cp05-31-2005 cAGENDA
SPECIAL MEETING - HUTCHINSON CITY COUNCIL
TUESDAY, MAY 31, 2005
1. CALL TO ORDER - 5:00 P.M.
2. NEW BUSINESS
(a) LETTING N0.4, PROJECTNO.OS-04 & OS-OS (DOWNTOWN STREETSCAPE) -DECLARING COST
TO BE ASSESSED, ORDERING PREPARATION OF PROPOSED ASSESSMENT AND SETTING
HEARING ON PROPOSED ASSESSMENT
Action - Motion to reject -Motion to approve
(b) DISCUSSION OF MOSQUITO CONTROL SPRAYING OPERATIONS
Action -
3. MISCELLANEOUS
(a) COMMUNICATIONS
4. ADJOURN
RESOLUTION NO. 12720
RESOLUTION DECLARING COST TO BE ASSESSED AND
ORDERING PREPARATION OF PROPOSED ASSESSMENT
ASSESSMENT ROLL N0.5074
LETTING N0.4
PROJECT NO.05-04 & 05-05
WHEREAS, cost has been determined for the improvement of:
05-04 Main Street between 1st Avenue N and 4th Avenue S by construction of
concrete sidewalk, street lights, traffic signal system revisions, landscaping,
restoration and appurtenances, and
05-05 Washington Avenue West between Main Street Sand Franklin Street SW by
construction of concrete sidewalk, street lights, watermain, storm sewer,
landscaping, restoration and appurtenances,
and the bid price for such improvement is $ and the expenses incurred or to be
incurred in the making of such improvement amount to $ so that the total cost of the
improvement will be $
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
HUTCHINSON, MINNESOTA:
• 1. The portion of the cost of such improvement to be paid by the City is hereby declared to be
$ and the portion of the cost to be assessed against benefited property owners is
declared to be $
2. Assessments shall be payable in equal annual installments extending over a period of 10
years, the first of the installments to be payable on or before the first Monday in January, 2006 and
shall bear interest at the rate of _ percent per annum from November 1, 2005.
3. The City Administrator, with the assistance of the Director of Engineering, shall forthwith
calculate the proper amount to be specially assessed for such improvement against every
assessable lot, piece or parcel of land within the district affected, without regard to cash valuation,
as provided by law, and he shall file a copy of such proposed assessment in his office for public
inspection.
4. The City Administrator shall, upon the completion of such proposed assessment, notify the
Council thereof.
Adopted by the Council this 31 st day of May 2005.
Mayor
City Administrator
a~~-~
• RESOLUTION NO. 12721
RESOLUTION FOR HEARING ON PROPOSED ASSESSMENT
ASSESSMENT ROLL NO. 5074
LETTING N0.4
PROJECT NO. 05-04 & 05-05
WHEREAS, by a resolution passed by the Council on the 3lstdayof May, 2005, the Director of
Engineering was directed to prepare a proposed assessment of the cost of improving:
05-04 Main Street between 1st Avenue N and 4th Avenue S by construction of
concrete sidewalk, street lights, traffic signal system revisions, landscaping,
restoration and appurtenances, and
05-05 Washington Avenue West between Main Street S and Franklin Street SW by
construction of concrete sidewalk, street lights, watermain, storm sewer,
landscaping, restoration and appurtenances,
WHEREAS, the Directorof Engineering has notified the Council that such proposed assessment
has been completed and filed in his office for public inspection.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
HUTCHINSON, MINNESOTA:
1. A hearing shall be held on the 14th day of June 2005, in the Council Chambers at Hutchinson
. City Center at 6:30 P.M. to pass upon such proposed assessment and at such time and place all
persons owning property affected by such improvement will be given an opportunity to be heard with
reference to such assessment.
2. The City Administrator is hereby directed to cause a notice of the hearing on the proposed
assessment to be published once in the official newspaper at least two weeks prior to the hearing,
and he shall state in the notice the total cost of the improvement. He shall also cause mailed notice
to be given to the owner of each parcel described in the assessment roll not less than two weeks
prior to the hearing.
3. The owner of any property so assessed may, at any time prior to certification of the
assessment to the County Auditor, pay the whole of the assessment on such property, with interest
accrued to the date of payment, to the City Administrator, except that no interest shall be charged if
the entire assessment is paid by November 15th, 2005. He may at any time thereafter, pay to the
City Administrator, the entire amount of the assessment remaining unpaid, with interest accrued to
December 31 of the year in which such payment is made. Such payment must be made before
November 15 or interest will be charged through December 31 of the succeeding year.
Adopted by the Council this 31 st day of May 2005.
Mayor
City Administrator
a ~G~
PUBLICATION NO. 7340
NOTICE OF HEARING ON PROPOSED ASSESSMENT
ASSESSMENT ROLL N0.5074
LETTING N0.4
PROJECT NO. 05-04 & 05-05
TO WHOM IT MAY CONCERN:
Notice is hereby given that the City Council will meet at 6:00 P.M. on the 14th day of June
2005, in the Council Chambers at City Hall at Hutchinson, Minnesota, to consider and possibly
adopt, the proposed assessment for the improvement of:
05-04 Main Street between 1st Avenue N and 4th Avenue S by construction of
concrete sidewalk, street lights, traffic signal system revisions, landscaping,
restoration and appurtenances, and
05-05 Washington Avenue West between Main Street S and Franklin Street SW by
construction of concrete sidewalk, street lights, watermain, storm sewer,
landscaping, restoration and appurtenances,
Adoption by the Council of the proposed assessment against abutting properly may occur at
the hearing.
You may at anytime prior to certification of the assessment to the County Auditor, pay the
entire assessment on such property, with interest accrued to the date of payment, to the City
• Administrator. No interest shall be charged if the entire assessment is paid by November 15th,
2005. You may, at anytime thereafter, pay to the City Administrator the entire amount of the
assessment remaining unpaid, with interest accrued to December 31st of the year in which such
payment is made. Such payment must be made before November 15th or interest will be charged
through December 31 st of the succeeding year. If you decide not to prepay the assessment before
the date given above, the rate of interest that will apply is 10 percent (plus or minus) per year. The
right to partially prepay the assessment shall be until November 15, 2005.
The proposed assessment is on file for public inspection at the City Administrator's Office.
The total amount of the proposed assessment is $ . W ritten or oral objections will be
considered at the meeting.
No appeal may be taken as to the amount of an assessment unless a signed, written
objection is filed with the City Administrator prior to the hearing or presented to the presiding officer
at the hearing. The Council may, upon such notice, consider any objection to the amount of a
proposed individual assessment at an adjoumed meeting upon such further notice to the affected
property owners as it deems advisable.
If an assessment is contested or there is an adjourned hearing, the following procedure will
be followed:
1. The City will present its case first by calling witnesses who may testify
by narratives or by examination, and by the introduction of exhibits.
After each witness has testified, the contesting party will be allowed to ask
• questions. This procedure will be repeated with each witness until neither
side has further questions.
a~G~
PUBLICATION NO. 7340
. ASSESSMENT ROLL N0.507
LETTING N0.4/PROJECT NO. 05-04 8~ 05-05
PAGE 2
2. After the City has presented all its evidence, the objector may call witnesses
or present such testimony as the objector desires. The same procedure for
questioning of the City's witnesses will be followed with the objector's
witnesses.
3. The objector may be represented by counsel.
4. Minnesota rules of evidence will not be strictly applied; however, they maybe
considered and argued to the Council as
to the weight of items of evidence or testimony presented to the Council.
The entire proceedings will be tape-recorded.
At the close of presentation of evidence, the objector may make a final
presentation to the Council based on the evidence and the law. No new
evidence may be presented at this point.
An owner may appeal an assessment to District Court pursuant to Minnesota Statutes
Section 429.081 by serving notice of the appeal upon the Mayor or CifyAdministratorwithin 30 days
after the adoption of the assessment and filing such notice with the District Court within ten days
• after service upon the Mayor or City Administrator.
Under Minnesota Statutes, Section 435.193 to 435.195, the Council may, in its discretion,
defer the payment of this special assessment for any homestead property owned by a person 65
years of age or older for whom it would be a hardship to make the payments. When deferment of
the special assessment has been granted and is terminated for any reason provided in that law, all
amounts accumulated, plus applicable interest, become due. Anyassessed propertyowner meeting
the requirements of the law and the resolution adopted under it, may within 30 days of the
confirmation of the assessment, apply to the City Clerk, for the prescribed form for such deferral of
payment of this special assessment on his property.
Gary D. Plotz, City Administrator
City of Hutchinson, Minnesota
PUBLISHED IN THE HUTCHINSON LEADER ON TUESDAY, MAY 31ST, 2005 AND
TUESDAY, JUNE 7TH, 2005.
i-J
a~~~
Downtown Streetscape Cost Estimates
•
Cost Breakdown
Base Bid $ 868,788.00
Alternate Bld (benches, litter, planters) $ 40,484.00
Street Light Materials $ 292,794.17
SEH Consulting Fees $ 202,000.00
Engineering/Administration $ 54,556.32
Fiscal/Legal/Finance $ 27,278.16
Total Project Cost
Clty COStS (Base & Alternate Bids)
ASSeSSed POrtlon (20% of Amount)
Total of Assessments
$1,485,900.65
$ 120,733.40
$1,365,167.25
$ 273,033.45
Bid Irregularities
• 2"d Low Bidder has indicated intent for legal action
o Exposure to city would be bid preparation costs
• 2nd Low Bidder was $120,000 Higher
• Bottom Line Bid amount did not change on low bid
• Other interpretation would have lowered, low bid by $135,000
• Contract, state statutes & bidding precedence/opinions allow for
minor irregularities & discretion
~~~)
Downtown Streetscape Cost Estimates
Original Report
Option "A" $2,030,095
Option "B" $2,013,348
Option "C" $1,673,883
Modified Plan $1,747,698
~~
Final Design
Engineer's Estimate $1,610,678 8%under ~~Nroafea~°
Final Cost $1,485,900 8%under"Estimate" •
Estimated Assessments
Feasibility Final
22 foot wide lot $ 2,152 $ 1,495 ~ 31~ ortgtnal~
44 foot wide lot $ 4,305 $ 2,990
66 foot wide lot $ 6,457 $ 4,485
200 foot wide lot $19,568 $13,591
r~
• T
V
COMPILED BY: K EXNER ASSESSMENT ROLL N0.5074 $67.952576 STREET COST/FF
COMPUTED BY: K E%NER LETTING N0.4/PROJECT NOS. 05-04 & 05-05
CHECKED BY: P VANDER VEEN 05-04: Maln Street between 1st Avenue N end dih Avenue S by eonslruetidn of concrete sldewa114 atreM Ilghts, treNie signal
system revlslans, landscaping restoration and appurtenanoes
1ST HEARING:
04/12/2005
NUMBER OF YEARS: 10 05-05: Washington Avenue West bMween Main Street S antl Frenklln Street SW by construdi0n of concrete eltlewalk, 2ND HEARING: 06/14/2005
INTEREST RATE: street Ilghts, watemwin, storm sewer, landscaping, restoration antl appurtenances, ADOPTED:
' ACCT... CRY PID NO. NAME 8 ADDRESS ! LEGAL OESCRYPRON ': STREET TOTAL DEFERRED • TOTAL ACTNE
NO. COUNTY PID NO.. OF PROPERTY OWNER AODRION OR SUBDWISK/N FF A$$ESSMENT ASSESSMENT ASSESSMENT'
1 0611629-030260 HUTCHINSON PROPERTIES LLC 2 MAIN ST SO
THOMAS E DAGGETT
1605] 6]3RD AVE LOT 1 8 N15' OF LOT 2, BLOCK 6
23.050.0530 HUTCHINSON MN 55350 SOUTH HALF CITY 218 $14,6]].]5 514,6)).]6
2 0811629-03-02]0 MTP PARTNERS LLP 14 MAIN ST SO
ATTN: TIM HACKER
14 MAIN STS 22' S OF N18' 8 22' N OF S4' OF LOT 2, BLOCK 8
23.0500540 HUTCHINSON MN 55350 SOUTH HALF CITY 44 $2,969.91 $2,959.91
3 06-1162903-0280 MAX J 8 NINA M MVERS 18 MAIN ST SO
16822 206TH CIR 54' OF LOT 2 8 N 1/3 OF LOT 3, BLOCK 8,
23.050.0550 HUTCHINSON MN 55350 SOUTH HALF CITY 26 $1 J66J] Si,)86.]]
q 06116-29-03-0290 STEVEN B BARTON 24 MAIN ST SO
30 MAIN STS CENTER 1/3 OF LOT 3. BLOCK e,
23.050.0560 HUTCHINSON MN 55350 SOUTH HALF CITY 22 $1,494.96 $1.494.96
5 061162903-0300 STEVEN B BARTON 30 MAIN ST SO
30 MAIN STS S 1/3 OF LOT 3, BLOCK 5,
23.050.05]0 HUTCHINSON MN 55350 SOIRH HALF CITY 22 81,494.96 S1A94.98
6 06-11629-03-0310 MICHAEL R 8 KARLA K MCGRAW 34 MAIN ST SO
]00 W AGNER ST SW N 12 OF LOT 4, BLOCK 8,
23.050.0580 HUTCHINSON MN 55350 SOUTH HALF CITY 33 $2,292.44 32,242.44
] 00416290&0320 JAMES M 8 PATRICIA L CORSON 40 MAIN ST 30
40 MAIN STS N24' OF S 12 OF LOT 4, BLOCK 8.
23.050.0590 HUTCHINSON MN 55350 SOUTH HALF CITY 24 $1,630.86 51.630.66
8 08118-2903-0330 W ILLIAM M 8 SUSAN M CORBY 44 MAIN ST SO
44 MAIN STS S9' OF LOT 4 8 N16' OF LOT 5, BLOCK 8,
23.050.0600 HUTCHINSON MN 55350 SOUTH HALF CITY 25 $1,698.81 $1,fi98.81
9 061162903-0340 LINDA M 8 DALE C POIRER 50 MAIN ST SO
50 MAIN STS S50' OF LOT 5, BLOCK 8.
23.050.0810 HUTCHINSON MN 55350 SOUTH HALF CITY 50 $3,30].fi3 53,397.83
10 0611629-030400 R B T COMPANY PUBLISHING 40 WASHINGTON AVE W
C/O RED WING PUBLISHING
23.050.0670 PO BOX 2010
REDWING MN 55066 E22'OF W66'LOT 108 E22'OF W66'OF N74'LOT 9, BLOCK 6,
SOUTH HALF CITY
22
$1,494.96
57,499.9fi
SAS%42005 LETTING NO.4N5-04 05-OS/PAGE 1 OF 9
COMPILED BV: K EXNER ASSESSMENT ROLL NO. 5074 $67.952576 STREET COST/FF
COMPUTED Bv
K EXNER LETTING N0.4/PROJECT NOS. 05-04 & 05-05
:
ANDER VEEN p5.04: Main Street between 1st Avenue N ano 4th Avenue S by construction of concrete Sidewalk, street Lights, traffic signal
landscaping restoretion entl apPUrtenancea
system revisions
1ST HEARING:
0 4/1 212 0 0 5
CHECKED BV: P V ,
NUMBER OF YEARS
10 ton Avenue West between Main Street S entl Franklin Street SW by construction of concrete sltlewalK
05-05: Washin 2ND HEARING: 06/74/2005
: g
INTEREST RATE: street IIgMS, watarmaln, storm sewer, lanoscaping, restoraNOn ana appurlanances, ADOPTED:
AGGT. CTry PID NO. NAMEBADDBF93 LEGAL DESCRIPTION ~ .STREET TOTAL DEFERRED TOTAL ACTNE-:
NO. COUNTY PID NO. f OF PROPERTY OWNER ADDRION OR SUBDIVISION ' FF ASSESSMENT ASSESSMENT ASSESSMENT
11 06-11629-03-0410 R 8 T COMPANY PUBLISHING 36 WASHINGTON AVE W
C/O REDWING PUBLISHING E 1/20F LOT 108
P O BOX 2010 E66' OF N14' 8 E67' OF 552' OF LOT 9, BLOCK B
23.050.0880 REO WING MN 55066 SOUTH HALF CITY 68 $4,489.8] 54,484.8)
12 061162403-0420 CITIZENS BANK 8 TRUST COMPANY 102 MAIN ST SO
102 MAIN ST 5 N50' OF LOT 1, BLOCK 12,
23.050.1030 HUTCHINSON MN 55350 SOUTH HALF CITY 50 $3,39].63 53,39].fi3
13 06116-2403-0430 CITIZENS BANK BTRUST COMPANY 104 MAIN ST S
102 MAIN STS S16' OF LOT 1 8 N9' OF LOT 2, BLOCK 12,
23.050.1040 HUTCHINSON MN 55350 SOUTH HALF CITY 25 $1,fi9B.81 51,698.81
14 061182&030440 JOANNE CLAY W ILLMERT 114 MAIN ST SO
114 MAIN STS 25' S OF N4 OF LOT 2, BLOCK 12,
23.050.1050 HUTCHINSON MN 55350 $OUTH HALF CITY 25 $1,898.81 51,696.81
15 0611629-03-0450 gICHARD A PETERSON 11 fi MAIN ST SO
116 MAIN STS 25' N OF S]' OF LOT 2, BLOCK 12,
23.050.1060 HUTCHINSON MN 55350 SOUTH HALF CITY 25 $1,698.81 57,698.87
16 061162&030460 KATHLEEN B KELLEY 122 MAIN ST 30
330 CARSON ST SW ST OF LOT 2 8 N22' OF LOT 3, BLOCK 12.
23.D50.1 W0 MUTCHINSON MN 55350 SOUTH HALF CITY 29 $1,970.62 51.410'62
17 06116240304]0 BRETT A B MARTA OMAN 126 MAIN ST SO
16690 ]05TH AVE CENTER 22' OF LOT 3, BLOCK 12.
23.050.1000 DASSEL MN 55325 SOUTH HALF CITY 22 $1,494.96 51,194.96
18 06-11629-03-0480 BRETT A 8 MARTA OMAN 13D MAIN ST SO
/669D 705TH AVE S22' OF LOT 3, BLDCK 12,
23.050.1090 DASSEL MN 55325 SOUTH HALF CITY 22 $1.494.96 51'494'96
1g 1)641628-03-0490 CHERYL J LABAT 132 MAIN ST SO
529 HILLTOP DR NE N22' OF LOT 4, BLOCK 12,
23.050.1100 HUTCHINSON MN 55350 SOUTH HALF CITY 22 $1,494.98 51,494.96
20 06-11629-03050D KEITH O 8 DANA LEE D EVENSON 134 MAIN ST SO
16561 ODAY AVE CENTER 1/3 OF LOT 6, BLOCK 12,
23.050.1110 HUTCHINSON MN 55350 SOUTH HALF CITY 22 $1,494.96 51,441.%
SA-SW4/2005 LETTING NO. 4/05-04 05-OSIPAGE 2 OF 9
COMPILED BV: K EXNER ASSESSMENT ROLL N0.5074 $67.952576 STREET COST/FF
COMPUTED BV: K EXNER LETTING NO. 4/PROJECi NOS. 05-04 & 05-05
CHECKED BV: P VANDER VEEN O5-Da: Main street between 1st Avenue N and 4th Avenue S by eonstmctlon of concrete sidewalk street lights, tropic signal
system revisions, landscaping restoration antl appunenancea
1ST HEARING:
0 4/1 212 0 0 5
NUMBER OF YEARS: 10 OS-%: Washington Avenue west between Main street S and Franklin Street SW Dy construction of concrete sidewalk 2ND HEARING: 06/14/2005
INTEREST RATE: street lights, watermaln, storm sewer, landscaping, restoration antl appunenancea, ADOPTED:
ACCT. CRYPID NO. `-. NAME 8 ADDRESS `LEGAL OESCRIPTiON ' STREET TOTAL QEkERRED "TOTAL ACTIVE
NO. COUNTY PIO NO. '. OF PROPERTY OWNER ADDRION ORSUBDIV510N FF ASSESSMENT ASSESSMENT ASSESSMENT
21 %-118-29-03-0510 MARK A 8 DEBRA M CORMIER 138 MAIN ST SO
138 MAIN STS 521.50' OF LOT 4, BLOCK 12,
23.050.1120 HUTCHINSON MN 55350 SOUTH HALF CITY 22 $1,494.% 51,499.%
22 OB-116-2&03-0520 ROBERT M & RENNAE C MCCARTHY 140 MAIN ST O
1025 6TH AVE SW N22' OF LOT 5 8 S.5' OF LOT 4, BLOCK 12,
23.050.1130 HUTCHINSON MN 55350 SOUTH HALF CITY 22 $1,494.% 51,494.96
23 0641t'r29-03-0530 HASSAN VALLEY LODGE N109 146 MAIN ST SO
146 MAIN ST S, P O 80X 12 S 2/3 OF LOT 5, BLOCK 12,
23.050.1140 HUTCHINSON MN 55350 SOVTH HALF CITY 44 $2,%9.91 S2,%9.57
24 %-116-29-03-%10 WALTER H OUAST TRUST 149 MAIN ST SO
P O BOX 233 522' OF LOT 6, BLOCK 13,
23.060.1220 HUTCHINSON MN 55350 SOUTH HALF CITY 22 $1,494.% $1,494.%
25 O(i-118-29-03-0620 LARRY J & ROSA L OOSTAL 14] MAIN ST SO
1215 CAROLINA AVE NW 24' S OF N20' OF LOT 6, BLOCK 13,
23.050.1230 HUTCHINSON MN 55350 SOUTH HALF~CITV 24 $1,830.68 51,630.86
26 0&116-29-03-0630 BRETT A 8 MARIA OMAN 141 MAIN ST SO
1 %90 ]05TH AVE N20' OF LOT 6 8 S4' OF LOT ], BLOCK 13,
23.050.1240 OASSEL MN 55325 SOUTH HALF CITY 24 $1.830.88 51,630.86
9 06-11 &29.03-0840 W ALTER H OUAST TRUST 137 MAIN ST SO
P O BOX 233 38' N OF S4' OF LOT ], BLOCK 13,
23.050.1260 HVTCHINSON MN 55350 SOVTH HALF CITY 36 $2,582.20 52,582.20
28 06-1162403-0650 ROBERT A 8 CHARLENE SCHLUETER 133 MAIN ST SO
23889 230TH ST N24' OF LOT 7, BLOCK 13,
23.050.1250 HUTCHINSON MN 55350 SOUTH HALF CITY 24 $1,630.86 51.630.%
29 OB-118-29-03-0660 SUSAN S KRAFT ETAL 131 MAIN ST SO
P O BO% 129 S 1/3 OF LOT e, BLOCK 13,
23.050.1280 HUTCHINSON MN 55350 SOUTH HALF CITY 22 $1,494.% 51,499.%
30 %-116-29-03.0670 KEITH R & LISA L KAMRATH 125 MAIN ST SO
]1 ]SHADY RIDGE RD NW CENTER 1/3 OF LOT 8 8 SB' OF N22', BLOCK 13
23.050.1270 HUTCHINSON MN 55350 SOUTH HALF CITY 30 $2,03(1.5(1 52,038.58
SA-W]4/2005 LETTING NO. 4/05-04 OS-65/PAGE 3 OF 9
ASSESSMENT ROLL NO. 5074 $67.952576 STREET COST/FF
COMPILED BV: K EXNER
4/PROJECT NOS. OS-04 & OS-05
LETTING NO
COMPUTED ev: K EXNER .
05-04: Main Street between 1st Avenue N antl gib Avenue S by construction of concrete sitlewelK street lights, troitie signal
lantlswping restoaiion antl appurtenances
visions
t
1ST HEARING: 04/12/2005
CHECKED BV: P VANDER VEEN ,
em re
sys O6/14/2005
tween Main Street S and Franklin Street SW by construction of concrete sitlewalk,
t b
i
A
W 2ND HEARING:
NUMBER OF YEARS: 10 es
e
ngton
venue
OS-O5: Wash
INTEREST RATE: street OgMS, watermaiq storm sewer, landscaping, restoration and appurtenances, ADOPTED:
ACCT. ` CITY PID NO. NAME $.AODRE55 LEGAL DESCRIPTION STREET TOTAL DEFERRED TOTAL ACTIVE .:
ASSESSMENT
NO. COUNTY PID NO. OF PROPERTY OWNER ADDRKIN OR SUBDNISION FF ASSESSMENT ASSESSMENT
31 06-116-29.03-0680 JOHN R SCHUTT 119 MAIN ST $O
119 MAIN STS N 1/3 OF LOT B EX SB' 8 S 1YJ OF LOT 9, BLOCK 13,
23.050.1290 HUTCHINSON MN 55350 SOUTH HALF CITY 38 $2,446.29 $2,446.29
32 0&118-29-03-0690 STEVEN L 8 JEAN M W ARD 113 MAIN ST SO
68625 215TH ST CENTER 1/3 OF LOT 9, BLOCK 13,
23.050.1300 DARWIN MN 55324-6581 SOUTH HALF CITY 22 $1,494.96 $1,494.98
33 06-11 F29-03-0]00 HOWARD J MADSEN 8 DUWAVNE P PETERSON 111 MAIN 5T SO
135 3RD AVE SE N 1/3 OF LOT 9, BLOCK 13,
23.050.1310 HUTCHINSON MN 55350 SOUTH HALF CITY 22 $1,494'96 $1'499'96
3q Ofi-116-29.03.0710 OUADE FAMILY LTD PARTNERSHIP 101 MAIN ST SO
23.050.1320 35 4TH AVE SE
HUTCHINSON MN 55350 LOT 10, BLOCK 13.
SDUTH HALF CITY
66
$4,484.87
~ $4,989.87
35 OB-118-29-0&1100 MARK B & BONNIE J WESTMILLER
227 MAIN 5T S 227 MAIN T SO
S 2/3 OF LOT B, BLOCK 27,
23.050.2190 HUTCHINSON MN 55350 SOUTH NALF CITY 44 $2.989.91 $2,989.91
38 06-118-29-03-1110 HIffCHINSON PROFESSIONAL BLDG 225 MAIN ST 50
540 MONTEREY TRAIL N 1/3 OF LOT e, BLOCK 27.
23.050.2200 DAKOTA DUNES SD 57049 SOUTH HALF CNV 22 $1,496'98 $1'496'96
3] OB-116-29-03-1120 RANDY LANG
104 FAIRW AV DR 221 MAIN ST SO
S 1/2 OF LOT 9, BLOCK 27.
23.050.2210 GLENCOE MN 55338 SOUTH HALF CITY 33 $2,242.44 5292.44
38 OE116-29-03-1130
23.050.2220 FIRST FEDERAL FSB
201 MAIN STS
HUTCHINSON MN 55350 213 MAIN ST SO
N 1/2 OF LOT 9 8 ALL OF LOT 10, BLOCK 27.
SOUTH HALF CITY
99
$6,727.31
56,727.31
3g 06-118-29-03-1160
23.050.2250 C G E PROPERTIES
540 HIDDEN CIR SW
HUTCHINSON MN 55350 218 MAIN ST SO
LOTS 1-2-3-4, 6LOCK 28,
SOUTH HALF CITY
284
$1],939.47
517,939.47
40 06-116-2&03-1170
23.050.2260 C G E PROPERTIES
540 HIDDEN CIR SW
HUTCHINSON MN 55350 246 MAIN 5T 50
LOT 5 8 N 12 E 12 OF VACATED 3RD AVE BETWEEN MAIN 8
FRANKLIN, OLOCK 28, SOUTH HALF CITY
107
$7,270.92
$7.270.92
SA-50742005 LETTING NO.4/06-04 05-05/PAGE 4 OF 9
~ ~ ~
XNER ASSESSMENT ROLL N0.5074 $67.952576 STREET COST/FF
COMPILED BY: K E
LETTING N0.4/PROJECT NOS. OS-04 & 05-05
COMPUTED Bv: K EXNER
05-04: Mein Street between 1st Avenue N and 4th Avenue S by conatruttion of concrete sidewalk street IIgMS, troHie signal
landscpping restoration and appurtenances
stem revisions
s
1 ST HEARING:
04/12/2005
CHECKED BY: P VANDER VEEN ,
y 06/14/2005
West between Main Street $ antl Franklin Street SW by eonstmctlon of concrete sl0ewalk,
t
A
hi 2ND HEARING:
NUMBER OF YEARS: 10 on
venue
ng
OS-05: Was
INTEREST RATE: street lights, watarmain, storm sewer, landscaping, restorohon and appurtenances, ADOPTED:
ACCT.. CITVPID NO. NAME SADDRESS `LEGAL DESCRIPTION STREET TDTAL DEFERRED TOTAL ACTNE
NO. COUNTY PID NO: OF PROPERTY OWNER 'ADDRION OR SUBDNgiION r FF 'ASSESSMENT ASSESSMENT ASSESSMENT -
41 06-116-29-Ofi-0010 FIRST MINNESOTA BANK NA 308 MAIN ST SO
4625 HW V 101 LOTS 12-3 & $1M2 OF E 1k OF VACATED 3RD AVE BETWEEN
23.050.2700 MINNETDNKA MN 55343 MAIN S FRANKLIN, BLOCK 32, SOUTH HALF CITY 239 $16,240.66 $16,240.66
q2 06-118-29-6fi-0036 FIRST MINNESOTA BANK NA 336 MAIN ST SO
4625 HWY 101 LOT 4, BLOCK 32,
23.050.2710 MINNETDNKA MN 55343 SOUTH HALF CITY 68 $4,484.87 51,484.87
q3 08-116-29-06-0040 FIRST CONGREGATIONAL CHURCH 114TH AVE SW
P O BOX 304 LOT 5. BLOCK 32,
23.050.2720 HUTCMINSON MN 55350 SOUTH HALF CITY 66 $4,484.87 54.484.87
qq 0&118-29-06-0150 FAITH LUTHERAN CHURCH 335 MAIN ST SO
335 MAIN STS LOTS 6 8 ] & S 1/2 OF LOT e, BLOCK 33,
23.050.2830 HUTCHINSON MN 55350 SOUTH HALF CITY 165 $11.212.17 $11'212'17
45 06-116-29-06-0160 FAITN LUTHERAN CHURCH 305 MAIN ST SO
335 MAIN STS LOT 10 6 N i/2 OF LOT 9, BLOCK 33,
23.050.2050 HUTCHINSON MN 55350 SOUTH HALF CITY 99 $6,727.31 $6,]27.31
q8 06-116'29-06-0161 FAITH LUTHERAN CHURCH 325 MAIN ST SO
335 MAIN STS N 1/2 OF LOT 8 6 S 1/2 OF LOT 9, BLOCK 33,
23.050.2040 HUTCHINSON MN 55350 SOUTH HALF CITY 88 $4,484.8] 54,486.87
47 31-117.29-14-0370 CURTIS E 8 JANEL M REITER 1q6 MAIN ST N
760 CENTURY AVE SW N48' OF LOT 1, BLOCK 42,
23.056.2940 HUTCHINSON MN 55350 NORTH HALFCITY 48 $3,261]2 53,26112
48 31-117.2&14-0380 JERALD 8 JONELL JONES 140 MAIN ST N
55524 CO RD 38 S18' OF LOT 1 8 N33' OF LOT 2, BLOCK 42,
23.056.2950 BUFFALO LAKE MN 55314 NORTH HALF CITY 51 $3,485.58 53,465.58
qg 31.1 V-2&14-0390 QUADE FAMILY LTD PARTNERSHIP
35 4TH AVE NE 122 MAIN ST N
N 1/2 OF LOT 3 8 S 12 OF LOT 2, BLOCK 42,
23.056.2960 HUTCHINSON MN 55350 NORTH HALF CITY 66 $4,484.87 54,484.87
50 31-117-29-14.0400 HOWARD P OUADE JR ETAL
354TH AVE NE 120 MAIN ST N
S1/20F LOT 3. BLOCK 42,
23.058.29]0 HUTCHINSON MN 55350 NORTH HALF CITY 33 $2,242.44 $2,242.14
SA-5074/2005 LETTING NO. 4/05.04 05-05/PAGE 5 OF 9
K EXNER
COMPILED BY ASSESSMENT ROLL NO. 5074 $67.952576 STREET COST/FF
:
OMPUTED BV
K EXNER LETTING N0.4/PROJECT NOS. 05-04 & 05-05
:
C
05-04: Main Street betvreen 1st Avenue N antl 4th Avenue E by construction of concrete sltlewalk, street lights, trottlc signal
lantlscaping restoration antl appurtenances
stem revisions
s
1ST HEARING:
04/12/2005
CHECKED BY: P VANDER VEEN ,
y 14/2005
ton Avenue West betvreen Main Street S an0 Franklin S[rcet SW by constmction of concrete sitlewelk,
hin
OS
O5
W 2ND HEARING: 06/
NUMBER OF YEARS: 10 g
as
-
:
INTEREST RATE: street lights, watemain, storm sewer, lantlscaping, restarotion end epPUnenances, ADOPTED:
ACCT, CITY PID NO. NAME S ADDRESS `LEGAL DESCRIPTION 'STREET TOTAL DEFERRED 'TOTAL ACTNE:
-
NO. COUNTY PID NO. OF PROPERTY OWNER ADD1710N OR $UBDNISION FF ASSFSSMEM` ASSESSMENT -ASSESSMENT
51 31-11]-29-14-0410 OUADE FAMILY LTD PARTNERSHIP 118 MAIN ST N
35 4TH AVE NE N 12 OF LOT 4, BLOCK 42,
23.056.2980 HUTCHINSON MN 55350 NORTH HALF CITY 33 $2,242.44 52,242.44
52 31-117-29-14-0420 OUADE FAMILY LTD PARTNERSHIP 116 MAIN Si N
359TH AVE NE N24'OFSi/2 OF LOT 4, BLOCK 42,
23.056.2990 HUTCHINSON MN 55350 NORTH HALF CITY 24 $1,830.86 $1,630.86
63 31-11 ]-2}14-0430 GLEN G C RI% 104 MAIN ST N
95 FRANKLIN ST SW LOT 5 8 S9' OF LOT d, BLOCK 42,
23.05fi.3000 HUTCHINSON MN 55350 NORTH HALF CITY 75 $5,098.44 f5,0%.94
54 31417-29-14-0480 GARY 8 MARY LYNNE CO% 48 MAIN ST N
48 MAIN STS N 2/3 OF LOT 1, BLOCK 50,
23.056.3580 HUTCHINSON MN 55350 NORTH HALF CITY 44 $2,989.81 52,989.91
55 31417-29-140490 BARBARA W ENDLING 40 MAIN ST N
' 69208 213TH ST S 1/3 OF LOT 1, BLOCK 50,
23.058.3570 DARWIN MN 55324 NORTH HALF CITY 22 $1,494.96 E7,491.%
56 31-117-29-14-0500 DURWOOD W & DORIS A LAMPRECHT 36 MAIN ST N '
361 BTM AVE S, P O BOX 143 N22' OF LOT 2, BLOCK 50,
23.056.3580 BROW NTON MN 55312.0143 NORTH HALF CRY 22 $1,494.% 51,494.%
57 31-117-29-14-0510 MARK T 8 LINDA R SCHMIDT 34 MAIN STN
39 MAIN STN CENTER 24' OF LOT 2, BLOCK 50,
23.056.3590 HUTCHINSON MN 55350 NORTH HALF CITY 24 $1,830.86 51,630.%
58 31-117-29.14-0520 TAMMY S LAUER 28 MAIN ST N
1255 ROLLING OAKS LN NW S20' OF LOT 2 8 N29' OF LOT 3, BLOCK 50,
23.058.3600 HUTCHINSON MN 55350 NORTH HALF CITY 49 $2,%9.91 S2,%9.91
59 31-117-29-14-0530 BRUGE E CHRISTIANSON 24 MAIN ST N
24 MAIN STN 20' S OF N24' OF LOT 3, BLOCK 50,
23.056.3810 HUTCHINSON MN 55350 NORTH HALF CITY 20 51,359.05 51,369.05
60 31-117-29-14-0540 NEIL J 8 LVNETTE R JENSEN 22 MAIN ST N
22 MAIN STN S22' OF LOT 3, BLOCK 50,
23.058.3820 HUTCHINSON MN 55350 NORTH HALF CITY 22 $1,494.96 51,484.%.
SA-5074/2005 LETTING N0. 410.5-04 OS-05tPAGE 6 OF 9
COMPILED BY: K EXNER ASSESSMENT ROLL NO. 5074 $67.952576 STREET COST/FF
COMPUTED BY: K EXNER LETTING NO. 4/PROJECT NOS. 05.04 & 05-05
CHECKED BY: P VANDER VEEN OS-Da: Maln Street between 1st Avenue N antl 4th Avenue S by <onstrucHOn of conerte sitlewelk, street Ilghts, treHic signal
system revisions, lantlecaving restoration antl appunenanees
1ST HEARING:
04M 712005
NUMBER OF YEARS: 10 05-05: Washington Avenue West between Mein Street S an0 Frenklln Street SW by constmcilon of concrete sltlewalk, 2ND HEARING: 06/14/2005
INTEREST RATE- street Ilghts, watemain, storm sewer, lantlscaping, restoration antl apPUrlenanees, ADOPTED:
ACCT. CRY PID NO. NAME BADDRESS - LEGAL DESCRIPTION : STREET TOTAL DEFERRED TOTAL ACTNE
NO: COUNTY PID NO. OF pROPERTV OWNER ADDITION OR SUBDIVISION FF ASSESSMENT ASSF9SMENT ASSE95MENT
61 31-11 ]-29-14-0850 MAIN ST SPORTS BAR INC 18 MAIN STN
18 MAIN STN N 1/3 OF LOT 4, BLOCK 50,
23.056.3630 HUTCHINSON MN 55350 NORTH HALF CITY 22 $1.494.% 51,494-98
62 31-117-29-14-0560 MAIN ST SPORTS BAii INC 18 MAIN ST N
18 MAIN STN CENTER 1/3 OF LOT 4, BLOCK 50, '
23.056.3640 HUTCHINSON MN 55350 NORTH HALF CITY 22 $1,494.96 $1,494.96
63 31-1V-29-14-05"!0 WAYNELB GERALDINE 85CHWARZE 12 MAIN STN
%01 MAJOR AVE S 7/3 OF LOT 4, BLOCK 50,
23.056.3850 gROWNTON MN 55312 NORTH HALF CITY 22 $1,494.96 51,494.%
64 31-1 V-29-14-0580 PAM SALZWEDEL 8 MAIN STN
8646 QUIMBV AVE SW N 1/3 OF LOT 5, BLOCK 50,
23.058.3670 COKATO MN 55321 NORTH HALF CITY 22 $1,494.96 51,494.96
65 31417-29.16-0590 MARK R DAW SON fi MAIN ST N
37 MAIN STN CENTER 22' OF LOT 5, BLOCK 50.
23.056.3680 HUTCHINSON MN 55350 NORTH HALF CITY 22 $1,494.96 57,494.98
6fi 31-117.2&14-(1600 LORRAINE A MEVER TRUST 2 MAIN ST N
65 JEFFERSON ST SE S22' OF LOT 5 8 2.55' X 132', BLOCK 50,
23.OSfi.36fi0 HUTCHINSON MN 55350 NORTH HALF CITY 157 $10,668.54 $10,668.51
8] 31-11 ]-2&15.0600 SCOTT DAVID RECH 3 MAIN ST N
D/&A SARIN DEVELOPMENT
3W N HOLCOMBE AVE W 82' OF 524' OF LOT e, BLOCK 49,
23.058.3440 LITCHFIELD MN 55355-2222 NORTH HALF CITY 24 $1,830.88 57,630.86
68 31417-29-150810 LVNETTE JENSEN ]MAIN ST N
7 MAIN STN N42' OF LOT 6, BLOCK 49,
23.056.3430 HUTCHINSON MN 55350 NORTH HALF CITY 42 $2.854.01 52,864.07
5g 31.11]-29-15-0620 ROGER 8 CAROLVN WACKER 11 MAIN ST N
469 CAMPBELL LN NW 528' OF LOT 7, BLOCK 49,
23.056.3450 HUTCHINSON MN 55360 NORTH HALF CITY 26 $1,]fifi]] 57,766.77
]0 31-117-28-15-0630 TING YOUNG ZHENG 19 MAIN ST N
8]5 CLEVELAND AVE SW SB' OF LOT 8 8 N40' OF LOT ], BLOCK a9,
23.058.3480 HUTCHINSON MN 55350 NORTH HALF CITY 48 $3,261.]2 $3,261.72
SA-5074/2005 LETTING NO. 4/05-04 OS-OS/PAGE ] OF 9
COMPILED Bv: K EENER ASSESSMENT ROLL NO. 5074 $67.952576 STREET COST/FF
COMPUTED BV: K E%NER LETTING NO. 4IPROJECT NOS. OS-04 8 OS-05
CHECKED BY: P VANDER VEEN OS-09: Maln Streetbetween 1st Avenue N antl 4th Avenue S by construction of concrete sitlewelk street lights, treNic signal
system revlslons, lantlscaping reatoretion antl appurtenances
1ST HEARING:
04/12/2005
NUMBER OF YEARS: 10 0$-O5: Washington Avenue Wast between Main Street S antl Franklin Street SW by <onatmctlon of concrete sltlewelk, 2ND HEARING: 06/14/2005
INTEREST RATE: street IIgMS, walermain, storm sewer, lantlseaping, reatoretlpn and appurtenances, ADOPTED:
ACCT.. CITY PID NO. NAME 8 ADDRESS ' LEGAL DESCRIPTN)N STREET TOTAL DEFERRED TOTAL ACTNE
NO. COUNTY PID NO. OF PROPERTY OWNER ADDITION OR SUBDNISION ' FF ASSESSMENT ASSESSMENT ASSESSMENT':
71 31417-2415-0840 W ILLIAM D 8 BECKV L HAAS 23 MAIN ST N
23 MAIN STN 22' N OF SB" OF LOT 8, BLOCK 49,
23.056.3470 - HUTCHINSON MN 55350 NORTH HALF CITY 22 $1.494.% 81,494.86
72 31-117-29-15-0650 HUTCHINSON HOSPITAL AUXILIARY 25 MAIN ST N
25 MAIN STN 22' N OF $22'8' LOT 8, BLOCK 49.
23.OSfi.3460 HUTCHINSON MN 55350 NORTH HALF CITY 16 $1,087.24 $1,09724
73 31-117-29-15-0660 LEEK 8 SHARON GRUENHAGEN 27 MAIN STN
20014 KOGLIN RD N20 OF LOT 8, BLOCK 49,
23.056.3490 HUTCHINSON MN 55350 NORTH HALF CITY 20 $1,358.05 $1,359.%
74 31-117-29-15-0670 ROGER 8 NANCY JANOUSEK 31 MAIN ST N
31 MAIN STN 520' OF LOT 9, BLOCK 49,
23.056.3500 HIITCHINSON MN 55350 NORTH HALF CITY 20 $1,359.05 51,359.0$
75 31-117-2945.0690 JANET M VALEN INC 35 MAIN ST N
35 MAIN STN S 2/3 OF LOT 9 EX S20, BLOCK 49,
23.056.3510 HUTCHINSON MN 55350 NORTH HALF CITY 24 $1,830.86 $1,630.66
76 31.117-29-15-0690 BARBARA E MILBACH 37 MAIN ST N
37 MAIN STN N 1/3 OF LOT 9, BLOCK 99,
23.056.3520 HUTCHINSON MN 55350 NORTH HALF CITY 22 $1,494.96 $1,4%.%
77 31-117-2945-0700 GOLD COIN INC 45 MAIN STN
P O BO% 835 CENTER PORTION OF LOT 20, BLOCK 49,
23.056.3540 HUTCHINSON MN 55350 NORTH HALF CITY 22 $1;494.98 $1,494.%
76 31.117.29-15-0710 GAIL L MCLAIN 43 MAIN ST N
33312 615TH AVE 820' OF LOT 10, BLOCK 49,
23.056.3530 LITCHFIELD MN 55355 NORTH HALF CITY 22 $1.499.% 51,4%.%
79 31-117-29.15.0720 DOUGLAS D 8 CAROL DOBRATZ 47 MAIN ST N
1001 LEW IS AVE SW N'LY PORTION OF LOT 10, BLOCK 99,
23.056.3550 HIfTCHINSON MN 55350 NORTH HALF CITY 22 $1.494.% 31,489.%
80 31-117-29-75-0]30 SHOPKO STORES INC 125 MAIN ST N
P O BOX 19060 LOT 1 EX N200 OF W200', BLOCK 1,
23.057.0010 GREEN BAV WI 54307-90fi0 HUTCHINSON DOW NTOW N REDEVELOPMENT PLAT 213 $14,473.89 $14,473.89
SA-5074/2005 LETTING NO.4/05-04 05-OS/PAGE 8 OF 9
~ ~
ASSESSMENT ROLL N0.5074 $67.952576 STREET COST/FF
COMPILED B K E%NER
4lPROJECT NOS. 05-04 8 OS-05
LETTING NO
COMPUTED BY: K E%NER .
i
nal
t
Ni
i
h
g
ra
c s
g
ts,
05-D0: Mein Street betvreen 1st Avenue N and 4th Avenue S by consirvc0on of concrete sltlewalk, street l
re9torotlon and appurtenances
a
in
l
ds
i
i 1ST HEARING: 0 4/1 212 0 0 5
CHECKED BY: P VANOER VEEN p
g
an
c
system rev
s
ons, 0 6/1 412 0 0 5
et S and Franklin Street SW by eonetructlon of concrete sltlewalk
Str
t
M
i
b 2ND HEARING:
NUMBER OF YEARS: 10 ween
e
n
e
e
OS-05: Washington Avenue West
INTEREST
ACCT. RATE:
CRY PID NO. street Iignts, watermaln, stor
NAMES ADDRESS m sewer, landscaping, restorotlon and appurtenances,
': LEGAi DESCRIPTION
' ADOPTED:
STREET
'
TOTAL DEFERRED
ASSESSMENT
'TOTAL ACTNE
'ASSESSMENT
NO.
81 COUNTY PID NO..
31-11 ]-2415-0]31 OF PROPERTY OWNER ~
WELLS FARGO
C/O PROPERTY TAX DEPT 303 AODRION OR SUBDIVISION
135 MAIN ST N . FF ASSESSMENT
P O BOX 4900 N200' OF W20D OF LOT 1, BLOCK 1,
23.05].0015 SCOTTSDALE A2 85261-4900 HUTCHINSON DOW MOWN REDEVELOPMENT PLAT 200 $13,590.51 113,590.51
TOTAL-ASSESSMENT ROLL NO.5074-LETTING N0.4N'ROJECT NOS. OS-0450505 4018 5473,033.45 50.00 ~- $273,033.45'-
SA~5074/2006 LETTING NO. 9/05-04 05-OS/PAGE 9 OF 9