preliminary and Final Plat — SWMF Addition
Southwest MN Foundation
Page 4
hie. as said track was located on February 12, 1991, and lying westerly of the east line
•
of said Lot 1 and its southerly prolongation and lying easterly of the east line of the
West 20.00 feet of said Lot 8 and its southerly prolongation.
2. The City Council has considered the recommendation of the Planning Commission and the effect of the
proposed use on the health, safety, and welfare of the occupants of the surrounding lands, existing and
anticipated traffic conditions, and the effect on values of properties to the surrounding area and the effect of
the use on the Comprehensive Plan.
3. The Council has determined that the proposed use is in harmony with the general purpose and intent of the
Zoning Ordinance and the Comprehensive Plan, if the conditions, as outlined below are met.
CONCLUSION
The City Council hereby approves the preliminary and final plat with the following conditions:
1. Revise plans with the updated building location as provided in the architectural
details 3/4/05 and additional comments by City Engineer.
2. Verify what will be done with the storm sewer line on the property. MNDOT
verified they will be relocating the line 3/9/05.
3. Landscaping is a high priority. A landscaping plan must be provided. This has
been completed, however the conditional use permit should state that the
landscaping plan, in its entirety will not be completed until September of 2007.
4. The platting of the property has been presented. Revised drawings of the
Outlot being part of the larger lot, should be submitted when the transfer of
land has been established and then the City Council could review the
Preliminary and Final Plat portions of the request.
5. A definitive plan on power poles must be received. Definitive dollar figures
have been provided to the applicant. No response to this issue has been
received at the date of this repot -.
Adopted by the City Council this 12th day of April, 2005
ATTEST:
Gary D. Plotz
City Administrator
0
Steven W. Cook
Mayor
-5$��
• .����.�w,.�. - - - - -- —— �•:w�- _�...YMEMOBANAUM =_:—:. �a:, , �: �::, �, M�„' �,• „,, :::•,.,•�.,:��.���.�••�,_ =�.�.•
TO: MAYOR AND CITY COUNCIL
FROM: RANDY DLVRIES — WATER /WASTEWATER DIRECTOR
SUBJECT: FUNDING LIST FOR WASTWATER IMPROVEMENTS
DATE: 3/25/2005
I am requesting a resolution of support to place the City of Hutchinson's
Wastewater Facility on the "Water Pollution Control Revolving Fund” list with the
MPCA. This will help us in securing either a grant or loan for the upcoming
Wastewater improvements.
Respectfully,
Y
`J
Randy eyries
Cc: John Rodeberg
Gary Plotz
John Olson
Kent Exner
Melissa Starke
Becca Cooper
L�
.511 �6
RESOLUTION NO. 12681
• RESOLUTION IN SUPPORT OF APPLYING
FOR
THE WATER POLLUTION CONTROL REVOLVING FUND
ALSO CALLED — STATE REVOVING FUND - (SRF)
AND TO BE PUT ON
THE PROJECT PRIORITY LIST (PPL) AT THE MPCA
TO BE ELIGIBLE FOR THE SFY 2006 INTENDED USE PLAN (IUP)
WHEREAS, the City of Hutchinson Wastewater Treatment Facility is requesting
placement on the Project Priority List (PPL) to the MPCA for eligibility for funding from
the Water Pollution Control Revolving Fund, also called the State Revolving Fund (SRF)
for the SFY 2006 IUP for improvements to the Wastewater Treatment Facility, and;
WHEREAS, the City of Hutchinson WWTF hereby expresses its official intent to use
the proceeds of this loan to reimburse construction expenditures that will occur between
2005 -2009 outlined in the Capital Improvement Plan. The estimated cost is $8,800,000,
and;
WHEREAS, the City of Hutchinson WWTF has the legal authority to apply for the loan,
and the financial, technical, and managerial capacity to repay the loan and ensure proper
construction, operation, and maintenance of the project for its design life.
• THEREFORE, BE IT RESOLVED, by the City Council of the City of Hutchinson to
support the Hutchinson Wastewater Treatment Facility applying for the Water Pollution
Control Fund and to be put on the Project Priority List at the Minnesota Pollution Control
Agency to be eligible for the State Revolving Fund 2006 Intended Use Plan.
Adopted by the Hutchinson City Council this 12`h day of April 2005.
ATTEST:
Gary D. Plotz
City Administrator
0
Steve W. Cook
Mayor
5 /b)5
RESOLUTION NO. 12682
CITY OF HUTCHINSON
RESOLUTION FOR PURCHASE
The Hutchinson City Council authorizes the purchase of the following:
ITEM I COST I PURPOSE I DEPT, I BUDGET I VENDOR
We following items were authorized due to an emergency need:
ITEM
COST
PURPOSE
DEPT.
BUDGET
VENDOR
8,500 Unleaded Gas
$15,687
Resale
HATS
YES
Schmeling Oil
Date Approved:
19 Motion Made By:
Seconded By:
Resolution submitted for Council action
by:
5�6)�)
• RESOLUTION NO. 12690
RESOLUTION ACCEPTING PLEDGED SECURITIES
FOR COLLATERAL FROM MIDCOUNTRY BANK, HUTCHINSON, MN.
WHEREAS, MidCountry Bank a city depository, has requested the
following securities be released under collateral agreement with
the City of Hutchinson:
FNMA ref
931027K00007
$2,000,000
08 -25 -23
FNMA ref
92013OK00001
$2,000,000
01 -25 -22
FNLB ref
040311K00022
$3,000,000
08- 25.23
AND, MidCountry Bank has requested the following security be
added under the collateral agreement with the City of Hutchinson:
FNMA (pool 254914) 09 -01 -13 cusip31371LDT3 $6,350,000
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUTCHINSON,
MINNESOTA:
THAT the City Finance Director be authorized to release and
accept the securities effective March 22, 2005.
0 Adopted by the City Council this 12th day of April 2005.
ATTEST:
Gary D. Plotz
City Administrator
•
even W. Cook
Mayor
JIJ
RESOLUTION NO. 12691
• . RESOLUTION APPROVING PLEDGE SECURITY FOR
COLLATERAL FROM HOME STATE BANK
OF HUTCHINSON, MINNESOTA
WHEREAS, the Home State Bank of Hutchinson, a City Depository,
has presented collateral as follows for the City of Hutchinson:
Columbia Heights MN GO Cusip 198684LA9 02/01/2013 $5,000
BE IT RESOLVED by the City Council of the City of Hutchinson,
Minnesota that the Finance Director be authorized to accept said
security as collateral effective March 23, 2005 and that said
collateral be deposited for safekeeping.
Adopted by the City Council this 12th day of April, 2005
• ATTEST:
Gary D. Plotz
City Administrator
Steven W Cook
Mayor
5��9
F-1 L
•
r
111 "Man Street Southeast
Hutchinson, MN 55350
(320)587- 5151/Fax'(320)234.4240
City of Hutchinson
APPLICATION FOR PEDDLERS, SOLICITORS, AND TRANSIENT MERCHANTS
All applications must be received at least 30 days before event in order to be considered
Application Type (choose one)
❑ Solicitors $100.00
ATransient Merchant $100.00
❑ Peddler $100.00
AEplicant Information
2" X 2" Picture Required
Name: _ �Qic%4I/ LLIIeN SE' p
t,1! Srdv
Height: to -_f Weight 730 Eye Color: 4W "A
Driver's License Number:
State: MAI
Permanent Address: y/
cry — stare
r
zip
Permanent Telephone: lz) 7f6���7
Temporary Address:
City Start
Zip
Temporary Telephone Access:
Have you been convicted of any crime, misdemeanor, or violation of any municipal ordinance, other than
traffic violations? U yes p no
If yes, state the nature of offense and
punishment or penalty assessed therefore:
,5(s)
•
L
City of Hutchinson
Application for Peddlers. Solicitors, and Transient Merchants
Page 7 of 3
Location
Address
Business Information
Describe relationship between applicant and employer:
�1 it
Describe nature of business and describe item(s) offered:
Arl Z >L e r r:GS q
//
,"r .I/
F3
Describe method of delivery:
eQ
Describe source of supply:
/+ ^
A�anY 17/�F�►% Grdrwerc• --Y � alrrrrrJ --
Supplier Name
Suppler Phone Number
Supplier Address
City
State ZIP
Supplier Name
Suppler Phone Number
Supplier Address
City
State Zip
Supplier Name
Suppler Phone Number
Su her Address
city
Slate Z
Provide two (2) property owners (preferably in McLeod County) for character references:
—_,;5E-Jay Rkf a.%/ 952 3 - 131.41E
Property Owner Name •� Property Owner Phone Number
! O F+, u I7rNC ame lrri,P -i6 NOV jw --,Nq
Property Owner Address Ciry Slate Zip
Gt/kv Lleer4ges3 _ (30'1) -yo- .57s
Property Owner Name Property Owner Phone Number
)tw 41(A
State zip
5(J
City ofHnlchinson
Application for Peddlers, Solicitors, and Transient Merchants
Page 3 of 3
r]
List last (up to three (3)) previous city(ies) where you carried on same activity:
�N s r 10
City State Date(s) of Activity
fiae #A/ - &7 40% Y ys
Cfty $talc Dale(s) of Activity
L�c 7itG i. r ekes .04/ i "d to t
City state Dates) of Activity
The following items need to be completed and /or attached in order for the application to be processed:
Applicationflnvcstigation fee paid in full (check or money order): yes O no
in full and
Cl no
I hereby certify 1 have completely filled out the entire above application and that the application is true, correct, and accurate.
I fully understand that any person who violates any provision of the Peddlers, Solicitors, and Transient Merchants Ordinance
No, 673 is guilty of a misdemeanor and upon conviction thereof shall be punished by a fine not exceeding $1,000.00 or by
imprisonment for a period not exceeding 90 days or both, plus, in either case, the costs of prosecution.
11
Police 17 approved
//
Applicant's
❑ denied Notes'
City Council Q approved ❑ denied Notes:
H $OWk t. IMMIOMAK
/ 1
L-A
3- fy eu _
Dare
'5 (C-)
APPLICATION FORK FOR
TEMPORARY RECYCLABLE MATERIAL COLLECTION
NAME AND ADDRESS OF OWNER
�d ktsk
Ma. c2 Ike h
427,s- / , �. o
& r _S75 -5 13
DRIVER'S LICENSE Its L kyA-R/7- 0&- / -O ry
c2S�
If, on -site operator is different than owner list names,
e_'P-� eaj'
C4Lr( S
LOCATION PROPOSED FOR TEMPORARY RECYCLING SITE:
• WQ �^ dLY' I h �f r
ZONING CLASSIFICATION OF ABOVE SITEi
WHICH DAY OF THE WEEK AND HOURS DO YOU ANTICIPATE OPERATING?
S DAY OF WEEK
HOURS
SPECIFY HERE OR ATT CH S�,4,0 - QF n FOR OYi . Y0E1�R PERIOD OR
MOREL E ✓cr4 �a // fj�, { `
LIST HOUSEHOLD ITEMS YOU PLAN TO SOLICIT OR ACCEPTv
A%cm . 0"5
,54
SUMMARY OF REGULATIONS
LIMITING THIS ACTIVITYx
NO SHREDDING OR STOCKPILING OF MATERIAL ON SITE (ORDINANCE 90 -24)
SEPARATORS AND COMPACTORS ALLOWED ONLY IF WITHIN VEHICLE OR NOT
ACCESSIBLE TO PUBLIC (ORDINANCE 90 -24)
NO COLLECTION WITHIN 200 FT. OF COMMERCIAL BUILDING OR 300 FT. OF
RESIDENCE (ORDINANCE 90 -24)
NO SIGNAGE ALLOWED, EXCEPT ATTACHED TO COLLECTION VEHICLE
(ORDINANCE 90 -24)
NO COLLECTION (OR SIGNAGE) ON CITY BOULEVARDS OR STREETS (CHAPTER
7 MUNICIPAL CODE)
ONLY HOUSEHOLD RECYCLABLES (EXAMPLE NEWSPAPERS, PLASTIC, GLASS,
METAL CANS) (ORDINANCE 90 -24)
WEIGHT SCALES SHALL BE CERTIFIED (STATE REGULATIONS)
I hereby agree to abide by ordinance number 90 -24 and all
other applicable State and city of Hutchinson Municipal Codes and
Regulations.
• Signature required owner /operator
Copies of ordinance(s) available upon request.
OFFICE USE
Application Approved
City Administrator
Copies Forwarded ( ),
Police Chief ( )
Zoning Official
City Attorney ( )
is
C) (CA)
r-1
LJ
March 9, 2005
Gary Plotz, City Administrator
City of Hutchinson
111 Hassan Street SE
Hutchinson, MN 55350
Hutchinson Jaycee Water Carnlual
PC Box 624
Hutchinson, MN 55359
www.watercarnival.nrg
Gary,
The 63rd Annual Hutchinson Jaycee Water Carnival will be held from June 1311' — 1911' this
year, and the entire committee is working hard to prepare for it. We are requesting that
. approvals and permits be issued for the 2005 Water Carnival as follows:
1. Close the appropriate streets and issue a Parade permit for the Grande Day Parade on Sunday, June
19'", from 11:00 AM to 4:00 PM. This year's parade route is different from last year. The parade will be
starting at the intersection of Hwy 15 and 3'd Avenue NW. The parade will go south on Main Street to e
Avenue where it will head west. It will continue to Lynn Road and head south. From there it will go west
on Linden Avenue and will end at the Rec Center dispersing on Harrington and Sunset. 3rd Avenue SW
and Les Kouba Parkway will serve as the staging area for the units. The bands will stage in Fireman's
Park and the Wells FargolShopko parking lot, providing they allow it.
2. Close or monitor intersections at all necessary points for Parade Route on Sunday, June 19'", from 10:00
AM to 4:00 PM.
3. Issue a permit to operate concession stands at the Grande Day Parade on Sunday, June 19"' in Library
Square or on 1"Avenue NE from Main Street to Hassan Street.
4. Issue a permit for the Water Carnival Outdoor Dances on Friday, June 17'" from 8:30 PM — 12:00
midnight and Sunday, June 19'" from 6:30 PM — 10:00 PM. Both dances will be held at the McLeod
County Fairgrounds. The committee requests that a police officer be provided for supervision and crowd
issues. The Water Carnival committee will be selling beer at these dances (see item 6.)
5_ Issue a permit for a fireworks display on Sunday, June 19"' beginning at approximately 10:00 PM at the
McLeod County Fairgrounds. Fire Chief Brad Emans will be notified concerning the display of fireworks.
The Water Carnival committee will arrange to have Sheriff Department, Fire Department and Ambulance
support on hand.
6. Issue anon -intoxicating liquor license for liquor sales on the following datestevents:
a. Friday. June 18 °' — McLeod County Fairgrounds from 8:30 PM -- 12:00 midnight
. b. Sunday, June 20"' — McLeod County Fairgrounds from 6:30 PM — 10:00 PM
Page 1 of 2
r-1
L-A
r�
0
Hutchinson la➢cee Water Carniuel
PI Box 624
Hutchinson, MM 55abo
www,watercarniva.l..orq
7. We have contracted with Mini Biff, Inc to provide portable lavatory services for the Grand Day Parade
route, Parade Ma Bing area, and Carnival Midway area.
The Water Carnival is a non- profit event, and the Jaycees would appreciate the waiver of any
fees or rentals during the duration of the Water Carnival to help defray expenses. We
appreciate the assistance received from the City of Hutchinson and its staff, and we could not
have a community celebration without this support.
I am in the process of obtaining a certificate of liability insurance coverage. I will make sure
you receive a copy.
If you should have any questions or concerns, or would like additional information, please
contact me at the numbers shown below.
nk you,
Dave Kramer
Commodore, 2005 Hutchinson Jaycee Water Carnival
(320) 587 -8888 (work)
(320) 587 -0885 (home)
(320) -4220 (mobile) s33 --�aao
kramer @hutchtel.net
Page 2 of 2
cc; Steve Cook, Mayor
Dan Hatten, Chief, HPD
grad Emans, Fire Chief
Dolf Moon, PRCE I7irector
die.
. .
AGRICULTURAL LEASE AGREEMENT
THIS LEASE AGREEMENT, made this day of _ 2005, by and
• between the City of Hutchinson, C' Lessor'), and Marvin Willhite, C Lessee').
1. ro{�,rly Description: Lessor hereby rents to Lessee in consideration of the rents and promises
hereinafter described the following property located in the City of Hutchinson, County of Mcleod
and State of Minnesota, described as follows:
That portion of the former railroad right -of -way between an extension of the south line of
the Willhite property located at 465 High Street NE, north to a point located on the south
line of the property located at 306 Highway 7 East.
2. Jg. The term of this Lease commences on the date of execution of this agreement and
terminates on the 31+k day of December, 2005.
3, R= Lessor agrees to pay Lessee $1 for the term of this lease agreement upon execution of this
agreement.
4. Purpos . The Lessor and Lessee understand and agree that fruits and vegetables will be planted
on the above - described property and the rail bed area itself shall not be disturbed during this process.
5. is Rasponsibilities, Lessor reserves the right to construct improvements, access or utilize
the property as long as any disturbance is limited to an area within 10 feet either side of the center of
the railroad corridor (former track). Any disturbance outside of this area will require a 30-day notice
to Lessor and an estimated damage to crops agreed upon between the parties will be paid to the
Lessor. Damage estimates may be subject to mediation.
6. Lessee's Responsibilities. Lessee shall be responsible for doing the following:
The Lessee shall occupy the premises for agricultural purposes only, The Lessee will use normal,
customary agricultural practices in the care and maintenance of the property and, without
limiting normal practices, keep the premises free of noxious weeds to the extent possible. Lessee
shall also maintain adjoining land (mowing, cleanup, etc.)
The Lessee agrees to comply with all statutes, ordinances, rules, orders, regulations, and
requirements of the federal, state, county, and municipal governments regulating the use of the
premises.
The Lessee shall allow access to the property by the Lessor and its agents during all reasonable
• hours for the purpose of examining the property to ascertain compliance with the terms of this
Lease and for any other lawful purpose including, but not limited to, exhibiting the property for
sale.
5(�
The Lessee shall not remove or move any existing structures or improvements made to the
property by the Lessor. The Lessee may not store equipment on the property for periods
exceeding one week without coordinating such storage with the Lessor.
The Lessee shall pile rocks or other items taken out of any field in areas designated by the
Lessor, if any.
The Lessee shall cultivate all fields prior to the termination of this lease.
7. Independent Entities. The Lessor does not retain the Lessee as an agent of the organization.
The Lessee does not retain the Lessor as an agent of himself. The Lessor shall not provide to the
Lessee, its agents or employees, any benefits or expenses, including, but not limited to insurance for
liability or property, or ordinary business expenses.
8. Costs associated The Lessor is not responsible for paying any of the Lessee's
costs associated with this Lease, including preparation of the property for agricultural use. The
Lessee shall pay all costs related to farming the property, including the cost of cultivating property
back at the end of this lease.
9. Insurance. The Lessee shall acquire and maintain property and /or liability insurance adequate
for their operations conducted on the property. The Lessee shall provide proof of insurance upon
request by the Lessor. The Lessee, while performing any service or function related to this lease,
. agrees to indemnify, save and hold harmless, defend the Lessor and all its agents and employees from
any and all claims, demands, actions or causes of action of whatever nature or character arising out of
or by reason of the execution or performance of functions provided in accordance with this
agreement.
10. ,Assignment and Subletting prohibited. Lessee agrees to assign or sublease the premises only
with the written consent of the Lessor. If the Lessor does not consent, it may, at its option,
terminate the lease.
11. Surrender gf Possession, The Lessee shall surrender the property to the Lessor in good
condition and repair upon termination of the Lease, whether by lapse of time or otherwise.
12, Termjn The Lessor may, after providing 90 days written notice take possession
of the property for any purpose deemed in the best interest of the organization. The Lessor shall
allow the Lessee to remove vegetation with normal, customary practices. .
13. u0 ret,$pjvment. The Lessor promises that the Lessee shall peaceably and quietly have, hold,
and enjoy the ]eased property for the term of this Lease provided Lessee performs the promises
• described herein. Lessor will still be responsible to pay costs as noted in 3(b) above.
s(g)
al �
14. Lessee's Default. Rights and remedies of the Lessee are cumulative. None shall exclude any
other right or remedy allowed by law or other provision of this agreement. In the event of one of
the following acts, the Lessee shall be in default
• a) Lessee fails, neglects, or refuses to keep and perform any conditions of this Lease, and if
such failure continues for a period of 30 days after written notification by the Lessor.
b) Should the Lessee make any assignment of any interest in this Lease to any entity without
the written consent of the Lessor.
In the event of any default or violation of this Lease continuing more than 30 days after written
notification by the Lessor to the Lessee of default, the Lessor may enter into and take absolute
possession of the property. Possession of the property in these conditions does not relieve the
Lessee of the obligation to pay the rent or abide by other conditions of the Lease.
In the event of any default or violation of the Lease continuing more than 30 days after written
notification by the Lessor to the Lessee of a default, the Lessor may return any rents paid by the
Lessee for that year and lease the property to another tenant.
15. Lease Agreement is Binding This Lease Agreement shall be binding upon the parties hereto and
their heirs, successors and assigns.
• 16. Notification. Notification related to lease shall be sent to the following addresses:
Lessee: Marvin Willhite Owner's Gary D. Plotz
465 High Street NE Representative: City of Hutchinson
Hutchinson, MN 55350 111 Hassan St SE
Phone (320) 587 -7766 Hutchinson, MN 55350
Phone (320) 587 -5151
IN TESTIMONY WHEREOF, the Lessor and Lessee have set their hands as of the day and year
fast above written.
LESSEE
STEVEN W. COOK, MAYOR
CITY OF HTUCHINSON
GARY D. PLOTZ, CITY ADMINISTRATOR
CITY OF HUTCHINSSON
•
LESSOR
MARVIN WILLHITE
5(S)
•
•
M. E M C.-) R A N D [J M
TO: Mayor and City Council
FROM: Kent Exner, City Engineer
Dan Hatten, Director of Police Services
RE: Consideration of Awarding Emergency Generator Upgrade Bid (Letting
No.16/Project No. 05 -18)
DATE: April 8, 2005
Attached is the Resolution Accepting Bids and Awarding Contract in regards to the Emergency
Generator Upgrade project.
Bids were received and opened on Friday, April 8'h. We have reviewed the bid data and researched
the respective low- bidder. The Engineer's opinion of probable cost of construction was $140,000.
We recommend awarding this project as described in the attached Resolution.
cc: GaryPlotz — CityAdminioator
John Rodeberg — Director of Public Works
G:Ymp�d Pro*CNV 16.0&18 CN hW1 �l Memo Bid Award.DDC
RESOLUTION NO, 12683
• RESOLUTION ACCEPTING BID AND AWARDING CONTRACT
LETTING NO. 16
PROJECT NO. 05-18
Whereas, pursuant to an advertisement for bids for the furnishing of all labor and material for
the following described improvement:
Design /Build of the relocation, modification, and installation of generator sets
currently owned by the City of Hutchinson and associated electrical work, and
bids were received, opened and tabulated according to law, and the following bids were received
complying with the advertisement:
Amount Bid
Honda Electric, 5075 Nielson Cir, Loretto, MN 55110 $123,600.00
Quade Electic, 35 -- 4`" Ave NE, Hutchinson, MN 55350 $121,700.00
and whereas, it appears that Quade Electric of Hutchinson, MN is the lowest responsible bidder.
• NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
HUTCHINSON. MINNESOTA:
1. The mayor and city administrator are hereby authorized and directed to enter into a contract
with Quade Electric of Hutchinson, MN 55350, in the amount of $121,700.00 in the name of the Cityof
Hutchinson, for the improvement contained herein, according to the plans and specifications therefor
approved by the City Council and on file in the office of the Director of Engineering.
2. The Director of Engineering is hereby authorized and directed to return forthwith to all
bidders the deposits made with their bids, except that the deposits of the successful bidder and the
next lowest bidder shall be retained until a contract has been signed, and the deposit of the successful
bidder shall be retained until satisfactory completion of the contract.
Adopted by the Hutchinson City Council this 12th day of April 2005.
City Administrator: Gary D. Plotz
•
Mayor: Steven W. Cook
5c,�
RESOLUTION NO. 12684
• RESOLUTION ORDERING PREPARATION OF REPORT ON IMPROVEMENT
LETTING NO.6
PROJECT NO. 05-20
WHEREAS, it Is proposed to improve:
Hutchinson Municipal Airport: Consisting of ditch cleaning, new REILs (& REILs circuit),
concrete hardstand, concrete helipad, concrete wash pad, hangar area lighting, new
primary power, jet fueling system, and electrical distribution building modifications.
WHEREAS, it is proposed to assess the benefited property for all or a portion of the cost of the
improvement, pursuant to Minnesota Statutes, Chapter 429,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUTCHINSON,
MINNESOTA:
THAT, the proposed Improvement has been referred to the Director of Public Works for study and that
he Is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as
to whether the proposed improvement Is feasible and as to whether it should best be made as proposed or in
connection with some other improvement, and the estimated cost of the improvement as recommended.
Adopted by the Council this 12th day of April 2005.
•
City Administrator: Gary D. Plotz
11
Steven W. Cook
5c,)
r1
L J
Cl
HUTCI3INSON PUBLIC WORKS[ENGINEERING DEPARTMENT.
Hutchinson City Center /I I I IIassan St SFJHutchiason MN 55350- 2522/320- 234- 4209/FAX 320 - 2344240
ENGINEERING REPORT
TO: Mayor and City Council
FROM: John Rodeberg, Director of Public Works
107a11AILVAPJAMIR
SUBJECT: Letting No. 6 /Project No. 05 -20
I have studied the following proposed improvement and find that the proposed project is feasible and
recommend it be constructed.
05 -20 Hutchinson Municipal Airport: Consisting of ditch cleaning, new REILs (& REILs
circuit), concrete hardstand, concrete helipad, concrete wash pad, hangar area
lighting, new primary power, jet fueling system, and electrical distribution building
modifications
ESTIMATED COST
TOTAL
Construction Cost
$240,000.00
Engineering - Consultant
$43,000,00
Administration . City
$11,000,00
Fiscal/Legal/interest
$6,000.00
ESTIMATED TOTAL
$300 000.00
ESTIMATED FUNDING
TOTAL
Assessable Cost
$0.00
Deferred Assessable Cost
$0.00
City Bonded
$0100
city - CIP'
$15,000.00
Federal FAA
$785,000.00
City -TIF
$0.00
MSA .
$0.00
MNIDOT
$0.00
ESTIMATED TOTAL
$300,000.00
-5(6
•
Hutchinson Municipal Airport
2005 CIP
Project Elements:
• T- Hangar Area Fighting
• New Primary Power
• Jet Fueling System
• Aircraft Wash Pad
• Concrete "Bard- Stand"
• Helipad
• New REILs & Dedicated Circuit
• Electrical Building Modifications
• Drainage Improvements
These project elements have been developed by the Airport Commission and City Staff,
and have been included in the CIP submitted to MnDOT Aeronautics.
The approximate total cost is $300,000. The cost estimate will be further refined when
• construction plans are finalized. All elements are anticipated to be eligible for 95% FAA
cost sharing, leaving a local share of $15,000. The federal funds will come from the
City's accumulated General Aviation entitlement ($150,000 per year, current balance of
$366,833).
A Disadvantaged Business Enterprise (DBE) program has been prepared, approved by
FAA, and adopted by the City. This is a prerequisite for any FAA grant in excess of
$250,000. The DBE goal for this project has been established at 1.2 %.
Bid opening is tentatively scheduled for May 6, 2005. At the May 10 Council meeting,
the City may consider award of the contract (subject to state and federal concurrence and
availability of funds). Formal contract award can occur after the federal grant is in -hand
(2 to 4 weeks after bid opening).
Construction could begin in June and continue for approximately 2- months. Minimal
impact is expected to normal operation of the airport - perhaps one day of fueling
interruption and 2 days of runway closure, all to be scheduled with the City and the
airport users.
is
_�5C 1)
Project Fee Estimate
RESOLUTION NO. 12685
. RESOLUTION RECEIVING REPORT AND WAIVING HEARING ON IMPROVEMENT
LETTING NO.6
PROJECT NO. 05-20
WHEREAS, pursuant to a resolution of the Council adopted April 12th, 2005, the Director of Public
Works has prepared a report in reference to the following improvement:
Hutchinson Municipal Airport: Consisting of ditch cleaning, new REILs (& REILs circuit),
concrete hardstand, concrete helipad, concrete wash pad, hangar area lighting, new
primarypower, jet fueling system, and electrical distribution building modifications.
WHEREAS, said report was received by the Council on February 8th, 2005.
WHEREAS, this improvement is 100% City Funded with no assessments to property owners and
therefore no public hearing is required.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUTCHINSON,
MINNESOTA:
1. The Council will consider the improvements of such streets in accordance with the reports and the
assessment of benefited property for all or a portion of the cost of the improvement pursuant to Minnesota
Statutes, Chapter 429, at an estimated total cost of the improvement of $300,000.00.
2. The public hearing is hereby waived as this improvement project is 100% City funded.
• Adopted by the Hutchinson City Council this 12th day of April 2005-
City Administrator: Gary D. Plotz
•
Mayor: Steven W.
RESOLUTION NO, 12686
. RESOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS AND SPECIFICATIONS
LETTING NO, 6
PROJECT NO. 05-20
WHEREAS, a resolution of the City Council adopted the 12th day of April, 2005, waived Council
Hearing on the improvement of:
Hutchinson Municipal Airport: Consisting of ditch cleaning, new REILs (& REILs circuit),
concrete hardstand, concrete helipad, concrete wash pad, hangar area lighting, new
primary power, jet fueling system, and electrical distribution building modifications.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUTCHINSON,
MINNESOTA:
1. Such improvement is hereby ordered as proposed in the resolution adopted the 12th day of April
2005.
2, Kent Exner is hereby designated as the Engineer for this improvement. He shall prepare plans and
specifications for the making of such improvement.
Adopted by the Council this 12th day of April 2005.
• Mayor: Steven W. Cook
City Administrator: Gary D. Plotz
��l 6
RESOLUTION NO. 12687
• RESOLUTION APPROVING PLANS AND SPECIFICATIONS
AND ORDERING ADVERTISEMENT FOR BIDS
of:
LETTING NO. 6
PROJECT NO. 05 -20
WHEREAS, the Director of Public Works has prepared plans and specifications for the improvement
Hutchinson Municipal Airport: Consisting of ditch cleaning, new REILs (& REILs circuit),
concrete hardstand, concrete helipad, concrete wash pad, hangar area lighting, new
primary power, jet fueling system, and electrical distribution building modifications.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUTCHINSON,
MINNESOTA:
1. Such plan's and specifications, a copy of which is attached hereto and made a part hereof, are
hereby approved.
2. The Director of Engineering shall prepare and cause to be inserted in the official newspaper, an
advertisement for bids upon the making of such Improvements under such approved plans and specifications.
The advertisement shall be published for three weeks, shall specify the work to be done, shall state that bids
will be received by the City Administrator until 10:00 am on Friday, May 6th, 2005, at which time they will be
publicly opened in the Council Chambers of the Hutchinson City Center by the City Administrator and/or
Director of Engineering, will then be tabulated, and will be considered by the Council at 6:00 pm on Tuesday,
May 10th, 2005 in the Council Chambers of the Hutchinson City Center, Hutchinson, Minnesota. Any bidder
whose responsibility is questioned during consideration of the bid will be given an opportunity to address the
Council on the issue of responsibility. No bids will be considered unless sealed and filed with the Director of
Engineering and accompanied by cash deposit, cashier's check, bid bond or certified check payable to the City
of Hutchinson for 5 percent of the amount of such bid.
Adopted by the Hutchinson City Council this 12th day of April 2005.
City Administrator: Gary D Plotz
Mayor: Steven W Cook
PUBLICATION NO. 7327
ADVERTISEMENT FOR BIDS
• LETTING NO. 6 1PROJECT NO. 05 -20
CITY OF HUTCHINSON DATED: APRIL 12TH, 2005
Project Location: Hutchinson Municipal Airport
Project Name: Letting No. 6 /Project No. 05 -20 - 2005 Airport Improvements
FAA AIP No: 3 -27- 0042 -05
State Project No.: 4304 -20
City Project No: Letting No. 6, Project No. 05-20
BIDS CLOSE AT: 10:00 AM ON MAY 6TH, 2005
NOTICE TO CONTRACTORS:
Sealed Bid Proposals for work indicated below at the Hutchinson Municipal Airport, McLeod County,
Minnesota, will be received at the Director of Public Works Office In the Hutchinson City Center, 111 Hassan
St SE, Hutchinson, MN 55350 until 10:00 AM on Friday, May 6th, 2005. Bids shall be directed to the
Director of Public Works, securely sealed and endorsed upon the outside wrapper "LETTING NO.
6 /PROJECT NO. 05 -20 — 2005 AIRPORT IMPROVEMENTS ". The bids will be opened and read aloud in the
City Council Chambers in the City Center at 10:00 AM, on the same day. The work, In accordance with
drawings and specifications prepared by TKDA, 1500 Piper Jaffray Plaza, 444 Cedar Street, St. Paul,
Minnesota 55101 -2140, consists of the following:
This project consists of ditch cleaning, new REILs (& REILs circuit), concrete hardstand, concrete helipad,
concrete wash pad, hangar area lighting, new primary power, jet fueling system, and electrical distribution
building modifications.
Major items of work are as follows:
•
Miscellaneous Removals
Ditch Cleaning
5,500
LF
8 & 12 -Inch Concrete Pavement
1,750
SY
Misc. Bituminous Patching
150
TN
Trench Drain
80
LF
6 -inch SJDIP Drain
300
LF
2 -Inch PVC Conduit
8,600
LF
600 V Conductor
27,000
LF
#1 Aluminum 15 KV Conductor
6,900
LF
REIL Units
4
EA
Electrical Handholes
17
EA
Electrical Building Modifications
1
LS
Hangar Floodlights
4
EA
10,000 - Gallon Jet Fueling System
1
LS
Bid Proposals shall be submitted on forms furnished for that purpose.
A pre -bid conference will be held at 10:00 AM, April 27, 2005 at the Arrival /Departure Building at
Hutchinson Municipal Airport. A site visit will be conducted following the pre -bid conference. Failure to
attend the pre -bid conference will not disqualify a firm from submitting a bid.
Consistent with Minnesota Statutes Sections 363.073 and §473.144, the City of Hutchinson may not accept a
bid or proposal for a contract or execute a contract in excess of $100,000 with any business unless said
business is in compliance with certain requirements concerning affirmative action plans. Evidence of
compliance must be submitted within two (2) City business days following opening of bids. Bids will be
• considered non - responsive if the compliance requirements are not met. Compliance requirements are
outlined in this project specification.
NONDISCRIMINATION IN EMPLOYMENT
Refer to Contract and Labor Provisions in the specifications for requirements.
PUBLICATION NO. 7327 - ADVERTISEMENT FOR BIDS
LETTING NO. 61PROJECT NO. 05 -20 — PAGE 2
• DISADVANTAGED BUSINESS ENTERPRISES
The goal of the City of Hutchinson for the utilization of Disadvantaged Business Enterprises (DBE) on this
Project is as follows:
DBE 1.2%
Refer to Instructions to Bidders for bid submittal requirements in Section 2 and Section 29, Items 1 through 4
Bidders will be prohibited from entering into agreements with a DBE in which the DBE promises not to provide
subcontracting quotations to other bidders.
A bidder's failure to show a good faith effort to achieve the specified contract goal for the participation of
DBEs in the completion of this project will be grounds for finding the bid non - responsive.
A bidder should contact the MN /DOT Equal Employment Office Contract Compliance Administrator at
651- 297 -1376 for information on qualifying for this DBE program or for assistance In identifying DBE
businesses.
NOTICE OF REQUIREMENTS FOR
AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY
1. The bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal
Employment Opportunity Construction Specifications" set forth herein.
2. The goals and timetables for minority and female participation, expressed in percentage terms for the
contractor's aggregate workforce in each trade on all construction work in the covered area are as
follows:
Goals for Minority Goals for Female Participation
Timetables Participation in Each Trade Participation in Each Trade
Upon publication State 1.8% State 9.4%
until further notice Federal 0.8% Federal 6.9%
These goals are applicable to all the contractors' construction work (whether or not it is Federal, or
Federally assisted) performed in the covered area. If the contractor performs construction work in a
geographical area located outside of the covered area, it shall apply the goals established for such
geographical area where the work is actually performed. With regard to this second area, the
contractor also is subject to the goals for both Its Federally involved and non - federally involved
construction.
The contractor's compliance with the executive order and the regulations in 41 CFR Part 60-4 and
Minnesota Statutes Section 473.144 and Minnesota Rules, Part 5000.3520 shall be based on Its
implementation of the Equal Opportunity Clause, specific affirmative action obligations required by
the specifications set forth in 41 CFR 60-4.3 (a) and Minnesota Rules, Part 5000.3540, and its efforts
to meet the goals. The hours of minority and female employment and training must be substantially
uniform throughout the length of the contract, and in each trade, and the contractor shall make a
good faith effort to employ minorities and women evenly on each of its projects. The transfer of
minority or female employees or trainees from contractor to contractor or from project
to project for the sole purpose of meeting the contractor's goals shall be a violation of the contract,
the executive order, the regulations in 41 CFR Part 60-4, Minnesota Statutes Section 473.144 and
Minnesota Rules, Part 5000.3520. Compliance with the goals will be measured against the total work
hours performed.
• 3. The contractor shall provide written notification to the Director, OFCCP, and the Compliance Division
of the Minnesota Department of Human Rights, within ten working days of award of any construction
subcontract (in excess of $10,000 for OFCCP reporting) at any tier for construction work under the
contract resulting from the solicitation. The notification shall list the name, address and telephone
56)
PUBLICATION NO. 7327 - ADVERTISEMENT FOR BIDS
LETTING NO. 6 1PROJECT NO. 05 -20 — PAGE 3
• number of the subcontractor; employer identification number of the subcontractors; estimated dollar
amount of the subcontract; estimated starting and completion dates of the subcontract; and the
geographical area in which the subcontract is to be performed.
4. As used in this notice, and in the contract resulting from this solicitation, the "covered area" is
McLeod County.
BID SECURITY
Each bid proposal shall be accompanied by a "Bid Security" in the form of a certified check made payable to
the City of Hutchinson in the amount of not less than 5% of the total bid or a surety bond in the same amount
payable to the City of Hutchinson, with the surety company thereon duly authorized to do business in the
State of Minnesota, such Bid Security to be a guarantee that the bidder will not, without the consent of the
City, withdraw his bid for a period of 60 days after the opening of bids, and if the successful bidder, will enter
into a contract with the City of Hutchinson, and in connection therewith, give Public Contractor's Bond as
required by law and on forms as furnished to him by the City; and the amount of the certified check will be
retained or the bond enforced by the City in case the bidder fails so to do.
The Bid Security of the three lowest bidders will be retained until the contract is executed, but in no event
longer than 60 days, provided that the Bid Security of the lowest responsible bidder shall be retained in any
event until the contract is executed and Public Contractor's Bond furnished as herein provided. No bidder
shall, without the consent of the City, withdraw his bid for a period of 60 days after the date for the opening
thereof.
The bid of the lowest responsible bidder will be accepted on or before the expiration of 60 days after the date
of the opening of bids, the City, however, reserving the right to reject any or all bids and to waive any
. informalities and irregularities.
AVAILABILITY OF CONSTRUCTION DOCUMENTS
Plans and specifications are on file for inspection at the office of the Director of Public Works at the
Hutchinson City Center, 111 Hassan St SE, Hutchinson MN 55350; at the office of TKDA,1500 Piper Jaffray
Plaza, 444 Cedar Street, St. Paul, Minnesota 55101 -2140; at the St. Cloud, Willmar, Mankato, Minneapolis
and St. Paul Builders Exchanges, F.W. Dodge Corporation, Construction Market Data; NAMC -UM Plan
Room.
Bidders desiring drawings and specifications for personal use may secure a complete set from;
Hutchinson City Center
Attn: Plans & Specs - PV
111 Hassan St SE
Hutchinson MN 55350
Phone; 320- 234 -4209 Fax: 320- 234.4240
Cost per set: $53.25 (non - refundable). Payment must be received prior to mailing.
Make checks payable to: City of Hutchinson
Include the following Information with your request: Company Name — Address — Phone - Fax
Gary D. Plotz, City Administrator
PUBLISH: Hutchinson Leader - Thursday, April 14th, 2005 & Thursday, April 21st, 2005
Construction Bulletin - Friday, April 15th, 2005 & Friday, April 22nd, 2005
JTCHINSON CITY CENTER
ENGINEERING DEPARTMENT
111 HASSAN STREET SE, HUTCINSON MN 55350
6121587.5151 FAX 81 2123 4 -424 0
ESTIMATE FOR PAYMENT
LETTING NO.61PROJECT NO. 01 -19
OTM &ASSOCIATES WC -JOB NMI
Project No. 01 -19: Louisiana St NW, Carolina Parkway NW & 7th Ave NW by construction of Sanitary Sewer & Services, Watermain & Services, Storm
Sewer, Grading, Gravel Base, Curb and Glitter, Bituminous Base, Bituminous Surfacing and Appurtenances
ESTIMATE NO. 4 (2ND REVISED FINAL) FOR THE MONTH OF: JUNE 2004
I Of
ADDRESS:
408 6TH ST, P O BOX 206
PREPARED BY:
PREPARED RY: K. MESSNER
PRINSBURG MN 66281 52497 -6011 FAX 320-978 -4978
CHECKED BY:
CHECKED BY: P. VANDER VEEN
PHONEIFAX:
328.978-6011 FAX: 32D478 -4976
COMPLETION DATE:
UU11ty 0710612001 Murat & Restoration 0713112001
= >FUN ➢:_�.__-_ �_ -;::
2009 IMi?ROVE IEHL- BOH08: .'- -
ESTIMATE I 529,254.92
RIGINAL CONTRACTAMOUNT
- - -, -- _` : ' -' _ -
- .:273,871:95
ESTIMATE 2 587,878.80
CHANGE ORDER NO. 1
$7,28L30
ESTIMATE 3 $[20,620.07
CONTRACT RECONCILIATION [averlunder]:
[$3,764.20
ESTIMATE 4 $0.00
REWSEE1 CONTRA0'C CMOUNTt. _
$277,389.05
ESTIMATE 5 $0.00
ESTIMATES $0.00
TOTAL -WORK COMPLETED -TO DATE:
$277,389_05
00
MATE 9 50.00 1.> i 1AL2i:V v hANV -" - _ - :.3v.UU
MATE 10 50.00 . ALL PREVIOUS PAYMENTS: 5237,753.79
MATE I 50.00 LIQUIDATED DAMAGES: @ $50DIDAY i DAYS $0.00
MATE 12 50.00
MATE 13 $0.00
AMOUNT REMAINING ON CONTRACT: $0.00
UNDERSIGNED CONTRACTOR CERTIFIES THAT TO THE BEST OF HISAIER IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, BASED ON ON-SITE
VLEDGE, INFORMATION AND BELIEF, THE WORK COVERED BY THIS OBSERVATIONS AND THE DATA COMPRISING THE APPLICATION, THE
ICATION FOR PAYMENT HAS BEEN COMPLETED IN ACCORDANCE WFFH THE DIRECTOR OF ENGINEERING CERTIFIES TO THE OWNER THAT THE WORK FN9
-RACT DOCUMENTS, THAT ALL AMOUNTS HAVE BEEN PAID BY HIMIHER FOR PROGRESSED TO THE POINT INDICATED, THAT TO THE BEST OF HISIHEF
K FOR WHICH PREVIOUS CERTIFICATES OF PAYMENT WERE ISSUED AND KNOWLEDGE, INFORMATION AND BELIEF, THE QUALITY OF THE WORK IS R
IENT RECEIVED FROM THE OWNER AND THAT CURRENT PAYMENT SHOWN ACCORDANCE WITH THE CONTRACT DOCUMENT, AND THAT THE
:IN IS DUE. CONTRACTOR IS ENTITLED TO PAYMENT OF AMOUNT CERTIFIED.
r THE CITY OF MITCHINSON AGREES THAT THE WARRANTY PERIOD
JUNE 1ST, 2004.
V
CITY ENGINEER OR DIRECTOR OF PUBLIC
�J L
r-I
Ah
HUTCHINSON CITY CENTER, ENGINEERING DEPARiftT, 111 HASSAN STREET SE, HUTCHINSON, MN 0350
LETTING NO. &PROJECT NO. 01 -19
#Otto & Associates IRc - Job /0641)
ESTIMATE NO. 4 {2ND REVISED FINAL) FOR THE MONTH OF: JUNE 2004 Page 2 of
s -fTFSI
.HO:
� _REFt
'170.. -
-" z::>Y-
, "" ,_- _ .--._ ; .: z: _ `.;,° ": `."_ -_- -- _ -_ : = -_ _ _ __ _
- = - ":_ - - "" -.- -ITEM
-= __ �__- - _
`:$lk5>.F -�'?
s-` H�li' � -. �
= - ° .BID- - -� _
TOTAL
-= ESTIMATE
- QUA"
� = .ESTIMATE �.
PAYMENT
DIVISION I - SANITARY SEWER CONSTRUCTION
1
0503
SEWER PIPE 8" PVC SDR 35, 0-12- DEEP
LIN FT
635.00
$11.40
57,239,00
635.00
$7,239.00
2
0503
SEWER PIPE 8" PVC SDR 35, 12' -14- DEEP
LIN FT
267.00
$12,40
53,310.80
267.00
53,310.80
3
0503
SEWER PIPE 8" PVC SDR 35, 14' -16' DEEP
LIN FT
85.00
$14.40
$1,224.00
85.00
$1,224.00
4
0503
SEWER PIPE 8" PVC SDR 26, 20-22" DEEP
LIN FT
1 147.00
$19.05
$2,800.35
147.00
$2,800.35
5
0503
SEWER PIPE 57 PVC SDR 26, 22 -24" DEEP
LIN FT
126.00
$23.05
$2,904.30
126.00
$2,904.30
6
0503
ISEWER PIPE S' PVC, SDR 26, 24-26' DEEP
LIN FT
120.00
523.05
$2,766.00
120.00
$2,766.00
7
503
8-X 4" PVC WYE
EACH
33.00
$68.00
$2,244.00
33.00
52,244,00
8
503
SERVICE PIPE 4' PVC SDR 35
LIN FT
2200.00
$6.80
$14,950.DO
2200.00
S14,960.00
9
2506
CONSTRUCT MANHOLES, 12'OEEP
EACH
5.00
$1,995.08
59,975.00
5.00
$9,975.00
16
2506
EXCESS DEPTH IN MANHOLES, SANITARY
LIN FT
32.DD
$112.00
$3,584.00
30.00
$3,360.00
11
2511
GRANULAR MATERIAL. FOUNDATION
CU YD
4DD.08
54.50
$1,600.00
368.00
$1,656.00
12
2503
CONN ECT TO EXISTING SANITARY SEWER
LS
1.00
$228.00
$220.00
1.00
$220.00
13
2506
REMOVE 6- PVC CLEAN OUT AND CONNECT TO EXIST STUB.
EACH
1.00
$228.00
$220.00
1.00
$220.00
14
503
lCONSTRUCT OUTSIDE DROP
LIN FT
9.24
$110.00
$1,016.40
9.24
$1,016.40
15
503
CONSTRUCT4"CLEANOUT
EACH
3.00
550.00
$150.00
3.00
$150.00
TOTAL - DIVISION I. SANITARY SEWER CONSTRUCTION
$54,413.65
S54,D45,85
DIVISION II - WATERMAIN CONSTRUCTION
1
504
6" MJ HU6 HYDRANT AND GATE VALVE
EACH
4.D0
$2,005.80
5$020.00
4.00
$8,020.00
2
504
8' GATE VALVE d SOX
EACH
3.0D
$810.00
$2,438.00
5.00
$4,050.00
3
504
6' D.I.P. WATERMAIN
LIN FT
1600.00
$15.90
530,240.00
1500.88
$28,350.00
4
504
6" D.1-P. WATERMAIN
LIN FT
1135.00
$15.20
$1,596.00
102-DO
$1,550.40
5
504
1 "CORPORATION STOP
EACH
33.00
$37.00
$1,221.00
33.80
$1,221.00
a
504
1 "CURB STOP AND BOX
EACH
33.00
$60.00
$2,640.00
33.00
$2,640.00
7
504
TAP SERVICE PIPING 1 "COPPER
LIN FT
1850.00
$8.00
$14,800.00
1650.00
$14,800.DQ
2511
GRANULAR MATERIAL, FOUNDATION
CU YD
180.00
$0111
$1.80
8.06
$0.80
504
CONNECT TO EXISTING S' STUB
EACH
3.00
$170.00
$510.00
3.00
$510.00
TOTAL - DMSION 0- WATERMAIN CONSTRUCTION
$61,458.80
$$1,141.40
DIVISION BI - STORM SEWER CONSTRUCTION
1
2503
12" RC PIPE SEWER CL III
LIN FT
173.06
$15.90
$2,750.70
160.00
$2,544.00
2
2503
15- RC PIPE SEWER CL III
LIN FT
26.00
$19.40
$504.40
26.00
5514.40
3
2503
18" RC PIPE SEWER CL III
LIN FT
33.00
$21.48
$706.26
25.00
$535,00
4
2506
CONSTRUCT CATCH BASIN MANHOLES 48'
EACH
2.00
$1,096.00
$2,196.00
2.00
$2,196.00
5
2506
CONSTRUCT CATCH BASIN 24 "X 36"
EACH
1.06
$907,00
$907.00
1.00
$907.00
6
2506
CONSTRUCT CATCH BASINS 27-
EACH
1.06
$600.00
$600.00
1.66
$600.00
7
2503
CONNECT TO EXISTING MH
EACH
1.00
$165.00
$165.00
1.08
$165.DD
a
2503
18- RCP FES WITRASH GUARD d RIP RAP
EACH
1.00
$560.00
$660.00
1.08
$660.00
TOTAL - DIVISION M -STORM SEWER CONSTRUCTION
$8,489.50
$8,111A0
n
L
r
Ak
HUTCHINSON CITY CENTER, ENGINEERING DEPARTMENT, 111 HASSAN STREET SE, HUTCHINSON, MN M50
LETTING NO. &PROJECT NO. 01 -19
10no a Associates Inc - Job *0641)
ESTIMATE NO. 4 (2ND REVISED FINAL) FOR THE MONTH OF: JUNE 2004 Page 3 of
-LTEYF
- -HQ.
:. REF__
: -1JD.
- - _- -1TEIYI'. =.- -.. __'-= : °.�",_ -_ = "'_��`11[�ki_
-
1[117Y_'
=C
- _.811)'- --
=-�7T6,E-
-ESTMATE
"- i3t1ANTiTY
' = ESTIMATE, _ -_
- - - -
= .F�#1YFIENT --
DVASION NSTREET CONSTRUCTION 5 RESTORATIOII
1
2112
SUBGRADE PREPARATION (MODIFIED TO 1- DEEP)
ROAD STA
21.40
$175 -00
$3,745.00
21.10
S3,692.50
2
2211
AGGREGATE BASE PLACED CLASS 5(CV)25% Crashed end. 1' behind cum}
CU YO
3020.00
$12.00
$36,240.00
3020.00
$36,240.00
3
2350
MN DOT 2331 TYPE 31 BITUMINOUS BASE (2 %-)
TON
900.00
$3200
$28.800.00
913.35
$29,227.20
4
2350
MN DOT 2331 TYPE 61 CS BITUMINOUS WEAR COURSE (1')
TON
375.00
$46.00
$18,000 00
465.30
$22,334.40
5
2357
BITUMIHOUS MATERIAL FOR TACKCOAT
GALLON
400.00
$1.50
$600.00
400.00
$600.00
6
2511
GE07EXTILE FILTER TYPE 6
SO YO
7880.00
$0.75
$5,910.DO
7660.00
$5,910.00
7
2531
CONCRETE CURRAND GUTTER, DESIGNS
UN FT
4300 -00
57.65
$32,895.00
43DD.00
$32,895.00
B
2502
4- PVC SDR 35, CORR PERF PE PIPE DRAIN
UN FT
43DO.DD
$2 -50
$10,750.00
4300.00
510,750.00
9
2575
SODDING
SQ YO
980 -00
53.50
$3,360.06
0.00
50.00
io
2575
SEEDING INCLUDING MULCH AND FERTILIZER
ACRE
4.50
$990.00
$4,050.00
0. DID
SO.00
11
2575
SALVAGE d 1NSTALL PERMANENT BARRICADE
EACH
1 -00
$200.00
$2D0.00
1.00
$200.00
12
2502
DRAIN TILE SERVICES
EACH
33.00
$120.00
$3,960.00
33.00
$3,950.00
13
2502
CONNECT TO EXISTING DRAIN TILE
EACH
4.00
$100.OD
$40100
4.00
5400.00
14
2592
CONNECT DRAIN TILE TO EXIST C8
EACH
4 -00
$150.00
$600.00
4.00
$500.60
TOTAL - DIVISION kV-STREET CONSTRUCTION AND RESTORATION
$149,610.00
$746,869.10
CHANGE ORDER NO. 1
DIVISION N - STREET CONSTRUCTION
1
2112
SUBGRADE PREPARATION
ROAD STA
9.60
$175.00
$1,680.00
9 -60
$1,680.00
2
RESET APRON. RIP RAP
LS
100
$1,301.30
$1,301.301
1.00
$1,301.30
TOTAL CHANGE ORDER NO. 1
$2,951.76
SP,981.30
CHANGE ORDER N0.2
DIUMM N- STREET CONSTRUCTION
6
2502
r PVC SDR 35
UK FT
430106
$1.00
$4,300.DO
4300.00
$4,300.00
TOTAL CHANGE ORDER NO.2
$4,360.00
$4,366.00
177777
- -
LE
- - -
: =
=
_
32751_ 0 ,75
-
- -
-
TOTAL CHANGE ORDER NO.1
52981.30
)2,981.30
TOTAL CHANGE ORDER NO.2
$4',360.00
K300.00
V^-
. 1
V
, • 4�
Mn/DoT TP- 2460 - 0112 -92) SHEET I OF 1 SHEETS
State of Minnesota — Department of Transportation
CHANGE ORDER #6
ntraetor: Duininck Brothers Construction State Project No.: 133-126-01/133-109-06
dress: P O Box 208, Prinsburg, MN 56281
Federal Project No.: STPX 4303(030)
Location: 2nd Avenue/Dale Street, Hutchinson, MN 55350 Contract No.: City. Project LI /03 -01
In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the
following provisions.
Replace the 3" PE Corrugated Perforated Pipe Drain with Sock with 4" — One Half Perforated PVC Pipe Drain with Sock.
This replacement will apply to all 9490 linear feet of drain the that will be placed adjacent/beneath the concrete curb and gutter on 2nd
Avenue and Dale Street.
The negotiated unit price of $4.30 /linear foot for the 4" — One Half Perforated PVC Drain with Sock is approved by SEE and the
additional cost has been computed as follows:
'era al Prices (3" PE Corrugated Perforated Drain with Sock):
9490 L.F. x $4.30/L.F. a $35,587.50
New. Price (4" —One Half Perforated PVC Pipe Drain with Sock):
9490 L.F. x $4.30/L.F. a $40,807.00
The ' ;fference in total cost is computed to be $5,219.50. This amount will be submitted to Mn/DOT in a request for Additional
encumbrance of Federal Funds.
This does not change the completion date.
TOTAL CHANGE ORDER NO.6 = $5,219.50
Contract Status
Original Contract
Net Change Prior C.O.'s I to 4
Change this C.O.
Revised Contract
_CHANGE IN CONTRACT TIME
Due to this change the Contract Time:
a. Is increased ( ) by . Working Days
Is decreased ( ) by Working Days
Is increased ( ) by Calendar Days
Is decreased ( ) by Calendar Days
b. Is not changed .( X )
c. Maybe revised if the work affected
.
the controlling operation. ( )
Time
Cost
06 28.9
15.718.42
$2,Q90.676.0§ T
Issued By: r
Q4/04105
Project/Re I nt/ ounty En leer
Date
Approved Hy:
Asst, District Engineer
ate
For Funding O
f014104105
Accepted By:
Contractor's Authorized Rep sentative
Date
Original to Project Engineer; copies to Contractor, Contract Admin, Eugr., Materials Office
�K)
CHANGE ORDER NQ:.: ; ::.:.: . :.. ...'.:
CITY OF HUTCHINSON'- ENGINEERING DEPARTMENT'::?
111 HASSAN S7 SE, HUTCHINSON MN 55350 (612) 234 - 420 > + " - ' "'' 8 ieet'1"of'7`6i' ; ; ;,:
TRACTOR: Duininck Bros Inc
Letting No. 1 Project No. 03 -01
SAP 133 -126 -01 & 133 - 109 -06
408 6th St, P O Box 208
Prinsburg MN 56281 -0208
Project Location:
Dale St SW & 2nd Ave SW
DESCRIPTION OF CHANGE: Replace 3" PE Corrugated Perforated Pipe Drain with
4" - One Half Perforated PVC Drain with Sock. This replacement will apply to all
9490 linear feet of drain tile placed adjacent/beneath the concrete curb and gutter
on 2nd Ave and Dale St. The negotiated unit price of $4.3011-17 is approved by SEH•
See Work Order No. 1
Dated: 04/04/2005
Item No.
Spec. Ref.
Item Name
Unit _l
quantity
Unit Price
Amount
DECREASE ITEMS:
3" PE Corrugated Perforated Drain with
Sock
LF
-9490
$3.75
($35,587.50)
INCREASE ITEMS:
4" - One Half Perforated PVC Pipe
Drain with Sock
LF
9490
$4.30
$40,807.00
TOTAL INCREASE
$5,219.50
NET INCREASE JI
$5,219.50
In accordance with the Contract and Specifications, the contract amount shall be adjusted in the amount of $
3,809.15 jadd)1(deduGQ. An extension of -0- days shall be allowed for completion. The original completion date shall
not be changed.
. ORIGINAL .CONTRACT' �
AMOUNT:,;; ,'>
PREVIOUS �' ' �- �
`. ADDITIONS %DEDUCTIONS
... �,:, ; �. � THIS �,��� - '. ;.::,:� ;:. ,i.
' ADDITIONIDEDUCTl9N ;',::r.': ;' ;.
r:.,; �
TOTAL %':,,
.
$2,069,928.99. %' `
$15,527.57
$5,219.50'
- 32,090,676.06, .
Approved by Hutchinson City Council: 04/12/2005
-- CHANGE Q.RDER. NO.: 3
•,
. HINSON _ E'NGINEE R ING.DE ARTIAEN!t;�,. -CI TYOF HUTC
111 HASSAN ST SE, HUTCHINSON: MN 55350 (612 ) 234 . -4209 sti"ot.ie:
RACTOR: Duininck Bros Inc
Letting No. 3 Project Nos. 03- 05/03- 06/03-
07/03- 08/03. 09/03 - 11/03.22
08 6th St, P O Box 208
'rinsburg MN 56281 -0208
Delaware st NW /Arch St
SE/Ludtke Ln NW /Florida St
Project Location: NW /Illinois St NW /Ranch Ave
SE/Sidewalks
IESCRIPTION OF CHANGE:. Non - Granite Concrete Sidewalks & Pedestrian Ramps
Dated; 10/11 /2004
Item NoV
Spec. Ref.
Item Name
Unit
Quantity
F Unit Price IF
Amount
INCREASE ITEMS:
2521
Pedestrian Ramp Surface
Each
6
$290.00
$1,740.00
Surface
Percent
10
$17.40
$174.00
2521
4" Non -Granite Concrete Sidewalk
SF
3343.1
$2.57
$8,591.77
2521
8" Non - Granite Concrete Sidewalk
SF
251.7
$3.60
$906.12
TOTAL
$11,411.89
NET INCREASE
$11,411.89
In accordance with the Contract and Specifications, the contract amount shall be adjusted in the amount of $
11,411.89 (addY(deduc+ An extension of -0- days shall be allowed for completion. The original completion date
shall not be changed.
RI{INAC'CON7FAC•
�•n%
ADDITI OED, IO
' .. HPREVIOUS TOTAL';
AODITIONf6€6U6�lCb4i %i , ,
`7 " °:$132,SS0.96, ".w " ".I' %�,:
..:•
- ..a2,
13.7 . ,.,.:,
:,11,,,.
.• .. $'746,706:57'.
$11,411.89 "`Op•
APPROVED:
Contractor
DAT1 =D: d 7
APPROVED:
Mayor
DATED: 04/12/2005
ROVED:
Di or
DATED: A -
17
APPROVED;
City Administrator
DATED: 04/122200
of En inee ing
I 7.r) 5'
S(. N
HUTCHINAWITY CENTER
ENGINEERING DEPARTMENT
111 HASSAN STREET SE, HUfCINSON MN 55350
6121567.5151 FAX 612J234.4240
ESTIMATE FOR PAYMENT
LETTING NO. &PROJECT NOS. 03-M3-06103-07/03-08103-09103-11/03-22
Project No. 0.3-05: Delaware St NW in Its entirety by construction of bituminous surfacing & appurtenances
Project No. 03-06: Arch St SE from 2nd Ave SE to Luce Line Trail by construction of storm sewer, bituminous surfacing & appurtenances
Project No. 0307: Ludtke Ln NW in its entirety by construction of bituminous surfacing & appurtenances
Project No. 03-08: Florida St NW in its entirety by construction of bituminous surfacing & appurtenances
Project No. 03.09: Illinois St NW In It s entirety by constructon of grading, gravel base, bituminous surfacing & appurtenances
Project No. 03-11: Ranch Ave SE from 5th Ave SE to Railroad Tracks by construction of hydrants, bituminous surfacing & appurtenances
Project No. 03-22: Sidewalk Improvements on School Rd NW at Califomia St by construction of concrete sidewalk & appurtenances
COMPLETION DATE: AUGUST 15,20D3
ESTIMATE NO.5 (FINAL) FOR THE MONTH OF: SEPTEMBER 2004
Dainln& Bros Inc
408 6[h Sc, P O Boa 208
Prinsburg MN 56281 -0268
rM-- .g7S-&01 I FAX 1269784.4978
ESTIATATE I -
- -��- $19,164.03
FSUNIATE 2 $
$56,432.44
ESTIMATE 3 $
$13 °2$0'65
ESTIMATE 4 $
$6,449.28
ESTIMATE 5 $
$0.00
ESTIMATE 6 $
$0.00
ESTIMATE 7 $
$0.00
ESTIh9 ATE 8 $
$0.00
ESTIMATE 9 3
30'00
ESTIMATE 10 $
$0.00
ESTIMATE 11 5
50.00
ESTIMATE 12 5
50.06
ESTIMATE 13 $
$0.00
ESTIMATE 14 $
$0.00
-
T
SNOWLEDGE, INFORMATION AND BELIEF, THE. WORK COVERED BY THIS
4PPLICATION FOR PAYMENT HAS BEEN COMPLETED IN ACCORDANCE WITH THE
,ONTRACT DOCUMENTS, THAT ALL AMOUNTS HAVE BEEN PAID BY HIM FOR WORK
=0R WHICH PREVIOUS CERTIFICATES OF PAYMENT WERE ISSUED AND PAYMENT
RECEIVED FROM THE OWNER AND THAT CURRENT PAYMENT,,91110WN HEREIN IS
DATE: INI 11204 Page 1 of 3
PREPARED BY: K. MESSNER
CHECKED BY; P. VANDER VEEN
FUND: 2003 IMPROVEhfEk-f BONDS
ORIGINAL CONTRACT AMOUNT: $ t 32,580.46
CHALNGE ORDER N0. 1 - 2 - 3 $14.125.61
LIQUIDATED DA -MAGES 20 DAYS -@ $ MTV (58,000.1)
SUS -TOTAL REVISED CONTRACT AMOUNT: $138,706.57
CONTRACT RECONCFLTATION (ov rlunder): f$5,327.68j
TOTAL REVISED CONTRACT AMOUNT: $133,375.89
TOTAL WORK COMPLETED TO DATE: :$133,376.89
TOTAL RETAINED: 0% $0.00
TOTAL FLUE CONTRACTOR: 5133,378.89
MATERIALS ON HAND $0.00
ALL PREVIOUS PAYMENTS: $95,266.40
T10UIDATED DA -MAGE5 @ 4001Dav 20.00 (58,(00.00)
ON WNTRACT:
OBSERVATIONS AND THE DATA COMPRISING THE APPLICATION, THE
DIRECTOR OF ENGINEERING CERTIFIES TO THE OWNER THAT THE WORK HAS
PROGRESSED TO THE POINT INDICATED, THAT TO THE BEST OF HIT
KNOWLEDGE, INFORMATION AND BELIEF, THE OUAUTY OF THE WORK IS IN
ACCORDANCE WITH y THE CONTRACT DOCUMENT, AND THAT THE CONTRACTOF
IS ENTITLED TO PXIMENT OF AMOUNT CERTIFIED.
(4 `fG
SIGNA RE OF CONTRACTOR DIRECTOR F NGI EERI NGIPU LjC WOR 5
ON WNTRACT:
OBSERVATIONS AND THE DATA COMPRISING THE APPLICATION, THE
DIRECTOR OF ENGINEERING CERTIFIES TO THE OWNER THAT THE WORK HAS
PROGRESSED TO THE POINT INDICATED, THAT TO THE BEST OF HIT
KNOWLEDGE, INFORMATION AND BELIEF, THE OUAUTY OF THE WORK IS IN
ACCORDANCE WITH y THE CONTRACT DOCUMENT, AND THAT THE CONTRACTOF
IS ENTITLED TO PXIMENT OF AMOUNT CERTIFIED.
(4 `fG
SIGNA RE OF CONTRACTOR DIRECTOR F NGI EERI NGIPU LjC WOR 5
LJ,
HUTCHINSON CITY CEN•fF.R, ENGINEERING DHPAR71NENf,111 SE. HDTCIIDVSON, MN W50 fiI275 8 7 -51 5 1 P4 3
3
NO5. 93-0 583-l6� @3•M+1F3�!&iO3•MN0_SIA3.21 • FSIY N0. S {FNQAL) FOR TyBHOhTHOF SEPTEMBER 2ll04 Date:
LETTING N0.3A'ROSBCF K. MFSSNER
INC., 408 5TH ST, P O BOX 2AS. PRiNSBTJAG MN Sfi281112Q8 PREPAR ED B Y:
CONTRACTOR: DUININCK BROS CIlECKED BY: P VANDER VEEN
FUND: 2003 TMpROVFM NT'BONDS .- , .< __, - - - - -- __ - -
-, - •;.. s= -', _ ...: :... .::: ". - 'r :BID ,2c -- . BID - ESTIMATE- - -`E$71MATE -S:
_. _= -: : . . ...
- =1jEM- ;:REF,: '_ .''.'':: -� _.;:. -', °::.':- ..._ :_ ° ` -:< _, : =.: ?' >e'; _:= = =:: :;�_.' ° �. - ,'.- - - - - - RICE -. _` `-- .TOTAL.. - L7UANTITY - PAYMENT -`
- -.. -.`UNIT ',t< aOANTl1'S3:- �E1NI'�P
NO. 'NO•; - -- °. °. . -.. .: `: - - ITEM:':..:-
$500.00 $503.00 103
DMIUCE W ATERMAIN CONSTRUCTION $500.00
t 2t 04 SND REINSTALL 8' DIP PLUG EACH 1
53.00 $855A0
2 2504 DON FITTINGS 295
54450 31,112.50 30.00 51,00
m
3 2504 8.fAIN DUCTILE IRON Cl52 LIN FT 25
$40.50 $t•C93.50 $972.00
4 2504 AIN DUCTILE IRON CL62 LN FT 27
$770.00 $7 O O 1.00 $
5 2504 LVE 8 SOX S
$1.950.0
EACH 1 $1,850.00 $1,850.CP L00
8 2504 HYDRANT
Sfi,181.0-0 $6,282.U0
TOTAL - DIVISION IFWATERMAIN CONSTRUCTION
DIVISION III -STORM SEWER CONSTRUCTION
510790
$100.00
1.N
$100.00
1
2104
P.EMOVE 6' DROP INLET
LUMP SUM
1
165
$5.00
5990.00
177.0.1
$T,062 -00
2
2704
REMOVE PIPE CULVER7
LIN FT
$50.00
550.00
1.10
$50.00
3
2404
SALVAGE CB CASTINGS
CONNECT TO EXSTNG STORM SEWER
$.'+00.00
5400,00
$ ?'70 -00
5400 -00
] f l
o.m
$300 -00
50 -00
a
03
CONNECT EXISTING FIELD TILE TO STORM SEWER 1
$7,825.5Df
3 ?3.m
$7,825.50
6
2503
12' PVC PERF PIPE SEINER SCR 35
MEACHI
523.50
sz5a.0o
}11P CONNECTION (2j
1
2952
3` PVC SU
$250 -00
$250 -00
1.m
$250.00
8
2502
CONNECT SUMP DISCHARGE TO CATCH BASIN A2
CONSTRUCT CATCH BASIN DESIGN C
F &I CB CASTING NEENAH 2535 FRAME 3 GRATE
TOTAL- DIVISION III -STORM SEWER CONSTRUCTION
EACH
1
1,105 -00
$350.00
$3,315.00
$350.00
$13,630.50
3.07
fp
$3,315.00
5350 -00
$13,502.50
9
2506
10
2506
DIVISION IV- STREET CONSTRUCTION AND RESTORATION
LIN FT
110
53.00
$330.001
153.50
$460.50
1
2104
1 REMOVE CURB & GUTTER
45
51'00
$45.00
n.[IG
$0.00
2104
REMOVE C NCRETE CROSS GUTTER
SO FT
$2.57
$242.50
]t.2a
Sb33 rp
2104
REMOVE BITUMINOUS SURFACING
SO YD
97
�
2104
SAWING CONCRETE PAVEMENT I FULL DEPR-I
LIN FT
BQ
577.00
5500.t>r
O:NI
$7010.00
2104
REMOVE AND REOCTE MAILBOX
PER POST
8
5107.00
5A00.00
7.M
$3,97590
pil
2505
COMMON EXCAVATION
CU YD
772
$590
$3,960 -00
195 w
$660.00
2105
TOPSOIL BORROW V)
CU YD
277
$11-06
$3,047.00
(A.m
CU YD
224
510.50
52,32x.50
52,320.50
2105
GRANULAR BORROW (C
ROAD STA
29.2
$50.00
$1,460.00
$1,4fi0.00
2112
GRADE AND LEVEL EXISTING GRAVEL SURFACE
$625.00
12
2112
SUBGRADE PREPARATION
ROAD STA
5
$125.00
$625.00
$7,151
13
2211
AGGREGATE BASE CLASS 5 25%CRLSHE
CU YD
439
$15.50
$9673
$8,804 -50
$55,535
-00
$52,042 -74
16
2350
TYPE MV3 NON - WEARING COURSE MIXTURE
TON
1512
$2.00
-76
$150.00
q
550.00
17
2357
BITUMRJOUS MATERIAL FOR TACK COAT
FRAME AND CASTING MANHOLE
GALLON
EACH
75
9
$250.00
$2,250.00
$2.SO0.DO.
18
2506
ADJUST
EACH
2
5150.00
5390.00
$150.00:
19
2506
ADJUST FRAME & GRATE CATCH BASIN
EACH
2
5350.4;1
$700.00
S7m
20
2504
ADJUST CURB BOX INCL SLEEVE
4
5175.00
5700.00
$675.00
21
2504
ADJUST VALVE BOX
RELOCATE LAWN SPRINKLER HEADS
EACH
EACH
3
5200.00
$600.00
9.00
$1.600.00'
5300.00
22
2504
23
2504
RELOCATE LAWN SPRNKLER CONTROL VALVES
EACH
3
8150.001
5450.00
2.LV
AML ____ _ Pana1n131
�.,` (A) 4' Concrete SSdewalk - POW Fun Amount Perk Enirance to Arhons Street 0,355.1 SF) - Paid 50% of Non{4anhe (1767.15 SF)
CENTER, ENGINEERING DEPARTMENT, lit I'
ar:, nl:rl,n3nnny
I.a, ».
,.....,e,•..,.
-
HIITCMTIMN CITY
LET7ING NO.3MROJECT NOS e3 -0SN3- 664]-07N}-0SA3A9N]- IlA}22 -ESTIM O. 5(FINAL)
FOR
THE MONTH Of SEPTEMBER
2004
Dare: 1N7
CONTRACTOR:
DUTNTNCK BROS INC., 408 5TH Sr. P O BOX 208, PRINSBURG MN 56281 -0208
PREPARED BY:
K. W-SSNER
P. VANDLR VLEti
FUND:
2003 Imp ROVEMEAT
-
BONDS � - -
-
':-BID:::_ __
CHECKEDBY:
- -
:._" ?. 81D -
ESTIMATE
_
-ESTIMATE, .
-
.'- ITEM-
F:_.._
'; =RE .._
"
., -_
- _
- `UNIT - %:
M.
QUANTITY
`? -UNIT PRICE -
-
- `--- _TOTAL -
-
QUANTITY
' -PAYMENT
-25
SO FT
4645
$2.86
$13,284.70
I356-19
$3,878.45
2521
4' CONCRETE SIDEWALK (A)
SO Fr
485
$4.07
$1,860.00
L31-V
$551.20
26
2521
8' CONCRETE SfDEWALN
EACH
10
$100.00
$1,C00.00
a.rn
$0.00
271
2521 1
PEDESTPIAN RAMP SURFACE
LIN FT
110
$14.00
$1.540.00
153 y
$2,169.00
28
2531
CONCRETE CURS 8 GUTTER DESIGN 861$
SO FT
45
$5.00
$225.00
a.01
.50.00
291
2531 1
CONCRETE CROSS GUTTER
57.3;
$3'65 rum
524.0
$2,365.20
221
2564 1
ZEBRA CROSSWALKWHfTE - EPDXY SQ Ff
500
SO YD
23e8
54 -00
$9.552.00
3LIU0
$13,0172 -
331
2575 1
SOOOIN G TYPE LAWN
LIN FT
0
S0 -o0
$0.00
9.00
SOm
341
3720 IS
EAL CONCRETE PAVEMENT JOINTS 3
$1.25
$637.57
RM.CO
S1,035.co
3733 1
GEOTE)MLE FILTER TYPE 5 SO YD
510
$112,569.46
599,466.715
TOTALL.- DIVISION N- STREET CONSTRUCTION AND RESTORATION
3132,580.96
$119,253.2 8
TOTAL - LETTNO NO. 31PROJECT NOS. OZONO2 -0SN2-06
CHANGE ORDER NO. 1
INCREASE ITEMS:
CY
34
$21:46
S729 -64
34.06
$7e164
Class 5 Shoulder Material
TOTAL CHANGE ORDER NO. I
$729.64
$729.64
CHANGE ORDER NO. 2
INCREASE ITEMS-.
Adjusl Manhole
Replace Irrigation System
Pa0
Lump Sum
Wm Sum
1
1
10°6
$250 -DO
$1,576.44
$1,576.44
5250.00
$1,576.44
$157.&4
51,984.08
1
1
1o%
$250 -00
$1,576.44
$157,66
$1,984.
2506
2504
TOTAL CHANGE ORDER N0.2
CHANGE ORDER NO. 3
INCREASE ITEMS:
INCREASE ITEMS:
Each
6
$290.00
51,740.00
6.00
$1,740.00
2521
Pedestrian RaMID Surface
Percent
10
$17.40
5174.00
1DM
5174.00
10% P 8 ) on P£de$ an Ramp Surface
4' Non -Gran to Concrete Sidewalk 5F
3343.1
$2.57
$9,591.77
3345.1
$9,591:11
2521
SF
251.7
$3.60
$906.12
25I.76
5906.12
2521
8- Nan - Granite Concrete Sidewalk
51i all
$11,411.89
:89
TOTAL CHANGE ORDER NO. 3
7pTp,L. LEn1N6 NO. 3,RROJECT NOD. �:� MJn 2 -ea CONTRACTIND
TOTAL CHANGE ORDERS NOS. 1, 2 a 3
LETTING NM 3MMECT NOS. 92 -W241 02-M WM CHANGE ORDERS
$132,564.%
5719253.28
614,125.fi1
$145,706.57
$14125.61
$133 378,89
TOTAL.
�.,` (A) 4' Concrete SSdewalk - POW Fun Amount Perk Enirance to Arhons Street 0,355.1 SF) - Paid 50% of Non{4anhe (1767.15 SF)
V4, (':l -. N E O DER NO: REVISED C HA G Y. HUTCHINSD ENGINEERING DEPARTMECIT DF N yrwfl, 2 2 A 4209,` - ,' s sat '11.1 ;HASSAN S7 SE, MUTCHINSDN' MN!' 55350 (61 )
RACTOR: Bauerl Companies
Letting No 5
Pro ect No, 03 -12
Shadow Wood Dr NE, Sauk Rapids MN 56379 -9690
Project Location: Edmonton Ave SE
DESCRIPTION: 1) Pay for 264 Yards of Topsoil Borrow and dozer work shaping
topsoil. Scraper, dozer, compactor & labor building subgrade of bike trail. Both
Items were needed after raising street grade 21/2 feet on Jefferson St SE from
119 +00 to 126 +00. 2) Temporary road construction and removal to 1440 & 1450
Jefferson St SE. 3) Deduct for billing from Randy's Bobcat Service to repair
driveway and temporary access road to 1507 Jefferson St SE. Bill was paid by City
to expedite payment,
Dated: 03/28/2005
Item Ne"
Spec. Ref.
Item Name
Unit
Quantity
Unit Price
Amount
INCREASE ITEMS:
Topsoil Borrow (Includes 10 ($4,339.50+
$434.00) prime allowance)
LUMP SUN
1.00
$4,773.50
$4,773.50
Temporary Road to 1440 & 1450
Jefferson St SE
LUMP SUN
1.00
$4,800.00
$4,800.00
DECREASE ITEMS:
Repair Driveway & Temporary Access
Road to 1507 Jeffeson St SE
LUMP SUN
1.00
($554.00 )1
($554.00
$9,019.50
NET INCREASE --- --- - - - - -- ---- - - -- _ —_
$9,019 "50
[$not n accordance with the Contract and Specifications, the contract amount shall be adjusted in the amount of
9,019.50(addy(dedust) An extension of -0- days shall be allowed for completion. The original completion date shat be changed.
ralilGIMAL'�ONT�IpG
AMS?UN'M,.I;'
PREVIM
"I NS /DEDUCTIONS
AD D1 TI Q
ADDITION /D61fvTIGl1� ";1�'; ;' ±�' ":, ",;.;
pl"
rn.r;e r
$71,051.20'
APPROVED:
Contractor
ATED:
APPROVED:
Mayor
DATED: 04/1212005
PPROVED;
Director of Engineering
DATED: 04/12/2005
APPROVED:
City Administrator
DATED: 04112/2005
r
5Cm
C.]
•
I 1 I Hassan Street Southeast
Hutchinson, MN 55350
(320)587-5151 /Pax:(320)234 -4240
City of Hutchinson
APPLICATION FOR GAMBLING DEVICES LICENSE
In provisions of the City of Hutchinson Ordinance No. 655 and Minnesota Statutes Chapter 349
All applications must be received at least 30 dagbefore event in order to be considered
❑ Full Year January 1 — December 31, Fee: $100.00
71eK&75 P /5'r.0 3u °ttr� — O•PAwiNN 'Ql CFL
Short Term Date(s) 5 8 o, — 9 1I D 5 Fee: $25.00
Month/Day/Year— Za ,IvVa /Year
)Yiniiotl(b 1n
Name Phone Number
I A r Il S3s�
265- �i cA /7yP4a e �C' ftHTGNiN Sc�xl %t%
Address where regular meeting are held City State zip
Day and time of meetings? —2
is this organization organized under the laws of the State of Minnesota? X yes ❑ no
How long has the organization been in existence? How may members in the organization?
What is the purpose of the organization? "C rG.
In whose custody will organization records be kept?
Name
The following in
the organization:
Amount of bond:
so
`;C5
Sg7 5-6 7 3
_
Phone Number
/'P7.v 553 50
State zip
�,. 1' +��`j`r y.n• "'.1 �� 'i�, " -��� „p.l . I", PoFY." tl• ":.: ",itl".ifx'�'8; ^v9: "- ' °' „g ^, VS +'.p.,.; .... � „a:
rovided concerning a fiAlity bond given by the gambling manager in favor of
of bonding company
is hereby made for
the
ng company
City
Duration of bond:
auirements: 17 Yes © no
State zip
C�
•
City of Harchinson
Applicarion for Bingo Gomblinq Devices license
Page 2 of 3
Dul ,Authorizetj Officer'of the Organization Information'"�i�`•+;:�' {'`
6AseY FOe C' 5-0 5—
True Name Phone Number
l7S i1.�cH 7rx e,-1 Nye sow �ln! -i 5 3s—a
Recidence.Address City State Zip
Date of Birth: i / 23 / ei Place of Birth: /-/t� rc // "U ;O 'V 44N
Month/day/year City State
Have you ever been convicted of any crime other than a traffic offense? ❑ yes 1)40
If yes, explain:
Desi gnatcd Gambling Mana er (Altach co a u rcial resolution or acrinn designating nu aribli 'Ytu'q' M ei)'
N,t-rHA .v OC64q s s 23 7 z
True Name Phone Number
/1,9(3 Zt7 6TN C /i2CC� _ /�Ircyl /N ca,` j 3S0
Residence Address City State zip
Date of Birth: 1 / /0 6 % Place of Birth: �✓ErL Pte- W -F
Month/day/year City State
Have you ever been convicted of any crime other than a traffic offense? 13 yes WO
If yes, explain;
How long have you been a member of the organization? Ba
Name of location where game will be played Phone Number
ZOS J"r ✓C- AL4 7CFl11/S0a: AIN f -?
Address of location where game will be played 7te,rcrs ✓ /STKtyrNr� a state �
Date(s) and/or day(s) gambling devices will be used: 8 —496 through Q 4! 1 —zoe S-
"L & AM
Hours of the day gambling devices will be used: From pM To PM
twjlau,6� w/r/4 'µ`t74Hw5v^,P Tzrz Owe Z' Aw i.v 7-/f,3
Maximum number of player;
A6o er In aeon �crC�t
Will prizes be paid in money or merchandise? ❑ money 1,inerchandise
Will refreshments be served during the time the gambling devices will used? ❑ yes Nlro
If yes, will a charge be made for such refreshments? ❑ yes no
names
,e Q,-?v T-
Name Title
!-7 41z S7!rPrT A144,X,., sv.✓ I'7N
Residence Address City Stare Zip
/,?4 S _ f�✓A STCG
Name Title
Residence Address City State zip
7bolo 61.pC'5C-4
Name
zv S* N —'
Residence Address
Title
/: A!
State
5Cnl
City of Hutchinson
Application for Bingo Gambling Pevices license
Page 3 of 3
Officers of Othcr Persons Paid for Serviee5 Information (if necessa .
,' lisl,additional numss 't)` �k ',
ra .. ij) �
Name
Title
Residence Address
City State
zip
Name
Title
Residence Address
City State
zip
Name
Title
Residence Address
Ci State
zi
The following items need to be completed and/or attached in order for the application to be processed:
n estgna mg manager: ❑ yes ❑ no
O yes ❑ no
O yes ❑ no
or money order): ❑ yes Q no
Application completed in full and signed by both authorized officer and gambling manager: es ❑ no
• Have you (Gambling Manager and Authorized Officer) read, and do you thoroughly understand the provisions of all laws,
ordinances, and regulations governing the operation and use of gambling devices (as outlined in City of Hutchinson
Ordinance 114.20 and Minnesota Statutes Chapter 349)7
Gambling Manager yes ❑ no IV q? Authorized Officer jNl e% ❑ no 15,
Initial Initial
I declare that the information I have provided on this application is truthful, and I authorize the City of Hutchinson to
investigate the information submitted. Also, I have received from the City of Hutchinson a copy of the City Ordinance No.
114.20 relating to gambling and I will familiarize myself with the contents thereof.
Signature of gambling manager of organization
y Z 5 r Z Zoo S
Date
Y / S2Zna 5
r Date
1�nte1 T{12li,tlS$�1J111Atf4r1 ,�'.;,p� 'n�'�.�r ' ', 1 d,� ' - •, �., _„ �,. � ', y!;� � �„t�� i
City Council ❑ approved ❑ denied Notes:
11
5(n)
0
Hutchinson City Center
Ill Hassan street SE
Hutchin.wn, MN 55350.2522
320. 587- 5151/Fax 320 -2344M
1 i' ■. E, M C3 .tt AL L \ .13 U 1.1'.8.
TO: Mayor and City Council
FRONT: John P. Rodeberg, Director of Public Works
RE: Consideration of Out -of -State Travel for Director of Public Works, John
Rodeberg
DATE: April 7, 2005
The Minnesota Transportation Alliance holds a yearly Congressional Fly -In to Washington, D.C. to
meet with our Congressmen and Senators to talk about transportation issues. I have not previously
attended, however the Hutchinson area has many current projects and issues:
• The County is working on the first phase of the SW bypass (with federal funds) and has
. preliminary approval for the second phase in 2008, depending on the state getting the
appropriate funds from the federal government.
• The City and County have been working on a NF bypass that would go north from TH 22 at
TH 7 and connect to North High Drive (CSAH 7). This may be hard to get into the local
capital improvement programs without additional funding.
• This same route may be extended in the future as part of a Highway 15 bypass of the City.
The City, County and State have been reviewing this option.
• The Highway 15 Coalition will be pushing for funding for a Corridor Study Plan, Several
representatives from the corridor will be out to the Fly -hl, and broad support may help get
quicker action.
• Some enhancement funding for the Luce Line Trail or Dakota Rail corridors may be
available.
• Also, discussions on funding of the Dam have been proceeding with Senator Coleman's,
Senator Dayton's, and Rep. Peterson's staff. First hand meetings may help this project move
along.
I did talk with Administrator Plotz and Mayor Cook prior to proposing to go, and have made
reservations based on a deadline of April 7'h. The fly -in is from June 7 to June 9s'. I have budgeted
funds to cover the expenses (estimated at $1,700) under Travel - School Conference.
Printed on =yckd papa - J / � N
aJ
RESOLUTION NO. 12688
. RE=SOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS AND SPECIFICATIONS
LETTING NO.7
PROJECT NO. 05-07 & 05 -08
WHEREAS, a resolution of the City Council adopted the 22nd day of March 2005, fixed a date for a
Council Hearing on the improvement of:
05 -07: Michigan Avenue from TH 7 to 5th Avenue SE — street resurfacing and repair of
existing utility infrastructure by construction of sanitary sewer, milling, concrete curb
and gutter, bituminous base, bituminous surfacing, restoration and appurtenances;
and
05 -08: Michigan Avenue NE, 1st Avenue SE, 2nd Avenue SE, 3rd Avenue SE and 5th
Avenue SE by complete railroad crossing removal and Street Maintenance in
various locations throughout the City by construction of grading, gravel base,
milling, concrete curb and gutter, bituminous base, bituminous surfacing,
restoration and appurtenances.
AND WHEREAS, ten days' mailed notice and two weeks' published notice of the hearing
was given and the hearing was held thereon on the 12th day of April 2005, at which all persons
desiring to be heard were given an opportunity to be heard thereon.
NOW THEREFORE, BE If RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUTCHINSON,
• MINNESOTA:
1. Such improvement is hereby ordered as proposed in the resolution adopted the 22nd day of
March, 2005.
2. Ken Exner is hereby designated as the Engineer for this improvement. He shall prepare plans and
specifications for the making of such Improvement.
Adopted by the Council this 12th day of April 2005,
Administrator: Gary D. Plotz
Mayor: Steven W. Cook
RESOLUTION NO. 12689
• RESOLUTION APPROVING PLANS AND SPECIFICATIONS
AND ORDERING ADVERTISEMENT FOR BIDS
LETTING NO.7
PROJECT NO. 05-07,05-08,05-09
WHEREAS, the Director of Engineering has prepared plans and specifications for the improvement of:
05 -07: Michigan Avenue from TH 7 to 5th Avenue SE — street resurfacing and repair of
existing utility infrastructure by construction of sanitary sewer, milling, concrete curb
and gutter, bituminous base, bituminous surfacing, restoration and appurtenances;
and
05 -08: Michigan Avenue NE, 1st Avenue SE, 2nd Avenue SE, 3rd Avenue SE and 5th
Avenue SE by complete railroad crossing removal and Street Maintenance in
various locations throughout the City by construction of grading, gravel base,
milling, concrete curb and gutter, bituminous base, bituminous surfacing,
restoration and appurtenances; and
05-09 2nd Avenue SW from Lake Street to Dale Street — complete street reconstruction
and replacement of existing utility infrastructure by construction of storm sewer
lateral, trunk and lateral sanitary sewer and services, lateral watermain and
services, grading, gravel base, concrete curb and gutter, bituminous base,
bituminous surfacing, sidewalk, landscaping, restoration and appurtenances.
. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HUTCHINSON,
MINNESOTA:
1. Such plans and specifications, a copy of which Is attached hereto and made a part hereof, are
hereby approved.
2. The Director of Engineering shall prepare and cause to be inserted in the official newspaper, an
advertisement for bids upon the making of such improvements under such approved plans and specifications.
The advertisement shall be published for three weeks, shall specify the work to be done, shall state that bids
will be received by the City Administrator until 10:00 am on Friday, May 13th, 2005, at which time they will be
publicly opened in the Council Chambers of the Hutchinson City Center by the City Administrator andfor
Director of Engineering, will then be tabulated, and will be considered by the Council at 6:00 pm on Tuesday,
May 24th, 2005 in the Council Chambers of the Hutchinson City Center, Hutchinson, Minnesota. Any bidder
whose responsibility is questioned during consideration of the bid will be given an opportunity to address the
Council on the issue of responsibility. No bids will be considered unless sealed and filed with the Director of
Engineering and accompanied by cash deposit, cashier's check, bid bond or certified check payable to the Cily
of Hutchinson for 5 percent of the amount of such bid.
Adopted by the Hutchinson City Council this 12th day of April 2005.
Mayor: Steven W. Gook
0 City Administrator: Gary D. Plotz
c' ba
PUBLICATION NO. 7328
ADVERTISEMENT FOR BIDS
• LETTING NO.7
PROJECT NOS. 05 -07, 05 -08 & 05-08
Hutchinson, Minnesota
TO WHOM IT MAY CONCERN: Dated: April 12, 2004
The City Council of the City of Hutchinson, Minnesota, will receive bids at the Office of the
City Administrator, 111 Hassan St SE, Hutchinson MN, until 10:00 am on Friday, May 13th, 2005,
for the making of the following described improvement:
05 -07: Michigan Avenue from TH 7 to 5th Avenue SE — street resurfacing and
repair of existing utility infrastructure by construction of sanitary sewer,
milling, concrete curb and gutter, bituminous base, bituminous surfacing,
restoration and appurtenances; and
05 -08: Michigan Avenue NE, 1st Avenue SE, 2nd Avenue SE, 3rd Avenue SE and
5th Avenue SE by complete railroad crossing removal and Street
Maintenance in various locations throughout the City by construction of
grading, gravel base, milling, concrete curb and gutter, bituminous base,
bituminous surfacing, restoration and appurtenances; and
05 -09 2nd Avenue SW from Lake Street to Dale Street — complete street
reconstruction and replacement of existing utility infrastructure by
construction of storm sewer lateral, trunk and lateral sanitary sewer and
• services, lateral watermain and services, grading, gravel base, concrete
curb and gutter, bituminous base, bituminous surfacing, sidewalk,
landscaping, restoration and appurtenances;
under Minnesota Statutes, Chapter 429 all in accordance with the Plans and Specifications on file in
the Office of the Director of Engineering.
Immediately following expiration of the time for receiving bids, the City Administrator and
Director of Engineering will publicly open bids, in the Council Chambers of the Hutchinson City
Center, The Council, will consider said bids at 6:00 pm on Tuesday, May 24th, 2005, in the Council
Chambers of the Hutchinson City Center.
The approximate major quantities of work involved are:
ITEM UNIT QUANTITY
All bids shall be made on the Proposal Forms of the City and shall be accompanied by a
cashier's check, bid bond or certified check, payable to the order of the City of Hutchinson,
Minnesota, for not less than five percent (5 %) of the amount bid. All checks or bid bonds will be held
• for sixty -five (65) days or until a contract is signed. Subsequent to that time, all non - forfeited checks
or bid bonds will be returned to the bidders.
�p l G)
11
PUBLICATION NO. 7328
LETTING NO.7
PROJECT NOS. 05.07, 05 -08 & 05 -09
PAGE
All bids shall also be accompanied by the required Insurance Certificates as noted in the
specifications and Certificate of Compliance with the Minnesota Worker's Compensation Law.
Bids shall be directed to the Director of Engineering, securely sealed and
endorsed upon the outside wrapper "LETTING NO. 71PROJECT NOS, 05 -07, 05 -08 & 05-
09".
The City Council reserves the right to reject all bids and to waive any informalities and
irregularities.
Copies of the Plans, Specifications and Proposal Forms are on file and are available from
the HUTCHINSON CITY CENTER, ENGINEERING DEPT., 117 HASSAN STREET SE,
HUTCHINSON MN 55350, and will be furnished on request to any prospective bidder �.
P The successful bidder will be furnished free of
charge, additional adequate number of specifications.
Gary D. Plotz, City Administrator
PUBLISHED IN THE HUTCHINSON LEADER ON THURSDAY, APRIL 21ST, 2005 AND
THURSDAY, APRIL 28TH, 2005 AND IN THE CONSTRUCTION BULLETIN ON FRIDAY, APRIL
22ND, 2005 AND FRIDAY, APRIL 29TH, 2005.
a
PUBLIC HEARING
for Proposeld Improvements
(Letting No. 7/ProiectNa. 05-07&08)
Michigan Street - TH 7 to 51h Ave SE
Deteriorating sweet surface, hi maintenance
.—T P0 of 20 to 26 on a scale of 100 — marginal
category
Some curb & gutter cracking and settlements
• Sanitary sewer system widi some rnineral deposits
and two known pipe failures.
• Anticipate increased traffic during TH 7 project
Railroad CTOSSing Removals
Removal ot'non-functional railroad crossings
Eliminate maintenance needs
Improve roadway ride
Michigan St, Is' Ave SE, 211d Ave SE, 1"d Ave
SE and 51h Ave SE
Thin Overlays
mom
Specific street segments/areas identified by
pavement management review
Significant surface deterioration
Addressing primarily collector streets:
Jefferson St SE, Century Ave, 2 nd Ave SE,
....... ...... 51n Ave SW, Roberts St SW, 3"d Ave. NW,
Lynn Rd SW, Lewis Ave SW, School Rd
NW, Elm St NE, McLeod Ave NE
a
Proposed 3a1x��rta�acmorlts
� . City Stare
Michigan Stmt ,
City pays for:
w Mill. entire cXisling pa'We179e'lSf 5u'rfaGt (2" flwEGlii1!eSS ).
500/O of ,"i;b'abi Ji -tati n proj ects .— hill & overlay
w Remve and replace sewre:ly deteri mated paverr; m to fall
'
. Sastitary sever repairs
dt iofexistingsectim
w peiouvt severely cracked and settled cuncretc cuth acrd
' . ati }tn eprazSSfrb removals
-.'..
gutter.
pfI1J, �,. . L t,f i6i �!G -day mlaimellance activities
w Mudpack moderately settled cowrelc curb and gutter.
;
11 777
w ptepair faired sanitary sever pipe itf nraarcas. :.
�:
-
w '0 er1a ttftire surface ^v*nnl nrss
y tratffxnrpmus cz ° dtiClC
' 1
... .
4,
3,
�z
PrOposed Terro mrit
, S r
Property t
a<
'+ Railroad Crossing ernr�vals
. Orope,rty Owner Fay, for
. 1^w,e�"e: "trsrck5, l��ta4t crack aid pav�iaicg',t .
of iWitl a� �' Sf.1 S�2 � elf mlfsfrc�ar
stteptase, ,
. NiJTl�- MCOO& ad COM W"%,Wn Wq= ua g
. Grade 6mssartg to match adja a nt roadway.
w t.Amatcd AomamA ft, ryOO tstr *lac W,patal0jl $2„166
. Siivrtatxthe c sing was vith biturntinotas
w 'f.Wms l AWr,ss awwa for fAi" 3W wWc (SHIL ,:; $4�3W
ri'PoT1MWed ibrvpic#'
"
Estimated Project Costs &
Proposed. Improve m 1t
ing..'.:
Financ
+ Thin {overlays
Estimated Construction Coet 1 215,000
W
. Mill kist g swf`ace as necessary to provide
a
tewi
Cost 26t6;S00
Estimated Project ;
maftchp�rixuts.
. Clean, sweep and Wk wat ov"r aa'
Trunk Sanitary Server Fund S l{l,
. ,r erliy existing pavement with i- V of
'FrunkWatennain Fund 0
bitarttninous. pavement
Bonding S 196,500,
- -
Ass %ments i
Estimated Project Financing S 26,66 tMa
2
x�
Vrojec Asses inert Information
Staff will conrrplete, the project design and go out fib Y
approved at the Ptablic llearina (April "12a)
An Ase,5,5rntPt Hgarigg is to tae held after bins, ,prior to award
of contract (possibly May 24e").
Actual final assessment costs to be calculated for.Pssessnwzut
Ileoxing band on the actual project c out.
m _ Interest rate will be detenrkne d by rage .that city motives for
the proicct boaads.fr wwmas rmod o u -.ow w w�b. d-%F dew':
"
rA4udik' meGJ`.fFr dinwrE rap�Awagd Yak gyp': dew eww�u,n6e w:''
it
Payment Options ,
Full (or pardal) payrotart wriflaout Est by November 15*
e
AaFler Tlo ra rcr lea, the assmsawnta EL" cer d ied to tae -mills ."
With ,inteca at -
vm ,AsS�sgrtte egaaal primipral jand
rat ti n t�7t �fiall kir 10 ypq ; With
decreasing Intelsat '
— moctw4t uaa
MfOrxuonlwto available, far prat city owe news
guidelines, who acre either over 65 yeawa old or disabled
11
1l \I � ► a \ 1 u_I
Date: April 8, 2005
To: honorable Mayor & City Council
Marc Sebora, City Attorney
From: Miles R. Seppelt, EDA Director
RE: Purchase Agreement with Nash Finch
As of this writing, (Friday morning at 8:45 AM) the city has not received a purchase agreement
from Nash Finch.
Their attorney is in the process of writing it up, and we should have it anytime now.
We have reached a verbal agreement with Nash Finch to sell the adjoining retail space to the city
for $50 per square foot, a total of $198,050. In 2001 the property was appraised at about
$205,000, so this is a particularly good price.
In addition, Nash Finch has agreed on a price of $5 per square foot for the parking lot space that
would be needed for the expanded Liquor Hutch. Total estimated cost would then be about
• $30,000 for the space we need for the expansion.
Total site acquisition costs would then be approximately $228,050.
We are hoping that the purchase agreement will come in later today so that the City Attorney can
review it and make a report to the City Council at Tuesday's meeting.
If at all possible, we will get you copies of the agreement in advance of Tuesday evenings
meeting.
If you have any questions or need additional information, please give me a call at 234 -4223,
0
ac�)
. MEMORANDUM
Date: April 5, 2005
To: Honorable Mayor & City Council
Marc Sebora, City Attorney
From: Miles R. Seppelt, EDA Director
Dan Wilson, Wilson Development Services
RE: Negotiated Settlement with Midwest Tae Kwon Do
In consultation with Mr. Dan Wilson, of Wilson Development Services (our relocation expert) we are
recommending a negotiated settlement in the amount of $20,000 for the relocation of Midwest Tae Kwon
Do.
Our reasoning:
Midwest Tae Kwon Do is a displaced business under the Minnesota Uniform Relocation Act: As such,
they are entitled to certain relocation rights and benefits.
Displaced businesses have the right to choose between the Actual Cost Approach and the Fixed Payment
Method of computing relocation claims. The displaced business has the right to choose the method in
which they receive the greatest relocation benefits. The Fixed Payment Method has a maximum payment
•' of $20,000.
Midwest Tae Kwon Do currently pays a significantly below- market -rate rent. They have negotiated a 10-
year lease with Nash Finch at a rate of approximately $3 per square foot initially, ramping up to $3.65 per
square foot in Year 10. This is dramatically below market rates for downtown Hutchinson, which are
typically in the range of $7 to $10 per square foot. Midwest Tae Kwon Do realistically will have to pay at
least double their current rate of rent in order to lease space.
In addition, Midwest Tae Kwon Do is limited in its ability to generate income. Currently the business has
approximately 100 students who pay an average of $45 per month for Tae Kwon Do lessons. This works
out to a gross income of approximately $4,500 per month or $54,000 per year. Any significant increases
in the tuition rate will result in lower enrollment at the school, which will keep gross income at essentially
its current level.
Finally, the business is a strong asset to the Hutchinson community. Midwest Tae Kwon Do provides
opportunities for young people to learn self - defense and self- discipline, improve their physical fitness and
build their self- esteem in a safe and supportive environment — all at a very reasonable cost. Considering
all the less desirable alternatives available to young people today, it is clear that Midwest Tae Kwon Do
satisfies an important need in our community. Naturally, we want to do everything possible to keep this
business in operation.
For these reasons, we are recommending a negotiated settlement in the amount of $20,000.
This settlement will resolve any leasehold interests in the existing property, discharge all of our legal
obligations visa -vis the relocation of Midwest Tae Kwon Do and give them the best possible chance to
relocate successfully and continue as a viable business.
r
A'
d9'
April 4, 2005
City of Hutchinson
Public Works Department
Maintenance Operations
1400 Adams St SE
Hutchinson, MN 55350
Phone (320) 234 -4219 Fax (320) 234 -6971
To: I3onorable Mayor and City Council members
From: John Rodeberg, Dir. of Public Works
John Olson, Public Works Supt.
Kent Exner, City Engineer
Subject: Street Patching
In January of this year, staff presented a report regarding pavement management. One important
part of pavement management is patching potholes and other pavement defects.
The City has limited resources available for patching and the price of patching materials have
increased over 18% this year. Patching resources can be further limited by response to
emergency needs and other priority maintenance activities. We expect only responses to known
pavement defects will be possible due to these limited resources. (Typically, pavement defects are
. defined as conditions resulting in abrupt depressions of more than 2 inches over an area greater than one
squarefoot)
Economic indicators identified in the recent pavement management report show resources are
best utilized to keep streets in excellent or good condition. Expending resources on streets in
poor and marginal condition is generally not cost -effective. To maximize the cost -effectiveness,
we intend to provide two levels of street patching:
Emergency ,Patching:
Crews are dispatched to areas based upon complaints or notice of accidents or damage
involving a pavement defect. Crews will determine appropriate patching methods, based
on time requirements or street condition.
Corrective Patching:
Crews are assigned to areas based upon an inspection plan. If resources are available,
crews will inspect each City street once per year. Marked crosswalks will be patched
from curb to curb once per year if defects are found.
Good representative patching methods will be employed on streets in excellent and good
condition in order to maximize longevity and cost - benefit of the patch. Cost - benefit will be
considered while determining appropriate patching methods on streets in poor, marginal, or
adequate condition. This represents a change from past practice. Focusing patching efforts on
streets in excellent and good condition, and less on streets in poor or marginal condition may
result in more complaints regarding street conditions, but we are convinced it is prudent that the
. City use discretion in patching to maximize use of available resources and their related cost -
benefit.
lc.
C
Ll
Hutchinson City Center
111 nassan Street SE
Ilutchinson, MN 55350-2522
320.587-5151Fax 320. 234 -4240
M. E M. O R. A. N DO LJ M
TO: Mayor and City Council
FROM: John P. Rodeberg, Director of Public Works
RE: Consideration of Approving Engineering Services Agreement with SRF
Consulting
DATE: April 6,200S
Attached please find the Engineering Services Agreement from SRF Consulting for preparing a
Feasibility Study for the Highway 7 /School Road Underpass that is proposed to receive $lM in
federal funding. SRF Consulting has previously worked on this project, and is in our approved
consulting pool for transportation related projects. They have also completed the City's
. Comprehensive Transportation Plan and our Light Traffic Plan.
This project was originally proposed in the mid -90's due to significant, community-wide concerns
raised about the safety of crossing Highway 7 on School Road. This route directly accesses the
schools. There has also been a pedestrian fatality at the intersection. The TEA 21 (Transportation
Efficiency Act for the 21" Century) application made through US Representative Colin Peterson's
office is also attached.
This study would determine the feasibility of the project, complete preliminary grading and site
plans, and lay the foundation to start a design that could be incorporated into the Highway 7 plans.
We need to complete this work within the next several months in order to coordinate with those
plans.
We recommending approving the Engineering Services with SRD Consulting for a not -to-
exceed amount of $7,950.
printed on recycled paper- (-;
liie
I-J .)
City of Hutchinson, MN Project Application * TEA 21 Reauthorization
•
"School Road Underpass"
Name the Congressional District of the primary Member of Congress supporting the project.
US Congressional District 7, US Representative Collin C. Peterson
2. Other Members supporting the project.
3. If the project is a highway project, identify the State or other qualified recipient responsible for
carrying out the project.
City of Hutchinson, Minnesota
4. If the project is a transit project, please identify the project sponsor (must bean eligible recipient of
Federal transit funds).
NA
5. Please categorize the project. (Check one)
Highway or bridge Intermodal facility (passenger)
_ Transit rail new start Intermodal facility (freight)
Bus, bus equipment, or bus facility XXX Bicycle and Pedestrian
Other (please specify)
6. Is the project eligible for the use of Federal -aid highway or transit funds under Title 23 or Title 49
of the United States Code?
Yes?
7. If the project is a highway or bridge project, is it on the National Highway System?
No
8. Briefly describe the total project.
The project, identified as the "School Road Underpass", is a pedestrian and bicycle tunnel
underneath State Trunk Highways 7 and 22 (TH 7122) near School Road NW in the City of
Hutchinson. The City has been working on providing a safe pedestrian and bicycle crossing at
this extremely busy intersection for over a decade. This work is hoped to be coordinated with
the State Highway 7115122 project proposed for construction in 2006 and 2007. One pedestrian
fatality has occurred since 1990.
a. Is it part of a larger system of projects and if so describe the larger system?
This tunnel is part of a comprehensive Light Traffic (bikes, pedestrians and transit) Plan
developed by the City in conjunction with the Minnesota Department of Transportation and
the Finnish Road Administration. The goal was to have an integrated trail system that
would have both transportation and recreational purposes, with an emphasis on connecting
destinations and points of interest. This underpass would provide service from the
residential northwestern portion of the City to the school campus and commercial areas to
the south. The City has only 3 north -south accesses across the Craw River, with the one at
School Road being the only crossing outside of downtown, and the main route that provides
. access to the schools. Currently there is an adjacent on- street bike route system that
� `e_)
• connects to the Luce Line Trail south of TH 7122. A State Highway project is proposed in
the immediate area far 2007. Without funding, that project will make it harder to complete
this work in the future.
b. What is the total estimated cost of the project?
The project is prelinsinarily estimated at $1.7M, with approximately $750,000 for the
tunnel itself,- $150,000 ofproperty acquisition; $250,000 in trail connection and
reconstruction; $200,000 for utility relocation; $200,000 in retaining walls; and $150,000
in engineering, administration and other costs.
9. Please identify the specific segment for which project finding is being sought, including terminus
points.
On the north side of TH 7122, the project would include trail connections to the adjacent local
streets (Shady Ridge Road and School Road) and a ramp, due to grade issues (requiring
retaining walls and guard rail). There would be a concrete box culvert crossing to the south
side of TH 7/22, where the project would terminate at the Luce Line State Trail.
10. What dollar amount are you requesting in the authorization for this project or segment of a project?
The City is requesting $1.4M. It is proposed that the City would pay for engineering and some
utility relocation costs, as well as the estimated $200, 000 of improvements required off this site
to provide other required trail connections to this area.
11. Project Schedule
a. What is the proposed schedule and status of work on the project?
. The project is currently under review by a city advisory group. The next step would be
coordination with the trunk highway project currently under design. Design work would
start in the summer of 2005, and construction would occur in 2006 or 2007.
b. What is the current stage of development of the project? (if the project is a transit new start,
please specify whether the project is in alternative analysis, preliminary engineering, final
design, has been issued a record of decision, under environmental review, or already has a
current full funding grant agreement.)
Preliminary engineering phase
12. Project Plan
a. Is the project part of the State's long -range plan?
No
b. Is the project included in the metropolitan and/or State Transportation Improvement
Program(s)?
No
13. Is the project considered by the State and/or regional transportation officials as critical to their
needs? Please provide a letter of support from the officials, and if you cannot, explain why not.
The project is proposed by the City of Hutchinson, and is not part of the MN Department of
Transportation or MNDepartment of Natural Resources system, although the project would
provide safe access across a state highway, and link a state trail to the local system.
• 14. Does the project have national or regional significance? Describe.
a (am)
The regional significance of the project is related to improved safety and the promotion of
. alternative transportation routes, as well as improved access to local and state trails.
F, r-I
L -.A
15. Has the proposed project encountered, or is it likely to encounter, any significant opposition or
other obstacles based on environmental or other types of concerns? If yes, please describe.
No
16. Describe the economic, environmental, congestion mitigation, and safety benefits associated with
completion of the project.
The project would help remove pedestrian and bicycle traffic from a congested intersection.
The current intersection has significant turning traffic, and multiple accesses to stores and a
frontage road near the intersection. The route currently has a high level of student crossing due
to the routes connection to the high school, middle school and elementary school campus. .
There was a pedestrian fatality at the intersection in the mid- 1990's.
17. Has the project already received funding through the State's federal -aid highway or transit formula
apportionments or from the Federal, State, local, or private funds? If yes, how much and from what
source?
No
18. Has the project received .funding in a previous authorization act?
No
19. If the project has received finding in a previous authorization act, please cite the act(s) and
amount(s) authorized.
NA
20. Has the project received funding in a previous appropriations act?
NA
21. If the project has received funding in a previous appropriations act, please cite the act(s) and
amount(s) appropriated.
NA
22. If the Committee on Transportation and Infrastructure chose to fund this project, please provide a
description of the project as you would like it to appear in the bill.
School Road Underpass of MN State Highways 7 and 22.
a 6�
ESRF
F-]
r-1
LJ
CONSULTING GROUP, INC.
Transportation • Civil • Structural • Environmental • Planning • Traffic • Landscape Architecture Parking
March 29, 2005
Mr. John P. Rodeberg, P.E.
Director of Engineering/Public Works
CITY OF HUTCHINSON
111 Hassan Street Southeast
Hutchinson, Minnesota 55350
Dear John:
RECEIVED Proposal No. P05170
MAR 3 12005
City of Hutchinson
Eng. pep.
SUBJECT: PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES
TH 7 / SCHOOL ROAD PEDESTRIAN UNDERPASS
As requested, we are pleased to submit this proposal for professional services to assist the City of
Hutchinson with evaluating a potential pedestrian underpass just west of School Road across
TH 7. We understand that the City may receive federal funds to help cover the cost of the
improvement.
SCOPE OF SERVICES
Based on our conversation, preparation of a Feasibility Study is the appropriate first step in
the design and approval process. Because of the potential impacts to the park and the
McLeod County Museum, we recommend completing a preliminary grading and site plan in
addition to the Feasibility Study. We have developed the following tasks and estimated hours to
complete the Feasibility Study:
TASK HOURS
1. Collect and Review available data 8
2. Prepare a Preliminary Grading Plan 24
3. Prepare an Illustrative Site Plan 12
4. Prepare a Feasibility Study with Cost Estimate 24
Total 68
If the project proceeds beyond the Feasibility Study, we are available to assist the City with
preparation of bid documents that could be incorporated in the TH 7 plans currently being
prepared by Mn/DOT. Tasks and hours are not included in this proposal for this additional work.
One Carlson Parkway North, Suite 150, Minneapolis, MN 55447 -4443
Telephone (763) 475 -0010 ■ Fax (763) 475 -2429 ■ http: / /www.srfconsulting.com
An Equal Opportunity Employer p r
A
Mr. John P. Rodeberg, P.E. - 2 - March 29, 2005
• BUDGET AND SCHEDULE
Based on the scope of services, we estimate our cost to perform this work to be $7,950. We will
not exceed this figure without your approval.
We are prepared to start work immediately so that the Feasibility Study will be completed by
May 15, 2005,
BASIS OF PAYMENT
We propose to be reimbursed for our services on an hourly basis for actual time expended.
Other direct project expenses, such as printing, supplies, reproduction, etc. would be reimbursed
at cost, and mileage would be reimbursed at the current allowable IRS -rate for business miles.
Invoices are submitted on a monthly basis for work performed during the previous month.
Payment is due within 30 days.
CHANGES IN SCOPE OF SERVICES
It is understood that if the scope or extent of work changes, the cost will be adjusted accordingly.
Before any out -of -scope work is initiated, however, we will submit a budget request for the new
work and will not begin work until we receive authorization from you.
NOTICE TO PROCEED
A signed copy of this proposal or separate authorization letter, either mailed or faxed to our
office, will serve as our notice to proceed. Our fax number is 763 -475 -2429.
We sincerely appreciate your consideration of this proposal and look forward to working with
you on this project. Please feel free to contact us if additional information regarding this
proposal is required.
Sincerely, APPROVED:
SRP CONSu'=G GROUP, INC.
7 te vorak, P .E.
ident
(signatum)
Name
Title
Date
This cost proposal is valid for a period of 90 days. SRF reserves the right to adjust its cost
is estimate after 90 days from the date of this proposal.
C
•
TO: Mayor & City Councils
FROM: Gary D. Plotz
DATE: April 6, 2005
SUBJF,CT: Identification of Core/Essential Services
Hutchinson City Center
111 Aas n street SE
Hutchio on, MN 55350.2522
320.587.5r51 /Fax 320.2344240
One of the Council's 2005 -2006 short -term goals is to identify core (essential) services.
Mayor Cook and I have discussed moving forward with accomplishing this goal prior to the 2006
budgeting process which begins with city directors in early June. Identification of core
(essential) services will also assist the city with the 2 -3 year budgeting process as we look to the
future.
Mayor Cook and I feel Doug Peters would be helpful in moderating this process of identification.
Mr. Peters has the following dates available:
April 19, 20, 25, 27
May 2, 3, 4
During recent visioning sessions, we have utilized a time frame of 9:00 a.m. — 12:00 noon.
I request that the Council set a workshop to achieve the goal of identifying core (essential)
services.
Printed on recycled paper -
•
•
•
R55APPYRV
CITY OF HUTCHINSON
By Check Number
AP Pa ment Re Ister with Voids
Check Date
03/29/2005
-
Ck Date
T pe
Check #
Vendor
Name
Amount
03129/2005
PK
128546
"
116423
AMENT, ADAM
60.00
03/29/2005
PK
128547
107549
AMERICINN
70,18
03/2912005
PK
128548
102533
HUTCHINSON CONVE
5,112.82
03/29/2005
PK
128549
102038
HUTCHINSON, CITY
163 500.00
03/29/2005
PK
128550
102052
QUALITY WINE & SPI
4,417.12
03/29/2005
PK
128551
102606
SCHMELING OIL CO
12,790.36
03/29/2005
PK
128552
120795
SUPER GROUP PAC
27,289.94
213,240.42
Account Nui
##
213 240.42
3 -zq-cs
Void Amou Payment T,
Check Par
Check Par
Check Par
Check Par
Check Par
Check Par
Check Par
213240.4
213240.4
PAYROLL. ACCOUNT • April 1, 2005
Period Ending; March 26, 2005
FOR COUNCIL LIST ONLY - ELECTRONIC TRANSFER
. TO STATE AND IRS
DO NOT ISSUE CHECKS FOR THIS PAGE
AMOUNT PEID
ACCT# NAME
$20,940.96
9995.2034 WITH. TAX
$11,635.94
ACCOUNT
$11,334.77
9995.2240
$3,217.29
9995.2242
$35,493.02 Sub -Total - Employee Contribution
$11,334.77 9995.2240
$3,217.29 9995.2242
$14,552.06 Sub -Total - Employer Contribution
050,045.08 Grand Total - Withholding Tax Account
DESCRIPTION
Employee Contribution - Federal Tax
Employee Contribution - Soc. Security
Employee Contribution - Medicare
Employer Contribution - Social Security
Employer Contribution - Medicare
$9,383.31
9995.2035
MN DEPT OF REVENUE
$11,635.94
102615
9995.2241
PERA Employee Contribution - Pension Plan
$13,781.64
102615
9995.2241
Employer Contribution - Pension Plan
$25,417.58
Sub -Total -
PERA
$15.86
102615
9995.2243
PERA -DCP Employee Contribution - Pension Plan
$15.86
102615
9995.2241
Employer Contribution - Pension Plan
$31.72
Sub - Total
- DCP
$25,449.30
GRAND TOTAL - PERA
0
Finance Director Approval
11
•
�j
855APPYRV
CITY OF HUTCHINSON
B Check Number
AP Pe ment Register with Voids
Check Date 04 108/2005
-
Ck Date Typ
Check R
Vendor Name'
Amount
04/06/2005
PK
128553
" 101919
AMERICAN FAMILY INS CO.
97,91
04/06/2005
PK
128554
121036
CNH CAPITAL AMERICA LLC
--
41,518.92
04/06/2005
PK
128555
121183
CNH CA TA HOLLAND CREDIT
234.10
0410612005
PK
128556
121278
COOK COUNTY COURT ADMIN.
500.00
04/06/2005
PK
128557
102450
DOSTAL ELECTRONICS CENTER
119,23
04/06/2005
PK
128558
113200
GREAT NORTHERN BARK COMPANY, I
2,827,25
04/06/2005
PK
128559
101875
GREAT WEST LIFE INS. CO.
300.00
04/06/2005
PK
128560
101872
H.R.L.A.P.R,
288.59
04/06/2005
PK
128581
102546
HCVN -TV
5,558.29
04/08/2005
PK
128562
121293
HOTDOT GRAPHIC SOLUTIONS
300.00
04/06/2005
PK
128563
102633
HUTCHINSON, CITY OF
7,359,42
04106/2005
PK
126564
102635
HUTCHINSON, CITY OF
581.56
04/06/2005
PK
128565
101873
ICMA RETIREMENT TRUST
3,8(17,20
04/0612005
PK
128566
101876
ING LIFE & ANN CO.
860.00
04/06/2005
PK
128567
102489
MCLEOD COUNTY COURT ADMINISTRA
370.00
0410612005
PK
128568
102489
MCLEOD COUNTY COURT ADMINISTRA
250.00
04/06/2005
PK
128589
102449
MINNESOTA CHILD SUPPORT PAYMEN
554.94
04/06/2005
PK
128570
103119
MINNESOTA DEPT OF EMPLOYEE REL
39.00
04/06/2005
PK
128571
102653
MINNESOTA DEPT OF MOTOR VEHICL
21.50
04/0812005
PK
128572
102579
MINNESOTA DEPT OF REVENUE
149.00
07706/2005
PK
1286731
102389
MINNESOTA FIRE SERVICE CERTIF
180.00
04/06/2005
PK
1285741
101914
NCPERS LIFE INS,
524.00
04/0612005
PK
128575
121199
NELSON )ODGE -GMC
30,112.04
04/0812005
PK
128576
102096
PRUDENTIAL MUTUAL FUNDS
30.00
04/0812005
PK
128577
102052
QUALITY WINE & SPIRITS CO.
1,906,11
04/06/2005
PK
128578
105090
SIBLEY COUNTY COURT ADMINISTRA
138.17
04/06/2005
PK
128579
105091
STEARNS COUNTY COURT ADMINISTR
300,00
04/08/2005
PK
128580
119799
STEVE'S OK SERVICES
2,802.80
0410812005
PK
128581
102618
TWO WAY COMM INC
75.00
04/06/2005
PK
128582
105122
WASTE MANAGEMENT
1,108.40
102,573.43
Account N
102,573.43
1�zc9�icoe o,,,� S
g- U D5
g.. _...
Cl
•
E
R55APPYR
CITY OF HUTCHINSON
By Check Number
AP Payment Register wlth Voids
Check Date
04/12/2005
-
Ck Date
Type
Check k
Vendor
Name
Amount
04/12/2005
PK
128583'
112402
ABELSON, RANDY
30.22
04/12/2005
PK
128584
102126
ACE HARDWARE
18.43
04/12/2005
PK
128585
120214
ACTIVAR INDUSTRIAL PLASTICS
494.99
04/1212005
PK
128586
119542
ALBERTS, MARK
275.30
04/12/2005
PK
128587
101829
ALBINSON
45,26
04/12/2005
PK
128588
121188
AMERICAN PRESSURE INC.
4,000.00
04/12/2005
PK
128589
101867
AMERICAN WATER WORKS ASSN
227,50
04/12/2005
PK
128590
102430
AMERIPRIDE LINEN & APPAREL
333.29
04/12/2005
PK
128591
111041
ARROW TERMINAL LLC
608.86
04/12/2005
PK
128592
102480
B. W. WELDING
1,641.17
0411212005
PK
128593
102870
BAERTSCHI, PAUL
100.00
04/12/2005
PK
128594
120299
BARGAIN -X, INC
227,91
04112/2005
PK
128595
117464
BARNUM GATE SERVICES INC
758.65
04/1212005
PK
128596
102943
13AUERLY COMPANIES
34,357.45
04/1212005
PK
128597
102367
BELLBOY CORP
1,680.40
04/1212005
PK
128598
102255
BEAKLEY RISK ADMINISTRATORS
800.00
04/12/2005
PK
128599
101916
BERNICK COMPANIES, THE
88.60
04/12/2005
PK
128600
120738
BERTELSON'S
148.94
04/12/2005
PK
126601
102837
BIOCYCLE
69.00
04/12/2005
PK
128602
119938
BLACKWELL, DAN
60.00
04/1212005
PK
128603
119212
BLOCK FARMS & TRUCKING
7,099,00
04/12/2005
PK
128604
113020
BOCK, CINDY
49.99
04/12/2005
PK
128605
102729
BOLTON & MENK INC.
6,715.41
04/12/2005
PK
128606
101987
BRANDON TIRE CO
297,24
04/12/2005
PK
128607
102136
BUSINESSWARE SOLUTIONS
331.17
04112/2005
PK
128608
102458
C & L DISTRIBUTING
27,670.40
04/12/2005
PK
128609
102088
CADO /ENGINEERING SUPPLY
67.51
04/12/2005
PK
126610
102083
CAMERA SHOP
125,82
04/12/2005
PK
128611
121311
CARQUEST OF HUTCHINSON
32.60
04/12/2005
PK
128612
102092
CARR FLOWERS
89.88
04/12/2005
PK
128613
102498
CARROT -TOP INDUSTRIES INC.
215.95
04/12/2005
PK
128614
102061
CASH WISE
53.24
04/12/2005
PK
128615
102253
CENTRAL MCGOWAN
123.10
04/1212005
PK
128616
121295
CHAPPELL CENTRAL INC.
119.19
04/12/2005
PK
128617
121026
CHEF CRAIG'S CAFE & CATERERS
652.31
04/12/2005
PK
128618
110865
CHOICEPOINT SERVICES INC
282.00
04/12/2005
PK
128619
105423
CINDY'S HOUSE OF FLORAL DESIO
62.84
04/12/2005
PK
128620
102863
CITY ENGINEERS ASSC OF MINNES
04/12/2005
04/12/!2005
PK
PK
128621
128622
121313
102741
CLARKE MOSQUITO CONTROL PRO
COBORN'S INCORPORATED
04/12/2005
PK
128623
103664
COOK, STEVE
N1,78O.98
04/12/'2005
PK
128624
121268
COOPER, SECCA
04/12/2005
PK
128625
114585
COPYMED INC
04/12/2005
PK
128628
117879
CORNWELLTOOLS
04/12/2005
PK
128627
102484
CORPORATE EXPRESS
129.41
04/12/2005
PK
128628
102159
COUNTRY KITCHEN
46.76
04/12/2005
PK
128629
103703
COWGER, KARLEEN
30.00
04/12/2005
PK
128630
102220
CROW RIVER PRESS INC
119.04
••LU.
•
0
0
04112/2005
PK
128531
102121
CROW RIVER VET CLINIC
402.69
04/12/2005
PK
128632
102186
CULLIGAN WATER COND
37,28
04/12/2005
PK
128633
102178
CURTIS 1000
923.31
04112/2005
PK
128634
101864
DAAK REFRIGERATION
42.00
04/12/2005
PK
128635
102488
DAY DISTRIBUTING
2,844.90
04/12/2005
PK
128636
102698
DEVRIES, RANDY
118.64
04/12/2005
PK
128637
103793
OLT SOLUTIONS
5,476.00
04/12/2005
PK
128638
104084
DONOHUE & ASSOC
8,256.24
04/12/2005
PK
128639
102275
DPC INDUSTRIES INC
2,013.44
04112/2005
PK
128640
113181
DROP -N -GO SHIPPING, INC
147.51
04/12/2005
PK
128641
102236
DUININCK BROS INC.
30,112.49
04/12/2005
PK
128642
102236
DUININCK BROS INC.
39,635.26
04112/2005
PK
128643
104415
EARTH TECH
77,565.00
04/12/2005
PK
128644
102495
EBERT, PAT
8.50
04/12/2005
PK
128645
1 102726
ECOLAB PEST ELIM
108.50
04/1212005
PK
128646
102364
ECONO FOODS
180.58
04/1212005
PK
128647
102356
ELECTRO WATCHMAN
1,635.84
04/12/2005
PK
128648
121314
ENGINEERING MINNESOTA
26.00
04/12/2005
PK
128649
121312
ENGINEERING REPRO SYSTEMS
53.25
04/12/2005
PK
128650
105671
FARLEY, JENNIFER
34830
04/12/2005
PK
128651
104137
FASTENAL COMPANY
110.26
04/12/2005
PK
128652
102738
FIRE INSTRUCTORS ASSN OF MN
630.52
04/12/2005
PK
128653
113201
FLORIDA GARDEN PRODUCTS, INC
3,802.00
04/12/2005
PK
128654
121304
FORCIER, VINCENT
60.00
04/12/2005
PK
128655
117541
FOUQUETTE, CYNDI
25.00
04/12/2005
PK
128656
121178
FOUST, CRYSTAL
17.15
04/12/2005
PK
128657
112129
FULLER & D'ALBERT INC
328,41
04/1212005
PK
128658
102526
G & K SERVICES
1,095.27
04/1212005
PK
128659
102700
G.A.THOMPSON CO.
600.86
04/12/2005
PK
128660
1020361
GAME TIME
121.40
04/12/2005
PK
128661
120284
GAVIN, OLSON & WINTERS, LTD
2,875,00
04/12/2005
PK
128662
103340
GEB ELECTRICAL INC
68.60
04/12/2005
PK
128663
105021
GENERAL TRADING CO
15.93
04/12/2005
PK
126664
121315
GIRLS SOFTBALL ASSOC,
7,530.60
04/12/2005
PK
128665
121296
GORACKE, SHAWN
20,00
04/12/2005
PK
128886
121297
GOSAIN, MUNTA
28.00
04112x2005
PK
128667
102524
GOVERNMENT TRAINING SERVICE
86.00
04/12/2005
PK
128668
102087
GRAINGER PARTS OPERATIONS
483.41
04/12/2005
PK
128669
120218
GRAND VIEW LODGE
100.00
04112x2005
PK
128670
105562
GRANIT BRONZ
124.18
04/12/2005
PK
128671
113200
GREAT NORTHERN BARK COMPANY
6,24620
04/12/2005
PK
128672
101874
GRIGGS & COOPER & CO
8,816.97
04/12/2005
PK
128673
112959
GRUBER PALLETS, INC
4,280.00
04/12/2005
PK
128674
102529
HACH COMPANY
446.34
04/12/2005
PK
128675
121318
HAGERTY, WANDA
70.00
04/12/2005
PK
128676
102451
HANSEN DIST OF SLEEPY EYE
1,746.50
04/12/2005
PK
128677
102089
HANSEN GRAVEL
491.80
04/12/2005
PK
128678
109799
HARRIS COMPANIES
1,611.00
04/12/2005
PK
128679
121298
HAUSLQDEN, LESLIE
143.00
04/12/2005
PK
128680
103240
HEMMAH, KATHY
37.74
04/12/2005
PK
128681
102701
HENRY'S WATERWORKS INC
533,78
04/12/2005
PK
128682
102531 IHENRYS
FOODS INC
534.05
LJ
J
r
L.
04/12/2005
04/12/2005
04/12/2005
04/12/2005
04/12/2005
PK
PK
PK
PK
PK
128683
128684
128685
126666
128887
101915
116866
102518
105080
121320
HERMELWHOLESALE
HEWLETT - PACKARD CO
HILLYARD FLOOR CARE /HUTCHINS
HIRSHFIELD'S DECORATING CENTEI
WOGUE, STEPHANIE
202.25
7,338.93
680.41
106.45
Y4.87
04/12/2005
PK
128688
102119
HOLT MOTORS INC
1,074.57
04/12/2005
PK
128689
117197
HOMETOWN REALTY
50.25
04/12/2005
PK
128690
110631
HOUK. PAM
25.00
04/12/2005
PK
128691
102265
HUIRAS, TIM
400.10
04/12/2005
PK
128692
102544
HUTCH CAFE
121-20
04 /12/2005
PK
128693
102544
HUTCH CAFE
134,90
04/12/2005
PK
128694
102319
HUTCHINSON AREA HEALTH CARE
350.00
04/12/2005
PK
128695
108389
HUTCHINSON AUTO CENTER
5.07
04/12/2005
PK
128696
105329
HUTCHINSON BUMPER TO BUMPER
852.70
04/12/2005
PK
128697
102530
HUTCHINSON CO -OP
9,689.16
04/12/2005
PK
128698
121321
HUTCHINSON COMMUNITY FOUNDA
50.00
04/12/2005
PK
128699
103430
HUTCHINSON JUNIOR LEAGUE BASE
24,266.00
04/12/2005
PK
128700
102537
HUTCHINSON LEADER
4,940.28
04/12/2005
PK
128701
102541
HUTCHINSON TELEPHONE CO
9,383.78
04/12/2005
PK
128702
105161
HUTCHINSON UTILITIES
83,553.03
04/12/2005
PK
128703
102543
HUTCHINSON WHOLESALE
3,25
04/1212005
PK
128704
102038
HUTCHINSON, CITY pF
167,000.00
04/12/2005
PK
128705
102633
HUTCHINSON, CITY OF
67,534.28
04/12/2005
PK
128706
102635
HUTCHINSON, CITY OF
5,261.97
04/12/2005
PK
128707
103246
HUTCHINSON, CITY OF
7,477.59
04/1212005
PK
128708
105160
HUTCHINSON, CITY OF
16,724.88
04/1212005
PK
128709
117018
INTERNATIONAL CODE COUNCIL
100.00
04/12/2005
PK
128710
103520
INTERSTATE BATTERIES
406,89
04/12/2005
PK
128711
121309
INVENSYS SYSTEMS INC
292,49
04/1212005
PK
128712
102062
JACK'S UNIFORMS 6 EQUIPMENT
302.63
04/12/2005
PK
128713
102208
JEFF'S ELECTRIC
478,21
04/12/2005
PK
1287 14
121316
JENSEN, BRITTA
20.00
04/12/2005
PK
128715
102554
JERABEK MACHINE SERV
12,82
04/12/2005
PK
128716
104564
JLR GARAGE DOOR SERVICE
412.39
04/12/2005
PK
128717
102556
JOES SPORT SHOP
130.22
04/12/2005
PK
128718
101938
JOHNSON BROTHERS LIQUOR GO.
15,305.37
04112/200
PK
128719
102555
JUUL CONTRACTING CO
611.00
04/12/2005
PK
128720
115115
KALDAHL, TIM
427.08
04/12/2005
PK
128721
103806
KING, KATHY
20.00
04/12/2005
PK
128722
102466
KKLN
11000.00
04/12/2005
PK
128723
105245
KLEMP W ISCHNACK, JULIE
2,073.37
04/12/2005
PK
128724
103114
KLOSS, TOM
83.86
04/1212005
PK
128725
121322
KOCKELMAN, KENNETH
175.00
04/12/2005
PK
128726
121317
KOSEK, GARY
60.00
04112/2005
PK
128727
121323
KOSEK, JEREMY -KOSEK TRUCKING
2,328.80
04/12/2005
PK
128728
105697
KOIC -0102
395.45
04/12/2005
PK
128729
102561
L & P SUPPLY CO
129.02
04/12/2005
PK
128730
101991
LAKES GAS CO.
551.30
04/12/2005
PK
128731
101974
LENNEMAN BEVERAGE DIST, INC
5,950.60
04/12/2005
PK
128732
101860
LINDER BUS COMPANY
2,030.00
04/12/2005
PK
128733
103795
LITTLE FALLS MACHINE
737.80
04/12x2005
PK
126734
104499
LOCATORS & -SUPPLIES
93,69
r
L J
•
0
04/12/2005
PK
128787
102052
QUALITY WINE & SPIRITS CO.
8,374.99
04/12/2005
PK
128788
102424
RADIO SHACK
62.80
04/12/2005
PK
128789
118021
REBUILD RESOURCES INC
243.46
04/12/2005
PK
128790
102432
REED BUSINESS INFORMATION
191,90
04/12/2005
PK
128791
121319
REGIONAL CARRIERS, INC
368.12
04/12/2005
PK
128792
121176
REINER ENTERPRISES, INC
8,634.05
04/12/2005
PK
128793
105266
RESERVE ACCOUNT
1,576.00
04/12/200$
PK
128794
118804
RICKERT EXCAVATING
351,307.17
04/12/2005
PK
1 128795
102358
RIDGEWATER COLLEGE
840.00
04/12/2005
PK
128796
108702
RIVER CITY PACKAGING INC
16,275.16
04/12/2005
PK
128797
104149
RIVER VALLEY TRUCK CENTERS
54.32
04/12/2005
PK
128798
121300
ROBERT MICHAEL'S HAIR SALON
200.00
04/12/2005
PK
128799
102225
RUNNING'S SUPPLY
818.09
04/12/2005
PK
128800
120561
RYMER, HOLLY
193.21
04/12/2005
PK
128801
104748
S & T OFFICE PRODUCTS
187.44
04/12/2005
PK
128802
102436
SARA LEE COFFEE & TEA
166.40
04/12/2005
PK
128803
116838
SCHAUBERGER, LEA
28.00
04112/2005
PK
128804
105065
SCHIROO
222,97
04/12/2005
PK
128805
102606
SCHMELING OIL CO
272.95
04/12/2005
PK
8806
1092011
OTT'SWINDOWS
42.60
04/12/2005
28807
112355
SEBORA, MARC
7.43
04/12/2005
8808
101892
SEH
19,699.90
04112/2005
8809
115821
SEPPELT, MILES
26.42
04/12/2005
8810
102837
SEVEN WEST WASH &DRY
292,34
04/12/2005
8811
110282
AK PEE, CITY OF
4,200.00
04/12/2005
8812
102719
SHAW, KAREN
200.00
04/12/2005
8613
102609
SHOPKO
97,3$
0411212005
8814
108768
SIGARMS INC
120.00
04/12/2005
8815
113335
SKILLPATH SEMINARS
179.00
04/12/2005
8816
119777
SKYLINE DISPLAY MIDWEST, INC
478.19
04/12/2005
$817
101949
SNAP -ON INDUSTRIAL
230.48
04/12/2005
8518
105492
SOUTH CENTRAL TECH COLLEGE
160.00
04/12/2005
PK
128819
10224$
SOUTHW EST MINNESOTA FOUNDAI
4,000.00
04/12/2005
PK
128820
120410
SPECIALTY WINES
123.33
04/12/2005
PK
128821
120514
SPRINT
215,93
04/12/2005
PK
128822
105064
SPRUCE RIDGE LANDFILL
15,646.13
04/12/2005
PK
128823
102242
SRF CONSULTING GROUP
10,413.23
04/12/2005
PK
128824
102747
ST. JOSEPH'S EQUIPMENT INC
585.20
04/12/2005
PK
128825
102584
STAR TRIBUNE
67,08
04/1212005
PK
128826
105091
STEAFINS COUNTY COURT ADMINIS
115.00
04112/2005
PK
128827
114796
STEPPINGSTONE.GALLERY
90.60
04/12/2005
PK
128828
102130
STEWARD ENTERPRISES
2,581.27
04/12/2005
PK
12$829
118862
STRATEGIC EQUIPMENT
384.96
04/12/2005
PK
128830
105075
T.I.P, INC
105.00
04/12/2005
PK
128831
121020
TAPS -LYLE SCHROEDER
20.00
04/12/2005
PK
128832
102659
TEK MECHANICAL
3,720.00
0411 2/2 00 5
PK
128833
120231
THORSON TRUCKING
350.00
04/12/2005
PK
128834
121305
TOM DAGGETT & ADVANCED AWNI
2,000.00
04/12/2005
PK
128835
121306
TOM DAGGETT & JOHN'S GLASS
5,000.00
04112/2005
PK
128836
119158
TOTAL FIRE PROTECTION
180.00
04/12/2005
PK
1288 37
102818
TOWN & COUNTRY TIRE
84.00
04H2120 05
PK
12863$
101971
TRAVELERS DIRECTORY SERVICE
250.00
0
04/12/2005
PK
128839
102620
TRI CO WATER
307.90
04/12/2005
PK
128640
103831
TRIMBLE NAVIGATION
25,280.44
04/12/2005
PK
128841
102619
TWO WAY COMM INC
873.54
04/12/2005
PK
128842
102427
UNISOURCE
1,724.08
04/12/2005
PK
126843
102624
UNITED BUILDING CENTERS
517.16
04/12/2005
PK
128844
119701
UNUM LIFE INS COMPANY OF AMER
2,729.94
04/12/2005
PK
128845
103210
USA BLUE BOOK
88.75
04/12/2005
PK
128846
103620
USFILTER ENVIREX PROD
1,492.00
04/12/2005
PK
128847
102132
VIKING COCA COLA
295,90
04/12/2005
PK
128848
102629
VIKING INDUSTRIAL CENTER
1,562.65
04/12/2005
PK
128849
105122
WASTE MANAGEMENT
52,468.55
04112/2005
PK
128850
103228
WASTE NEWS
25.00
04/12/2005
PK
128851
101913
WATER ENVIRONMENT FED
184.00
04/1212005
PK
128852
102929
WEIS, MARK
80.00
04/12/2005
PK
126853
102165
WELCOME NEIGHBOR
60.00
04/12/2005
PK
128854
102063
W ENDLANDT TREE SERVICE INC.
745.51
04/1212005
PK
128855
103870
WEST GROUP
403.78
04/12/2005
PK
128856
118486
WILSON DEVELOPMENT SERVICES
526.13
04/12/2005
PK
12B857
102452
WINE MERCHANTS INC
331.20
04/12/2005
PK
128858
119211
WORK CONNECTION, THE
3,524.30
04/12/2005
PK
128859
119724
WRIGHT COUNTY
1,276.86
04/12/2005
128860
1053541W
RIGHT COUNTY COURT ADMIN
300.00
04/12/2005
128861
10 2076
X -ERGON
453.70
04/12/2005
qPK
128862
103849
YORK INTERNATIONAL CORP
1,465.00
04/12/2005
128863
105571
IZEP MANUFACTURING CO
371.05
1,397,532.00
. Account Ni
is
1,397,532.00