cp08-26-250
NOW We
HUTCHINSON
A CITY ON PURPOSE.
CITY OF HUTCHINSON
MCLEOD COUNTY
HUTCHINSON, MINNESOTA
NOTICE OF A SPECIAL CITY COUNCIL WORKSHOP
Tuesday, August 26, 2025
3:00 p.m.
Council Chambers — Hutchinson City Center
Notice is hereby given that the Hutchinson City Council has called a special workshop meeting
for Tuesday, August 26, 2025, at 3:00 p.m. in the Council Chambers at the Hutchinson City
Center, 111 Hassan Street SE, Hutchinson, Minnesota for the following purpose:
• Strategic Planning Session
C='
Matthew Jaunic dministr
-
DATED: August 21, 2025
POSTED: City Center
000MEN"
am
HUTCHINSON
A CITY ON PURPOSE.
CITY OF HUTCHINSON
MCLEOD COUNTY
HUTCHINSON, MINNESOTA
NOTICE OF A SPECIAL CITY COUNCIL WORKSHOP
Tuesday, August 26, 2025
4:00 p.m.
Council Chambers — Hutchinson City Center
Notice is hereby given that the Hutchinson City Council has called a special workshop meeting
for Tuesday, August 26, 2025, at 4:00 p.m. in the Council Chambers at the Hutchinson City
Center, I I 1 Hassan Street SE, Hutchinson, Minnesota for the following purpose:
• BUDGET WORKSHOP #2 (CAPITAL IMPROVEMENT PLAN)
Matthew Jaunich, ?it dininistrator
DATED: August 21, 2025
POSTED: City Center
HUTCHINSON CITY COUNCIL
MEETING AGENDA
TUESDAY, AUGUST 26, 2025
CITY CENTER — COUNCIL CHAMBERS
(The City Council is provided background information for agenda items in advance by city staff, committees and boards. Many decisions
regarding agenda items are based upon this information as well as: Citypolicy andpractices, inputfrom constituents, and other questions
or information that has not yet been presented or discussed regarding an agenda item.)
1. CALL MEETING TO ORDER — 5:30 P.M.
(a) Approve the Council agenda and any agenda additions and/or corrections
2. INVOCATION — Our Savior's Lutheran Church
(The invocation is a voluntary expression of the private citizen, to and for the City Council, and is not intended to affiliate the City
Council with, or express the City Council's preferencefor, any religious/spiritual organization. The views or beliefs expressed by the
invocation speaker have not been previously reviewed or approved by the Council or staff)
3. PLEDGE OF ALLEGIANCE
4. RECOGNITION OF GIFTS, DONATIONS AND COMMUNITY SERVICE TO THE CITY
(a) Resolution No. 15900 — Resolution Accepting $25,000 Donation from Citizens Bank & Trust Co. for
Grandstand Project at Veterans' Memorial Field
PUBLIC COMMENTS
is is an opportunity or members of the public to address the City Council. If the topic you would like to discuss is on the agenda, please
ask the Mayor if he will be accepting public comments during the agenda item if not a public hearing. Ifyou have a question, concern or
comment, please ask to be recognized by the mayor —state your name and address for the record. Please keep comments under 5 minutes.
Individuals wishing to speakfor more than five minutes should ask to be included on the agenda in advance of the meeting. All comments
are appreciated, but please refrain from personal or derogatory attacks on individuals)
5. CITIZENS ADDRESSING THE CITY COUNCIL
6. APPROVAL OF MINUTES
(a) Regular Meeting of August 12, 2025
CONSENT AGENDA
(The items lisAU77 consi eration will be enacted by one motion unless the Mayor, a member of the City Council or
a city staff member requests an item to be removed. Traditionally items are not discussed)
7. APPROVAL OF CONSENT AGENDA
(a) Consideration for Approval of Sanitary Sewer for The Landing Project
(b) Consideration for Approval of Closing 200 Block of Hassan Street on September 5, 2025, for Customer
Appreciation Event
(c) Consideration for Approval of Issuing Temporary Liquor License to Hutchinson Jaycees on September
12-13, 2025, at McLeod County Fairgrounds
(d) Consideration for Approval of Issuing Parade Permit to Hutchinson High School Student Council on
September 24, 2025, for Homecoming Parade
CITY COUNCIL AGENDA —August 26, 2025
(e) Consideration for Approval of Resolution No. 15894 — Resolution Adopting Findings of Fact and
Reasons for Approval of a Final Plat for Wendwood With Favorable Planning Commission
Recommendation
(f) Consideration for Approval of Resolution No. 15895 — Resolution Adopting Findings of Fact and
Reasons for Approval of Conditional Use Permit for a Data Center in an I-2 Zoning District Located at
1025 5 h Avenue SE With Favorable Planning Commission Recommendation
(g) Consideration for Approval of Resolution No. 15896 - Resolution Adopting Findings of Fact and
Reasons for Approval of Conditional Use Permit for a Planned Development in the Shoreland District
for an 81-Unit Apartment Building in a C-3 Zoning District Located at 126 Franklin Street SW With
Favorable Planning Commission Recommendation
(h) Consideration for Approval of Resolution No. 15898 — Resolution Adopting Findings of Fact and
Reasons for Approval of a Lot Split at 951 Golf Course Road NW With Favorable Planning
Commission Recommendation
(i) Consideration for Approval of Resolution No. 15899 — Resolution Adopting Findings of Fact and
Reasons for Approval of a Variance Application to Exceed the Residential Unit Density Allowable and
to Deviate from the Minimum Open Space and Design Criteria for The Landing Project With Favorable
Planning Commission Recommendation
(j) Consideration for Approval of Resolution No. 15897 — Resolution to Dispose Surplus Property (IT
Equipment)
(k) Consideration for Approval of Resolution No. 15902 — Resolution Adopting Findings of Fact and
Reasons for Approval of a Sketch Plan and Comprehensive Plan Amendment for an Apartment Project
Located at 135 North High Drive NE With Favorable Planning Commission Recommendation
(1) Appointment of Steve Kropp to the Parks/Recreation/Community Education Advisory Board to August
2028
(m)Claims, Appropriations and Contract Payments
PUBLIC HEARINGS — 6:00 P.M.
8. CONSIDERATION OF ORDINANCE NO. 25-857 — AN ORDINANCE APPROVING REVISIONS TO
SECTIONS OF THE HUTCHINSON CITY CHARTER AS RECOMMENDED BY THE CHARTER
COMMISSION
purpose of this portion of the agenda is to provide the CounciTwith information necessary to craft wise policy.
ides items like monthly or annual reports and communications from other entities.)
9. BORN LEARNING TRAIL — PARK REQUEST
10. HUTCHINSON JUNIOR LEAGUE BASEBALL ASSOCIATION — BATTING CAGE REQUEST
11. VMF GRANDSTAND PROJECT UPDATE — FINAL COSTS AND FUNDING
2
CITY COUNCIL AGENDA —August 26, 2025
12. DISCUSSION ON THE USE OF 429 REVENUE BONDS TO ASSIST WITH THE EXPANSION OF
HOUSING WITHIN THE COMMUNITY
UNFINISHED BUSINESS
NEW BUSINESS
13. APPROVE/DENY FIRST READING OF ORDINANCE NO. 25-858 — AN ORDINANCE FOR THE
SALE OF MUNICIPALLY -OWNED PROPERTY TO HUTCHINSON — THE LANDING, LLC
14. APPROVE/DENY FIRST READING OF ORDINANCE NO. 25-859 — AN ORDINANCE OF THE CITY
OF HUTCHINSON VACATING THE ALLEY IN BLOCK 41, NORTH HALF HUTCHINSON
15. APPROVE/DENY FIRST READING OF ORDINANCE NO. 25-860 — AN ORDINANCE OF THE CITY
OF HUTCHINSON VACATING THE RIGHT-OF-WAY (SANITARY SEWER) EASEMENT LOCATED
AT 126 FRANKLIN STREET NW
16. APPROVE/DENY RESOLUTION NO. 15901 — RESOLUTION FOR THE SALE OF GENERAL
OBLIGATION IMPROVEMENTS BONDS, SERIES 2025A
GOVERNANCE
(The purpose of this portion of the agenda is to deal with or
development issues, including policies,
performances, and other matters that manage the logistics of the organization. May include monitoring reports,
policy development and governance process items.)
17. MINUTES/REPORTS FROM COMMITTEES, BOARDS OR COMMISSIONS
(a) City of Hutchinson Financial Report and Investment Report for July 2025
NHSCELLANEOUS
18. STAFF UPDATES
19. COUNCIL/MAYOR UPDATE
20. CLOSED SESSION PURSUANT TO MINNESOTA STATUTE §13D.05, Subd_ 3(c) TO DISCUSS
PURCHASE OF REAL PROPERTIES DESCRIBED AS:
SECT-04 TWP-116 RANGE-030 120.00 AC N 120 AC OF SE'/4
SECT-04 TWP-116 RANGE-030 40.00 AC S 40 AC OF SE 1/4
SECT-09 TWP-116 RANGE-030 13.59 AC THAT PART OF NW 1/4 NE 1/4 & PART OF NE 1/4 NW'/4
13.59 AC
ADJOURNMENT
CITY OF HUTCHINSON
RESOLUTION NO. 15900
RESOLUTION ACCEPTING DONATION
WHEREAS, the City of Hutchinson is generally authorized to accept donations of real and
personal property pursuant to Minnesota Statutes Section 465.03 for the benefit of its citizens,
and is specifically authorized to accept gifts and bequests for the benefit of recreational services
pursuant to Minnesota Statutes Section 471.17,- and
WHEREAS, the following persons have offered to contribute the cash amounts set forth below
to the city:
Name of Donor Amount Donation Date
Citizens Bank & Trust Co $25,000.00 8/7/2025
Hutchinson Huskies $4,990.86 8/19/2025
WHEREAS, such donations have been contributed to the City of Hutchinson Parks
Department towards the grandstand project at Veterans Memorial Field.
WHEREAS, the City Council finds that it is appropriate to accept the donations offered.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
HUTCHINSON, MINNESOTA, AS FOLLOWS:
THAT, the donations described above are hereby accepted by the City of Hutchinson.
Adopted by the City Council this 26th day of August 2025.
ATTESTED:
Matthew Jaunich
City Administrator
APPROVED:
Gary T. Forcier
Mayor
HUTCHINSON CITY COUNCIL
MEETING NHNUTES
TUESDAY, AUGUST 12, 2025
CITY CENTER — COUNCIL CHAMBERS
(The City Council is provided background information for agenda items in advance by city staff, committees and boards. Many decisions
regarding agenda items are based upon this information as well as: Citypolicy andpractices, inputfrom constituents, and other questions
or information that has not yet been presented or discussed regarding an agenda item)
1. CALL MEETING TO ORDER — 5:30 P.M.
Mayor Gary Forcier called the meeting to order. Members present were Tim Burley, Pat May, Chad Czmowski
and Dave Sebesta. Also present were Matt Jaunich, City Administrator and Marc Sebora, City Attorney.
(a) Approve the Council agenda and any agenda additions and/or corrections
Matt Jaunich, City Administrator, noted that an additional item needs to be added under New Business as
Item 11.5 —approving a satisfaction of mortgage.
Motion by Burley, second by Czmowski, to approve the agenda with the additional item noted. Motion
carried unanimously.
2. INVOCATION — A moment of silence was held in lieu of an invocation.
(The invocation is a voluntary expression of the private citizen, to and for the City Council, and is not intended to affiliate the City
Council with, or express the City Council's preferencefor, any religious/spiritual organization. The views or beliefs expressed by the
invocation speaker have not been previously reviewed or approved by the Council or staff)
3. PLEDGE OF ALLEGIANCE
4. RECOGNITION OF GIFTS, DONATIONS AND COMMUNITY SERVICE TO THE CITY
PUBLIC COMMENTS
(T is is an opportunity or members of the public to address the City Council. If the topic you would like to discuss is on the agenda, please
ask the Mayor if he will be accepting public comments during the agenda item if not a public hearing. Ifyou have a question, concern or
comment, please ask to be recognized by the mayor —state your name and address for the record. Please keep comments under 5 minutes.
Individuals wishing to speakfor more than five minutes should ask to be included on the agenda in advance of the meeting. All comments
are appreciated, but please refrain from personal or derogatory attacks on individuals)
5. CITIZENS ADDRESSING THE CITY COUNCIL
6. APPROVAL OF MINUTES
(a) Strategic Planning Session of July 22, 2025
(b) Regular Meeting of July 22, 2025
Motion by Czmowski, second by Sebesta, to approve the minutes as presented. Motion carried
unanimously.
CONSENT AGENDA
(The items listMT7 consi eration will be enacted by one motion unless the Mayor, a member of the City Council or
a city staff member requests an item to be removed. Traditionally items are not discussed)
7. APPROVAL OF CONSENT AGENDA I
(a) Consideration for Affirmation of Board Appointments/Reappointments
1. Appointment of Heidi Tague to Bicycle/Pedestrian Advisory Committee to August 2028
2. Reappointment of Mark Hanneman to Bicycle/Pedestrian Advisory Committee to August 2028
3. Reappointment of Deb Card to Bicycle/Pedestrian Advisory Committee to August 2028
CITY COUNCIL MINUTES — August 12, 2025
4. Reappointment of Margo Kaping to PRCE Advisory Board to August 2028
5. Reappointment of Liz Stearns to PRCE Advisory Board to August 2028
(b) Consideration for Approval of Construction Services Agreement with Nero Engineering (Solids
Improvement Project)
(c) Consideration for Approval of Engineering Services Agreement with SEH (Pond Planning Proposal)
(d) Consideration for Approval of Hangar Repair Project
(e) Consideration for Approval of Repairs for Aquatic Center
(f) Consideration for Approval of Squad Car Purchase
(g) Consideration for Approval of Resolution No. 15892 — Resolution Approving the Decertification of Tax
Increment Financing District 4-20 of the City of Hutchinson
(h) Claims, Appropriations and Contract Payments — Register A
Motion by May, second by Sebesta, to approve Consent Agenda I. Motion carried unanimously.
APPROVAL OF CONSENT AGENDA II
(a) Claims, Appropriations and Contract Payments — Register B
Motion by Burley, second by May, with Czmowski abstaining, to approve Consent Agenda II. Motion
carried unanimously.
PUBLIC HEARINGS — 6:00 P.M. - NONE
purpose o t is portion o t e agenda is to provi e the Counci with information necessary to craft wise policy.
ides items like monthly or annual reports and communications from other entities.)
UNFINISHED BUSINESS
NEW BUSINESS
9. APPROVE/DENY RESOLUTION NO. 15891 — RESOLUTION ACCEPTING BID AND AWARDING
CONTRACTS FOR THE ROBERTS PARK COMPLEX LIGHTING PROJECT
Lynn Neumann, PRCE Director, presented before the Council. Ms. Neumann explained that the equipment
and installation were bid out separately with the total bid package coming in at $574,785.00 which was
below
the original estimate of $765,000. This project has been included in the Facilities Plan and the capital
improvement plan for several years. The project has faced several delays and the lights are now in disrepair
and require replacement.
2
CITY COUNCIL MINUTES — August 12, 2025
Motion by Czmowski, second by May, to approve Resolution No. 15891. Motion carried unanimously.
10. APPROVE/DENY SETTING STRATEGIC PLANNING SESSION FOR AUGUST 26, 2025
Motion by May, second by Burley, to set strategic planning session for August 26, 2025, at 3:00 p.m.
Motion carried unanimously.
11. APPROVE/DENY SETTING BUDGET WORKSHOPS FOR AUGUST 26 AND SEPTEMBER 9, 2025
Motion by May, second by Burley, to set budget workshops for August 26 and September 9, 2025, at 4:00
p.m. Motion carried unanimously.
11.5 APPROVE/DENY SATISFACTION OF MORTGAGE
Marc Sebora, City Attorney, presented before the Council. Mr. Sebora explained that in 1996 JME, Inc.,
the predecessor to Impressions Inc. received a forgivable loan from the EDA that was secured by a
mortgage from JME, Inc. The loan was to be forgiven after 10 years if JME, Inc. did not sell any of its
property or did not go through bankruptcy. Neither of those events happened so the loan was forgiven. The
City was contacted recently by an attorney representing Impressions, Inc. asking for a formal satisfaction of
the mortgage so that this outstanding mortgage could be recorded as satisfied in order to provide clear title
to the property.
Motion by May, second by Czmowski, to approve satisfaction of mortgage with JME, Inc. Motion carried
unanimously.
GOVERNANCE
(The purpose of this portion of the agenda is to deal with organizational development issues, including policies,
performances, and other matters that manage the logistics of the organization. May include monitoring reports,
policy development and governance process items)
12. MINUTES/REPORTS FROM COMMITTEES, BOARDS OR COMMISSIONS
(a) City of Hutchinson Financial Report and Investment Report for June 2025
NHSCELLANEOUS
13. STAFF UPDATES
Tom Gifferson — Chief Gifferson spoke about motorized scooters compared to ebikes and even skateboards.
Staff reminded listeners that biking, skateboarding, etc. is not allowed in the downtown district on the
sidewalks. General discussion was held regarding bicycle rules/regulations and perhaps signage/speed
limits/etc. on trails. This will be a topic of discussion at the Bicycle/Pedestrian Advisory Committee.
Lynn Neumann — Ms. Neumann noted that the aquatic center closes this Saturday, however will remain open
for early morning lap swim for the next week or two. There may be some bonus days for the aquatic center if
there is adequate staffing. If this is able to be achieved, information will be posted on the PRCE Facebook
page.
Mike Stifter — Mr. Stifter noted that Hassan Street paving/striping is complete. Dale Street will have concrete
work complete this week with paving starting next week.
CITY COUNCIL MINUTES — August 12, 2025
Matt Jaunich —Mr. Jaunich noted that backyard chicken regulations/licensing are in effect and available. The
City has issued one license so far.
14. COUNCIL/MAYOR UPDATE
Several Council Members noted that the Hutch Huskies amateur baseball team are in the state tournament
which is being hosted in Hutchinson this year. They also commented on the McLeod County Fair starting on
Thursday and the successful Stroll for Hope event held last week.
ADJOURNMENT
Motion by May, second by Czmowski, to adjourn at 6:05 p.m. Motion carried unanimously.
.19
c: HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE
IIIIIIII
PO - The Landing Sanitary Sewer
Agenda Item:
Department: Public Works
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Mike Stifter
Agenda Item Type:
Presenter: Mike Stifter
Reviewed by Staff ❑
Consent Agenda
Time Requested (Minutes): 5
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
One quote package for a public sanitary sewer realignment was sent out on Tuesday, August
19th with bids expected back by 1 pm on Monday, August 25th. This work is integral to The
Landing's redevelopment project which is slated to begin in/around mid -September.
Staff will be on hand to answer any questions and the quote(s) will be made available at the
meeting.
The Engineer's estimate for the project is $106,430 and quote materials have been sent to five
(5) contractors.
BOARD ACTION REQUESTED:
Fiscal Impact: $ 106,430.00 Funding Source: TBD by Finance
FTE Impact: Budget Change: New Bu
Included in current budget: No 0
PROJECT SECTION:
Total Project Cost: $ 106,430.00
Total City Cost: $ 106,430.00 Funding Source: TBD by Finance
Remaining Cost: $ 0.00 Funding Source: N/A
n O
OWNN
O a
W o
W o00Nr-W
W O
o O
O O
W
N�
o O
o0
0
Oo0
0 0
0) Cl)
vt 01
W)
a?
L W
�
O)Nyp0r-0mw
0 r'
N
W8
hBU)
N
M
C
C
f0 01 .�
O
F
co
F
(y (�]
pp
Q)
�0 V
O O
0
W 7
r;
N W
N t�
N
N
I- [`�7
60
O N
N
N
c in z V4 V
0
�
o
❑_
� niF,�v,ine,rr,v,�
fAto
vj
e,e>e,
t0
W mN200 EO)
N
2¢¢
m
N\
O
m
N
O�
0't
aN
N04
000<0
o
cm
>�e
C M G
O
X Ef = p�
w G C m !Y
w
U
0
O
w
=�
O
OD
(00.
N W
r- m
m W
W r•
co W
W O
(V
0 0
W r•
K m L O m
Ob .4 0 m
1
N
N
0-
In
(`]
N
W W
11') N
D1 r
W fA
N
f9
M
f9
69
W v
f9 r•
N o�
N N>
w
N ll")
f9
69
w
O
oO
t0
W
N
i9
w69f9
jcq
O
E
m
m
N
O
a0000000000000
00000000000Noo
00000p
00000
N
U
J
ri
n90
N�
K;
W
0 r:
N
N
r0-
WNIn
Oo
Oc
I--l+)
OoO
coM
v61�
N6sNN0
vhWo
cl)(9
fogn
9 6
razor
❑
Q%»
OT
TT
�t=aVr
C
M%
NijNVy1�
c
4,
Ofn)
O
0-
o0O
�T
C❑'Q,
w
0)O
ofn
o m
N fAWf9Nf9f9
0 N.
N r`
N V
MNO
r` 7
W 9
0
N
f9
0000
OWaCIF)
�Y!
0W
QW0
T
0.m
r
N N
69Gl�
co
N
49
f09
Ho
HO00O0(h
w
�Lo
Z
60
00000000000000
080800
noo
`N
o }0
¢
�0000000000000o
0
w
0 0
0 o
0 0
0 0
0 0
0 N
o
0 0
0
!9
W
C fn N
F
O
(-
0
O
0 0
o 0)
0) v
- Q)
W m
N 0)
LL7 v
O
N W
O
o9
W h
W O
W
v^OWoWNNW-
W
tl9
f9
w
fA �
V!
n
fA
V
f9
117 0.
m
uCII) �u� 2 N E
❑
m
O
❑
m
69
JV�F�-
O
O=
o co^u
L
f�
O
T
w0000000fn000000
0 0
OO
0 0
0 0
0 0
0 0
0 0
0 0
W
�0000�1
0 0
0 0
L0 (�
C O N
orm Of1��
O
w
pp
O
V c y fT
m Y a L C C
V
O
Q
U
f9 0
OIn
0 0
W
W f9
W W
M f9
N
W fA
W
f9
p(1
f9 O
N
f9
O OO
f9O'
md E
aa
Am
9
O M
O
M
49
f9
fAOO
v)
!n
Wf9
c Q
= x a
❑
❑
"k
1011u,
Z O
m
m
m
Z O co
i A I
J
J
p000000000000
L 7
0 0
0 O
O O
O O
O O
O O
000o0p
0
0 O
o O
O
z
¢
Q
O O
O O
o O
O O
O O
O O 000
O
v0)000
pp O
O O
O
y
H
O
O
O
V-
OO
000o
NOO
OO)(O
W
00
oc R
NAM
v0000
O
v0w>
�N
WW
O W
NN
Nf9
Nf9
7 a0
O N
0
M
❑_
O
O
❑_
f9 WN
f9 f9
f9 f9
to
f9
f9
f9 f9
W
w
m
M
m
CD
OO
g
O00
p 0
0 00000
0 000
000
00
�
O f� C
(V
O
w`
a
r
a
o 0
0 0
O O
p o
D N
uoi o
uoi o
W
0 0
N r`
0
0
N
0 0
W. 0
0 0
0'o
=
L
'a3
❑
❑
W
O fA
W W
��fA�f9
In
�y���fA
N
moo]
�•--
cn
wJ,
0 0
0 0
0 0
0 0
0 O
a o
0 0
C�
v o
O o
0 0
Z W
m
Alll Ntl f 10
m
Q
=
O 0
N o]
W m
W 0
� O�
O' N
N
O
o
V/
O r Z
d
Z
Q Q
w
Q
aLU
CO
�
D1 -,,
L LL}
pQ
LL
LL l-
F- �
❑} lFl.
LL�
2
�
2 D
N J V% Z
N
lINII
m
p
=dz¢¢wzwzzzzaaz
0
j J
W W
W J
(q J
J J
J w
w J
zU¢¢a
J
a W
W
M�
QW
J
J
2�
T- m a
� o
o
2o
c
U) @)
f3f
w
a. w
>
N
Z 'n
C
w
a
a
w
=
O
U
65�
w?
N
�_
HHW
>
w
>
>V
_
m
0<W
?W��
oU
oJ�
V
W
��6�
MWd¢
a
ZOO
(7
W
<
�W�$
Uvai}owuwi�
Ro<�a
O Z
Q
m
Z
0
Wes=
O
F�a(A207F
S
O
W
m
W
v0
T
LU
W
Q
wwULL(Qa(naOC�
XLL,
z U
O
O
❑Oazm
N F
z
O
Z
G.
V
w
}v0
W 3-0
w
- fnqotl
O
H
JaWk'
FFJwa
w
V)Jfn
a wx�,��nam
W
tpWd'
a❑Fa0�
WW
Z_
O—O
w
W
wZW
�JF
Z
O
J fnzaoww(LouoUao
au)a❑vH
ww
W
2z
JW
W
zF
V fo��=Zz❑aw
❑JO
(Lco
W o')Ow
0���
W
J
z�FVF4
W ZZixwc')
NU
w
gOFX
FUw
o�U❑CL
Omww
wowwFFz
UOUOzJ
a>zm❑>>wozooz��
LLoz)
W
O F
W
O W
m w
W
2 0
d
W
0 a
N
❑
U(nwFaw<
wBo=
ED
(nw
UCH
ON W311
'ON 3NIl
/0000�� HJERPE CONTRACTING, INC.
HJERPE 16246HWY15S
P.O. BOX 517
CONTRACTING INC. HUTCHINSON, IVIN 55350
\ZMTW� PHONE: (320) 234-8305
To: City of Hutchinson, MN
Contact:
Jocelyn Jacobson
Address: Ill Hassan Street SE
Phone:
Hutchinson, MN 55350-2522
Fax:
Project Name: Hutchinson - The Landing Sewer Relocation
Bid Number:
170528
Project Location: Hutchinson
Bid Date:
8/25/2025
Addendum #: 0
Line # Item Description
Estimated Quantity Unit
Unit Price
Total Price
Sanitary Sewer
10 Dewatering (all utilities)
1.00 LS
$1.00
$1.00
20 12" PVC SOR 35 Sanitary Sewer (All Depths)
490.00 LF
$100.00
$49,000.00
30 Construct Manhole (48") over Ex. Sanitary Sewer
2.00 EACH
$10,000.00
$20,000.00
40 Standard 48" Diameter Manhole (0-8' Depth)
3.00 EACH
$6,300.00
$18,900.00
50 Extra Depth 48" Diameter Manhole
6.00 VF
$365.00
$2,190.00
60 Televise Sanitary Sewer- 12"
490.00 LF
$6.00
$2,940.00
70 Polystyrene Insulation (4" thick)
8.00 SY
$35.00
$280.00
80 Remove and Dispose of Ex. 12" Sanitary Sewer Pipe
300.00 LF
$6.50
$1,950.00
90 Abandon In place Ex. Sanitary Sewer
30.00 LF
$65.00
$1,950.00
100 Remove & Replace 51" Arch Rcp Storm Sewer
10.00 LF
$1.00
$10.00
110 Remove & Replace 12" Storm Sewer
10.00 LF
$445.00
$4,450.00
120 8" Mn DOT 3138, Class 5 Agg. Base (P)
240.00 SY
$1.00
$240.00
130 5" MnDOT 2360, SPWEA340F Bit. Wear Course
200.00 SY
$1.00
$200.00
140 8618 Concrete Curb & Gutter
14.00 LF
$108.00
$1,512.00
Total Price for above Sanitary Sewer Items:
$103,623.00
Turf Restoration & Erosion Control
150
Silt Fence (Type Heavy Duty)
1,070.00 LF
$2.15
$2,300.50
160
Seed And Mulch (MNDOT 21-111 Mix) (P)
0.14 ACRE
$7,000.00
$980.00
170
Manufactured Inlet Protection
9.00 EACH
$150.00
$1,350.00
180
Construction Entrance Inc. Maint.
1.00 EACH
$450.00
$450.00
190
Maintain Existing Erosion Control Devices
1.00 LS
$1.00
$1.00
Total Price for above Turf Restoration & Erosion Control Items:
$5,081.50
Total Bid Price: $108,704.50
Notes:
• THANK YOU FOR THE OPPORTUNITY TO QUOTE.
8/25/2025 11:36:49 AM Page 1 of 2
Est. Plan
Description Unit Qty.
SANITARY SEWER
1. Dewatering (all utilities)
L.S.
1.00
2. 12" PVC SDR 35 Sanitary Sewer (All Depths)
L.F.
490.00
3. Construct Manhole (48") over Ex. Sanitary Sewer
EACH
2.00
4. Standard 48" Diameter Manhole (0-8' Depth)
EACH
3.00
5. Extra Depth 48" Diameter Manhole
V.F.
6.00
6. Televise Sanitary Sewer
L.F.
490.00
7. Polystyrene Insulation (4" thick)
S.Y.
8.00
8. Remove and Dispose of Ex. 12" Sanitary Sewer Pipe
L.F.
300.00
9. Abandon in place Ex. Sanitary Sewer
L.F.
30.00
10. Remove & Replace 51" Arch Storm Sewer (42" Egiv.)
L.F.
10.00
11. Remove & Replace 12" Storm Sewer
L.F.
10.00
12. 8", MnDOT 3138, Class 5 Agg. Base (P)
S.Y.
240.00
13. 5" MnDOT 2360, SPWEA340F Bit. Wear Course
S.Y.
200.00
14. B618 Concrete Curb & Gutter
L.F.
14.00
Subtotal Sanitary Sewer
TURF RESTORATION AND EROSION CONTROL
15. Silt Fence (Type Heavy Duty)
16. Seed and Mulch (MNDOT 21-111 Mix) (P)
17. Manufactured Inlet Protection
18. Construction Entrance Inc. Maint.
19. Maintain Existing Erosion Control Devices
Subtotal Turf Restoration and Erosion Control
SUMMARY
Subtotal Sanitary Sewer
Subtotal Turf Restoration and Erosion Control
11101fv
Unit Total
Price Price
L.F.
1,070.00
AC.
0.14
0'
EACH
9.00
EACH
1.00
C j
L.S.
1.00
(��
31/. 0V
f6 3
8/17/2025 � 0 1 -1 ov.6,ROPOSAL
Description
SANITARY SEWER
1. Dewatering (all utilities)
2. 12" PVC SDR 35 Sanitary Sewer (All Depths)
3. Construct Manhole (48") over Ex. Sanitary Sewer
4. Standard 48" Diameter Manhole (0-8' Depth)
5. Extra Depth 48" Diameter Manhole
6. Televise Sanitary Sewer
7. Polystyrene Insulation (4" thick)
8. Remove and Dispose of Ex. 12" Sanitary Sewer Pipe
9. Abandon in place Ex. Sanitary Sewer
10. Remove & Replace 51" Arch Storm Sewer (42" Egiv.)
11. Remove & Replace 12" Storm Sewer
12. 8", MnDOT 3138, Class 5 Agg. Base (P)
13. 5" MnDOT 2360, SPWEA340F Bit. Wear Course
14. B618 Concrete Curb & Gutter
Subtotal Sanitary Sewer
TURF RESTORATION AND EROSION CONTROL
15. Silt Fence (Type Heavy Duty)
16. Seed and Mulch (MNDOT 21-111 Mix) (P)
17. Manufactured Inlet Protection
18. Construction Entrance Inc. Maint.
19. Maintain Existing Erosion Control Devices
Subtotal Turf Restoration and Erosion Control
SUMMARY
Subtotal Sanitary Sewer
Subtotal Turf Restoration and Erosion Control
TOTAL
Est. Plan Unit Total
Unit Qty. Price Price
L.S. 1.00 $32,381.03 $32,381.03
L.F. 490.00 $150.55 $73,769.50
EACH 2.00 $9,562.60 $19,125.20
EACH 3.00 $7,268.08 $21,804.24
V.F. 6.00 $267.48 $1,604.88
L.F. 490.00 $3.00 $1,470.00
S.Y. 8.00 $133.01 $1,064.08
L.F. 300.00 $16.78 $5,034.00
L.F. 30.00 $66.14 $1,984.20
L.F. 10.00 $1,747.57 $17,475.70
L.F. 10.00 $226.28 $2,262.80
S.Y. 240.00 $38.27 $9,184.80
S.Y. 200.00 $126.09 $37,827.00
L.F. 14.00 $50.00 $700.00
$225,687.43
L.F. 1,070.00 $2.10 $2,274.00
AC. 0.14 $5,000.00 $700.00
EACH 9.00 $150.00 $1,350.00
EACH 1.00 $2,016.49 $2,016.49
L.S. 1.00 $1,237.93 $1,237.93
$7,551.42
$225,687.43
$7, 551.42
$233,238.85
Exca -
11,49 Highway 22 S.
Hutchinson, IVIN 55350
320) 587-5918
8/17/2025 00410-1 PROPOSAL
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
Temporary road closure request
Agenda Item:
Department: Police Services
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Thomas D Gifferson
Agenda Item Type:
Presenter: Thomas D Gifferson
Reviewed by Staff
Consent Agenda
Time Requested (Minutes): 2
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
Several business owners along the 200 block of Hassan St South are hosting a customer
appreciation event on Friday September 5, 2025. They are requesting a section of Hassan
Street north of 3rd Avenue South be temporarily closed for the event. The proposed closure
would take place from 3pm to 6pm.
Staff have reviewed the request and recommend approval of the request.
List of businesses participating in the event:
True Journey
Peterson, Juergenson, Hemerick and Company
Muddy Cow
West Central Technology
The Title Team
Hometown Mortgage
Hutchinson Chiropractic and Wellness.
BOARD ACTION REQUESTED:
Recommend Approval
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No
Included in current budget: Yes
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source: N/A
Remaining Cost: $ 0.00 Funding Source: N/A
Muddy Cow
35 31d Avenue
Hutchinson, MN 55350
Mdemars@muddycowbar.com
612-750-3635
Monday, July21st, 2025
Hutchinson City Council
111 Hassan St SE
Hutchinson, MN 55350
Dear Members of the City Council,
Re: Proposal for One -Day Off -Site Beer Sales Permit
I hope this letter finds you well. My name is Mason DeMars, and I am writing to propose a
request for a one -day off -site beer sales permit for "4th Annual Happy Hour on Hassan",
which will be held on Friday, September 5th, 2025, at 239 Hassan St SE, Hutchinson, MN
55350. As part of our community outreach and event planning efforts, we aim to provide
attendees with a positive and enjoyable experience, and we believe that allowingthe sale
of beer during the event will contribute significantly to the event's success.
Event Overview:
Event Name: 4th Annual Happy Hour on Hassan
Date: Friday, September 5th, 2025
Time: 3pm to 6pm
Location: Parking lot of 239 Hassan St SE, Hutchinson, MN 55350
Expected Attendance: Approximately 400
The event will feature clients from 6 different businesses coming together to enjoyfree
food, dessert, beer, and raffle prizes. The beer provided by Muddy Cow will only be
available to clients with drink tickets purchased from Muddy Cow by the participating
businesses, we are expecting a large turnout of clients. Last year at this event we had 3BC
Brewing Company provide the beer, but with Muddy Cow being a new business
participating in this event we figured it made sense to have Muddy Cow provide the
beverages. Hassan street in front of the 239 Hassan St parking lot is blocked off by the
Hutchinson Police Department to ensure safety to everyone in attendance.
Request Details: Myself, Muddy Cow, and five other businesses respectfully request a
permit to be able to provide beer in the parking lot of 239 Hassan St SE for this event.
Beer Sales: Beer beverages will be sold by Muddy Cow.
Vendor Licensing: The vendor selling beer will be fully licensed and compliant with all local,
state, and federal regulations regarding the sale of alcohol.
ID Checking & Security: All attendees will be required to show valid identification to prove
they are of legal drinking age. Additionally, we will have trained security personnel on -site to
monitor alcohol consumption and ensure responsible drinking.
Sales Hours: Beerwill be sold between 3pm and 6pm, and we will ensure that all outside
sales cease when the event is over, in tine with city alcohol sales ordinances.
Public Safety and Community Impact:
We are fully committed to ensuring that the sale of beer does not negatively affect the
safety or well-being of the public. To that end, we will take the following steps:
Responsible Alcohol Service: We will ensure that all alcohol is served responsibly, with a
maximum of two drinks per person per transaction. Additionally, servers will be trained to
recognize signs of intoxication and to refuse service if necessary.
Transportation Assistance: We will partner with local transportation services, including
taxis and ride -sharing companies, to ensure that attendees have access to safe rides
home.
Economic and Community Benefits:
Allowing the sale of beer at this event will provide several benefits to the city, including:
Increased Revenue: The sale of beer will contribute to the overall revenue of the event,
some of which will be reinvested into future community events and initiatives.
Local Business Support: Many local businesses, including food vendors and event
organizers, will benefit from the increased foot traffic that this event will generate.
Enhanced Community Engagement: The addition of alcohol will help to make the event
more appealing and enjoyable for attendees, fostering a sense of community and bringing
people together.
Conclusion:
We believe that this proposal aligns with the city's goal of promoting positive community
events and contributing to the local economy. We assure you that we are fully committed to
ensuring that this event is conducted in a responsible, safe, and enjoyable manner for all
participants. We kindly request your support in granting a one -day off -site beer sales
permit for Happy Hour on Hassan.
Thank you for your time and consideration of this proposal. We are happy to meet with any
of you to discuss any further details or answer any questions you may have.
Sincerely,
Mason DeMars
General Manager
Muddy Cow
All participating businesses signatures:
Muddy Cow
True Journe _
Hutchinson Chiropractic & Wellness
PJ H & CO;
West Central Technology
HUTCHINSON CITY COUNCIL
HUTCHINSW Request for Board Action
A CITY ON PURPOSE,
Agenda Item: Temporary Liquor License - Hutchinson Jaycees
Department: Administration
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete Yes
Contact: Melissa Starke
Agenda Item Type:
Presenter: Melissa Starke
Reviewed by Staff ✓❑
Consent Agenda
Time Requested (Minutes):
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
The Hutchinson Jaycees have submitted a temporary liquor license to dispense liquor at the McLeod County
Fairgrounds at an event being held September 12 & 13, 2025. The Hutchinson Jaycees are a nonprofit organization
and meet the requirements for a temporary liquor license.
BOARD ACTION REQUESTED:
Approve issuing temporary liquor license to Hutchinson Jaycees on September 12 & 13, 2025, at McLeod County
Fairgrounds.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
Minnesota Department of Public Safety
Alcohol and Gambling Enforcement Division
�► (O:D 445 Minnesota Street, Suite 1600, St. Paul, MN 55101
651-201-7507 TTY 651-282-6555
Alcohol 1k Gambling Enlorcemanl APPLICATION AND PERMIT FOR A 1 DAY
TO 4 DAY TEMPORARY ON -SALE LIQUOR LICENSE
Name of organization Date of organization Tax exempt number
Hutchinson Jaycees 01/18/2019 41-1430060
Organization Address (No PO Boxes)
City State Zip Code
P.O. Box 624
Hutchinson Minnesota 55350
Name of person making application
Business phone Home phone
Chrissy Forcier
952-212-2924
Date(s) of event
Type of organization ❑ Microdistillery ❑ Small Brewer
9/12/2025 - 9/13/2025
❑ Club ❑ Charitable ❑ Religious 0 Other non-profit
Organization officer's name
City State Zip Code
Chrissy Forcier
Hutchinson Minnesota 55350
Organization officer's name
City State Zip Code
Minnesota
Organization officer's name
City State Zip Code
Minnesota
Location where permit will be used. If an outdoor area, describe.
McLeod County Fairgrounds, 840 Century Ave. SW, Hutchinson,
MN 55350
If the applicant will contract for intoxicating liquor service
give the name and address of the liquor license providing the service.
Hutch JC members will be providing bartending services -
several members are TIPS certified and will be managing sales.
If the applicant will carry liquor liability insurance please provide the carrier's name and amount of coverage.
Insurance by Design, Scott Rupp - $1,000,000 - see attached
APPROVAL
APPLICATION MUST BE APPROVED BY CITY OR COUNTY BEFORE SUBMITTING TO ALCOHOL AND GAMBLING ENFORCEMENT
City or County approving the license
Fee Amount
Event in conjunction with a community festival ❑ Yes ❑ No
Current population of city
Please Print Name of City Clerk or County Official
Date Approved
Permit Date
City or County E-mail Address
Signature City Clerk or County Official
CLERKS NOTICE: Submit this form to Alcohol and Gambling Enforcement Division 30 days prior to event
No Temp Applications faxed or mailed. Only emailed.
ONE SUBMISSION PER EMAIL, APPLICATION ONLY.
PLEASE PROVIDE A VALID E-MAIL ADDRESS FOR THE CITY/COUNTY AS ALL TEMPORARY
PERMIT APPROVALS WILL BE SENT BACK VIA EMAIL. E-MAIL THEAPPLICATION SIGNED BY
CITY/COUNTY TO AGE.TEMPORARYAPPLICATION@STATE.MN.US
ACOR" CERTIFICATE OF LIABILITY INSURANCE
DATE (MMIDDIYYYY)
01 /03/2025
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
CONTACT Scott Rupp
NAME:
Insurance by Design, LLC
(952) 808-7002 (952) 808-7004
(FAX
AICNNo Ext : C No):
E-MAIL scottr@insurancedesign.net
7303 161st St W
ADDRESS:
INSURER(S) AFFORDING COVERAGE
NAIC #
Ste 200A
INSURERA: Michigan Millers Mutual Ins
14508
Rosemount MN 55068
INSURED
INSURER B : Michigan Millers Mutual Ins
14508
INSURERC:
JCI Minnesota
INSURER D :
DBA: Minnesota Jaycees
INSURER E :
56633 150th St
INSURER F :
Austin MN 55912
COVERAGES CERTIFICATE NUMBER: CL24122605869 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
TYPE OF INSURANCE
INSD
WVD
POLICYNUMBER
POLICY EFF
MM/DD/YYYY
POLICY EXP
MM/DD/YYYY
LIMITS
X
COMMERCIAL GENERAL LIABILITY
EACH OCCURRENCE
$ 1,000,000
CLAIMS -MADE FX OCCUR
PRETE
M SES Ea occurrr.nce
$ 300,000
MED EXP (Any one person)
$ 10,000
PERSONAL &ADV INJURY
$ 1,000,000
A
Y
C012637205
01/01/2025
01/01/2026
L AGGREGATE LIMIT APPLIES PER:
GENERAL AGGREGATE
$ 3,000,000
POLICY❑PRO �
JECT: LOC
MOTHER
PRODUCTS - COMP/OP AGG
3,000,000
$
$
AUTOMOBILE
LIABILITY
COMBINED SINGLE LIMIT
Ea accident
$
BODILY INJURY (Per person)
$
ANYAUTO
OWNED SCHEDULED
AUTOS ONLY AUTOS
BODILY INJURY (Per accident)
$
PROPERTY DAMAGE
Per accident
$
HIRED NON -OWNED
AUTOS ONLY AUTOS ONLY
X
UMBRELLA LIAB
X
OCCUR
EACH OCCURRENCE
$ 1,000,000
AGGREGATE
$ 1,000,000
B
EXCESS LAB
CLAIMS -MADE
L010647805
01/01/2025
01/01/2026
DED I I RETENTION $
$
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY Y/ N
PER OTH-
STATUTE ER
ANY PROPRIETOR/PARTNER/EXECUTIVE ❑
OFFICER/MEMBER EXCLUDED?
NIA
E.L. EACH ACCIDENT
$
E.L. DISEASE - EA EMPLOYEE
$
(Mandatory in NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
E.L. DISEASE - POLICY LIMIT
$
Each Occurrence
$1,000,000
A
Liquor Liability
C012637203
01/01/2025
01/01/2026
General Aggregate
$1,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
Provides evidence of insurance for the Hutchinson Jaycees as respects to Land Castle Summer Extravaganza, being held at McLeod County Fairgrounds, 840
Century Ave. SW, Hutchinson, MN 55350. McLeod County Fairgrounds and City of Hutchinson are named Additional Insured under the General Liability per
written contract.
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
City of Hutchinson
ACCORDANCE WITH THE POLICY PROVISIONS.
111 Hassan St SE
AUTHORIZED REPRESENTATIVE
Hutchinson MN 55350
@ 1988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD
re HUTCHINSON CITY COUNCIL
H UTC H I N SO H Request for Board Action
A CITY ON PURPOSE.
Agenda Item: Homecoming Parade Permit
Department: Administration
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete Yes
Contact: Melissa Starke
Agenda Item Type:
Presenter: Melissa Starke
Reviewed by Staff ✓❑
Consent Agenda
Time Requested (Minutes):
License Contingency No
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
The City has received a parade permit application from the Hutchinson High School in reference to the 2025
Homecoming Parade. The Annual Homecoming Parade will be held on September 24, 2025. The parade will go from
the Middle School Parking lot on South Grade Road then along School Road to the High School parking lot. This
request requires South Grade Rd between Dale St and School Rd to be closed, School Rd between South Grade Rd
and Roberts Rd between the hours of 12:30 pm and 1:30 pm for this event. The police department has reviewed the
application and has no concerns.
BOARD ACTION REQUESTED:
Approve issuing parade permit to Hutchinson High School on September 24, 2025.
Fiscal Impact: $ 500.00 Funding Source: Police
FTE Impact: 4.00 Budget Change: No
Included in current budget: Yes
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
�r
nu i %oHINSON
A CITY ON PURPOSE. Received: 8/18/2025
111 Hassan Street Southeast
Hutchinson, MN 55350
(320) 587-5151/Fax: (320) 234-4240
City of Hutchinson
APPLICATION FOR PARADE PERMIT
(Under Ordinance, No-71.01)
All applications must be received at (past 20 a s before event in order to be considered
S ' -11 314) r 567 -�( �-(
-rr Organization Name Phone Number
#,"
Organization Address c1ty State Zi
Parade Information.
Ofl`ker Name
Residence Address
Parade Chairman Name
Phone Number
City State Zip
Phone Number
Residence Address city State
Parade Date: -���, �`�� Q�j~ Assembly Time: / d2 • "id
Location and Description of Assembly Area:
Starting Time of Parade: (, 10 P,m Estimated Time of Parade: /h�/)
Starting Point of Parade: (l [?3 _
Route of Parade Travel: 5c "i 47/ld sckw 9d AYt V
L. , i ► I .L. — . . I .4--j _ d.. , n ..
Ending Point of Parade: oqy
Approximate Number of Units, Animals, and Vehicles which will constitute Parade: '
Type and Description of Animals and Vehicles: ns�i�ls d l(IItu�1
Maximum Interval of Space to be Maintained Between Units:
Maximum Length of Parader
Minimum and Maximum Speed of Parade: MPH
Portion of Street Width Traversed: ` 14 4 k— C3s1
City ofHulrh/nson
Appllrallon for Parade Phrm/t
Page 2 of1
I.:Uu.emaAVplwwuw0-,h,ade Pcr6r. tic
I declare that the Information I have provided on this application Is truthful, and I authorize the City of Hutchinson to
investigate the information submitted.
` t 0
Signature of authofwM officer of organization or parade chairman Date
Internal Use
C
Police proved ❑ denied Signature
City Council ❑ approved ❑ denied Signature:
f
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
Consideration of a Preliminary and Final Plat for Wenwood
Agenda Item:
Department: Planning
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Dan Jochum
Agenda Item Type:
Presenter: Dan Jochum
Reviewed by Staff
Consent Agenda
Time Requested (Minutes): 5
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
The property owner is requesting to reconfigure property that has been previously platted. There
are currently three lots owned by the two applicants. The proposed plat is also three lots,
however the existing lots that contain the Wendling and Schermann homes are proposed to be
made larger through the proposed plat.
Nobody from the public spoke regarding this request. The Planning Commission voted
unanimously (6-0) to recommend approval of this request.
BOARD ACTION REQUESTED:
Approval of preliminary and final plats.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: New Bu
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source: N/A
Remaining Cost: $ 0.00 Funding Source: N/A
CITY OF HUTCHINSON
MCLEOD COUNTY, MINNESOTA
RESOLUTION NO. 15894
RESOLUTION ADOPTING FINDINGS OF FACT AND REASONS FOR APPROVAL OF A FINAL
PLAT FOR WENWOOD.
FACTS
James and Barb Wendling are the owners of property located at 715 Park Island Dr SW and 735 Park
Island Dr SW, and Bruce and Ann Schermann are the owners of property located at 705 Park Island Dr
SW.; and,
2. The subject properties are legally described as:
705 Park Island Dr SW
— Lot 1; Block 2, Stearns Woods
715 Park Island Dr SW
— Lot 2; Block 2, Stearns Woods
735 Park Island Dr SW
— Lot 3; Block 2, Stearns Woods
James and Barb Wendling along with Bruce and Ann Schermann have applied for a three -lot final plat,
located at 705, 715 and 735 Park Island Dr SW, Hutchinson, MN, to be known as Wenwood.
4. The Planning Commission met on August 19, 2025 and held a public hearing on the request and
considered the effects of the proposal on the health, safety, and welfare of the occupants of the
surrounding lands, existing and anticipated traffic conditions, and the effect on values of properties in
the surrounding area and consistency with the Comprehensive Plan, and hereby recommends approval
of the request subject to the following findings and conditions:
a. The final plat shall be recorded at the McLeod County Recorder's Office within 270 days of
approval.
b. Developer/Builder is responsible to extend City infrastructure/services to serve 735 Park Island Dr
SW (or any further subdivision of said lot).
5. The City Council of the City of Hutchinson reviewed the request at its meeting on August 26, 2025
and has considered the recommendation and findings of the Planning Commission and hereby does
recommend approval of the final plat of Wenwood subject to the following findings and conditions:
a. The final plat shall be recorded at the McLeod County Recorder's Office within 270 days of
approval.
b. Developer/Builder is responsible to extend City infrastructure/services to serve 735 Park Island Dr
SW (or any further subdivision of said lot).
APPLICABLE LAW
6. The final plat request meets the following standards as required in Sections 153.035 and 153.050-
153.051 of the City of Hutchinson Municipal Code.
CONCLUSIONS OF THE LAW
7. The requested plat is consistent with the comprehensive plan and applicable ordinances.
Findings of Fact — Resolution # 15894
Final Plat — Wenwood
Page 2
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Hutchinson, Minnesota, that the
preliminary and final plats for Wenwood is approved.
Adopted by the City Council this 26t' day of August, 2025.
ATTEST:
Matthew Jaunich
City Administrator
Gary T. Forcier
Mayor
u
FIRM
HUTCHINSON
A CITY ON PURPOSE.
DIRECTORS REPORT - PLANNING DEPARTMENT
To: Hutchinson Planning Commission
From: Dan Jochum, AICP and City of Hutchinson Planning Staff
Date: August 19, 2025
Application: Consideration of a Preliminary and Final Plat for Wenwood
Applicant: Jim and Brad Wendling and Bruce and Ann Schermann
PRELIMINARY AND FINAL PLAT FOR WENWOOD
The property owner is requesting to reconfigure property that has been previously platted.
There are currently three lots owned by the two applicants. The proposed plat is also three
lots, however the existing lots that contain the Wendling and Schermann homes are proposed
to be made larger through the proposed plat.
Indicates property described in this notice
N
o�
�g
705
-14 ----------- 735
1 715
GENERAL INFORMATION
Existing Zoning: R-1 Single -Family Residential
Property Location: 705, 715 and 735 Park Island Dr SW
Size: Varies
Existing Land Use: Single-family residential and vacant
Adjacent Zoning: R-1 and R-2
Adjacent Land Use: Residential and farmland
Comprehensive Plan: Low Density Residential
Zoning History: Platted in 2003 with Stearns Woods
Applicable Regulations: 153.035 and 153.050 Hutchinson City Code
Transportation: Park Island Drive SW
Physical Characteristics: Relatively flat
Analysis:
The proposed Wenwood Plat is a three -lot replat that reconfigures the existing lots and makes
the two lots that have homes on them larger and the lot at 735 Park Island Dr SW slightly
smaller. The lot at 735 Park Island Dr SW will need utilities extended to it to be developable.
The existing utilities are located near the end of the paved portion of Park Island Dr SW. It is
also likely that the lot at 735 Park Island Dr SW may be further subdivided in the future since it
is over 1-acre in size. All costs related to extending City services will be at the cost of the
developer/builder in the future. All of the proposed lots meet the lot size requirements of their
respective zoning districts.
Final Plat Review Criteria
After the submittal of the final plat, the Planning Commission shall recommend approval or
disapproval of the plat. Failure of the Planning Commission to act upon the final plat shall be
deemed a recommendation of approval of the plat. If plat disapproval is recommended, the
grounds for disapproval shall be stated in the records of the Planning Commission.
A plat shall not be recommended for approval unless it:
(a) Conforms to the preliminary plat;
(b) Conforms to the design standards set forth in this chapter;
(c) Conforms to the adopted Comprehensive Plan; and
(d) Is in accordance with all requirements and laws of this state.
Recommendation:
Staff recommends approval of this request.
If Planning Commission feels this Plat is acceptable the following conditions should be applied to
the final plat approval:
1. The final plat shall be recorded at the McLeod County Recorder's Office within 270
days of approval.
2. Developer/Builder is responsible to extend City infrastructure/services to serve 735
Park Island Dr SW (or any further subdivision of said lot).
I
WENW000 PRELIMINARY PLAT
i
i
-- I —4
11.4399
,= a� I
PC
- _—. "—'086 FTS li,ll
ACRESI;,nll
III - 3
ors _ �-E_���II i 49,016FT2
i I�. " 6ae:g 'gl�ll •". 1.13 ACRES
1 'M! Ib e
�2" s� � �" ,.
2 511��„
0
�
e w_:�a:�:mg�Jl.
-------����-_-�-_ __
— — — — -- —
0 III I
LEGEND
E. G. BUD & SONS, INC.
1-711 Professional Land Surveyors
9 ,m 990 5th Ave SE, Suite 2
Hutchinson, MN 55350
T.I. (320) SBT-20M
VICINITY MAP
PPRT OE SEC. O4, T- IIS, RNG 30
NORTH
/ GRAPALC SGZE
scree zH rear
MCLEOD COUMY, MIN NEM—
(NOSCALE) BENCHMARK a
DESCRIPTION OF PARCELS BEING PLATTED
Parcel ovmed bV Bruce N. S hermann & Vanessa M. Schermaaa:
- L .- z si.ARxs woods -- co°°ry m ° .1. i warn Need N°c xo Aasoaee
Parcels owned bV Ross J. Wendlmg & KVIe A. WendlmR subie& to a III
estate of lames L. Wendlmg & Barbara A Wendlmg :
wo(1),1ock iwo(1), MFMRxs woods, namtl cw°ry,Mnnesota ae-Qc 1.1 Hoc xu Ada —
Lct.,.lock 2, si.n.xs woods, naeod cwnry, nl° ... ax Q.c. Nexl Hoc. xa Aa5 —
PARCELAREA
LIT I6.Q.
—A....
T—LNR—A— .............. ..,sL..Q.. —1A—
NOTES
I
m :sew
WENW000
x9 x ...... x.x xxx„
.oF ---- -- _ �m
S5-6'z7 E
r
-- -----
9,, 43
R-�eb.e9-7 15 —
mm���x. �„v rA.�,r rvxx�,: � e- -66 w — ,I•i.'�,, �� ,�
�..�:��, .xv.x, m�, ,xmv � r,.x,� �, xm, a:.°:� a rrw,� xr �:,°:�, :�, .,.. �:� ..•�.:: ..: .....:.� ���, ,:r : zx,� ��� �� � ; �:�; �`� .�� i III I� I g s s
n
am<: �. w°xei xg eom°�o n wmai xg I � ` I B I
I ^»I
� as
e "el
sn.c or wrvrvcm*n I n. � I I B I
rnuMv or
- a....-- ---- -�-'
I e I
v nI F ocF F ur cxmm�s,�xx e.°�,.s I .if 4g� _ oo Iw a 11
SURVE
AFI
' I
- ire xo r�� I . •
N,v o -- ------
3
r�ax� N..�=s xx��r� °u°re m� ��rvx,: x ��xx. \ s x �..1�.. 1.
PLANNING WMMI5510N. GILL OF N ,CrINSON MINNF—A
�, axo,o.ox °r �xe Pxxxxg �omm�ox o�,x. R„ o, x.,�No� �xxvo,a o, a m�xx, ,xe•�� ox ,xuaor o.� ,xs —
0
Z
LERENR
GRAPHIC SCALE
ORIENTATION
i
i
i
i roressionai Lana surveyors
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
Consideration of a Conditional Use Permit for a Data Center in an 1-2 Zoning
Agenda Item: District located at 1025 5th Ave SE.
Department: Planning
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Dan Jochum
Agenda Item Type:
Presenter: Dan Jochum
Reviewed by Staff
Consent Agenda
Time Requested (Minutes): 5
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
The applicant, Anthony Levesque, is requesting a conditional use permit for a data center to be
located at 1025 5th Ave SE in an 1-2 Heavy Industry Zoning District. See attached staff report for
more information.
One member of the public spoke regarding this request and asked if the Data Center would
receive reduced utility rates. Staff noted that discussion regarding rates isn't relevant to the CUP
request as the City has no control over utility rates. The person commented about the low
number of jobs this use would create.
The Planning Commission asked questions about noise generation and the applicant noted it
would be less than Hutch Utilities generation and less than the Grain Elevator. Noise will be
within MPCA standards for an industrial use and there are no residential properties nearby.
There was a question about the proximity to the Charter school and possible noise conflicts with
the school. It was again noted that the noise will be within MPCA guidelines and should not be
an issue with surrounding properties.
The Planning Commission voted unanimously (6-0) to recommend approval of the request.
BOARD ACTION REQUESTED:
Approval of Conditional Use Permit.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: New Bu
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source: N/A
Remaining Cost: $ 0.00 Funding Source: N/A
CITY OF HUTCHINSON
MCLEOD COUNTY, MINNESOTA
RESOLUTION NO. 15895
RESOLUTION ADOPTING FINDINGS OF FACT AND REASONS FOR APPROVAL OF
CONDITIONAL USE PERK HT FOR A DATA CENTER IN AN I-2 ZONING DISTRICT LOCATED
AT 1025 5TH AVE SE.
FACTS
1. Schnel No 1 LLP is the owner of a parcel of land located at 1025 51h Ave SE, Hutchinson Minnesota;
and,
2. The subject property is legally described as: Lot 4, Block 1, First Addition to Hutchinson Industrial
District.
3. alavesque has applied to the City for a conditional use permit for a data center in an I-2 zoning district
located at 1025 5th Ave SE.
4. The Planning Commission met on August 19, 2025, and held a public hearing on the request and
considered the effects of the proposal on the health, safety, and welfare of the occupants of the
surrounding lands, existing and anticipated traffic conditions, and the effect on values of properties in
the surrounding area and consistency with the Comprehensive Plan, and hereby recommends approval
of the request subject to the following findings and conditions:
a. The proposal would meet the standards for granting a conditional use permit, subject to the
conditions stated.
b. The applicant must submit fully engineered civil site plans when applying for a building
permit.
c. The proposed building design will need to meet building code and the design and plans must
be approved by the City of Hutchinson Building Official.
d. Noise mitigation will be required to mitigate any noise the facility produces. The building
permit submittal shall include a preliminary noise analysis and methods to ensure the noise is
within MN State Standards. Once the data center is up and running a full noise study shall be
completed within 180 days to confirm facility is within MN State Standards for noise. If it
does not comply with State noise standards it shall be brought into compliance within 60 days.
e. If a generator is installed in the future it will need to meet all State of MN noise level limits.
f. The conditional use permit shall remain in effect as long as the conditions required by the
permit are observed. Any expansion or intensification of a conditional use or change to
another conditional use requires approval of a new conditional use permit.
5. The City Council of the City of Hutchinson reviewed the requested conditional use permit at its
meeting on August 26, 2025, and has considered the recommendation and findings of the Planning
Commission and hereby does recommend approval of the conditional use permit, subject to the
following findings and conditions:
a. The proposal would meet the standards for granting a conditional use permit, subject to the
conditions stated.
b. The applicant must submit fully engineered civil site plans when applying for a building
permit.
c. The proposed building design will need to meet building code and the design and plans must
be approved by the City of Hutchinson Building Official.
Findings of Fact — Resolution # 15895
1025 5' Ave SE Conditional Use Permit
Page 2
d. Noise mitigation will be required to mitigate any noise the facility produces. The building
permit submittal shall include a preliminary noise analysis and methods to ensure the noise is
within MN State Standards. Once the data center is up and running a full noise study shall be
completed within 180 days to confirm facility is within MN State Standards for noise. If it
does not comply with State noise standards it shall be brought into compliance within 60 days.
e. If a generator is installed in the future it will need to meet all State of MN noise level limits.
f. The conditional use permit shall remain in effect as long as the conditions required by the
permit are observed. Any expansion or intensification of a conditional use or change to
another conditional use requires approval of a new conditional use permit.
APPLICABLE LAW
6. The conditional use permit request meets the following standards as required in Sections 154.063 of
the City of Hutchinson Municipal Code:
(a) The proposed building or use at the particular location requested is necessary or desirable to
provide a service or a facility which is in the interest of the public convenience and will
contribute to the general welfare of the neighborhood or community;
(b) The proposed building or use will not have a substantial or undue adverse effect upon adjacent
property, the character of the neighborhood, traffic conditions, utility facilities and other matters
affecting the public health, safety and general welfare; and
(c) The proposed building or use will be designed, arranged and operated so as to permit the
development and use of neighboring property in accordance with the applicable district
regulations.
CONCLUSIONS OF THE LAW
7. The requested conditional use permit is consistent with the comprehensive plan.
8. The proposed use will not have a substantial or undue adverse effect upon adjacent property,
character of the neighborhood, traffic conditions, utility facilities and other matters affecting the
public health, safety and general welfare.
9. The proposed use will be designed, arranged and operated so as to permit the development and use of
neighboring property in accordance with the applicable district regulations
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Hutchinson, Minnesota, that the
application to issue a conditional use permit for a data center in an I-2 zoning district located at 1025 5th Ave
SE, Hutchinson MN is approved.
Adopted by the City Council this 26th day of August, 2025.
ATTEST:
Matthew Jaunich
City Administrator
Gary T. Forcier
Mayor
u
HUTCHINSON
To: Hutchinson Planning Commission
From: Dan 7ochum, AICP Planning Director
Date: August 13, 2025, for August 19, 2025, Planning Commission Meeting
Application: Consideration of a Conditional Use Permit for a Data Center in an I-2
Zoning District located at 1025 5th Ave SE
Applicant: Anthony Levesque
CONDITIONAL USE PERMIT
The applicant, Anthony Levesque, is requesting a conditional use permit for a data center
to be located at 1025 5th Ave SE in an I-2 Heavy Industry Zoning District.
" Indicates property described in this notice
5TH AVE SE
Existing Zoning:
Property Location:
Existing Land Use:
Adjacent Land Use
And Zoning:
Comprehensive
Land Use Plan:
Zoning History:
Applicable
Regulations:
Analysis and
Recommendation:
GENERAL INFORMATION
I-2 Heavy Industry
1025 5th Ave SE
Vacant
Industrial
Industrial
Property was platted in 1978 and has been
undeveloped since that time.
Section 154.068 (C), Hutchinson City Code
As the Planning Commission may recall, the Zoning Ordinance was recently amended to
allow Data Centers in Industrial Zones by Conditional Use Permit. Data Centers have
become more prevalent over the past 10-years or so due to the increased demand in
technology.
Data Centers come in many shapes and sizes. The largest ones can be 100,000 square
feet and even larger. This spring a 1.4 million square foot data center was approved
for a 70-acre site in the Twin Cities. The application in front of the Planning
Commission is for a small-scale data center. The building is proposed to be
approximately 7,200 square feet and a fenced area adjacent to the building that is
approximately 8,000 square feet that will have dry -coolers located in it. The fenced
area will likely have acoustical panels installed to keep noise contained to levels allowed
by the Minnesota Pollution Control Agency. The entire Data Center facility will need to
meet City of Hutchinson, as well as State of Minnesota regulations regarding noise
regulations and other applicable rules. Staff is recommending that a preliminary noise
analysis be completed prior to the facility opening that would utilize the design
standards of each piece of equipment to determine noise mitigation required. In
addition, staff recommends that once the facility is up and running, another noise study
be completed on -site using the actual noise the site produces to inform the study. The
results of this study would be reviewed and anything not meeting City or State
guidelines would need to addressed and mitigated so the site meets all noise
requirements. All of the noise analysis will need to be completed by a certified entity.
Staff understands a generator will not be utilized at this site for back-up power. If one
were to be used in the future it will need to meet all relevant codes and meet State of
Minnesota noise rules as well.
The site plan included with this application is a preliminary site plan. If the Conditional
Use Permit is approved fully engineered plans for the site will be required with the
building permit submittal. Staff understand that the cooling of the site will be done
with a glycol system versus chillers that use water.
There will not be a lot of employees on -site when the proposed facility is up and
running. Staff members will come in and work on equipment on an as needed basis.
City building department staff will be reviewing the Architectural plans for the project to
determine if they meet building code requirements. The building design will have to
meet all required building codes before a building permit is issued for the project.
The applicant has been working closely with Hutchinson Utilities Commission on this
project as power availability is very critical to a data center project. The property being
proposed for the data center is adjacent to a Hutchinson Utilities generation plant.
Approval of a conditional use permit (CUP) is required in order to allow a Data Center in
the I-2 Zoning District. A CUP shall be granted only if evidence is presented to establish
the following:
(a) The proposed building or use at the particular location requested is necessary
or desirable to provide a service or a facility which is in the interest of the
public convenience and will contribute to the general welfare of the
neighborhood or community;
(b) The proposed building or use will not have a substantial or undue adverse
effect upon adjacent property, the character of the neighborhood, traffic
conditions, utility facilities and other matters affecting the public health,
safety and general welfare; and
(c) The proposed building or use will be designed, arranged and operated so as
to permit the development and use of neighboring property in accordance
with the applicable district regulations.
Staff finds that the request would meet the requirements of granting a conditional use
permit (Section 154.068) and recommends approval subject to the findings and
conditions listed in the draft Resolution, including these specific conditions:
1. The proposal would meet the standards for granting a conditional use permit,
subject to the conditions stated.
2. The applicant must submit fully engineered civil site plans when applying for a
building permit.
3. The proposed building design will need to meet building code and be the design
and plans must be approved by the City of Hutchinson Building Official.
4. Noise mitigation will be required to mitigate any noise the facility produces. The
building permit submittal shall include a preliminary noise analysis and methods
to ensure the noise is within MN State Standards. Once the data center is up
5.
A
and running a full noise study shall be completed within 180 days to confirm
facility is within MN State Standards for noise. If it does not comply with State
noise standards it shall be brought into compliance within 60 days.
If a generator is installed in the future it will need to meet all State of MN noise
level limits.
The conditional use permit shall remain in effect as long as the conditions
required by the permit are observed. Any expansion or intensification of a
conditional use or change to another conditional use requires approval of a new
conditional use permit.
REF. NOTES (Oj
Owner
[�-IM Data Centers Inc.
Levesque
251 Little Falls D
Wilmington, DE 19808
Pojed Ar0itectrt
Richard Burton
333S' 21st St Suite 102
Lincoln NE 68510
0
NORTH
DRAFT SUBMITTAL
NOTFOR
CONSTRUCTION
A001
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
Consideration of a Conditional Use Permit for a Planned Development in the Shoreland Zoning
Agenda Item: District for an 81-unit apartment building in a C-3 Zoning District located at 126 Franklin St NW.
Department: Planning
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Dan Jochum
Agenda Item Type:
Presenter: Dan Jochum
Reviewed by Staff
Consent Agenda
Time Requested (Minutes): 5
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
Hutchinson — The Landing, LLC has submitted application for a Conditional Use Permit for a
Planned Development within the Shoreland District for the former Medical Center site that is
owned by the City of Hutchinson. The proposal is for an 81-unit apartment building with a
first -floor parking garage and three stories of apartment units above the parking garage for a
total of four stories.
Nobody from the Public spoke regarding this request, however the DNR provided a letter to the
Planning Commission saying that they think the City needs to amend its shoreland ordinance in
order to process this request. City Planner Jochum and City Attorney Sebora noted that upper
level apartments are allowed by right in the C-3 Zoning District this property is located in and that
doing the CUP process is allowing an extra layer of review for the Planning Commission and
residents to have an opportunity to speak if they would like. The City of Hutchinson is the
regulatory governmental unit (RGU) for this project and is confident we are interpreting the
ordinance correctly and that this project can be done without amending the zoning ordinance.
The Planning Commission discussed the importance of this project to the health of Downtown
Hutchinson and the improvement to the site that would be made if this project moved forward
compared to existing and past conditions on the site.
The Planning Commission voted unanimously (6-0) to recommend approval of the request.
BOARD ACTION REQUESTED:
Approval of Conditional Use Permit.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: New Bu
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source: N/A
Remaining Cost: $ 0.00 Funding Source: N/A
CITY OF HUTCHINSON
MCLEOD COUNTY, MINNESOTA
RESOLUTION NO. 15896
RESOLUTION ADOPTING FINDINGS OF FACT AND REASONS FOR APPROVAL OF
CONDITIONAL USE PERMIT FOR A PLANNED DEVELOPMENT IN THE SHORELAND
DISTRICT FOR AN 81-UNIT APARTMENT BUILDING IN A C-3 ZONING DISTRICT LOCATED
AT 126 FRANKLIN ST NW.
FACTS
The City of Hutchinson is the owner of property located at 126 Franklin St NW, 135 and 145 1st Ave
NW, 125, 135 and 145 Glen St NW, Hutchinson Minnesota; and,
2. The subject property is legally described as:
126 Franklin St NW — Lots 1-2-3-4-5; Block 41, Townsite of Hutchinson North Half
135 1st Ave NW —
East '/2 of Lots 607, Block 41, Townsite of Hutchinson North Half
145 1st Ave NW —
West'/2 of Lots 607, Block 41, Townsite of Hutchinson North Half
125 Glen St NW
— Lot 8, Block 41, Townsite of Hutchinson North Half
135 Glen St NW
— Lot 9, Block 41, Townsite of Hutchinson North Half
145 Glen St NW
— Lot 10, Block 41, Townsite of Hutchinson North Half
3. The Landing — Hutchinson, LLC has applied to the City for a conditional use permit for a Planned
Development in the Shoreland Zoning District for an 81-unit apartment building in a C-3 Zoning
District located at 126 Franklin St NW, 135-145 lst Ave NW and 125-135-145 Glen St NW.
4. The Planning Commission met on August 19, 2025, and held a public hearing on the request and
considered the effects of the proposal on the health, safety, and welfare of the occupants of the
surrounding lands, existing and anticipated traffic conditions, and the effect on values of properties in
the surrounding area and consistency with the Comprehensive Plan, and hereby recommends approval
of the request subject to the following findings and conditions:
a. The proposed project is consistent with the Comprehensive Plan, as well as the Downtown
Plans for the City.
b. The proposed land uses, densities and values are needed to make the redevelopment of the site
financially feasible.
c. The redevelopment of the site will remove an incompatible, obsolete and blighted vacant land
area from the area.
d. The proposed redevelopment will improve land use, and environmental conditions for this site
over existing conditions related to public safety, flood protection, storm water management and
storm water and ground water quality and shoreland impact zone protections.
e. The City has reviewed the grading plans and understands more than 1,000 cubic yards or fill
will be removed and is approved per this Conditional Use Permit and the signed Engineered
plans received by the City.
f. The engineered plans designate the FEMA floodplain; however, DNR recommends the plans
include the floodway boundary. As proposed work is near the floodway boundary for Otter
Lake, it would be beneficial to have it clearly marked on the plans. In addition, DNR
recommends the floodway boundary be staked during the construction phase of the project to
prevent encroachment into the floodway. Any work within the floodway would require
additional review, permitting, no rise certification, etc.
Findings of Fact — Resolution # 15896
The Landing Conditional Use Permit
Page 2
g. A sidewalk is required on the south side of the building per the site plan approval
recommendations in April, 2025.
h. A formal development agreement will need to be entered into between the City and the
Developer for this project.
i. All required variances, building permits and any other required local, state or federal permits
must be obtained prior to the issuance of a building permit for the project.
5. The City Council of the City of Hutchinson reviewed the requested conditional use permit at its
meeting on August 26, 2025, and has considered the recommendation and findings of the Planning
Commission and hereby does recommend approval of the conditional use permit, subject to the
following findings and conditions:
a. The proposed project is consistent with the Comprehensive Plan, as well as the Downtown
Plans for the City.
b. The proposed land uses, densities and values are needed to make the redevelopment of the site
financially feasible.
c. The redevelopment of the site will remove an incompatible, obsolete and blighted vacant land
area from the area.
d. The proposed redevelopment will improve land use, and environmental conditions for this site
over existing conditions related to public safety, flood protection, storm water management and
storm water and ground water quality and shoreland impact zone protections.
e. The City has reviewed the grading plans and understands more than 1,000 cubic yards or fill
will be removed and is approved per this Conditional Use Permit and the signed Engineered
plans received by the City.
f. The engineered plans designate the FEMA floodplain; however, DNR recommends the plans
include the floodway boundary. As proposed work is near the floodway boundary for Otter
Lake, it would be beneficial to have it clearly marked on the plans. In addition, DNR
recommends the floodway boundary be staked during the construction phase of the project to
prevent encroachment into the floodway. Any work within the floodway would require
additional review, permitting, no rise certification, etc.
g. A sidewalk is required on the south side of the building per the site plan approval
recommendations in April, 2025.
h. A formal development agreement will need to be entered into between the City and the
Developer for this project.
i. All required variances, building permits and any other required local, state or federal permits
must be obtained prior to the issuance of a building permit for the project.
APPLICABLE LAW
6. The conditional use permit request meets the following standards as required in Sections 152.090-
152.096 and 154.063 of the City of Hutchinson Municipal Code:
(a) The proposed building or use at the particular location requested is necessary or desirable to
provide a service or a facility which is in the interest of the public convenience and will
contribute to the general welfare of the neighborhood or community;
(b) The proposed building or use will not have a substantial or undue adverse effect upon adjacent
property, the character of the neighborhood, traffic conditions, utility facilities and other matters
affecting the public health, safety and general welfare; and
Findings of Fact — Resolution # 15896
The Landing Conditional Use Permit
Page 3
(c) The proposed building or use will be designed, arranged and operated so as to permit the
development and use of neighboring property in accordance with the applicable district
regulations.
CONCLUSIONS OF THE LAW
7. The requested conditional use permit is consistent with the comprehensive plan.
8. The proposed use will not have a substantial or undue adverse effect upon adjacent property,
character of the neighborhood, traffic conditions, utility facilities and other matters affecting the
public health, safety and general welfare.
9. The proposed use will be designed, arranged and operated so as to permit the development and use of
neighboring property in accordance with the applicable district regulations
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Hutchinson, Minnesota, that the
application to issue a conditional use permit for planned Development in a Shoreland Zoning District for an 81-
unit apartment building in a C-3 Zoning District located at 126 Franklin St NW, 135-145 1st Ave NW and 125-
135-145 Glen St NW, Hutchinson MN is approved.
Adopted by the City Council this 26th day of August, 2025.
ATTEST:
Matthew Jaunich
City Administrator
Gary T. Forcier
Mayor
u
FIRM
HUTCHINSON
A CITY ON PURPOSE.
DIRECTORS REPORT - PLANNING DEPARTMENT
To: Hutchinson Planning Commission
From: Dan 7ochum, AICP
Date: August 19, 2025
Application: The Landing Project Conditional Use Permit
Applicant: Hutchinson — The Landing, LLC
Owner: City of Hutchinson
Background:
Hutchinson — The Landing, LLC has submitted application for a Conditional Use Permit for a
Planned Development within the Shoreland District for the former Medical Center site that is
owned by the City of Hutchinson. The proposal is for an 81-unit apartment building with a first -
floor parking garage and three stories of apartment units above the parking garage for a total of
four stories.
�Intlicates property described in this
notice
* 145
CEDAR AVE NW
7k 135
... z
Z
�^ z
117
�t 125
- —_-
z
Z
J
-
FIRST AVE
NW
-�
GENERAL INFORMATION
Existing Zoning:
C-3 Downtown Commercial
Property Location:
135/145 151 Ave NW — 125, 135, 145 Glen St NW.
Existing Land Use:
Vacant — former single-family homes/medical center
Adjacent Land Use/Zoning:
Commercial and Residential
Downtown Plan:
Multi -family redevelopment
Zoning History:
Single-family homes built in 1930s-1950s were
bought by the City a few years ago and demolished
for redevelopment.
Applicable Regulations:
Sections 152.090-152.096 of City Code
Background:
The 2013 Downtown Plan for Hutchinson identified the former Medical Center property for
redevelopment due to it being a blighted property within the Downtown area. The City/EDA
acquired the property shortly after the 2013 Downtown Plan was completed and razed the
blighted building. The City applied for a FEMA grant for the portions of this site that were
within the 100-year floodplain and received a grant to have the homes from the 100-year
floodplain removed. The City/EDA acquired the rest of the homes on the block that were out of
the 100-year floodplain for the purposes of a redevelopment project that would be consistent
with the vision of the 2013 and 2024 Downtown Plans. For the past 8-10 years the City/EDA
have sought to create a public sector/private sector partnership that could make the
redevelopment of the former Medical Center site a reality.
In 2021 the EDA entered into an agreement with a private developer to redevelop the site into
an apartment complex. A concept plan was approved by the City for the project. Due to
economic conditions at the time the developer decided not to move forward with the project
and the EDA started marketing the site to developers once again. Since 2021 several other
developers have been interested in a project on this site; however projected project costs have
been too substantial for the private sector to absorb alone.
Over the past nine months or so the City/EDA has been working with Hutchinson — The
Landing, LLC on plans to redevelop the site. Two other developers submitted proposals to the
EDA for the project and Hutchinson — The Landing, LLC was chosen for the project. The
City/EDA has been working closely with the developer on coming up with a project that will be
feasible for the site. A concept/site plan was approved by the City in April of 2025. The project
will need to be supported by a Tax Increment Financing (TIF) District in order for this site to be
redeveloped. Unfortunately, without TIF a development project on this site does not appear to
be feasible.
At this time the developer is proposing an 81-unit apartment building that will include first floor
inside parking and three -stories of apartment units above. The 81 units is a slight increase
from the concept plan that had 79 units. In order for this project to be financially feasible for
the developer a minimum of 81 units are needed or the financials do not work.
As noted above the following items have been approved for this project previously:
• Site plan approval — April 2025
• Rezoning of Western half of site — April 2025
The following have been applied for by the developer for consideration this month:
• Variances
• Conditional Use Permit for a Planned Development within the Shoreland District
Conditional Use Permit for Planned Development:
A Commercial Planned Development is required for a project like this per the City Shoreland
Management Ordinance. Commercial Planned developments (PDs) are allowed for new projects
on undeveloped land, redevelopment of previously -built sites or conversions of existing
buildings and land.
The applicant has applied for a Conditional Use Permit for a Commercial Planned Development
for the proposed project. The project is proposed to be an 81-unit apartment building that
features first floor parking and three -stories of apartment units above. The building footprint is
28,803 square feet. The entire site area for the project is approximately 92,590 square feet.
Development Plan
The concept plan approved in April 2025 was for a 79-unit apartment complex that featured 1st
floor parking and three -stories of apartment units above. The current proposal is the same
amount of total square footage but the unit mix was adjusted slightly and is now proposed to
be 81-units. The site also has a large stormwater pond to treat all of the run-off from the
development site and a portion of Glen St NW which will improve water quality.
Land Use Analysis
The high -density residential project was chosen by the City for the following reasons.
The cost of redevelopment includes property acquisition, building demolition and
removal, soil corrections, site grading, site storm -water management and utilities. A
preliminary financial analysis of this project shows that the proposed density and values
of the apartment building will provide sufficient tax revenues to allow the project to
financially break even. The redevelopment project's density and building values are
needed to generate revenues through Tax Increment Financing (TIF) to make the
overall site redevelopment financially feasible. Alternative land uses likely cannot
generate the tax base needed to make the redevelopment feasible.
Over the years the City has examined alternative residential land uses for the site
including lower density homes, twin -homes and townhomes, and found that these land
uses do not provide the needed values to make redevelopment financially feasible. A
lower density housing project would have had a significant project deficit that would not
have allowed those types of projects to be feasible.
If the City were to develop the property into park/open space the entire cost of
redevelopment would fall to the City without any revenue in return to cover the costs of
improvements. This would have the potential to burden City finances, including the
potential for property tax levy increases.
2. Based on the City's most recent housing study, the City needs a variety of housing types
to fill the need we have in all sectors of housing. The latest data indicates the City has a
rental vacancy rate of about 2%, which is much lower than the recommended 5% or
more. This 81-unit apartment will be an attractive, high amenity apartment building
that is not currently available in Hutchinson.
3. The project site located on the NW side of Downtown Hutchinson and near all of the
recreational trails and open space along the Crow River offers a great setting that can
be an asset to Downtown Hutchinson and provide much needed housing for Hutchinson.
4. The proposed projects proximity to Downtown provides convenient market support for
downtown businesses. Studies have shown that having healthy residential
neighborhoods in and adjacent to downtown are what make a successful downtown.
5. The project is intended to make the missing connection between Girl Scout Park and
Cedar Park. This was identified in each of the last two Downtown Plan's the City
adopted. Additionally, significant private money has been raised so re -install the river
fountain near this location and this project will facilitate the trail that will allow better
access to the river for views of the fountain.
6. The project also establishes a comprehensive storm drainage collection and treatment
for the area to ensure untreated stormwater is not going into the River.
Building Location
The building meets the required 50-foot shoreline building setback. The building will be
approximately 75' from the north lot line of the single-family homes located to the south and
approximately 125' from the east property line of the single-family home to the west.
One half of the required 50-foot Shoreland Overlay District building setback is defined as the
shoreline impact zone. The City cleaned all of this area up including removal of dead trees and
invasive species. The project also included shoreline stabilization and restoration to reduce
erosion along the riverbank.
The building is setback very close to the street on the south and east side to fit the character of
a downtown building. This is consistent with the Downtown Plan concepts for this site.
The site plan also provides green space and extensive landscaping to provide additional
screening and separation between the apartment building and single-family homes.
The apartment has an outdoor recreational area for residents on the river side (north) of the
building as well as the small dog park area on the west side of the building. The stormwater
pond will be located on the NW portion of the lot and will also provide buffering of the building
from the single-family neighborhood to the west.
The City will be installing a public trail on the north side of the building between the building
and the river that will connect Girl Scout Park and Cedar Park. There will be sidewalk around
the building to provide connection to the Downtown and surrounding neighborhoods. Staff
would like to note there isn't a sidewalk shown on south side of the building but one should be
included.
Project Density
Based on the Shoreland Ordinance and guidance by the DNR, this type of project needs to be
administered as a Conditional Use Permit for a Planned Development. The shoreland ordinance
requires a base density evaluation to be completed to determine how many units can go on the
site.
Base Density Evaluation/Tier Analysis
The total site area is 92,590 square feet. Tier 1 is 56,120 square feet and tier 2 is 36,470
square feet. The average unit size square footage is 931 square feet and is needed for the
density calculation. The unit size is converted to a floor area ratio (FAR) that plugs into the
calculation. The floor area ratio is the percentage of the total square footage that can be
utilized for a building. The calculation is below:
Tier 1 Suitable Area 50,843 square feet X .099 (floor area ratio) = 5,033 square feet available.
Tier 2 Suitable Area 36,470 square feet X .099 (floor area ratio) = 3,610 square feet available.
Tier 1 Allowable Dwelling Units calculation 5,033 square feet/931 square feet (average
dwelling size) = 5.4 Units
Tier 2 Allowable Dwelling Units calculation 3,610 square feet/931 square feet (average
dwelling size) = 3.9 Units
Total Dwelling Units Allowed per tier analysis = 9.3 Units.
The calculation of allowable density based on the base density evaluation in the shoreland
ordinance would allow a total of 9.3 apartment units on the entire site. The density count is
below the project needed unit count of 81 to make the project economically viable. For
context, previously there were five single-family homes and the medical center building on the
site. The 81-units over the 2.126 acres is 38 units per acre. Additionally, Park Towers located
on the southern edge of Downtown Hutchinson is 1.63 acres and 62 units per acre. The
density proposed of 38 units per acre is typical for a 'downtown" housing project and is
significantly less than both Park Towers and Evergreen Apartments downtown.
As the Planning Commission is aware there are two variance requests for this project is also on
the agenda for consideration this evening and is on the agenda prior to this CUP application. If
the variance isn't approved the CUP request should be denied due to the fact that the project
cannot be built without the variance. If the variance requests are approved the request for a
CUP can move forward if the Planning Commission wishes to approve it.
Environmental Review
The Shoreland Ordnance indicates that Commercial Planned Developments are required to go
through an environmental review process called an Environmental Assessment Worksheet
(EAW). In December of 2024 the City self -certified the City of Hutchinson Comprehensive Plan
and related documents so that an EAW is not required for attached housing projects of 375
units or less and detached housing projects of 250 units or less. The City received approval
that the documents were accepted and we were self -certified in December, 2024.
Similar Proiects in Shoreland Areas
There are several communities throughout the State that have done similar size/scale/density
projects within Shoreland Areas. There are similar projects in Delano, Victoria, Chaska,
Excelsior, Mound, Spring Park and many other communities. There is a Senior Living Facility in
Silver Lake that is multi -unit building right on the lake. Based on staff review of project sites in
these communities it appears all of these projects have significantly higher density than what
the shoreland ordinance would allow. Based on staff research some projects received
variances, while it appears others were built without following any Shoreland rules. In general,
there appears to be a lot of inconsistency on how these types of projects are reviewed and
approved throughout the State.
Floodplain Considerations
Per the City Floodplain Ordinance, a Conditional Use Permit is required for the moving of more
than 1,000 cubic yards of material within the Floodplain, unless it is used to elevate a building
out of the regulatory flood protection elevation. It is the intention of the City to include the
conditions for moving more than 1,000 cubic yards of fill within this Conditional Use Permit.
The conditions will be noted below at the end of the report.
Consistency with Local Plans
The project is consistent with the Hutchinson Downtown Plan adopted in 2024.
.y.- 1--
_J rJog
Figure 12023 Downtown Plan Concept
The 2023 Downtown Plan noted that Downtown Hutchinson needs more residents to support
Downtown so that retail stores, restaurants/entertainment establishments remain viable or grow
stronger. This site provided the best opportunity to bring a project into Downtown Hutchinson
because the City already owned the entire block. The City and EDA were looking fora high -
quality project that would enhance Downtown Hutchinson and chose to work with GC Real
Estate Partners because of their experience with similar high -quality projects in the area
(W111mar and Litchfield). In order to best maximize the site and to get a high -quality project
with more amenities than usual (parking garage, roof -top patio, nverfront patio, better building
Anishes) the project needs to have a minimum of81-units to make the project financially
feasible. The 81-units also meet the City's goal of adding more people that are going to live,
work, shop and recreate in Downtown Hutchinson. The project is going to have a flat roof to
have a 'downtown" look and feel similar to many of the existing downtown buildings.
Recommendation:
Staff recommends approval of the Conditional Use Permit with the following findings and
conditions:
1. The proposed project is consistent with the Comprehensive Plan, as well as the
Downtown Plans for the City.
2. The proposed land uses, densities and values are needed to make the redevelopment
of the site financially feasible.
3. The redevelopment of the site will remove an incompatible, obsolete and blighted
vacant land area from the area.
4. The proposed redevelopment will improve land use, and environmental conditions for
this site over existing conditions related to public safety, flood protection, storm water
management and storm water and ground water quality and shoreland impact zone
protections.
5. The City has reviewed the grading plans and understands more than 1,000 cubic yards
of fill will be moved and is approved per this Conditional Use Permit and the signed
Engineered plans received by the City.
6. The engineered plans designate the FEMA floodplain; however, DNR recommends
the plans include the floodway boundary. As proposed work is near the floodway
boundary for Otter Lake, it would be beneficial to have it clearly marked on the
plans. In addition, DNR recommends the floodway boundary be staked during the
construction phase of the project to prevent encroachment into the floodway. Any
work within the floodway would require additional review, permitting, no rise
certification, etc.
7. A sidewalk is required on the south side of the building per the site plan approval
recommendations in April, 2025.
8. A formal development agreement will need to be entered into between the City and
the Developer for this project.
9. All required variances, building permits and any other required local, state or federal
permits must be obtained prior to the issuance of a building permit for the project.
11
C- RIVER GENERAL SITE NOTES
--77-
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ------- .....
SITE KEYNOTES
ED SITE DETAILS (SI-0X)Q
8%DNEU TS
FFE
L- - - - - -
OM A=
(P-E =H STREE�
FOR PERMIT APPROVAL
THE [RHOING
NUTCHINS ON, MN
REAL ESTATE �� """I
0"
COLE GROUP
11 111
11111,
11
mom!I ARCH ITECTS
PARTNERS �� LumberOneAvon ' ' ' '
216 Park Avenue S., Suite 102 • St. Cloud, MN 5=1
PhOn (3 )65465Jo Fax:(-)-65Jo
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
Consideration of a Lot Split located at 951 Golf Course Rd NW
Agenda Item:
Department: Planning
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Dan Jochum
Agenda Item Type:
Presenter: Dan Jochum
Reviewed by Staff
Consent Agenda
Time Requested (Minutes): 5
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
The property owner is requesting a lot split of 951 Golf Course Rd NW. This is a 9.88-acre
parcel that is proposed to be split into two parcels. The southerly parcel will have the existing
home located on it and the northerly parcel will have the area to the north of the home. The lot
split will create two parcels. The property is zoned R-1 Residential and both proposed lots will
meet the lot size requirements of the R-1 Zoning District. If either of the two lots that are created
by this lot split are proposed to be further subdivided a plat will be required.
A public hearing was not required for this request but one neighbor requested to address the
Planning Commission and asked about drainage of their property onto the Bullert property. Staff
noted this is simply a lot split application and drainage is not something that is reviewed or as
part of a simple lot split application.
The Planning Commission did not have any questions regarding the request and unanimously
recommended approval of the request.
BOARD ACTION REQUESTED:
Approval of lot split.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: New Bu
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source: N/A
Remaining Cost: $ 0.00 Funding Source: N/A
CITY OF HUTCHINSON
MCLEOD COUNTY, MINNESOTA
RESOLUTION NO. 15898
RESOLUTION ADOPTING FINDINGS OF FACT AND REASONS FOR APPROVAL OF A LOT
SPLIT AT 951 GOLF COURSE RD NW.
FACTS
1. Bullert Revocable Family Trust is the owner of land located at 951 Golf Course Rd NW, Hutchinson.
2. The subject property is legally described as: 10.68 AC (.399 AC ROAD R/O/W) OF NE 1/4 NW 1/4
FULL LEGAL: Beginning at the Southeast corner of the Northeast quarter of the Northwest quarter
(NE 1/4 of NW 1/4) of Section36, Township 117, Range 30; thence West 1 chain, thence North 31 1/2
degrees West 4 and 1/2 chains, thence North 24 1/2 degrees West 8 chains, thence North 11 degrees
West 7.93 chains to the Section line; thence East 8.65 chains, thence South 20 chains to the place of
beginning, containing 11 acres, more or less, McLeod County Minnesota, EXCEPTING
THEREFROM all the land described as Parcels No. 2 and 2A of Right -of -Way Plat No. 4. (10.68 AC
(.399 AC ROAD R/O/W) OF NE 1/4 NW 1/4 SECTION 36-117-30)
Mark and Lora Bullert have applied to the City for a lot split to create two parcels at 951 Golf Course
Rd NW.
4. The Planning Commission met on August 19, 2025, and held a public hearing on the request and
considered the effects of the proposal on the health, safety, and welfare of the occupants of the
surrounding lands, existing and anticipated traffic conditions, and the effect on values of properties in
the surrounding area and consistency with the Comprehensive Plan, and hereby recommends approval
of the request subject to the following findings and conditions:
a. The applicant shall record the lot split with McLeod County.
b. Future subdivision will require a plat.
c. Any future development proposals shall go through the appropriate approval process with the
City of Hutchinson.
d. All assessments must be paid prior to the lot split being recorded.
5. The City Council of the City of Hutchinson reviewed the requested lot split at its meeting on February
27, 2024, and has considered the recommendation and findings of the Planning Commission and
hereby does recommend approval of the lot split, subject to the following findings and conditions:
a. The applicant shall record the lot split with McLeod County.
b. Future subdivision will require a plat.
c. Any future development proposals shall go through the appropriate approval process with the
City of Hutchinson.
d. All assessments must be paid prior to the lot split being recorded.
APPLICABLE LAW
6. The lot split request meets the standards as required in Section 153.005 of the City of Hutchinson
Municipal Code, Subdivision Control.
Findings of Fact — Resolution # 15898
951 Golf Course Rd NW, Lot Split
Page 2
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Hutchinson, Minnesota, that the
application to issue a lot split at 951 Golf Course Rd NW to Mark and Lora Bullert is approved.
Adopted by the City Council this 26t' day of August, 2025.
ATTEST:
Matthew Jaunich
City Administrator
Gary T. Forcier
Mayor
u
FIRM
HUTCHINSON
A CITY ON PURPOSE.
DIRECTORS REPORT - PLANNING DEPARTMENT
To: Hutchinson Planning Commission
From: Dan 7ochum, AICP and City of Hutchinson Planning Staff
Date: August 19, 2025
Application: Consideration of a Lot Split Located at 951 Golf Course Rd NW,
Hutchinson.
Applicant: Mark and Lora Bullert
Lot Split:
The property owner is requesting a lot split of 951 Golf Course Rd NW. This is a 9.88-acre
parcel that is proposed to be split into two parcels. The southerly parcel will have the existing
home located on it and the northerly parcel will have the area to the north of the home. The
lot split will create two parcels. The property is zoned R-1 Residential and both proposed lots
will meet the lot size requirements of the R-1 Zoning District. If either of the two lots that are
created by this lot split are proposed to be further subdivided a plat will be required.
" Indicates property described in this
_ 12T-ENW
notice - f
r
-
I
I c
k
9
f
V r"
z 951
1V4�
°
GENERAL INFORMATION
Existing Zoning: R-1 Medium Density Residential
Property Location: 951 Golf Course Road NW
Lot Size: Proposed Southerly Parcel 2.68 acres
Proposed Northerly Parcel 8.48 acres
Existing Land Use: Single-family home and open space
Adjacent Land Use: Residential and open space
Adjacent Zoning: R-1 Residential, R-2 Residential and R-2 PD
Comprehensive Plan: Low Density Residential
Zoning History: None on file. Home was built when the property was located
outside of City limits.
Applicable
Regulations: Section 153.005
Analysis:
The existing home will remain. The northerly parcel will be marketed for sale for by the current
owners. Any future subdivision of either lot will be required to go through the City platting
process. Any future development plans would have to be reviewed and approved by the City
through the appropriate planning and review process.
Recommendation:
Staff recommends approval of the lot split with the following conditions:
1. The applicant shall record the lot split with McLeod County.
2. Future subdivision will require a plat.
3. Any future development proposals shall go through the appropriate approval process
with the City of Hutchinson.
4. All assessment must be paid prior to the lot split being recorded.
BOUNDARY SURVEY
-for- Mark & Lora Bullert
-of- 951 Golf Course Road NW,
Hutchinson, MN
l
NORTH
GRAPHIC SCALE
sr•.: zW raar
LEGEND
0 DENOTES I0.IX1 MOHUHEM SET Map(EO a'S.5]56652)OS
---- DENOTES RULLOIxc SERAC%ESNE
f —Yp�- DENOTES WET 1PND
1 C1NIN � 66 FEET
1 i 12M AVENLE NW ..
.ecpl
1 {1�
1
1
Yes
1 �
111
llllll 1 � 11
\
MATES
NdE wrvey wx cpmgsee M E.G. RW ,rrE Son, Irt m 6/1)/20N.
Reenrys Mwwe an baw m [M MSed Co. C— Sys. NaD 93 (96
PorcY ID NumOr� z3.0]6.5)00.
�, a �w w �.a aMw[ ma M6rrt eruM wm�. mnnw,.l..w,wn:.
�/ n mw Man n,o:.� Ate. wrverewwtt
w ,.weave r«.ate......x en. min ,a.r:tw ro�ry
TM.xtax, d M..%�Mm9 ewAa-war tl cax e«ae. Reee aM ]nM1.—, we ewe n.
TM CRY d MRM MonMf en Npemer%fw— Case Rwe Mat appnrs w M roeE
6 Wrrts wNl. MMM�9rnr�t wx a �gvwa[atl Ex,tl on HpcwR PIT sM fwM
.y monu.�rM1s. wn am on M Iattr aM an Nwnn x
YAK% CM A
8.48 ACRES TOTAL
7.4t ACRES EXCLUDING R/W
PARCEL B
2.68 ACRES TOTAL
2,6t ACRES EXCLUDING R/W
I1
t1 Tv
9�
RECORD DESCRIPTION PER W.D. DOC. #449285
Dq v�p ,c tM S tw
n w 9IMnatiwr-voW31,
acYv 1q tip31, twm.n, wEzr cdevTt�MlNs�NTOMM1EMREMVRwQuM.n rM.Ma .It.Mm1n Nad..Mmvlw :Qxwvarz4 +tMad w112
wawF.liw).93ww te.bsMsn o m1sxz ' MwMuelroze.baI
r
s.....
. 6
[
PARCEL Ar PROPOSED DESCRIPTION '
+Mt p,rc d tM tr,« ex<�Ma blow we9 wrc a tM NwtMxt QN.,tr tl tM N„Mwxt Qe.rcr d s.c«„ 36, raw«nv 21), Rw9e 30, Md.pa coNvtr. nRRx«,, ry�a9 irrM,m a, taw wreertr Ne.r«e t0 x 1,w ♦.
Bgmirp MtM SwrtMxt cwrwrd[M Nw1Qu.rtrd[M NprtnwntQwrtrdSeca«36, TownM�p11).Ra•pe 30,[M1rre west1 Win,Vain wrM 311I2 crepe«west. aM 1n Msrc,Mince N«M 2a In OpmF WxtIdvi�w.[Mw NaM 116,9rae+Wxt ).93 Mum mtM SeM«Fee; Merce Ead
e.65 swn, tMrce Sw%n 20 Mrrs [p tM Platt— d pey mMvrxrp 11 crux, more or Ix,, MCL,pO CwMy, Muxw«e, E%C£pTING THEREFROM DA lMt bM dsmbW x Porm4 M. 2 aM 2Ad RgMM-waY Plat fx. a.
1w A, tlxcn0atlxftllows: C «wrdsaa Nortnwxt Qurtr dead Srnan 36; tnrre,anMm abrp Me,xtAMdwO NOMwxt Quercr 650.591eM to Me Mw deegn«e9I sa�tlDm A; tlwra soutnwrteur dAlrt��p ta[M ngM 59 spree 25 muwtx 09 secamadrtarae of
a5.63 reM, inert «kss, t9 MeweHwry rsw d tM1e abwietEesmEetl hxt aM seE Dee A pre temu,utup.
I nrW vntr ttwt trx wrvev. W a
TM, r,a m«,e. e.ae.are,,m«.wNaa. ,Rd n,wnd ro,Rv «w •n e...ew,<vd.ra.a err�rzwaa«wr, ey m. ar •.w
PARCEL BA PROPOSED DESCRIPTION ai awar a'a asa w«wa«
v. Nwi dtM state d Min�w«a.
TMt� d M. tr,a aecnlrM wow Nre9 wrz dM. rorznesat QNarcr d uw Nwenw.c pa..t.. er srnw. 36, )owRlw 11), Rrp. ]9, Me.w c«,Mv. McM,m,, Mav
wu[ yuf,OM wrMrtr bmtlwas Uw A.
Re9«.M at [M SoutMaM miner d tM 19ortMmt urts or tM Natnwxt Quests d Ssuon ]6, Townnp IS). Rage 30, thence Wes[ 1 Mwn, Mrre NortM1 311n tlep.n K1MT D. NE
Q
E �.. `� We eeM1/zMrs,MexeNorm2alnE «eeW ratluim,t s eNrcnlld«.ewart).93Mem wtMSeaamine;MareEx e.65Mrn.l� ceSdM20Cwin
■/) tp Me plan d 6epwwp, r«rrmrp 11 a«es. mort w Ns,. Ma.eoE Crmtr, W mesa, E%CEI'<ING TNPtEFR[lM ep tNt lutl aecnws a Rrceh ft. 2 aM 2A d R.g -Wry
Professional Land Surveyors -..4.
990 5th Ave SE Suite 2 a faawa « mr pxM.MM., min. d �N«M MQ.rz. d «as.�,m36:tMr. w.n.rcYaM 9tM.a ewd .6Nwawx Q r n
wwr-e9Maeem 91e�n 1. tM1e pwnt d beprvrq N s d Nr�e A; tMrce sautnw—y eeflen W w tM nol 59 Oe9rex YS mrMs 09 s,cwtla a tlMsre d 3e5.63 teR. mwe w less. to Me
Hutchinson, MN 55350 : 5rylMdw.6p.nM6t� 9. — —;
Tea. (320) 587-2025 Tde tray rptxrre a6e .de, Rwre or wa. w N ewwrz w .nv •m xl ..,«n.m, d.«wb.
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
Consideration of Variances for The Landing project located at 126 Franklin St SE
Agenda Item:
Department: Planning
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Dan Jochum
Agenda Item Type:
Presenter: Dan Jochum
Reviewed by Staff
Consent Agenda
Time Requested (Minutes): 5
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
Hutchinson — The Landing, LLC is requesting two variances for the proposed Landing project
located on the former Medical Center site in Downtown Hutchinson. The first request is to
exceed the residential unit density allowable under 152.094 of Hutchinson City Code and the
second is to deviate from the minimum open space and design criteria under 152.095 of
Hutchinson City Code.
Nobody from the Public spoke regarding this request. The Planning Commission discussed that
they felt these two variances meet the requirement to grant a variance and discussed findings to
support the variance.
The Planning Commission voted unanimously (6-0) to recommend approval of both variances
been requested by the applicant. See the findings of fact resolution attached below for the finds
to support the issuance of the variances.
BOARD ACTION REQUESTED:
Approval of both variances requested by the applicant.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: New Bu
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source: N/A
Remaining Cost: $ 0.00 Funding Source: N/A
CITY OF HUTCHINSON
MCLEOD COUNTY, MINNESOTA
RESOLUTION NO. 15899
RESOLUTION ADOPTING FINDINGS OF FACT AND REASONS FOR APPROVAL
OF A VARIANCE APPLICATION TO EXCEED THE RESIDENTIAL UNIT DENSITY
ALLOWABLE AND TO DEVIATE FROM THE MINIMUM OPEN SPACE AND
DESIGN CRITERIA FOR THE LANDING LOCATED AT 134/145 1ST AVE NW,
125/135/145 GLEN ST NW AND 126 FRANKLIN ST NW.
FACTS
1. The City of Hutchinson is the owner of property located at 126 Franklin St NW, 135
and 145 1st Ave NW, 125, 135 and 145 Glen St NW, Hutchinson Minnesota; and,
2. The subject property is legally described as:
126 Franklin St NW — Lots 1-2-3-4-5; Block 41, Townsite of Hutchinson North Half
135 1st Ave NW —
East'/2 of Lots 607, Block 41, Townsite of Hutchinson North Half
145 1st Ave NW —
West'/2 of Lots 607, Block 41, Townsite of Hutchinson North Half
125 Glen St NW
— Lot 8, Block 41, Townsite of Hutchinson North Half
135 Glen St NW
— Lot 9, Block 41, Townsite of Hutchinson North Half
145 Glen St NW
— Lot 10, Block 41, Townsite of Hutchinson North Half
3. Hutchinson -The Landing, LLC is the applicant for a variance to exceed the residential
unit density allowable under 152.094 of Hutchinson City Code and to deviate from the
minimum open space and design criteria under 152.095 of Hutchinson City Code.
4. The property is located in the C-3 (Downtown Commercial) Zoning District.
5. The proposal would vary from Section 152.094 and 152.095 in that exceed the
residential unit density and deviate from the minimum open space and design criteria.
6. Following a public hearing on the application, the City of Hutchinson Planning
Commission has recommended approval of the variance on August 19, 2025 with the
following findings:
a. The variance requests are in harmony with the purposes and intent of the ordinance.
b. The proposed variance is consistent with the Comprehensive Plan and other adopted
Hutchinson Downtown Plans.
c. The applicant's request to use the property as an apartment building in a downtown
area is reasonable.
d. The property is unique due to its backward "L" shape and being within the FEMA
floodplain. Additionally, it is unique because a portion is undevelopable due to
restrictions from A FEMA floodplain buyout program.
e. The project will maintain the essential character of the locality as there are other similar
size and scale projects in downtown Hutchinson and along the Crow River.
f. The proposed land uses, densities and values are needed to make the redevelopment of
the former Medical Center site financially feasible.
g. The redevelopment of the former Medical Center site will remove an incompatible, and
blighted vacant lot from the area.
Findings of Fact —
Resolution 15899
Variance
The Landing
08/26/2025
Page 2
h.
The proposed redevelopment will improve land use, and environmental conditions for
this site over existing conditions related to public safety, flood protection, storm water
management and storm water and ground water quality and shoreland impact zone
protections.
i.
The waterfront area adjacent to the site will be public open space that will allow access
to the waterfront with a trail.
J.
The proposed variances for shoreland development density and open space meet the
criteria for shoreland variances outlined in Section 152.113 of Hutchinson City Code.
7. The City Council of the City of Hutchinson reviewed the requested variance at its
meeting on August 26, 2025 and has considered the recommendation and findings of
the Planning Commission and hereby does recommend approval of the variance request
with the following findings:
a. The variance requests are in harmony with the purposes and intent of the ordinance.
b. The proposed variance is consistent with the Comprehensive Plan and other adopted
Hutchinson Downtown Plans.
c. The applicant's request to use the property as an apartment building in a downtown
area is reasonable.
d. The property is unique due to its backward "L" shape and being within the FEMA
floodplain. Additionally, it is unique because a portion is undevelopable due to
restrictions from A FEMA floodplain buyout program.
e. The project will maintain the essential character of the locality as there are other similar
size and scale projects in downtown Hutchinson and along the Crow River.
f. The proposed land uses, densities and values are needed to make the redevelopment of
the former Medical Center site financially feasible.
g. The redevelopment of the former Medical Center site will remove an incompatible, and
blighted vacant lot from the area.
h. The proposed redevelopment will improve land use, and environmental conditions for
this site over existing conditions related to public safety, flood protection, storm water
management and storm water and ground water quality and shoreland impact zone
protections.
i. The waterfront area adjacent to the site will be public open space that will allow access
to the waterfront with a trail.
J. The proposed variances for shoreland development density and open space meet the
criteria for shoreland variances outlined in Section 152.113 of Hutchinson City Code.
APPLICABLE LAW
8. Minnesota Statue Section 462.357, subd. 6 provides:
(a) Variances shall only be permitted (a) when they are in harmony with the general
purposes and intent of the ordinance and (b) when the variances are consistent
with the comprehensive plan.
(b) Variances may be granted when the applicant for the variance establishes that
there are practical difficulties in complying with the zoning ordinance. "Practical
difficulties," as used in connection with the granting of a variance, means that (a)
the property owner proposes to use the property in a reasonable manner not
Findings of Fact — Resolution 15899
Variance
The Landing
08/26/2025
Page 3
permitted by the zoning ordinance; (b) the plight of the landowner is due to
circumstances unique to the property not created by the landowner; and (c) the
variance, if granted, will not alter the essential character of the locality.
CONCLUSIONS OF THE LAW
9. There are unique circumstances to the property not created by the landowner.
10. The variance will maintain the essential character of the locality.
11. The variance is consistent with the intent and purpose of the Shoreland Zoning
Ordinance. Section 152.113 provides a mechanism to provide for variations from these
regulations, standards, restrictions and limitations in accordance with M.S. Chapter 462
which regulates variances.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Hutchinson, Minnesota, that the application to issue a variance to exceed the residential unit
density allowable under 152.094 of Hutchinson City Code by allowing 81 apartment units and to
deviate from the minimum open space and design criteria under 152.095 of Hutchinson City
Code by allowing 40% open space for property located at 135/145 1st Ave NW, 125/135/145
Glen St NW and 126 Franklin St NW is hereby approved.
Adopted by the City Council this 26th day of August, 2025.
ATTEST:
Matt Jaunich Gary T. Forcier
City Administrator Mayor
u
HUTCHINSON
A CITY ON PURPOSE.
DIRECTORS REPORT - PLANNING DEPARTMENT
To: Hutchinson Planning Commission
From: Dan 7ochum, AICP
Date: August 19, 2025 Planning Commission Meeting
Application: The Landing Project Variance Requests
Applicant: Hutchinson — The Landing LLC
Owner: City of Hutchinson
Background:
Hutchinson — The Landing, LLC is requesting two variances for the proposed Landing project
located on the former Medical Center site in Downtown Hutchinson. The first request is to exceed
the residential unit density allowable under 152.094 of Hutchinson City Code and the second is
to deviate from the minimum open space and design criteria under 152.095 of Hutchinson City
Code.
* Indicates property described in this notice
J * 145
CEDAR AVE NW * 135
z �c 125
IZ
145 135
FIRSTAVE NW
F
I�
GENERAL INFORMATION
Existing Zoning:
C-3 Downtown Commercial
Property Location:
135/145 151 Ave NW — 125, 135, 145 Glen St NW.
Existing Land Use:
Vacant — former single-family homes/medical center
Adjacent Land Use/Zoning:
Commercial and Residential
Downtown Plan:
Multi -family redevelopment
Zoning History:
Single-family homes built in 1930s-1950s were
bought by the City a few years ago and demolished
for redevelopment.
Applicable Regulations:
Sections 152.094 and Sections 152.095
Background:
The 2013 Downtown Plan for Hutchinson identified the former Medical Center property for
redevelopment due to it being a blighted property within the Downtown area. The City/EDA
acquired the property shortly after the 2013 Downtown Plan was completed and razed the
blighted building. The City applied for a FEMA grant for the portions of this site that were
within the 100-year floodplain and received a grant to have the homes from the 100-year
floodplain removed. The City/EDA acquired the rest of the homes on the block that were out of
the 100-year floodplain for the purposes of a redevelopment project that would be consistent
with the vision of the 2013 and 2024 Downtown Plans. For the past 8-10 years the City/EDA
have sought to create a public sector/private sector partnership that could make the
redevelopment of the former Medical Center site a reality.
In 2021 the EDA entered into an agreement with a private developer to redevelop the site into
an apartment complex. A concept plan was approved by the City for the project. Due to
economic conditions at the time the developer decided not to move forward with the project
and the EDA started marketing the site to developers once again. Since 2021 several other
developers have been interested in a project on this site; however projected project costs have
been too substantial for the private sector to absorb alone.
Over the past nine months or so the City/EDA has been working with Hutchinson — The
Landing, LLC on plans to redevelop the site. Two other developers submitted proposals to the
EDA for the project and Hutchinson — The Landing, LLC was chosen for the project. The
City/EDA has been working closely with the developer on coming up with a project that will be
feasible for the site. A concept/site plan was approved by the City in April of 2025. The project
will need to be supported by a Tax Increment Financing (TIF) District in order for this site to be
redeveloped. Unfortunately, without TIF a development project on this site is not feasible.
At this time the developer is proposing an 81-unit apartment building that will include first floor
inside parking and three -stories of apartment units above. The 81 units is a slight increase
from the concept plan that had 79 units. In order for this project to be financially feasible for
the developer a minimum of 81 units are needed or the financials do not work.
As noted above the following items have been approved for this project previously:
• Site plan approval — April 2025
• Rezoning of Western half of site — April 2025
The following have been applied for by the developer for consideration this month:
• Variances
• Conditional Use Permit for a Planned Development within the Shoreland District
Variance Request:
The developer has applied for two variances for this project as noted above. One request is to
exceed the residential unit density allowable under 152.094 and the other is to deviate from the
minimum open space requirement found in 152.095. Section 152.113 of Hutchinson City Code
has a provision for an applicant to apply for variances in the Shoreland Zoning District. That
section notes that variances may only be granted in accordance with M.S. Chapter 462, which is
the State Statute regulating variances.
The variance application is attached to this report. Please review the application as it relates to
this request.
The following is an overview from the League of Minnesota Cities on reviewing variance
applications.
Granting a Variance
The city may grant a variance if enforcement of a zoning ordinance provision, as applied to a
particular piece of property, would cause the landowner "practical difficulties." For the variance
to be granted, the applicant must satisfy the statutory three -factor test for practical difficulties
(Minn. Stat. § 462.357, subd. 6). If the applicant does not meet all three factors of the statutory
test, the city should not grant the variance. Also, variances are only permitted when:
• They are in harmony with the general purposes and intent of the ordinance, and
• The terms of the variance are consistent with the comprehensive plan.
Legal standards
When considering a variance application, a city exercises "quasi-judicial" authority. This means
the city acts like a judge in evaluating the facts against the legal standard. The city's role is
limited to applying the legal standard of practical difficulties to the facts presented by the
application. If the applicant meets the standard, then the city may grant the variance.
In contrast, when the city writes the rules in the zoning ordinance, the city is exercising
"legislative" authority and has much broader discretion.
Practical difficulties
"Practical difficulties" is a legal standard that cities must apply when considering applications for
variances. It is a three -factor test and applies to all requests for variances. To constitute
practical difficulties, all three factors of the test must be satisfied.
Reasonableness
The first factor is that the property owner proposes to use the property in a reasonable manner.
This factor means that the landowner would like to use the property in a particular reasonable
way but cannot do so under the rules of the ordinance.
It does not mean that the land cannot be put to any reasonable use whatsoever without the
variance. For example, if the variance application is for a building too close to a lot line or does
not meet the required setback, the focus of the first factor is whether the request to place a
building there is reasonable.
Uniqueness
The second factor is that the landowner's problem is due to circumstances unique to the
property not caused by the landowner.
The uniqueness generally relates to the physical characteristics of the particular piece of
property, that is, to the land and not personal characteristics or preferences of the landowner.
When considering the variance for a building to encroach or intrude into a setback, the focus of
this factor is whether there is anything physically unique about the particular piece of property,
such as sloping topography or other natural features like wetlands or trees.
Essential character
The third factor is that the variance, if granted, will not alter the essential character of the
locality.
Under this factor, consider whether the resulting structure will be out of scale, out of place, or
otherwise inconsistent with the surrounding area.
For example, when thinking about the variance for an encroachment into a setback, the focus is
how the particular building will look closer to a lot line and if that fits in with the character of
the area.
Undue hardship
"Undue hardship" was the name of the three -factor test prior to a May 2011 change of law
(2011 Minn. Laws, ch. 19, amending Minn. Stat. § 462.357, subd. 6).
The 2011 law restored municipal variance authority in response to a Minnesota Supreme Court
case (Krummenacher v. City of Minnetonka, 783 N.W.2d 721 (Minn. June 24, 2010)). The law
now does both of the following:
• Provides consistent statutory language between city land use planning statutes (Stat. §
462.357, subd. 6) and county variance authority (Minn. Stat. § 394.27, subd. 7).
• Clarifies that conditions may be imposed on granting of variances if those conditions are
directly related to, and bear a rough proportionality to, the impact created by the
variance.
The 2011 law renamed the municipal variance standard from "undue hardship" to "practical
difficulties," but otherwise retained the familiar three -factor test of
• reasonableness
• uniqueness
• essential character
Variance Analysis
Based on the information above the City has to review the variance request while following the
Statues set forth by the State of Minnesota regarding variances. The following questions need
to be answered in order to determine if the variance should be approved or denied.
Is the variance in harmony with the purposes and intent of the ordinance?
The applicant answered this question yes on their application and stated the following:
The policy stated for the shoreland ordinance is as follows, and is noted in 152.002 of
Hutchinson City Code:
The uncontrolled use of shore/ands of the city affects the public health, safety and general
welfare not only by contributing to pollution ofpublic waters, but also by impairing the local tax
base. Therefore, it is in the best interests of the public health, safety and welfare to provide for
the wise subdivision, use and development of shorelands of publIc waters The state legislature
has delegated responsibility to local governments of the state to regulate the subdivision, use
and development of the shorelands of public waters and thus preserve and enhance the quality
of surface waters, conserve the economic and natural environmental values ofshorelands and
provide for the wise use of waters and related land resources This responsibility is hereby
recognized by the city.
This project will improve shoreland conditions on this previously blighted commercial property
location along the Crow River in Downtown Hutchinson. The proposed stormwater pond will
treat and retain stormwater from the site prior to it entering the Crow River. This project will
preserve the shoreland as public shoreland that is owned by the City and therefore not be
developed into docks or boat slips for a private development. There will be a trail constructed
that allows public access along the shoreline of the entire project site. Additionally, the pond
will enhance the water quality in the area including treating water before it enters the Crow
River. If the site were to remain undeveloped, stormwater from the area would continue to
enter the Crow River prior to being stored and treated.
A key component of the project is preserving the public waterfront to allow the public access to
the river. If this project doesn't move forward and the property was sold to another Developer
there may not be an opportunity to have the waterfront be public open space as a different
Developer may have different project goals. This proposed project appears to meet the policy
stated in 152.002 of the Hutchinson Shoreland Ordinance and meets the intent and harmony of
the ordinance. It should also be noted that under section 152.113 of the Hutchinson Shoreland
Ordinance has a provision for variances.
Staff Analysis of Question #1
City staff also believes the answer to this question is yes, the variance is in harmony with the
purposes and intent of the ordinance. In reviewing the policy noted above (section 152.002) of
City Code, staff believes this project is not an uncontrolled use of shoreland and will improve
the safety, public health and general welfare by treating the stormwater on -site prior to it
entering the Crow River. Additionally, the waterfront along this stretch of the will be publicly
owned waterfront that can be accessed by anybody. The post development conditions of the
site will be improved as compared to current conditions as an overgrown vacant lot and
previous conditions as a blighted former commercial property in Downtown Hutchinson.
Additionally, all stormwater on the site will be treated. The variance request is to allow 40%
open space versus 50% open space. Staff feels it is important to note that much of the 40%
open space will be publicly accessible open space rather than private open space. Public access
to our rivers and waters is very important and this project will facilitate public access along the
waterfront in the form of a trail. There will be no dock or marina facilities if the waterfront is
public.
Is the variance consistent with the Comprehensive Plan?
The applicant answered this question yes on their application and stated the following:
The 2013 City of Hutchinson Comprehensive Plan guided this area for Mixed -Use Development.
Furthermore, the plan highlights Smart Growth principles to guide development that include
mixed land use, housing opportunities and choices, distinctive neighborhoods with a sense of
place, open space and vital environmental areas, full and efficient use of urban services, and
"human -scaled design". The proposed project meets all of the items noted under the City
Comprehensive Plan Smart Growth Policy.
In addition, there are several goals within the Land Use section of the comprehensive plan that
support this project. Goal3. Plan for the orderly, efficient, and fiscally responsible growth of
residential development in Hutchinson. The specific policies of this goal that support this
project are: 1. Continue to guide residential growth in an orderly and compact manner so that
new developments can be effectively served by public improvements and that the character and
quality of the City's existing neighborhoods can be maintained and enhanced. 5. Encourage
compatible infill residential developments throughout the developed portions of the City to
encourage the efficient use of land, the establishment of a strong tax base, and the cost-
effective provision of City services 6. Encourage the incorporation of a system of trails,
sidewalks, and open spaces in new residential development 7. Encourage redevelopment
when possible. 8. Encourage 2596 of all new residential development to locate downtown.
Goal 6.- Support the economic viability of the downtown mixed (business) use district There is
also a specific policy that supports this and that is policy 3 that says: encourage and support
innovative housing opportunities in the downtown area.
As noted above, the future land use map in the Comprehensive Plan guides the subject
property as "mixed -use". The Comprehensive Plan defines mixed use as follows: Mixed Use —
Identifies areas intended to provide a mix of commercial, residential, public/institutional-related
uses Ina pedestrian friendly/human scale environment: Mixed use areas are found in
downtown Hutchinson, as well as the Highway 7 Corridor.
In addition to the Comprehensive Plan, the City of Hutchinson has adopted two Downtown
Plans in 2013 and 2024 respectively. Both of these plans identified the subject site for
redevelopment into multi -family apartment type housing.
It is clear that the City has planned for this site to be a high -density multi -family housing site
from the information contained in the 2013 Comprehensive Plan, 2013 Imagine Hutchinson
Downtown Plan and the 2024 Hutchinson Downtown Plan Update.
Staff Analysis of Question #2
All of the information the applicant provided for this question is factually accurate. Staff agrees
that this request is consistent with the comprehensive plan.
Does the proposa/put the propedy to use in a reasonable manner?
The applicant answered this question yes on their application and stated the following:
Yes, this proposal puts the property to use in a reasonable manner. This property is located in
Downtown Hutchinson and is zoned C-3 Central Commercial which allows upper level apartment
units. It is reasonable to think that an apartment building would be located in a zoning district
and downtown area that allows apartment units on upper levels. There are apartment buildings
located in and around Downtown's all across Minnesota and the United States. In addition, all
of the long-range planning documents that City has adopted guide this area for the type of
project being proposed.
Redevelopment projects can be very difficult to accomplish due to project economics. The City
has spent considerable money cleaning up the site and removing a blighted building and several
homes that were at risk for flooding. Although that work has been completed, this site is now a
vacant property within Downtown Hutchinson that does not look good because it is sitting
vacant and not developed. The proposed land uses, densities and values are needed to make
the redevelopment of the site financially feasible. If the project doesn't move forward blight
and nuisance conditions are a concern because vacant properties have proven to have many
issues related to illegal dumping, criminal activity, standing water, overgrown weeds and
uncontrolled stormwater run-off. The proposed redevelopment will improve land use, and
environmental conditions for this site over existing conditions related to public safety, flood
protection, storm water management and storm water and ground water quality and shoreland
impact zone protections.
Staff Analysis of Question #3
Staff agrees with the applicant that this is a reasonable use of the property. There are many
examples of similar scale apartment buildings in Downtown Hutchinson, as well as shoreland
areas all throughout Minnesota. Redevelopment of this parcel is not financially feasible without
the density that is being proposed for this project. It is reasonable to use a property in a way
that is financially feasible.
Are there circumstances unique to the proper[v7
The applicant answered this question yes on their application and stated the following:
Yes, there are several items that make this property unique. First the developable portion of
the lot is an unusual shape and is a backwards "L" making it more difficult to site a building on
the lot. A portion of the property is not developable because it was funded by a FEMA grant to
remove homes from the floodplain. The City needs to retain ownership of that portion of the
property and a pond will be located in that area. This makes the size of the lot challenging to
create enough density to make the project financially feasible. Additionally, the lot is located it
both the 100-year and 500-year floodplain which is unique compared to most properties in
Downtown Hutchinson.
Staff Analysis of Question #4
All of the information the applicant provided for this question is factually accurate. Staff agrees
that there are circumstances unique to the property.
Will the variance maintain the essential character of the localitv7
The applicant answered this question yes on their application and stated the following:
The variance will not create a building that will be out of scale, out of place or inconsistent with
the surrounding area. There are other buildings in Downtown Hutchinson that are taller (6
stories). Both Park Towers Apartments and Evergreen Apartments in Hutchinson are about 60-
units per acre density, while this proposed project is 38-units per acre. There are also many
buildings downtown that have zero setback and are close to property lines that are similar to
the proposed project. The proposed project will meet all applicable setbacks and will have the
look and feel of many of the downtown buildings that have been in Hutchinson for the past
100-plus years.
Staff Analysis of Ouestion #5
Staff agrees with the applicant that the variance will maintain the essential character of the
locality. The proposed project is very similar in size and scale to other projects located in
Downtown Hutchinson and along the Crow River.
Conclusion
Based on the review of Minnesota State Statutes regarding variances and the application
received by Hutchinson — The Landing, LLC staff believes the legal standards for granting a
variance have been met. Staff believes the variance application meets the "practical difficulties"
legal standard that cities must apply when considering applications for variances. As noted
above in the analysis, staff believes the application meets the three factors to constitute a
"practical difficulty" which are reasonableness, uniqueness and essential character.
Additionally, staff believes the request is consistent with the comprehensive plan as noted
above and is also in harmony with the purposes and intent of the ordinance.
Based on this analysis Staff recommends approval of the variance request to exceed the
residential unit density allowable under section 152.094 of Hutchinson City Code. This variance
would allow the construction of 81-apartment units on the site. Additionally, Staff recommends
variance to section 152.095 regarding open space requirements that would allow 40% open
space versus the 50% permitted by ordinance.
If the Planning Commission doesn't agree that the variance requests meet the threshold to
approve a variance the Planning Commission should vote to deny the variances with the
appropriate findings for denial.
The following are findings that support approval of the variances, if the Planning Commission so
chooses to recommend approval to the City Council based on the Staff recommendation.
1. The variance requests are in harmony with the purposes and intent of the ordinance.
2. The proposed variance is consistent with the Comprehensive Plan and other adopted
Hutchinson Downtown Plans.
3. The applicant's request to use the property as an apartment building in a downtown
area is reasonable.
4. The property is unique due to its backward "L" shape and being within the FEMA
floodplain. Additionally, it is unique because a portion is undevelopable due to
restrictions from a FEMA floodplain buyout program.
5. The project will maintain the essential character of the locality as there are other similar
size and scale projects in downtown Hutchinson and along the Crow River.
6. The proposed land uses, densities and values are needed to make the redevelopment of
the former Medical Center site financially feasible.
7. The redevelopment of the former Medical Center site will remove an incompatible, and
blighted vacant lot from the area.
8. The proposed redevelopment will improve land use, and environmental conditions for
this site over existing conditions related to public safety, flood protection, storm water
management and storm water and ground water quality and shoreland impact zone
protections.
9. The waterfront area adjacent to the site will be public open space that will allow access
to the waterfront with a trail.
10. The proposed variances for shoreland development density and open space meet the
criteria for shoreland variances outlined in Section 152.113 of Hutchinson City Code.
11
C- RIVER GENERAL SITE NOTES
--77-
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ------- .....
SITE KEYNOTES
ED SITE DETAILS (SI-0X)Q
8%DNEU TS
FFE
L- - - - - -
OM A=
(P-E =H STREE�
FOR PERMIT APPROVAL
--- CROW RIVER
------------------
------ ----------
LEGAL DESCRIPTION
41
- - —
------ - -------
BLOCK I
GENERAL NOTES
'2
ouriOTa
LEGEND
5 cr
LOT I
i 1-m
91
19
—z—
t
z E-
--AVENUE YORTHWEST
0 F
XXX
D4/Dl/2D25
NUMBER 005-
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
Consideration for approval of disposal of surplus property (Resolution #15897)
Agenda Item:
Department: Information Technology
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Tom Kloss
Agenda Item Type:
Presenter: Tom Kloss
Reviewed by Staff ❑
Consent Agenda
Time Requested (Minutes):
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
The Information Technology department has surplus property no longer needed for municipal
operations.
Staff is requesting approval to recycle the outdated equipment utilizing the services from PCs for
People. All items in this round of recycling will be accepted at no charge.
BOARD ACTION REQUESTED:
Consideration to approve/reject disposal of surplus property, Resolution # 15897
Fiscal Impact: $ 0.00 Funding Source:
FTE Impact: Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost: $ 0.00
Total City Cost: $ 0.00 Funding Source: N/A
Remaining Cost: $ 0.00 Funding Source: N/A
RESOLUTION NO. 15897
RESOLUTION TO DISPOSE SURPLUS PROPERTY
WHEREAS, the City of Hutchinson has accumulated surplus property; and,
WHEREAS, the Hutchinson City Code provides, pursuant to Section 91.41, for public
sale of surplus property;
THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
HUTCHINSON THAT:
The Hutchinson City Council hereby approves the sale of surplus items identified on
Exhibit A to PCs for People
Approved by the City Council this 26th day of August 2025.
ATTEST:
Gary Forcier, Mayor Matt Jaunich, City Administrator
Item Type
PC
Item Description
Dell PC
Serial Number
FXST9Z2
PC
Dell PC
FXSOBZ2
PC
Dell PC
76MMSZ2
PC
Dell PC
FXR2BZ2
PC
Dell PC
BJY41T2
PC
Dell PC
58HYH63
PC
Dell PC
FXRZ9Z2
PC
Dell PC
FXRV9Z2
PC
Dell PC
JFR5SZ2
PC
Dell PC
8BMPY12
PC
Dell Laptop
9GNG8S2
PC
Dell PC
5MDVZC3
PC
Dell PC
BJZ51T2
PC
Dell PC
JFQPSZ2
PC
Dell PC
76PNSZ2
PC
Dell PC
BJY31T2
PC
Dell PC
BQ2W9T2
PC
Dell PC
BJY81T2
PC
Dell PC
BQ31BT2
PC
HP PC
2UA4210SH9
PC
Dell PC
JFR4SZ2
PC
Dell PC
JFR6SZ2
PC
Dell PC
JFQR903
Monitor
HP Monitor
3CQ0060NTB
Monitor
HP Monitor
3CQ136BHJB
Monitor
Planar Monitor
PL340TD100903
PC
HP Compaq
2UA5180957
PC
Dell PC
8BMSY12
PC
Dell PC
SGOTXBI
PC
Dell PC
JXBB9Z1
PC
Dell PC
7Z36343
PC
Dell PC
67CTY12
PC
Dell PC
67CVY12
Monitor
HP Monitor
CNT734QB6H
Monitor
HP Monitor
3CQ136BMV9
PC
HP PC
2UA6341P7W
PC
Dell PC
BJY71T2
PC
Dell PC
7Z37343
PC
Dell PC
BJX91T2
PC
HP PC
8CG7312F5Q
PC
Dell Laptop
813S1Z2
PC
HP PC
2UA41928SQ
PC
Dell Laptop
360L473
PC
Dell Desktop
FXRX9Z2
PC
HP Desktop
MXL425214W
PC
Dell Laptop
202JS73
Item Type
PC
Item Descr Serial Number
HP Desktol8CG7312FSP
Monitor
HP Monito 3CQ136BMVC
Monitor
HP Monito 3CQ148BZWT
Monitor
HP Monito 3CQ148BZWQ
Monitor
HP Monito CNC55380JRR
PC
RhinoTab RHM1-0618-2586
PC
Dell PC 7VQR9Z2
PC
Dell PC JFQP903
PC
Dell PC 76MNSZ2
Monitor
HP Monito 3CQ131CLCX
iPad
iPad Pro DMPYN5A5KD6J
iPad
iPad Pro DMPYNB63KD6J
iPad
iPad Pro DMPZ7ADPKD6J
iPad
iPad Pro DMPZ7CWLKD6J
iPad
iPad Pro DMPZ7FS6KD6J
Tablet
RhinoTab RHM1-1118-3195
Monitor
Dell Monit, 99KRQT3
UPS
White UPS PC22M17BWF
UPS
Powerwar( RV035A0042
Monitor
Elo Touch : K225183968
Switch
Cisco Catal FOC1243Z1GG
Switch
Cisco Catal FOC1041Y05X
Switch
Cisco Catal FDO1235Y38W
Switch
Cisco Catal FDO1835R278
Switch
Cisco Catal CAT1115RJ6W
Switch
Cisco Catal FOC1331V3DF
Switch
Cisco Catal FOC1047Z5F4
Switch
Cisco Catal JAE26141LC2
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
Consideration of a sketch plan and comprehensive plan amendment for the former
Agenda Item: Burns Manor Property at 135 North High Drive.
Department: Planning
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Dan Jochum
Agenda Item Type:
Presenter: Dan Jochum
Reviewed by Staff
Consent Agenda
Time Requested (Minutes): 5
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
The purpose of this application is to determine, generally speaking, if the City would be receptive
to this project. The applicant is seeking some assurance that the City is generally on board with
the concept before more detailed professional design services are contracted for. The lot is
zoned R-1 Low Density Residential. If the sketch plan is found to be generally acceptable, the
developer could choose to move forward with submittals, rezoning, preliminary/final plat
applications, etc. and start the formal development review process.
A public hearing was not held for this request, as it is not required.
The Planning Commission commented about how this would be a good reuse of the former
Burns Manor site. There were a few questions around access to the site and it was noted the
plans will be refined to determine the appropriate access off N. High Drive.
The Planning Commission voted unanimously (6-0) to recommend approval of the sketch plan
and amend the Comprehensive Plan to guide this property to Mixed Use as the future land use
category versus low density residential.
BOARD ACTION REQUESTED:
Approval of Site Plan and Comprehensive Plan Amendment.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: New Bu
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source: N/A
Remaining Cost: $ 0.00 Funding Source: N/A
CITY OF HUTCHINSON
MCLEOD COUNTY, MINNESOTA
RESOLUTION NO. 15902
RESOLUTION ADOPTING FINDINGS OF FACT AND REASONS FOR APPROVAL OF A SKETCH
PLAN AND COMPREHENSIVE PLAN AMENDMENT FOR AN APARTMENT PROJECT LOCATED
AT 135 N. High Drive NE.
FACTS
1. Willard Exsted is the owner of 135 N. High Dr NE; and,
2. Steve Kuepers has applied for a sketch plan review and comprehensive plan amendment for an
apartment project at 135 N. High Dr. NE
3. The Planning Commission met on August 19, 2025 and considered the request and recommended
approval of the sketch plan and comprehensive plan amendment with the following considerations:
• Recognition that this is a sketch plan only and the City will have to approve more detailed
plans as the process moves forward.
• Further study will be required with regards to access to the site from N. High Drive and if
turn lanes will be needed.
• Pedestrian facilities need to be flushed out as project advances.
• Recognition that units counts and types may change slightly based on market needs and
conditions.
• Comprehensive Plan future land use designation for subject property will be changed to
Mixed -Use Development from Low Density Residential.
4. The City Council of the City of Hutchinson reviewed the site plan approval at its meeting on August
26, 2025 and has considered the recommendation and findings of the Planning Commission and
hereby does recommend approval of the sketch plan and comprehensive plan amendment with the
following conditions.
• Recognition that this is a sketch plan only and the City will have to approve more detailed
plans as the process moves forward.
• Further study will be required with regards to access to the site from N. High Drive and if
turn lanes will be needed.
• Pedestrian facilities need to be flushed out as project advances.
• Recognition that units counts and types may change slightly based on market needs and
conditions.
• Comprehensive Plan future land use designation for subject property will be changed to
Mixed -Use Development from Low Density Residential.
Findings of Fact— Resolution # 15902
Burns Manor Sketch Plan
Final Plat
Page 2
APPLICABLE LAW
1. The sketch plan review request meets the standards as required in Section 153.020 and 153.100 of the
City of Hutchinson Municipal Code:
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Hutchinson, Minnesota, that the
sketch plan and comprehensive plan amendment located at 135 N. High Dr. NE, Hutchinson, MN is approved.
Adopted by the City Council this 26th day of August, 2025.
ATTEST:
Matthew Jaunich
City Administrator
Gary T. Forcier
Mayor
u
HUTO INSON
A CITY ON PURPOSE.
DIRECTORS REPORT - PLANNING DEPARTMENT
To:
From:
Date:
Application:
Applicant:
Property Owner:
Hutchinson Planning Commission
Dan ]ochum, AICP
August 19, 2025
Sketch Plan Review — 135 N High Drive NE
Steve Kuepers
Willard Exsted
SKETCH PLAN REVIEW — 135 N High Drive NE — Residential Development
The purpose of this application is to determine, generally speaking, if the City would be
receptive to this project. The applicant is seeking some assurance that the City is
generally on board with the concept before more detailed professional design services
are contracted for. The lot is zoned R-1 Low Density Residential. If the sketch plan is
found to be generally acceptable, the developer could choose to move forward with
submittals, rezoning, preliminary/final plat applications, etc. and start the formal
development review process.
P1: 0011720150050
'Ji. RY„yy
• 7
_Jr
NORTH HIGH OR NE
Existing Zoning:
Property Location:
Lot Size:
Existing Land Use:
Adjacent Land Use:
Adjacent Zoning:
Comprehensive Plan:
Zoning History:
Applicable Regulations:
Sketch Plan Review
GENERAL INFORMATION
R-2 Medium Density Residential and C-4 Commercial
135 N. High Drive NE
13.37 Acres
Open Space
Residential to South, East and West. Agricultural to
North
R-11 R-2, and C-4.
Low Density Residential Neighborhood
Former Burns Manor Nursing Home. Site has been
vacant since approximately 2012.
Section 153.020
Steve Kuepers of Kuepers Architects and Builders has submitted the attached sketch
plan for review. The location of the site is 135 N. High Drive NE, located a few blocks
east of the Highway 15 and North High Drive Roundabout. This site has been vacant
since the Burns Manor nursing home was demolished in approximately 2012-2013.
Kuepers Architects and Builders owns and manages apartment complexes all of the
State of Minnesota. Steve Kuepers and his team built Highfield Apartments on the
south side of Hutchinson near Kwik Trip starting in approximately 2016. The first phase
of the Highfield project was three 29-unit buildings. A few years later phase two was
built and featured two 35-unit buildings. In total, 157 apartment units were built on the
site.
Burns Manor was a 120-bed nursing home facility built in 1964-65. The facility became
functionally obsolete with outdated design and features. Hutchinson Health looked into
possibly remodeling Burns Manor but that was not feasible and Harmony River on the
south side of Hutchinson opened in 2012 and serves as a replacement for Burns Manor.
After the facility was closed there were attempts to find a new use for the building
including discussions about converting it into apartments but the building was ultimately
demolished due to it being functionally obsolete. The City had an option to purchase
the property but chose not to and a local real-estate developer acquired the property.
Please see the aerial photograph below of the facility in 2011. The site had two nursing
home wings and a large parking area in the middle of the facility as well as an access
road going to the rear of the facility for employee parking and deliveries. There was
also a maintenance garage and parking area to the north of the facility.
Since the property has been vacant it has been listed for sale by the owner Willard
Exsted. There have been many informal discussions on uses for the property ranging
from single-family homes, duplexes and multi -family housing. This sketch plan
application from Kuepers is the most formal request the City has received in regards to
this property.
The sketch plan received from Kuepers includes three apartment buildings each with
44-units. The project would have a total of 132-apartment units. There are also six
detached garage buildings that include a total of 76 single -stall garage units. The
parking lots have spaces for 258 cars. In total there are 334 parking stalls on -site
between the garages and surface parking. The site also has a central courtyard with
green space and a play structure. There is also a sport court and a dog run proposed
for the NW corner of the site. There are three stormwater basins located on the south
side of the site near N. High Drive NE to treat stormwater and the potential for more
stormwater treatment on the NW portion of the site. If the project were to move
forward detailed engineering will be provided that will provide more detailed
information regarding stormwater management.
The site will be accessed off N. High Drive NE. City Staff would like to work with the
developer to determine the best area for access into the site. It may be best to have
one access point rather than two access points onto the County Road. If this sketch
plan moves forward an engineering analysis will need to be completed by the applicant
to determine if any turn lanes will be required on N. High Drive or if the roadway will
work in its current configuration. Ultimately, McLeod County is the road authority and
will approve access points.
The utilities to serve the site are located in the N. High Dr. NE right-of-way. Exact
utility sizes and details will be provided if the project moves forward and detailed
engineering is completed. The concept plan includes a 30-foot proposed easement on
the east side of the property that would allow for a future connection to the property
within City limits located to the north of this site. Additionally, there is a proposed
easement on the NW side of the property that could potentially allow utilities to come
from the Hwy 15 area to service the property to the north of the proposed site. Staff
thinks that development of the property to the north is many years away as access and
utilities aren't readily available. Additionally, the land use to the north outside of City -
limits is somewhat erratic and 203,d St is a dead-end township gravel road that isn't
particularly suited for increased traffic. A more large-scale development plan is likely
needed before the area to the north of the former Burns Manor nursing home is
developed.
Generally speaking, Staff thinks this is a good concept for the former Burns Manor Site.
There are some things that need to be tweaked with the site plan but that is typical for
a sketch plan review process.
Staff wants to remind the Planning Commission and applicant that the purpose of the
sketch plan review is to provide general comments to the developer regarding the
concept plan. Staff does not have enough detailed information to provide highly
detailed comments at this point. That will come during a future step, which is formal
site plan approval after detailed engineering plans are submitted for review.
Comprehensive Plan Amendment
If the Planning Commission thinks the proposed sketch plan is a good idea a
Comprehensive Plan amendment should be discussed. The Comprehensive Plan
currently guides this property as Low Density Residential Neighborhood. A
comprehensive plan amendment to the future land use map would be needed if this
sketch plan were to move forward. If the Planning Commission thinks the sketch
presented makes sense Staff recommends amending the Comprehensive Plan future
land use designation for the parcel to Mixed -Use land use designation. Staff would
recommend the Mixed -Use designation for the following reasons:
• Currently the subject parcel has two zoning designations, R-2 Residential and C-4
Fringe Commercial. Mixed -Use would allow for different land uses on the parcel
similar to what current zoning allows. The Apartment project would be
permitted under Mixed -use, as would potential commercial development off of
Hwy 15 North.
• There is a mix of current land use and zoning in the vicinity of the subject
property. The area to the south is a medium density neighborhood. The areas
to the east and west are low density residential lots. The area of Hwy 15 and N.
High Drive NE is a commercial area with a gas station, radio station and a
commercial/industrial use to the north of the gas station.
• The previous use of the property as a nursing home fits into the Mixed -Use
designation as well and this proposed sketch plan is a similar scale and density to
the former nursing home.
• The area to the north of the subject site is an agricultural field at this time. In
the future this parcel may be developed into something different, including
residential or even commercial/industrial because of what land uses are located
to the north within Hutchinson Township. Having the subject property guided as
Mixed -use provides a buffer between possible commercial/industrial uses and the
residential uses located to the South.
Recommendation:
Staff recommends this concept plan and Comprehensive Plan amendment be approved
with the following considerations:
1. Recognition that this is a sketch plan only and the City will have to approve more
detailed plans as the process moves forward.
2. Further study will be required with regards to access to the site from N. High
Drive and if turn lanes will be needed.
3. Pedestrian facilities need to be flushed out as project advances.
4. Recognition that units counts and types may change slightly based on market
needs and conditions.
f -Qr
.F
/ n
'RENDERINGS ARE FOR CONCEPTUAL USE ONLY*
Hutchinson N High Drive I Renderings
HUTCHINSON, MN 1 07.31.2025 1 #XX-XXXX
[� KU EPERS
ARCHITECTS & BUILDERS
FEV15GH5 DAiE
MAX UNITS
1575 AGRE5 (65(,�0 5QPT )
68b/I7O 5,000 = ZZ5/o5 UNITS MAX
PARKING REQUIREMENTS.
15 5TALL5 PER 6EDROGM -_-
AA UNIT = 1095 5TALL5
1095 + IG95 + 1095 = �,28.5 STALLS MIN - 22
-
333 STALLS SI10WN
EXISTING TREES - -_
n �/��i _
=e°o
m B"__ � m iR
w LOT 3
n i xx
—N w S
� —;UNI
z
--- ---
i
�i
� J WET' G �
Lor zLOF I LJ.J
WE m
E-1
N NOT DRIVE
mom
siTE FLAN
u
:=01ft"
HUTCHINSON
A CITY ON PURPOSE.
BOARDS/COMMISSION INTEREST FORM
www.ci.hutchinson.mn.us
Hutchinson City Center, ill Hassan St. SE, Hutchinson MN
Name: Steve Kropp
Address: 16813 206th Circle Hutchinson, MN 55350
Fax # (320) 234-4240
Phone # (320) 587-5151
Home Phone #: n/a Work Phone #: 320-455-8095
Cell Phone #: 320-583-2220 Email Address: stevekropp45@gmail.com
Occupation: State Farm Insurance Agent
Place of Employment: Self - State Farm
Educational Background: BS in Plant Science: Minor Ag-Business
Number of years as Hutchinson Resident: 21
I am interested in serving on the following City Board or Commission:
❑ Airport Commission (5 yr. term)
❑ Bicycle/Pedestrian Advisory Committee (3 yr. term)
o Charter Commission (4 yr. term)
❑ HRA Board (5 yr. term)
❑ EDA Board (6 yr. term)
❑ Library Board (3 yr. term)
X Park/Rec/Comm Ed Board (3 yr. term)
❑ Planning Commission (5 yr. term)
❑ Police Civil Service Commission (3 yr. term)
❑ Public Arts Commission (3 yr. term)
❑ Senior Advisory Board (3 yr. term)
❑ Sustainability Advisory Board (3 yr. term)
❑ Utilities Commission (5 yr. term)
-OVER-
Explain why you are interested in this
board/commission: I am an avid outdoorsman and enjoy the Hutchinson parks
and trails often. I also enjoy U'ving back the our community.
Please describe any prior/current experience that may relate to serving on this
board/commission: I have been in leadership positions in the Hutchinson Jayees,
Hutchinson Water Carnival, and Hutchinson Dollars For Scholars (current Pres.)
I've also served on the Hutchinson Leadership board.
Please List Other Municipal Boards and/or Commission you may have served.
Years Served
1.) to
2.) to
3.) to
4.) to
Please return completed form to Melissa Starke at City Center, 111 Hassan Street SE, if you are
interested in serving on any of the above boards/commissions. We thank you for your interest.
This form will be placed on file and we will refer to the file as openings occur.
CHECK REGISTER A FOR CITY OF HUTCHINSON
CHECK DATES 8/13/25 - 8/26/25
Check Date
Check#
Name
Description
Amount
8/8/2025
EFT
EFTPS
Payroll Report 7/20/25 - 8/2/25
92,079.05
8/8/2025
EFT
MN Dept of Revenue
Payroll Report 7/20/25 - 8/2/25
18,180.37
8/8/2025
EFT
VOYA (Hutch City of)
Payroll Report 7/20/25 - 8/2/25
475.00
8/8/2025
EFT
Child Support
Payroll Report 7/20/25 - 8/2/25
706.96
8/8/2025
EFT
UNUM Voluntary Insurance
Payroll Report 7/20/25 - 8/2/25
317.07
8/8/2025
EFT
PERA
Payroll Report 7/20/25 - 8/2/25
68,407.73
8/8/2025
EFT
Health Equity
Payroll Report 7/20/25 - 8/2/25
18,018.47
8/8/2025
EFT
Mission Square
Payroll Report 7/20/25 - 8/2/25
3,705.49
8/8/2025
EFT
VOYA (CITY OF HUTCH)
Payroll Report 7/20/25 - 8/2/25
250.00
8/8/2025
302598
Manual Employee Check
Payroll Report 7/20/25 - 8/2/25
1,025.07
8/8/2025
302599
Manual Employee Check
Payroll Report 7/20/25 - 8/2/25
77.57
8/8/2025
302600
HART
Payroll Report 7/20/25 - 8/2/25
521.53
8/8/2025
302601
NCPERS
Payroll Report 7/20/25 - 8/2/25
208.00
8/26/2025
302602
CANNON, MICHAEL
UB REFUNDS
120.00
8/26/2025
302603
DEROCK, JOSH
UB REFUNDS
15.38
8/26/2025
302604
HAUGEBERG, JARVIS
UB REFUNDS
86.42
8/26/2025
302605
KASTEL, BRUCE &JUDY KING
UB REFUNDS
43.47
8/26/2025
302606
KESLER, GABRIELAC
UB REFUNDS
115.00
8/26/2025
302607
LABRAATEN, ERIC
UB REFUNDS
35.54
8/26/2025
302608
LOFGREN, CHRIS
UB REFUNDS
30.03
8/26/2025
302609
MOLDAN, KATELYN
UB REFUNDS
35.10
8/26/2025
302610
ULRICH, RANDY
UB REFUNDS
41.68
8/26/2025
302611
ZAPPA, JEFF
UB REFUNDS
130.00
8/26/2025
302612
AARP
AARP INSTRUCTION - SR CTR
415.00
8/26/2025
302613
ACE HARDWARE - 1315
REPAIR & MAINT SUPPLIES - MULTIPLE DEPTS
285.76
8/26/2025
302614
ACE HARDWARE - 1790
SHOP SUPPLIES - FIRE
103.31
8/26/2025
302615
ACE HARDWARE - 1825
WASP KILLER - POLICE
10.00
8/26/2025
302616
ADVANCED ENGINEERING & ENVIRONMENTA
SCADA MAINT & REPAIRS - WATER/WWTP
5,505.42
8/26/2025
302617
ALEX AIR APPARATUS 2 LLC
ANNUAL BREATHING AIR QUALITY TEST - FIRE
869.23
8/26/2025
302618
ALLINA HEALTH SYSTEM
ALLINA MEDICAL EDUCATION - FIRE
889.91
8/26/2025
302619
AMERICAN RED CROSS
LIFEGUARD RECERT- WATER PARK
968.00
8/26/2025
302620
ANIMAL MEDICAL CENTER ON CROW RIVER
ANIMAL IMPOUNDS - POLICE
1,566.00
8/26/2025
302621
APEX ENGINEERING GROUP INC
ENVIRONMENTAL TRANSITION - WW/STORMWATER
1,738.00
8/26/2025
302622
ARTISAN BEER COMPANY
COST OF GOODS SOLD - LIQUOR HUTCH
527.55
8/26/2025
302623
AUTO VALUE - GLENCOE
WINDOW WASH FLUID, A/C COMP SEAL - HATS
219.39
8/26/2025
302624
BELLBOY CORPORATION
COST OF GOODS SOLD - LIQUOR HUTCH
4,289.07
8/26/2025
302625
BERNICK'S
COST OF GOODS SOLD - LIQUOR HUTCH
2,441.05
8/26/2025
302626
BOBBING BOBBER BREWING CO
COST OF GOODS SOLD - LIQUOR HUTCH
163.81
8/26/2025
302627
BOLTON & MENK INC
VARIOUS PUBLIC WORKS PROJECTS
7,865.50
8/26/2025
302628
BRANDON TIRE CO
TIRE REPAIRS - PARKS
273.60
8/26/2025
302629
BRAUN INTERTEC CORP
MATERIALS TESTING - HASSAN
4,239.20
8/26/2025
302630
BREAKTHRU BEVERAGE MN WINE & SPIRITS
COST OF GOODS SOLD - LIQUOR HUTCH
22,560.97
8/26/2025
302631
BRYAN ROCK PRODUCTS
AGLIME FOR MISC BALLFIELDS - PARKS
1,221.15
8/26/2025
302632
C & L DISTRIBUTING
COST OF GOODS SOLD - LIQUOR HUTCH
37,212.42
8/26/2025
302633
CARS ON PATROL SHOP LLC
TOW/IMPOUNDS, REPAIRS - POLICE
1,702.17
8/26/2025
302634
CENTRAL HYDRAULICS
REPAIR & MAINT SUPPLIES- MULTIPLE DEPTS
451.55
8/26/2025
302635
CENTRAL MCGOWAN
WELDING SUPPLIES- HATS
279.36
8/26/2025
302636
CINTAS CORPORATION
SUPPLIES & SERVICE - MULTIPLE DEPTS
650.94
8/26/2025
302637
CLARKE ENVIRONMENTAL MOSQUITO MGMT
JULY MOSQUITO CONTROL -STREETS
36,713.00
8/26/2025
302638
CORE & MAIN LP
REGISTERS, SENSUS ANALYTICS - WATER
16,270.01
8/26/2025
302639
CORRAGROUP
CREDITREPORT- POLICE
13.00
8/26/2025
302640
COUNTRY CLUB TERRACE
PERMIT REFUND - BLDG INSPEC
60.00
8/26/2025
302641
CRAVENS, PAUL
REIMB: SAFETY FOOTWEAR - CREEKSIDE
225.00
8/26/2025
302642
CRESTED RIVER
COST OF GOODS SOLD - LIQUOR HUTCH
270.00
8/26/2025
302643
CROW RIVER WINERY
COST OF GOODS SOLD - LIQUOR HUTCH
1,030.80
8/26/2025
302644
CUSTOMIZED FIRE RESCUE TRAINING INC
PUMP CLASS TRAINING - FIRE
550.00
8/26/2025
302645
DAHLHEIMER BEVERAGE
COST OF GOODS SOLD - LIQUOR HUTCH
45,369.75
8/26/2025
302646
DESIGN ELECTRIC INC
ELECTRICAL WORK IN VMF RESTROOMS - PARKS
819.58
8/26/2025
302647
DIMLER, KYLE
REIMB: JURY DUTY - BLDG INSP
6.48
8/26/2025
302648
DLT SOLUTIONS LLC
AUTOCAD SOFTWARE - MULTIPLE DEPTS
12,077.37
8/26/2025
302649
DORSEY & WHITNEY LLP
TIF LEGAL WORK- EDA
2,412.00
8/26/2025
302650
E2 ELECTRICAL SERVICES INC
VFD INSTALL, REPAIRS- MULTIPLE DEPTS
6,138.04
8/26/2025
302651
EHLERS &ASSOCIATES INC
TIF 4-24THE LANDING, TIF REPORTING FEES
16,310.00
8/26/2025
302652
ELK RIVER COMPOSTING INC
COMPOST BULK- CREEKSIDE
18,271.82
8/26/2025
302653
FARM -RITE EQUIPMENT
EQUIPMENT PARTS - MULTIPLE DEPTS
1,356.90
8/26/2025
302654
FASTENAL COMPANY
REPAIR & MAINT SUPPLIES - MULTIPLE DEPTS
2,129.72
8/26/2025
302655
FIRSTADVANTAGE LNS OCC HEALTH SOLU
DRUG TESTING
585.50
8/26/2025
302656
FLAGSHIP RECREATION
NEW SEATING BENCH - PARKS
2,366.00
CHECK REGISTER A FOR CITY OF HUTCHINSON
CHECK DATES 8/13/25 - 8/26/25
Check Date
Check#
Name
Description
Amount
8/26/2025
302657
FORUM COMMUNICATIONS PRINTING
FALL 2025 PRCE BROCHURE
3,237.71
8/26/2025
302658
FOSTER MECHANICAL
HVAC REPAIR - POLICE
615.00
8/26/2025
302659
GALLS LLC
TROUSERS - POLICE
72.97
8/26/2025
302660
GRAINGER
SPRAY GUN, BAGS, LEG PROTECTORS - MULTIPLE DEPTS
876.62
8/26/2025
302661
GREEN EARTH LAWN CARE INC
FERTILIZATION BASEBALL FIELDS - PARKS
707.15
8/26/2025
302662
HANSEN GRAVEL INC
ROCK BEHIND TWO SHEDS AT VMF - PARKS
742.50
8/26/2025
302663
HAWKINS INC
FERRICCHLORIDE -WWTP
12,073.39
8/26/2025
302664
HEALTHPARTNERS INC
MEDICAL INSURANCE
152,429.58
8/26/2025
302665
HERALD JOURNAL PUBLISHING
PUBLICATIONS, ADS - MULTIPLE DEPTS
1,916.75
8/26/2025
302666
HERC-U-LIFT
ANNUAL INSPECTION -ARENA
172.00
8/26/2025
302667
HERITAGE POOL SUPPLY GROUP INC
CHEMICALS - WATERPARK
289.04
8/26/2025
302668
HILLYARD/HUTCHINSON
REPAIR&MAINTSUPPLIES- MULTIPLEDEPTS
7,689.48
8/26/2025
302669
HJERPE CONTRACTING
LINE, MAIN, STORM REPAIRS- MULTIPLE DEPTS
33,715.11
8/26/2025
302670
HOISINGTON KOEGLER GROUP INC
FESTIVAL STREET/SIGNAGE -EDA
6,312.25
8/26/2025
302671
HOLT-PETERSON BUS
SEPT 2025 TOUR - SR CTR
905.00
8/26/2025
302672
HOME CITY ICE COMPANY
COST OF GOODS SOLD - LIQUOR HUTCH
1,306.18
8/26/2025
302673
HORIZON COMMERCIAL POOL SUPPLY
PERALITE FILTER MEDIA- WATERPARK
588.00
8/26/2025
302674
HUTCHINSON CO-OP
FUEL & SUPPLIES - MULTIPLE DEPTS
25,063.51
8/26/2025
302675
HUTCHINSON FIGURE SKATING ASSOC
REGISTRATION FEES -ARENA
9,560.00
8/26/2025
302676
HUTCHINSON HEALTH
PREEMPLOYMENT PHYSICALS - MULTIPLE DEPTS
765.00
8/26/2025
302677
HUTCHINSON HRA
HOME IMPV LOAN - HRA
1,200.00
8/26/2025
302678
HUTCHINSON UTILITIES
UTILITIES
83,616.09
8/26/2025
302679
HUTCHINSON WHOLESALE #1550
EQUIPMENT PARTS - MULTIPLE DEPTS
252.20
8/26/2025
302680
HUTCHINSON WHOLESALE #1551
FUEL FILTERS FOR GRINDER - CREEKSIDE
81.80
8/26/2025
302681
HUTCHINSON WHOLESALE #1552
PLAYGROUND SOCKET SET - PARKS
12.99
8/26/2025
302682
HUTCHINSON WHOLESALE #2520
ENGINE 2 ANTI -FREEZE - FIRE
39.98
8/26/2025
302683
HUTCHINSON, CITY OF
WATER BILLS - MULTIPLE DEPTS
6,733.75
8/26/2025
302684
HUTCHINSON, CITY OF
VOID
-
8/26/2025
302685
INDEPENDENT EMERGENCY SERVICES
911 PS/ALI SERVICE- POLICE
10.77
8/26/2025
302686
INTERSTATE BATTERY SYSTEM OF MPLS
BATTERY STOCK- HATS
1,053.65
8/26/2025
302687
INTERSTATE BEARING SYSTEMS INC
BAGGER PARTS-CREEKSIDE
137.20
8/26/2025
302688
ISD #423
JULY 2025 CE PAYOUT
8,245.60
8/26/2025
302689
JAUNICH, MATT
REIMB: CGMC, COMPASS MTGS -ADMIN
127.40
8/26/2025
302690
JIXXIE INC
COST OF GOODS SOLD - LIQUOR HUTCH
174.00
8/26/2025
302691
JLR GARAGE DOOR SERVICE
OVERHEAD DOOR RPR- WWTP
213.50
8/26/2025
302692
JOHNSON BROTHERS LIQUOR CO
COST OF GOODS SOLD - LIQUOR HUTCH
37,817.42
8/26/2025
302693
JOHNSON CONTROLS FIRE PROTECTION LP
MONITORING - EVENT CTR
202.34
8/26/2025
302694
JUUL UNDERGROUND LLC
AIRPORT RUNWAY CULVERT GRADING PROJECT
15,622.24
8/26/2025
302695
KAHNKE BROTHERS NURSERY
TREES -STREETS
2,164.50
8/26/2025
302696
KRANZ LAWN & POWER
OIL, CHAINS, BLADES, HELMET - PARKS
235.96
8/26/2025
302697
L & P SUPPLY OF HUTCHINSON INC
FUEL, BELTS, TIRES - MULTIPLE DEPTS
965.33
8/26/2025
302698
LAWSON PRODUCTS INC
WASHERS, NUTS, SCREWS, FITTINGS - HATS
444.87
8/26/2025
302699
LOGIS
LOGIS CONSULTING, LICENSING - MULTIPLE DEPTS
10,323.10
8/26/2025
302700
MARCO TECHNOLOGIES LLC
PRINTING CONTRACTS - MULTIPLE DEPTS
263.12
8/26/2025
302701
MCLEOD COUNTY RECORDER
NOTARY COMMISSION - POLICE
20.00
8/26/2025
302702
MCLEOD FOR TOMORROW
MCLEOD FOR TOMORROW - MULTIPLE DEPTS
1,800.00
8/26/2025
302703
MEEKER COUNTY TREASURER
REGISTER NOTARY- MV
20.00
8/26/2025
302704
MEI TOTAL ELEVATOR SOLUTIONS
ELEVATOR MAINTENANCE - LIBRARY
236.42
8/26/2025
302705
MENARDS HUTCHINSON
REPAIR& MAINTSUPPLIES- MULTIPLE DEPTS
814.23
8/26/2025
302706
MIDWEST PLAYSCAPES INC
PLAYGROUND SAFETY MULCH - PARKS
2,940.00
8/26/2025
302707
MINI BIFF
PORTA TOILET RENTALS- MULTIPLE DEPTS
1,235.93
8/26/2025
302708
MINNESOTA DEPT OF LABOR & INDUSTRY
PRESSURE VESSEL INSPECTIONS - MULTIPLE DEPTS
450.00
8/26/2025
302709
MINNESOTA VALLEY TESTING LAB
LAB SAMPLE TESTING - MULTIPLEDEPTS
5,692.80
8/26/2025
302710
MOMENTUM TRUCK GROUP
MS812TWHEEL -STREETS
790.00
8/26/2025
302711
N EO ELECTRICAL SOLUTIONS
REILREPAIR-AIRPORT
1,429.59
8/26/2025
302712
NORTH CENTRAL LABORATORIES
LAB CHEMICAL STANDARDS, SUPPLIES - WWTP
1,487.72
8/26/2025
302713
NOTHING BUT HEMP
COST OF GOODS SOLD - LIQUOR HUTCH
2O4.00
8/26/2025
302714
OFFICE DEPOT
OFFICE SUPPLIES - MULTIPLE DEPTS
318.68
8/26/2025
302715
OFFICE OF SECRETARY OF STATE
NOTARY RENEWAL- POLICE
120.00
8/26/2025
302716
OFFICE OF THE SECRETARY OF STATE
NOTARY RENEWAL- MV
120.00
8/26/2025
302717
PACE ANALYTICAL SERVICES LLC
SEDIMENT TESTING&ANALYSIS- STORMWATER
951.00
8/26/2025
302718
PAUSTIS WINE COMPANY
COST OF GOODS SOLD - LIQUOR HUTCH
5,356.50
8/26/2025
302719
PEOPLEREADY INC
CREEKSIDE TEMP STAFFING
3,956.40
8/26/2025
302720
PHILLIPS WINE & SPIRITS
COST OF GOODS SOLD - LIQUOR HUTCH
8,976.67
8/26/2025
302721
PIONEER ATHLETICS / PIONEER MFG
STARLINER PAINTER FOR VMF - PARKS
218.88
8/26/2025
302722
PJN BUILDERS LLC
HOME REPAIR GRANT - HRA
9,800.00
8/26/2025
302723
POLYDYNE INC
DEWATERING POLYMER - WWTP
2,740.50
8/26/2025
302724
POMP'S TIRE SERVICE INC
EN945GTIRES -ENG
1 555.20
CHECK REGISTER A FOR CITY OF HUTCHINSON
CHECK DATES 8/13/25 - 8/26/25
Check Date
Check#
Name
Description
Amount
8/26/2025
302725
POSTMASTER
UTILITY BILLS
1,930.00
8/26/2025
302726
PREMIER TECH SYSTEMS & AUTOMATION
BAGGER PARTS - CREEKSIDE
41.86
8/26/2025
302727
PREMIUM WATERS
PARK BREAKROOM WATER
96.73
8/26/2025
302728
PRO AUTO MN INC
OIL CHANGES, TIRE REPAIRS - MULTIPLE DEPTS
132.69
8/26/2025
302729
REINER ENTERPRISES INC
ST. CLOUD YARDWASTE HAULING - CREEKSDIE
7,347.61
8/26/2025
302730
RUNNING'S SUPPLY
REPAIR & MAINT SUPPLIES - MULTIPLE DEPTS
233.37
8/26/2025
302731
S&STRUCKING LLC
ST. CLOUD HAULING -CREEKSIDE
750.76
8/26/2025
302732
SAM'S TIRE SERVICE
TIRES SQD 8 - POLICE
552.00
8/26/2025
302733
SCHERER & SONS TRUCKING INC
FLATBED TRUCKING - CREEKSIDE
1,075.00
8/26/2025
302734
SCHWEISS DOORS
STORM DAMAGE REPAIRS -AIRPORT
6,097.32
8/26/2025
302735
SMALL LOT WINE AND SPIRITS
COST OF GOODS SOLD - LIQUOR HUTCH
1,472.60
8/26/2025
302736
SOUTHERN GLAZER'S WINE AND SPIRITS
COST OF GOODS SOLD - LIQUOR HUTCH
11,716.83
8/26/2025
302737
SOUTHERN MINNESOTA INSPECTION
ANNUAL LIFT INSPECTIONS- MULTIPLE DEPTS
2,352.65
8/26/2025
302738
ST. CLOUD REFRIGERATION INC
HVAC AUTOMATION, REPAIR - ARENA
24,584.18
8/26/2025
302739
STANDARD PRINTING-N-MAILING
POSTAGE, UB BILLS- MULTIPLE DEPTS
8,193.13
8/26/2025
302740
STAPLES ADVANTAGE
OFFICE SUPPLIES - MULTIPLE DEPTS
314.29
8/26/2025
302741
STREICH TRUCKING
BULKFREIGHT- CREEKSIDE
7,965.00
8/26/2025
302742
SUMMER LAKES BEVERAGE LLC
COST OF GOODS SOLD - LIQUOR HUTCH
363.00
8/26/2025
302743
SYSCO WESTERN MN
AQUATIC CENTER - CONCESSIONS
5,023.56
8/26/2025
302744
TALL SALES COMPANY
JULY COMMISSIONS - CREEKSIDE
12,329.84
8/26/2025
302745
THOMPSON EXCAVATING LLC
REED SEDGE PEAT-CREEKSIDE
10,150.00
8/26/2025
302746
THOMSON REUTERS-WEST
CLEAR SEARCH SUBSCRIPTION - POLICE
213.05
8/26/2025
302747
TRI COUNTY WATER
BOTTLED WATER - MULTIPLE DEPTS
134.56
8/26/2025
302748
TRUE BRANDS
COST OF GOODS SOLD - LIQUOR HUTCH
435.51
8/26/2025
302749
TRUSTED COACHES
BACKGROUND CHECKS & TRAINING - REC
970.00
8/26/2025
302750
TWO-WAY COMMUNICATIONS INC
MS785T & MS721T -STREETS
580.90
8/26/2025
302751
UNITED TACTICAL SYSTEMS LLC
PEPPERBALL ROUNDS - POLICE
1,079.75
8/26/2025
302752
USA BLUE BOOK
LAB SUPPLIES - WWTP
172.76
8/26/2025
302753
VERIZON WIRELESS
PHONE SERVICES
760.22
8/26/2025
302754
VESSCO INC
WATSON MARLOW PUMPHEAD -WWTP
1,226.47
8/26/2025
302755
VIKING BEER
COST OF GOODS SOLD - LIQUOR HUTCH
14,142.60
8/26/2025
302756
VIKING COCA COLA
COST OF GOODS SOLD - LIQUOR HUTCH
509.35
8/26/2025
302757
VINOCOPIA INC
COST OF GOODS SOLD - LIQUOR HUTCH
1,712.75
8/26/2025
302758
VOS CONSTRUCTION INC
HVAC VENTILATION PROJECT 2024 - FIRE
5,220.00
8/26/2025
302759
WASTE MANAGEMENT OF WI -MN
REFUSE TAKEN TO LANDFILL
9,017.53
8/26/2025
302760
WELCOME NEIGHBOR
ADVERTISING - LIQUOR HUTCH
60.00
8/26/2025
302761
WEST CENTRAL SANITATION INC
REFUSE - COH & RESIDENTIAL
60,782.43
8/26/2025
302762
WILSON'S NURSERY INC
TREES -STREETS
4,286.00
8/26/2025
302763
WINE COMPANY, THE
COST OF GOODS SOLD - LIQUOR HUTCH
2,352.40
8/26/2025
302764
WINN EXTERIORS LLC
PERMIT REFUND - BLDG INSPEC
61.00
8/26/2025
302765
WM MUELLER & SONS
1/4 VIRGIN SAND BLACKTOP - STREETS
364.91
8/27/2025
302766
GAVIN, JANSSEN, STABENOW, & MOLDAN LTD
PROSECUTIONS - LEGAL
3,700.00
8/28/2025
302767
HUTCHINSON, CITY OF
WATER BILL - HATS
1,372.30
8/29/2025
302768
THOMSON REUTERS-WEST
OPERATING SUPPLIES - LEGAL
1,412.42
Total - Check Register A:
$ 952,574.85
Department Purchasing Card Activity -July 2025
Date
Department
Vendor Name
Description
Amount
7/28/2025
ADMIN
COUNTRY INN & SUITES
Hotel Cost for GCMC Summer Conference
379.10
7/27/2025
ADMIN
BURGER KING
Lunch coming backfrom GCMC Summer Conference
14.66
7/15/2025
CITY OF HUTCHINSON
CASH WISE FOODS
Directors Picnic meat/cookies/groceries
931.96
7/15/2025
CITY OF HUTCHINSON
WAL-MART
Directors Picnic groceries
66.81
7/17/2025
CITY OF HUTCHINSON
CASH WISE FOODS
Directors Picnic groceries
6.99
7/2/2025
CREEKSIDE
Mailchimp
Email marketing, monthly newsletter
33.00
7/3/2025
CREEKSIDE
IA DEPT OF AGRICULTURE
Jan -Jun 2025 Fertilizer fees
120.06
7/4/2025
CREEKSIDE
ULINE
Open House supplies
189.50
7/4/2025
CREEKSIDE
ULINE
Open House supplies
189.49
7/8/2025
CREEKSIDE
SPS COMMERCE
June 2025 SPS fees; UH/Do it Best
252.21
7/9/2025
CREEKSIDE
APPLE.COM/BILL
iCloud storage; Akosek
0.99
7/9/2025
CREEKSIDE
US COMPOSTING COUNCIL
2025-2026 USCC STA Membership renewal
975.00
7/9/2025
CREEKSIDE
US COMPOSTING COUNCIL
2025-2026 USCC STA Membership renewal
850.00
7/14/2025
CREEKSIDE
AMAZON
Particulate respirators
32.44
7/15/2025
CREEKSIDE
DSUBANCOM
Trailer #130 tarp stops
186.50
7/15/2025
CREEKSIDE
DSUBANCOM
Trailer #129 tarp stops
186.50
7/16/2025
CREEKSIDE
TARGET
Open House supplies
5.40
7/16/2025
CREEKSIDE
TARGET
Open House supplies
5.39
7/16/2025
CREEKSIDE
CASH WISE FOODS
Open House supplies
86.31
7/16/2025
CREEKSIDE
CASH WISE FOODS
Open House supplies
86.31
7/16/2025
CREEKSIDE
WM SUPERCENTER
Open House supplies
19.38
7/16/2025
CREEKSIDE
WM SUPERCENTER
Open House supplies
19.38
7/18/2025
CREEKSIDE
AMAZON
Kleenex
4.61
7/18/2025
CREEKSIDE
AMAZON
Open House supplies
9.99
7/18/2025
CREEKSIDE
WAL-MART
Open House supplies
15.48
7/18/2025
CREEKSIDE
WAL-MART
Open House supplies
15.48
7/18/2025
CREEKSIDE
COSTCO
Open House supplies
508.61
7/18/2025
CREEKSIDE
COSTCO
Open House supplies
508.61
7/13/2025
EDA
UDEMY: ONLINE COURSES
Professional development course on Al
97.08
7/17/2025
EDA
JIMMY JOHNS
Lunch for Finance Team meeting
111.59
7/25/2025
EDA
JIMMYS PIZZA HUTCHINSON
Lunch for EDA Board meeting
101.89
7/28/2025
EDA
GoToCom*GoToMeeting
GO TO Meeting subscription
155.34
7/29/2025
EDA
CASH WISE FOODS
Plates, etc. for Workforce Roundtable
17.23
7/29/2025
EDA
CASH WISE -CARIBOU
Coffee for Workforce Roundtable
86.06
7/30/2025
EDA
CASH WISE FOODS
Plasticware for Workforce Roundtable
2.69
7/30/2025
EDA
CASH WISE FOODS
Snacks for Workforce Roundtable
27.98
7/10/2025
FINANCE
AMAZON
City Center - Sharpie pens
11.26
7/15/2025
FINANCE
AMAZON
Admin - business card holder
7.19
7/31/2025
FINANCE
EZBUSINESS FEE
Credit Card Service Fee
15.00
7/10/2025
FIRE
CASH WISE FOODS
Bottled drinking water
37.90
7/18/2025
FIRE
FASTENAL COMPANY
Threaded rod, charcoal grill repair
24.73
7/20/2025
FIRE
SPTRUEWERK
FF uniform pants
151.30
7/20/2025
FIRE
CARLY'S SHOES
Black boot polish for FF uniform boots
11.98
7/25/2025
FIRE
DOMINO'S
FF food for multi hour grain bin rescue call
39.65
7/25/2025
FIRE
DOMINO'S
FF food for multi hour grain bin rescue call
59.48
7/24/2025
FIRE
WM SUPERCENTER
Bottled drinking water & electrolyte powder
102.41
7/30/2025
FIRE
CASH WISE FOODS
Coffee supplies
80.95
7/8/2025
IT
NETWORKSOLUTIONS
Public Arts Email
2.25
7/17/2025
IT
SOLARWINDS
Desktop remote control software
288.00
7/17/2025
IT
BESTBUYCOM
Samsung 43" TV
279.99
7/18/2025
IT
AMAZON
HDMI Cable
7.99
7/18/2025
IT
AMAZON
HDMI Cable
9.29
7/24/2025
IT
AMAZON
iPhone case
12.99
7/24/2025
IT
AMAZON
Galaxy Tablet Case
21.59
7/30/2025
IT
TERMINALDEPOT
CC reader power supply
35.12
7/31/2025
IT
AMAZON
Laptop Battery
55.98
7/1/2025
LIQUOR HUTCH
FACEBOOK
FB advertising
81.33
7/2/2025
LIQUOR HUTCH
City Hive Inc
Website and Online ordering fee
99.11
7/6/2025
LIQUOR HUTCH
AMAZON
Bathroom tissue
47.97
7/6/2025
LIQUOR HUTCH
AMAZON
Paper towels
144.54
7/9/2025
LIQUOR HUTCH
AMAZON
Shelf tag backing
75.46
7/11/2025
LIQUOR HUTCH
MENARDS HUTCHINSON MN
Cleaning supplies
36.05
7/11/2025
LIQUOR HUTCH
HUTCHINSON ACE
Bolts for cooler slides
4.99
7/16/2025
LIQUOR HUTCH
RITE
Cloudretailer POS monthly fee
268.44
7/17/2025
LIQUOR HUTCH
AMAZON
Push Spring Dispensers for THC section reset
791.42
7/20/2025
LIQUOR HUTCH
AMAZON
6 pack rings
216.24
7/18/2025
LIQUOR HUTCH
AMAZON
Thermal cash register tape
140.72
7/22/2025
LIQUOR HUTCH
AMAZON
Cloth tablecloths for store events
78.71
7/23/2025
1 LIQUOR HUTCH
EBAY
Door closer for automatic doors
61.37
Department Purchasing Card Activity -July 2025
Date
Department
Vendor Name
Description
Amount
7/28/2025
ADMIN
COUNTRY INN & SUITES
Hotel Cost for GCMC Summer Conference
379.10
7/23/2025
LIQUOR HUTCH
AMAZON
Labels for THC section reset
13.99
7/25/2025
LIQUOR HUTCH
AMAZON
Case for social media Ipad
10.78
7/27/2025
LIQUOR HUTCH
OPENAI CHATGPT SUBSCR
Monthly ChatGPT subscription for social media marketing
20.00
7/30/2025
LIQUOR HUTCH
AMAZON
Kleenex
86.30
7/30/2025
LIQUOR HUTCH
AMAZON
labels for THC section reset
12.92
7/22/2025
MOTOR VEHICLE
PEOPLESCAFE
Lunch while on tour of the Rush City Prison
25.57
7/3/2025
PARK & REC
AMAZON
Sanitizer Test Tape
10.79
7/2/2025
PARK & REC
WHEN I WORK INC
Employee Scheduling Software
420.00
7/2/2025
PARK & REC
MAGNOLIA BLOSSOM LLC
Senior Trips - August Tour
2,921.28
7/6/2025
PARK & REC
KWIK TRIP
Concessions Supplies - Roberts/Waterpark
392.31
7/3/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
391.81
7/9/2025
PARK & REC
KWIK TRIP
Concessions Supplies - Roberts/Waterpark
184.46
7/8/2025
PARK&REC
CHURCH BASEMENT LADIES
Senior Trips -August Tour
1,663.58
7/13/2025
PARK & REC
KWIK TRIP
Concessions Supplies - Roberts/Waterpark
409.37
7/11/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
382.90
7/13/2025
PARK & REC
WAL-MART
Concessions Supplies - Roberts/Waterpark
20.86
7/16/2025
PARK & REC
KWIK TRIP
Concessions Supplies - Roberts/Waterpark
504.00
7/16/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
303.64
7/16/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
429.16
7/16/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
33.99
7/17/2025
PARK & REC
Prime Video
Senior Center Movie - "The Long Game"
4.30
7/20/2025
PARK & REC
KWIK TRIP
Concessions Supplies - Roberts/Waterpark
204.68
7/20/2025
PARK & REC
KWIK TRIP
Concessions Supplies - Roberts/Waterpark
199.00
7/20/2025
PARK & REC
AMAZON
Headset for Phone
129.99
7/21/2025
PARK & REC
WM SUPERCENTER
Concessions Supplies - Roberts/Waterpark
87.32
7/22/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
56.80
7/22/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
56.80
7/22/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
140.94
7/24/2025
PARK & REC
KWIK TRIP
Concessions Supplies - Roberts/Waterpark
238.00
7/23/2025
PARK & REC
AMAZON
File Cabinet for Office
179.98
7/22/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
400.66
7/22/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
400.66
7/27/2025
PARK & REC
KWIK TRIP
Concessions Supplies - Roberts/Waterpark
312.00
7/29/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
93.96
7/29/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
74.52
7/31/2025
PARK & REC
KWIK TRIP
Concessions Supplies - Roberts/Waterpark
384.00
7/31/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
303.93
7/31/2025
PARK & REC
AMAZON
Concessions Supplies - Roberts/Waterpark
273.54
7/9/2025
PLANNING
AMAZON
Signs
13.94
7/9/2025
PLANNING
AMAZON
Signs
13.94
7/11/2025
PLANNING
INTERNATIONAL FACILITY M
JJ - IFMA membership
349.00
7/13/2025
PLANNING
AMAZON
Occupancy Sensor
156.00
7/6/2025
POLICE
AMAZON
Nitrile gloves
62.00
7/17/2025
POLICE
AMAZON
Signage
16.99
7/16/2025
POLICE
AMAZON
Paper towels
33.68
7/17/2025
POLICE
AMAZON
Hand soap
50.63
7/23/2025
POLICE
AMAZON
Lens cleaner
18.85
7/30/2025
POLICE
Philips North America
Defib battery (west arena)
128.52
7/30/2025
POLICE
AMAZON
Roll towels and scissors
197.14
7/2/2025
PUBLIC WORKS
CUSTOMER ELATION
Monthly Dispatch Services -Total $285.60
142.80
7/2/2025
PUBLIC WORKS
CUSTOMER ELATION
Monthly Dispatch Services
142.80
7/2/2025
PUBLIC WORKS
UTILITY LICENSE APPLICATION
Utility Crossing Application
3,500.00
7/9/2025
PUBLIC WORKS
eBay
Refund Posted for this Duplicate Pymt last month
70.12
7/9/2025
PUBLIC WORKS
eBay
Eco Drain 21 Parts
70.12
7/9/2025
PUBLIC WORKS
AMAZON
Replacement Drain Valve for Compressor
308.99
7/10/2025
PUBLIC WORKS
TRAFFIC SAFETY WAREHOUSE
Red Stop Sign Flashing Beacons for Temp at Fairgrounds
518.32
7/14/2025
PUBLIC WORKS
AMAZON
Micro SD Card Reader
12.92
7/20/2025
PUBLIC WORKS
FULLSOURCE LLC
Safety Vest
70.96
7/20/2025
PUBLIC WORKS
AMAZON
Packing Tape Dispensers
32.74
7/24/2025
PUBLIC WORKS
NAIL GUN DEPOT
Digital Level
374.54
7/24/2025
PUBLIC WORKS
HAYES INSTRUMENT
Marking Paint
166.80
7/23/2025
PUBLIC WORKS
HUTCHSTATION
Hutchinson Station Subscription for Streets Dept
6.99
7/25/2025
PUBLIC WORKS
AUTOMATION TECHNOLOGY
Valve for MBR
860.94
7/28/2025
PUBLIC WORKS
AMAZON
Office Chair
148.00
7/30/2025
PUBLIC WORKS
CUSTOMER ELATION
Monthly Dispatch Services
85.00
7/30/2025
PUBLIC WORKS
CUSTOMER ELATION
Monthly Dispatch Services
85.00
7/30/2025
PUBLIC WORKS
UTILITY LICENSE APPLICATION
Utility Crossing Application 2nd
3,500.00
7/31/2025
PUBLIC WORKS
LIBERTY TIRE SERVICES LLC
Tire Recycling
1,831.30
Department Purchasing Card Activity -July 2025
Date
Department
Vendor Name
Description
Amount
7/28/2025
ADMIN
COUNTRY INN & SUITES
Hotel Cost for GCMC Summer Conference
379.10
Total P-Cards:
$ 34,349.24
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
Agenda Item: Consideration of Charter Commission Amendments
Department: Legal
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Marc Sebora
Agenda Item Type:
Presenter: Marc Sebora
Reviewed by Staff ❑
Public Hearing
Time Requested (Minutes): 10
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
The Hutchinson Charter Commission met on January 13, 2025, and March 18, 2025, to review and discuss proposed
changes to the City Charter. The changes reviewed pertained to the following sections:
4.01 - Regular Municipal Election
4.011 - Primary Municipal Election
4.02 - Special Elections
4.03 - Filing for Office
On July 11, 2025, the Charter Commission formally submitted a recommendation to the City recommending that the
above -mentioned sections be amended by ordinance. The proposed ordinance encapsulates the specific changes as
proposed by the Charter Commission.
Minnesota Statute Section 410.12, Subd. 7 allows for Charter amendments to be enacted by ordinance following a
public hearing. These amendments may be considered for adoption by a unanimous vote of the Council via
ordinance. If approved, the second reading and adoption of the ordinance with the amendments would be set for
September 9, 2025. Should the Council approve the ordinance, the amendments will take effect 90 days from the
date of the adoption of the ordinance. During that 90 day period, citizens can circulate a petition and file with the City
a petition with 1010 verified signatures of registered voters requesting that any of the proposed changes above be
voted on at a referendum.
This ordinance must be approved unanimously in order to take effect.
BOARD ACTION REQUESTED:
Consider recommendations of Charter Commission for City Charter amendments and set second reading of
Ordinance No. 25-857 for September 9, 2025.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
HUTCHINSON CHARTER COMMISSION
July 11, 2025
Hutchinson City Council
111 Hassan St. SE
Hutchinson, MN 55350
Re: Charter Commission Recommendation
Dear City Council:
The Hutchinson Charter Commission met on January 13, 2025 and March 18, 2025, to review
and discuss proposed changes to the City Charter. The changes reviewed pertain to sections in
Chapter 4 — Nominations and Elections.
The Charter Commission voted to recommend amendment, by way of ordinance, of the sections
as follows:
Section 4.01. REGULAR MUNICIPAL ELECTION. A regular municipal election shall be
held on the first Tuesday after the first Monday in November of each even -numbered year at such
place or places as the city council may designate. The city administrator shall give at least two
weeks' publication notice of the time and place of holding such election, and of the officers to be
elected. At least one xeel two weeks before the election the city administrator shall publish a
mile bnotice to voters pursuant to Minnesota Statute Section 204D.16 in the official
newspaper and post a sample ballot at appropriate locations for public inspection. Failure to give
such a notice or to make such publication or posting shall not invalidate the election.
ill • PAT111111111116T
1111 1141�. ..
Section 4.02. SPECIAL ELECTIONS. The council may by resolution order a special election
and provide all means for holding it. Except as provided in Section 2.09, the city administrator
shall give at least two weeks" published notice of a special election. The procedure at such election
shall conform as nearly as possible to that prescribed for other city elections. , :,,eluding a
m-unieipa4 e'eetion if an „leetive eff ee is to be filled at the speeia4 eleeti
Section 4.03. FILING FOR OFFICE. No earlier than 60 98 days or later than 4-5 84 days before
the re ular municipal prime election, or such other time periods mandated by law, any registered
voter of the city qualified under the state constitution for elective office may, by filing an affidavit
of candidacy for a designated elective office and paying a filing fee of $20 to the city administrator,
have such voter's name placed on the regular municipal pr-ifnafy election ballot. Absentee ballots
shall be available -30 46 days prior to the prime or regular municipal election. Each sueh
These amendments include eliminating the designated seat system and primary elections. Some
of the amendments also include language changes to coincide with Minnesota election law.
On behalf of the Charter Commission, please accept the recommendations as described above
and consider adopting them by ordinance.
Ordinance No. 25-857
Publication No.
AN ORDINANCE ADOPTING REVISIONS TO SECTIONS 4.01, 4.011, 4.02 and 4.03
OF HUTCHINSON CITY CHARTER
The City Council hereby ordains:
WHEREAS, the Hutchinson Charter Commission met on January 13, 2025, and March
18, 2025, to review sections of the City Charter for updating or amending; and,
WHEREAS, the Hutchinson Charter Commission voted unanimously for revisions to be
made to Section 4.01 amending the publication requirements for sample ballots to coincide with
state law; and,
WHEREAS, the Hutchinson Charter Commission voted unanimously for revisions to be
made to Section 4.011 by striking the entire section; and,
WHEREAS, the Hutchinson Charter Commission voted unanimously for revisions to be
made to Section 4.02 by removing language referencing a primary municipal election; and,
WHEREAS, the Hutchinson Charter Commission voted unanimously for revisions to be
made to Section 4.03 by removing language referencing a primary election and amending the
timelines for candidate filing periods and absentee ballot availability to coincide with statutory
requirements; and,
WHEREAS, Minnesota Statute 410.12, Subd. 7, allows Charter changes to be made by
ordinance,
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
HUTCHINSON, THAT
Sections 4.01, 4.011, 4.02 and 4.03 of the Hutchinson City Charter as attached hereto are
hereby revised and these changes to the City Charter will take effect 90 days from adoption of
this ordinance.
Adopted by the City Council this day of , 2025.
Attest:
Matthew Jaunich, City Administrator Gary T. Forcier, Mayor
Section 4.01. REGULAR MUNICIPAL ELECTION. A regular municipal election shall be
held on the first Tuesday after the first Monday in November of each even -numbered year at
such place or places as the city council may designate. The city administrator shall give at least
two weeks' publication notice of the time and place of holding such election, and of the officers
to be elected. At least one week two weeks before the election the city administrator shall
publish a sample WW4 notice to voters pursuant to Minnesota Statute Section 204D.16 in the
official newspaper and post a sample ballot at appropriate locations for public inspection.
Failure to give such a notice or to make such publication or posting shall not invalidate the
election.
M.. �:�tsss�r!�rrs.
No
Section 4.02. SPECIAL ELECTIONS. The council may by resolution order a special election
and provide all means for holding it. Except as provided in Section 2.09, the city administrator
shall give at least two weeks' published notice of a special election. The procedure at such
election shall conform as nearly as possible to that prescribed for other city elections.
Section 4.03. FILING FOR OFFICE. No earlier than bd 98 days or later than 45. 84 days
before the regular municipal pr-imat=y election, or such other time periods mandated by law, any
registered voter of the city qualified under the state constitution for elective office may, by filing
an affidavit of candidacy for a designated elective office and paying a filing fee of $20 to the city
administrator, have such voter's name placed on the regular municipal primary election ballot.
Absentee ballots shall be available �0 46 days prior to the priffhar"r regular municipal election.
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
Born Learning Trail - Park Request
Agenda Item:
Department: PRCE
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Lynn Neumann
Agenda Item Type:
Presenter: Community Member - Ari Z
Reviewed by Staff
Communications, Requests
Time Requested (Minutes): 5
License Contingency N/A
Attachments: No
BACKGROUND/EXPLANATION OFAGENDA ITEM:
Community member, Ari Zaske, has reached out to PRCE regarding the addition of a United
Way Born Learning Trail to our parks system. She presented this request to the PRCE Advisory
Board on Monday, August 18th, and the Board expressed their support for the project. The
proposed location for the trail is Rotary Park.
The Born Learning Trail provides valuable resources for early childhood learning and offers
opportunities for visibility and volunteer engagement. These engaging, physical learning
activities are designed for parents or caregivers to enjoy with young children in outdoor settings
such as trails, parks, and schoolyards. Attached are photo examples of the Born Learning Trail.
Citizens Bank and SWIF have committed to supporting this project. SWIF will fund the Born
Learning Trail Kit, while Citizens Bank will handle the installation of the trail in collaboration with
Parks Staff.
Ari Zaske will attend the council meeting to present the request and discuss funding and
installation options for the project. Lynn Neumann will also be present to address any additional
questions.
BOARD ACTION REQUESTED:
Approve the Born Learning Trail Park Request.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No 0
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
g
i
, . ..
.' <<. point � a&
rea
,y ,, f)rf11/, l�,
-i
��,.
"&Ak wa
Start your child on the road to reading.'1
�'. 1 �'•;.`.' �`i At .
��'=���,#:�� •� - .. -r . "fir:. ���� d�':,
41
r __ Trail tip: Playing with letters and sounds helps
_, children get ready to read. - '4 _'_
c
• - l .
� United
Way
I
For more ideas, visit -
b—le—mgo�rgdi'
y ..
vt Sc
k senale a Z ,�-
_� lea
_ -
_ rn -
14 f, Ar'n� 'fit
Comience el Camino de leer con su Wino.
Sefiale [as tetras pintaclas en el suelo.
1\� - Diga et soniclo que hace cada tetra..�_
T _
iL Jen urn,
�.
Lugar con Las tetras y Los sonidos ayudan V
a preparar a Los nmos a leer.
LIVE UNITED
_
Mriant
Did you nal learning is
happeni :he time?
- Fm war .n Wgether, just look
for the irning Trpl1 signs.
- 0y play iJ exploring you help
young "Oh!!- get ready for success
50a • ,rid in IIEe.
can tum everytlay
moma „ earning moments.
- - happy tra[tsl . '.
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
Hutchinson Junior League Baseball Association - Batting Cage Request
Agenda Item:
Department: PRCE
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Lynn Neumann
Agenda Item Type:
Presenter: Hutchinson Junior League I
Reviewed by Staff
Communications, Requests
Time Requested (Minutes): 10
License Contingency N/A
Attachments: No
BACKGROUND/EXPLANATION OFAGENDA ITEM:
The Hutchinson Baseball Association has contacted PRCE regarding their request to add a
batting cage to Northwoods Park. Josh Vandenberg presented this request to the PRCE
Advisory Board.
The association has been actively fundraising for this project, which is currently not included in
the city's Capital Improvement Plan (CIP). They propose to cover the cost of the materials and
equipment needed for the batting cage, and they have requested that Parks staff handle the
installation to help reduce overall costs. However, the PRCE Department has not yet established
a date for the installation. PRCE staff indicated they are willing to perform the labor once the
association has completely raised the necessary funds to purchase all required materials and
equipment. PRCE staff will make the decision when the installation would occur based off
staffing capacity and other projects.
Josh Vandenberg, a community member and member of the Hutchinson Junior League Baseball
Association, will attend the upcoming council meeting to present the request and discuss the
fundraising efforts for the batting cage. Lynn Neumann will also be present to address any
additional questions.
BOARD ACTION REQUESTED:
No City Council Action is needed at this time.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No 0
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
VMF Grandstand Project Update - Final Costs and Funding
Agenda Item:
Department: Finance
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Andy Reid
Agenda Item Type:
Presenter:
Reviewed by Staff
Communications, Requests
Time Requested (Minutes):
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
Now that the VMF Grandstand project is complete and the State Amateur baseball tournament is in
progress, I wanted to present the City Council with a final cost and funding analysis of the project.
The attached analysis shows that the actual costs of $680,780 exceeded the estimated project by
$30,780. In turn, donations totaled $280,780 and exceeded the estimate by $30,780.
The net cost to the City is $400,000, which is the maximum amount set by the city council when the
project was approved. The donation total includes $50,000 to be received in 2026.
The increase in costs is related to contractor work that wasn't anticipated when the project was bid,
such as additional water lines, relocated curb stop, added wire mesh to sidewalks, added curb and
sidewalk between the garages/buildings and ADA strip in front of the grandstand. These costs were
covered by the contingency set aside for the project.
Other costs were added at the request of the Huskies and covered by additional donations, such as
fencing behind/under the grandstand, grading for the artificial turf and landscaping materials.
BOARD ACTION REQUESTED:
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost: $ 680,780.00
Total City Cost: $ 400,000.00 Funding Source: Capital Projects Fund - Facility Plan
Remaining Cost: $ 280,780.00 Funding Source: Donations received to date & in 2026
VMF Grandstand Project
Grandstand Cost
Architect Cost
Other City Costs / Contingency
Total Costs
Donations
Received to Date
To Receive in 2026
Total Donations
Estimate
Actual
Difference
$564,525
$590,783
$26,258
$43,000
$42,462
-$538
$42,475
$47,535
$5,060
$650,000
$680,780
$30,780
-$250,000
-$230,780
-$50,000
-$250,000-$280,780-$30,780
Net City Cost (Maximum) $400,000 $400,000 $0
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
Discussion on Using 429 Revenue Bonds to Assist with the Expansion of Housing
Agenda Item: within the Community
Department: Administration
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Matt Jaunich, Andy Reid
Agenda Item Type:
Presenter: Matt Jaunich, Andy Reid
Reviewed by Staff
Communications, Requests
Time Requested (Minutes): 15
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
Please see the attached memo and concept plan.
BOARD ACTION REQUESTED:
No action at this time. Discussion only.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source: N/A
Remaining Cost: $ 0.00 Funding Source: N/A
R
HUTCHINSON
A CITY ON PURPOSE.
Memo
Office of the City Administrator
111 Hassan Street SE
Hutchinson, MN 55350-2522
320-234-4241/Fax 320-234-4240
To: Mayor Forcier and City Council Members
From: Matt Jaunich, City Administrator
Date: 8/26/2025
Re: Discussion on Using 429 Revenue Bonds to Assist with the Expansion of Housing
within the Community
Workhorse Land Development is currently pursuing the Randy Anderson land off of Golf Course
Road and Montana Street for future housing. I've attached a copy of their concept plan which
includes 17 single family lots, 44 townhome units, 30 tri-plex units, and 168 apartment units.
For the past several months, the City has been talking with the Developer about doing a
Housing TIF to assist in the financing of the development. Recently, we were approached by
the Developer about the concept of using 429 Revenue Bonds, in addition to a Housing TIF, to
assist in the development costs. Staff has looked into this financing tool and is seeking City
Council input on whether or not this type of financial assistance would be acceptable.
Here is some additional background information.
Minnesota Statute 429 provides cities with the authority to issue bonds for private development.
As the Council is aware, we utilize this statute most years for our roadway improvement
bonding and the process the Developer is seeking would be similar to the extent of a statutory
process that needs to be followed, such as having the city council hold a hearing on the
improvement, ordering the improvement and preparation of plans/specifications, approving
plans/specifications, ordering advertisement of bids, declaring cost to be assessed, public
hearing on proposed assessments, accepting bid and awarding contract. This would require
time and effort by the city's engineering department, working with the Workhorse Land
Development team.
There are two options for issuing bonds:
1. General Obligation Bonds — this is our typical bond issuance for roadway
improvements where the City pledges its taxing authority to cover the debt service.
Issuing this type of bonds for Workhorse places all of the risk on the City, so it is not an
option we want to pursue.
2. Revenue Bonds — this option would pledge special assessment repayments as the only
source to service the debt. The City has no liability for debt service other than collecting
the assessments from the County and passing them along to the bond trustee. An
escrow account would likely be created with a portion of the bond proceeds, to be
managed by the bond trustee and used to cover any shortages in assessment revenue.
Please note that this is not a financing tool the City has used in the past, at least not in
recent history, for new housing developments.
The revenue bonds would be very similar to conduit bonds issued by the City with the main
difference being our involvement with assessments and carrying the liability on the City balance
sheet. For conduit bonds, we only need to provide notes within our annual audit report. Issuing
this type of bond could also impact future Bank Qualifications on city bonds. The Bank
Qualification issue is related to Tax -Exempt bonds issued by the City with a maximum of $10M
per year. If we go over the $10M, then it narrows the pool of buyers and ultimately pushes up
our interest rate. Tax-exempt bonds could be issued for city infrastructure within the project,
such as streets, water/sewer mains, etc. Taxable bonds could also be issued (and not applicable
to the Bank Qualification) for improvements to the actual, buildable lots. So, in the end, we
could in theory issue both types of bonds and perhaps the Tax-exempt issue could be low
enough to keep us under the $10M threshold. Just something to keep in mind with this type of
funding.
Revenue bonds present more risk to the bondholder due to the limited revenue source
(assessments) and no guaranty by the City tax levy. Therefore, the interest rate likely will be
higher to compensate for that risk. The bond company will probably scrutinize the revenue
stream and limit the amount of bonds in relation to assumptions made on the repayment
schedule of assessments, however that is all on the Workhorse Land Development team. The
benefit to Workhorse is that they likely need less up -front equity investments. With the debt
carried on the City's balance sheet, it is not on theirs in terms of the underwriting from the
other potential lenders involved, but this type of financing likely will lead to higher lot costs in
turn with the special assessments.
Finally, in the event of default on bond payments, our bond consultant doesn't believe that the
City's bond rating would be affected as long as we do everything we are supposed to do as
defined within the bond covenants.
If the Council is comfortable in pursuing this financing option, staff would recommend the
following as conditions:
The City will want to have a say in the bonding company Workhorse uses for this type of
financing. We will want to know which firms are involved and what they have done to
ensure that their bonding company selection was competitive.
The City will use Ehlers as our Bond Counsel and it is our expectation that Workhorse
and any of their partners would work closely with them on financing for this project.
As we noted, it is their intention to use Housing TIF as well. I would say the City is still
2
interested in providing this as an option, and the City would provide TIF for the
apartments. If 429 financing is going to be used, the City will not provide TIF to fund
the owner -occupied housing. If the City is going to be floating a bond on behalf of the
development, city staff has concerns on supplementing the owner -occupied housing
units with TIF when that would have a requirement that 95% of the first-time home
buyers needing to meet affordability requirements. With City public subsidy
requirements needing to fill the "gap", we can be supportive of one or the other, but not
both.
• When it comes to TIF, the City provides "Pay as You Go" TIF funding. The Pay Go Note
would be the responsibility of the developer.
• Also, when it comes to TIF, the Developer needs to keep in mind that only qualified
costs are reimbursable, which are to be verified by the City prior to and upon completion
of the project.
• The Developer needs to remember that a Housing TIF of any kind has a statutory
affordability requirement and this needs to be built into the proforma. 20% to 40% of
the rental units must meet the affordability requirements while it is 95% of the owner -
occupied units when TIF is used.
• It is also important for the Developer to remember that for a project to receive TIF, the
project needs to meet the "But For" Test as required by Minnesota Statutes. To do this
test they will have to be fully transparent and open on all of their revenue sources and
project expenses. Most of this information has not yet been provided to the City to run
an accurate TIF projection. Essentially, the City needs to know how much the Developer
is asking for and if that amount will meet the "But For" Test.
Andy and I will be present at the meeting to answer any questions you may have on this
funding possibility.
Matt
I
Concept Plan
Golf Course Rd, Hutchinson MN
Multi -Family Residential Development
IngI IFa ily
i
Date: 10/172024 Project By: Workhorse Land Development
%� ��i �"� j City: Hutchinson, MN 651100th St
PID:230365600 - �,✓ %�
� Roberts, WI 54023
I -- �' --
Park/PicklebalF � � � I I I I I I i t I
A_J L_J Concept Information
Unit Type(s): Single Family, Twinhomes, Tom homes, and Apartment
_ s
Twu 'Fto rest Unit Count: 259 units
Ir—, 17 Single Family Lots N
44 dm nhoe Units
r 1 \�'Rr30 Townhomes (3 Plex) Units
9
��\ _ wa168 Apartment Units
—_J IL J IL J IL_J ILJIl�j Roadway LF:4,3oo LF
Gross Density:
C
Site Information
Gross S to Area37.8 acres
\� Existin Zonin R 1 Low Density Residential
9 9 Y
Proposed Zonirtj.2 / R-3 / R-4 Residential Districts
r � I
Zoning Requirements - R-3 Medium -High Density Residential District
- - , Single Family Twinhomes Townhomes
t quit qu r Required Provided
7, ed Provided Re ed provided Re
_ Min. Lot Size 7,200 sf 7,200 sf 5,000 sf 5,000 sf 4,200 sf 4,200 sf
_10 >- Min. Lot Width
Intenor. 60' 80' 80, 80' non non
� �— K j Comer. 80' 80' n/a n/a non
/ Min. Lot Depth: 120' 130' 120' 120' non non
N
Front Setback: 8' 8. 10, 10, 30' a 30 e
Side Setback: 8' 8' 10' 10' 20' 20'
Comer Setback: 25' 25' 25'
25' 25' 25'
Rear Setback: 25' 25' 25' 25' 25' 25'
0
IT
PROJECT NAME
SURVEY NAME, SURVEY #
STREET ADDRESS ,Exas R NKNON EN G1 N EERI N G R RM rvo. 12 2 EX
CITY, TEXAS
oRTe'in 52-701 s PHONE # o
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
CONSIDERATION OF ORDINANCE FOR THE SALE OF MUNICIPALLY OWNED
Agenda Item: REAL PROPERTY
Department: EDA
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Miles R. Seppelt
Agenda Item Type:
Presenter: Miles R. Seppelt
Reviewed by Staff ❑
New Business
Time Requested (Minutes): 5
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
Preparations are continuing for the redevelopment of the old medical clinic site located at 126
Franklin Street North.
This past Spring, the City distributed a Request for Proposals (RFP) to developers inviting them
to submit ideas for redeveloping the site. As an incentive, the winning developer would be able
to purchase the site for $1. CG Real Estate Partners of St. Cloud submitted the proposal
deemed to be the in the best interests of the City and the best fit for the site. Their proposal calls
for the development of an 81-unit market rate apartment complex on the site with construction
projected to begin this fall.
The next step in the process is for the City Council to consider adoption of an ordinance selling
the property to the developer. The ordinance and purchase agreement are ATTACHED for your
review.
Staff will be on hand at the council meeting to provide additional information and answer any
questions you may have.
In the meantime, if you have any questions or need additional information, please give me a call
anytime at 234-4223.
BOARD ACTION REQUESTED:
Approval of first reading of ordinance.
Fiscal Impact: Funding Source: Planning dollars
FTE Impact: Budget Change: New Bu
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source:
Remaining Cost: $ 0.00 Funding Source:
ORDINANCE NO. 25-858
PUBLICATION NO.
AN ORDINANCE OF THE CITY OF HUTCHINSON, MINNESOTA, AUTHORIZING THE SALE OF
MUNICIPALLY OWNED REAL PROPERTY
THE CITY OF HUTCHINSON ORDAINS:
Section 1. That the municipally owned real property legally described as follows:
A. Lots 1, 2, 3, 4, 5, Block 41, North Half Hutchinson
B. W '/2 of Lots 6-7, Block 41, North Half Hutchinson
C. E'/2 of Lots 6-7, Block 41, North Half Hutchinson
for good and valuable consideration is hereby transferred and conveyed to Hutchinson — The Landing,
LLC or its successor or assigns as agreed upon in the purchase agreement.
Section 2. The City Administrator, Matthew Jaunich, or his designee is authorized to sign any
and all documents on behalf of the City to effectuate the closing of this transaction.
Section 3. This ordinance shall take effect upon its adoption and publication.
Adopted by the City Council this 9tn day of September, 2025.
Gary T. Forcier
Mayor
ATTEST:
Matthew Jaunich
City Administrator
PURCHASE AND SALE AGREEMENT
(the "Agreement ")
Date: _, 2025
(the "Agreement Date")
ARTICLE I
PARTIES
The parties to this Agreement are the City of Hutchinson, Minnesota, a Minnesota
municipal corporation ("Seller"), and Hutchinson — The Landing, LLC, a Minnesota limited
liability company ("Bum"). This Agreement sometimes refers to Seller and Buyer individually
as a "Party" and collectively as the "Parties."
ARTICLE II
PROPERTY/PURCHASE AND SALE
2.1 Proper . The real property that is the subject of this Agreement is commonly
known as: 126 FRANKLIN ST NW; 145 1 ST AVE NW; and 135 1 ST AVE NW, all located in
the City of Hutchinson, McLeod County, Minnesota, with assigned PID Nos. of 23-056-2880, 23-
056-2890, and 23-056-2900 respectively, the legal description of which is to conform to the Title
Commitment (as defined in Section 5.1(c)) and be added to this Agreement on the attached
EXHIBIT A (the "Land). The Land is generally depicted on the attached EXHIBIT A-1. The
term "Property" as used in this Agreement includes the Land and all improvements and fixtures
situated on, and all hereditaments and appurtenances to, the Land.
2.2 Project,• Purchase and Sale. In consideration of Buyer constructing an apartment
complex containing approximately eight -one (81) units, inclusive of sidewalks improvements and
necessary soil corrections, upon the Property (the "Project") Seller will sell the Property to Buyer,
and Buyer will purchase the Property from Seller, pursuant to the terms of this Agreement.
ARTICLE III
PURCHASE PRICE AND PAYMENT
3.1 Purchase Price. The purchase price for the Property is One and Zero/l00 Dollars
($1.00) (the "Purchase Price").
3.2 Payment Terms. Upon Seller's full performance of Seller's obligations under this
Agreement, at Closing, Buyer will tender the Purchase Price (subject to prorations, reductions and
credits as provided herein) to Seller in cash or certified funds via wire transfer.
175352372v2
ARTICLE IV
CLOSING
4.1 ClosinQ. The closing of the transaction this Agreement contemplates (the
"Closing") will occur through (the "Title Com an ") by 3:00 p.m.
on the earlier of (a) , 2025, or (b) on such other date as the Parties may mutually agree
to in writing ("Date of Closing"), at which time:
a. Seller will:
(i) Execute and/or deliver to the Title Company's closing agent (the
"Closing Agent"), with copies to Buyer, and make arrangements to have the
Closing Agent record or file in the appropriate county land records, any documents
necessary to establish the marketability of Seller's title to the Property, subject only
to Permitted Encumbrances (as defined below);
(ii) Execute and deliver the Deed (defined in Section 4.2) to Buyer;
(iii) Execute and deliver to Buyer and Title Company an appropriate
Minnesota Uniform Conveyancing Form Affidavit;
(iv) Deliver to Buyer and Title Company all necessary documents
authorizing Seller's conveyance of the Property to Buyer and identifying the
individual(s) authorized to execute the Deed and any other documents required by
this Agreement;
(v) Execute and deliver to Buyer a non -foreign affidavit containing such
information as is required under Internal Revenue Code Section 1445(b)(2) and any
regulations relating to Internal Revenue Code Section 1445(b)(2);
(vi) Execute and deliver to the Closing Agent, Buyer or other
appropriate party appropriate Federal Income Tax Reporting Forms;
(vii) Execute and deliver to the Closing Agent, with a copy to Buyer, a
completed Minnesota Department of Health Well Disclosure Certificate or include
on the Deed the statement "The Seller certifies that the Seller does not know of any
wells on the described real property" or the statement "I am familiar with the
property described in this instrument and I certify that the status and number of
wells on the described real property have not changed since the last previously filed
well disclosure certificate" followed by Seller's signature;
(viii) Execute and deliver to the Closing Agent, with a copy to Buyer, any
disclosures or statements required by any governmental or quasi -governmental
entity having jurisdiction over the Property;
(ix) Execute and deliver to the Closing Agent, with copies to Buyer, and
make arrangements to have the Closing Agent record or file in the appropriate
2
175352372v2
county land records, the affidavits described in Minnesota Statutes Sections 116.48,
subdivision 6 and 115B.16, subdivision 2 if required;
(x) Pay or provide evidence of payment of the following: the fees due
upon the recording any documents necessary to place record title in the condition
provided for in this Agreement; Seller's share of real estate taxes and, if applicable,
levied or pending special assessments pursuant to Article VI;
(xi) Deliver to Closing Agent with a copy to Buyer the signed settlement
statement in the form provided by Title Company;
(xii) Provide Buyer with all information necessary for Buyer to complete
a certificate of real estate value, transfer tax form, property transfer form, or similar
document, if applicable; and
(xiii) Execute such other documents as Closing Agent or Title Company
may reasonably require to close the transaction this Agreement contemplates.
b. Buyer will:
(i) Tender the Purchase Price to Seller in accordance with Article III
above;
(ii) Pay or provide evidence of payment of the following: the State Deed
Tax due upon the execution of the conveyance described in Section 4.2; the portion
of Buyer's share of real estate taxes and, if applicable, levied or pending special
assessments pursuant to Article VI; all costs associated with Buyer's inspection and
testing of. the Property; all costs associated with Buyer's financing, if any, including
mortgagee's title insurance policy costs and premiums, if any; the cost of the Title
Commitment; the premium for Buyer's owner's policy of title insurance, if any,
including the cost of any extended coverage and endorsements required by Buyer;
the fees due upon the recording of the Deed; Buyer's attorneys' fees; and the Title
Company's fee to conduct and insure the Closing;
(iii) Complete an electronic certificate of real estate value, transfer tax
form, property transfer form, or similar document, if applicable; and
(iv) Execute such other documents as Closing Agent or Title Company
may reasonably require to close the transaction this Agreement contemplates.
4.2 Conveyance Terms. Upon Buyer's full performance of Buyer's obligations under
this Agreement, at Closing, Seller will execute and deliver to Buyer a Limited Warranty Deed
("Deed"), the form of which is attached hereto as EXHIBIT B, conveying fee title to the Property
to Buyer subject only to the following:
a. The Covenant and Right of Re -Entry in favor of Seller set forth in the Deed;
b. Building, zoning and subdivision statutes, laws, ordinances and regulations;
3
175352372v2
C. Reservations of .minerals or of mineral rights in favor of the State, of
Minnesota, if any;
d. The lien of real estate taxes and special assessments not yet due and payable;
e. Liens, defects or encumbrances arising through Buyer;
f. Any documents affecting title expressly called for under this Agreement;
and
(collectively, "Permitted Encumbrances').
4.3 Possession. Upon Buyer's full performance of Buyer's obligations under this
Agreement, Seller will deliver possession of the Property to Buyer at Closing.
ARTICLE V
TITLE COMMITMENT AND TAX INCREMENT FINANCING
5.1 Title Commitment. Buyer, at Buyer's sole cost and expense, will obtain a
commitment from Title Company to issue an ALTA form Owner's Policy of Title, insuring
Buyer's title to the Property ("Title Commitment").
5.2 Tax Increment Financing Contin encv. The Parties' obligations to close on the
transaction contemplated under. this Agreement is contingent upon:
a. Seller . establishing Municipal, Development District No. 4 (the...
"Development District") and adopting a development program pursuant to Minnesota Statutes,.
Section 469.124 through 469.133, as amended;.and
b. Seller establishing, within the Development District, Tax Increment
Financing District No. 4-24 and adopting a tax increment financing plan therefor which provides
for the use of tax increment financing in connection with Buyer's development of the Project
within the Development District pursuant to the provisions of Minnesota Statutes, Section 469.174
through 469.1794, as amended.
ARTICLE VI
TAXES AND ASSESSMENTS / PRORATIONS
6.1 Taxes and Assessments. The Parties will pay the real estate taxes (which term, as
used in this Agreement, includes service charges assessed against real property on an annual, basis
pursuant to Minnesota Statutes Section 429.101) and special assessments as follows:.
a. On or before the.Date of Closing, Seller shall pay all real estate taxes and
service charges and any penalties and interest due and payable with respect to the Property
for all years prior to -the year of Closing.
II
u
175352372v2
b. . Buyer and Seller will pro -rate the real estate taxes and service charges (if
any) due and payable in the year of Closing on a per -diem basis using a calendar year, to
the Date of Closing. The Parties shall pro -rate these amounts using current year real estate
tax information if available, and, if current year tax information is not available, using the
amount of the -real estate taxes due and payable in the year immediately preceding the year
of Closing; provided, however, in the event a separate tax statement for the Property is
unavailable as, of the Date of Closing, the real estate taxes payable in the year of Closing
will be prorated based on the ratio of the square footage of the Property to the square
footage of the tax parcel or parcels which include(s) the Property. In such event, at such
time as a separate tax statement for the Property becomes available, Seller and Buyer agree
to recalculate the proration of real estate taxes for the Property payable in the year of
Closing and to make such adjustments, refunds or additional payments as are applicable
based on this subsection:
C. Buyer shall pay all real estate taxes, special assessments (except as provided
above), and service charges due and payable in the years following the year of Closing.
6.2 Prorations. Seller will pay all utility and other costs and expenses relating to the
Property and accruing prior to the Date of Closing. Buyer will pay all of such costs and expenses
accruing on and after the Date of Closing.
ARTICLE VII
REPRESENTATIONS; _WARRANTIES AND ADDITIONAL COVENANTS
7.1 By Seller. Except as expressly set forth in this Agreement, Seller makes no
representations, warranties or guarantees whatsoever including, but not limited to, any
representations, warranties or, guarantees as to the condition of or title to the Property or any
portion thereof. Seller represents and warrants to Buyer as follows:
a. Seller has the corporate authority necessary to enter into this Agreement and
comply with Seller's obligations hereunder;
b. Seller is not a foreign person, foreign partnership, foreign trust or foreign
estate as those terms are -defined in Section 1445 of the Internal Revenue Code;
C. To Seller's actual knowledge, there are no pending or threatened
condemnation or eminent domain proceedings which affect the Property;
d. To Seller's actual knowledge, there is no litigation pending or threatened
which affects the Property or the use thereof by Buyer;
e. To Seller's "knowledge, there are no wells, as that term is defined in
Minnesota Statutes Section 103I.005, subdivision 21, located on the Property.
f. -To Seller's knowledge, there are no underground or above ground storage
tanks of any size or type located on the Property and no underground sewage treatment
system is located'on or serves the Property.
5
175352372v2
g. To Seller's knowledge, methamphetamine production has not occurred on
the Property.
7.2 By Buyer. Buyer represents and warrants to Seller as follows:
a. Buyer is a limited liability company, validly existing and in good standing
under the laws of Minnesota. The individual(s) executing this Agreement on behalf of
Buyer have the legal and corporate authority and the legal capacity to execute this
Agreement on behalf of Buyer and to bind Buyer. Buyer has the full and complete
authority to enter into this Agreement, to purchase the Property, and construct the Project.
b. Buyer has not engaged any individual or entity to act as Buyer's real estate
agent or broker in connection with this transaction. Buyer agrees to indemnify and hold
Seller harmless from any claim, "damage; cost or expense for such brokerage commission
or finder's fee incurred as _a result of any other brokerage agreement entered into by Buyer,
and to pay all costs of defending any action or lawsuit brought to recover any such fees or
commissions incurred by Seller, including reasonable attorneys' fees.
C. Buyer is not a,person or entity with whom Seller is restricted from doing
business with under the USA Patriot Act and Anti -Terrorism Laws, including without
limitation persons and entities named on the Office of Foreign Asset Control Specially
Designated Nationals and Blocked Persons List and Buyer is not, directly or indirectly,
acting for or on behalf of any_ such person or entity. Buyer is not engaging in this
transaction, directly or indirectly, in violation of any laws relating to drug trafficking;
money laundering or predicate crimes to money laundering. None of the funds of Buyer
have been or will be derived from any unlawful activity with the result that the transaction -
contemplated hereby is or will be in violation of applicable State or Federal laws. Buyer
has and will continue to implement procedures to ensure that the foregoing representations
and warranties remain true and correct at all times prior to Closing.
7.3 AS -IS Condition.
a. Buyer is hereby purchasing the Property in "AS -IS, WHERE -IS" condition
and "with all faults", and agrees that it relies upon no warranties, representations or
statements by Seller, or any other persons acting by or on behalf of Seller, in entering into
this Agreement or in closing the transactions described herein, except for the express
representations and warranties set forth herein. Buyer's closing on the acquisition of the
Property shall constitute conclusive evidence that Buyer is satisfied with the condition of
and title to the Property. In closing and completing this transaction, Buyer will have relied
exclusively upon its own inspections and reviews, and not upon any representation or
warranty of Seller or its agents or employees except those expressly set forth herein.
b. Except for the express representations, warranties and obligations of Seller
set forth herein, Seller makes no warranties, representations or statements whatsoever,
express or implied, concerning or relating to the Property, including without limitation: the
income or expenses. of the Property; zoning and building codes and other similar
restrictions; availability or cost of utilities; the environmental condition of the Property;
m
175352372v2
the presence or absence of any hazardous substances, hazardous materials, petroleum, or
any substances regulated by federal, state or local law in, on or under the Property;
compliance of the Property with any law, regulation, ordinance or similar requirement,
including without limitation the Americans with Disabilities Act; or the physical'condition
of the Property or any improvements thereon. Buyer acknowledges that no agents,
employees, brokers or other persons are authorized to make any representations or
warranties for or on behalf of Seller.
C. Buyer acknowledges and agrees that any personal property, if any, to be
conveyed in this transaction from Seller to Buyer will be transferred by quit claim bill of
sale, with no representation,. warranty or guaranty, expressed or implied, regarding the
condition of or the title to such Personal Property, and Buyer further agrees to accept such
Personal Property in its "AS -IS, WHERE IS" condition at closing.
d. Buyer (arid any party claiming through or under Buyer) hereby agrees that
following the Closing, Seller shall be fully. and finally released from any and all claims or
liabilities against the Seller relating to or arising on account of the condition of or title to
the Property, including without limitation, any matters specifically referenced in this
Agreement, except for the express representations, warranties and obligations of Seller set
forth herein. This Section 7.3 shall survive the closing of the transactions contemplated by
this Agreement or the earlier termination of this Agreement.
ARTICLE .VIII
INDEMNIFICATION
8.1 By Seller. Seller must. indemnify and defend Buyer against and hold Buyer
harmless from any and all claims, causes of action, administrative orders, costs, expenses and
liabilities of every kind and nature and howsoever originating and existing, brought by third parties
against Buyer or Seller arising. out of. Seller's negligent or willful misconduct in its operation or
ownership of the Property prior to'the Date of Closing, including Buyer's attorneys' fees and costs
incurred in defending against claims to establish or enforce such liabilities. The provisions of this
Article VIII shall not apply to a breach of representation in Article VII, and for such breach of
representation the provisions of Article VII shall control.
8.2 By Buyer. Buyer must indemnify and defend Seller and hold Seller harmless from
any and all claims, causes of action, ,administrative orders, costs, expenses and liabilities of every
kind and nature howsoever originating and existing, brought by third parties arising out of Buyer's
negligent or willful. misconduct in its operation or ownership of the Property subsequent to the
Date of Closing, including Seller's attorneys' fees and costs incurred in defending claims to
establish or enforce such liabilities. The provisions of this Article VIII shall not apply to a breach
of representation in Article VII, and for such breach of representation the provisions of Article VII
shall control.
7
175352372v2
ARTICLE. IX
CONDEMNATION
If a public or private entity with the power of eminent domain commences condemnation
proceedings against all. of any part of the Property, Seller shall immediately notify Buyer, -,and
Buyer may, at Buyer's sole option, terminate this Agreement. Notwithstanding the foregoing,
Buyer may not terminate this Agreement if the condemnation is for a right-of-way or utility and
such condemnation will not materially affect Buyer's intended use of the Property. Buyer will
have 10 days from Buyer's receipt of Seller's notice to Buyer to exercise Buyer's termination right;
If Buyer does not exercise Buyer's termination right, then the Parties shall fully perform their
obligations under this Agreement, with no reduction in the Purchase Price, and Seller shall 'assign
to Buyer, on the Date of Closing, all of Seller's right, title and interest in any award made -or to'be
made in the condemnation proceedings. Seller may not designate counsel, appear or otherwise act
.with respect to any such condemnation proceedings without Buyer's prior written consent unless
Buyer fails to respond within 5 days to a request for written consent.
ARTICLE X
ASSIGNMENT
Except to an entity that is wholly owned or controlled by Buyer, Buyer shall not assign this
Agreement without Seller's prior written consent, which consent may be withheld in Seller's
reasonable discretion. Notwithstanding the foregoing, if this Agreement is assigned by Buyer
hereunder, Buyer shall remain jointly and severally liable, along with the assignee, for Buyer's
.obligations under this Agreement: Buyer shall cause any permitted assignee to acknowledge in
writing that it will be bound by all of the terms and conditions of this Agreement, with said
acknowledgement set forth in a form subject to Seller's reasonable approval.
ARTICLE XI
MISCELLANEOUS
12.1 Time. Time is of the essence for all provisions of this Agreement.
12.2 Notices. All notices given under this Agreement shall be in writing and 2 shall -be
sent by personal delivery, certified mail, return receipt requested; for next day delivery; by a
nationally recognized Iovernight delivery service that provides evidence of the date of delivery; or.
by electronic mail, in any case with all charges prepaid, addressed to the appropriate party at its.
address listed below. The notice will be effective as of the date the Party sending such notice
deposits the notice with the.,United States. Postal Service with all necessary, postage paid,. for
delivery to the other Party via certified mail, return receipt requested, at the address set forth below.
If a Party delivers a notice provided for in this Agreement in a different manner; than,, described in
175352372v2
the preceding sentence, the notice is effective as of the date the other party actually receives the
notice.
To Buyer:
Hutchinson — The Landing, LLC,
Attn: Andy Martin
3345 West St. Germain Street
St. Cloud, MN 56301
Email: andym@gcremn.com
To Seller: City of Hutchinson
Attention: Economic Development Director.
111 Hassan St. SE
Hutchinson, MN 55350
E-mail: MSeppelt@hutchinsommm.gov
With a copy to: Taft Stettinius & Hollister LLP
Attn: Adam Niblick
2200 IDS Center
80 South 8`h Street
Minneapolis, MN 55402
E-mail: ANiblick@taftlaw.com
All notices given in accordance with this Section are deemed received 3 business "days after Having
been deposited with the'U.S. Postal Service`(if sent by certified mail), on the date delivered if by
personal delivery or electronic mail or one (I) business day after deposit (if sent by overnight
delivery). Notices given bycouns' l to`'a Party in accordance with the above are deeined'giveri by
such Party. Any Party may change.its address for the service of notice by giving ten (10) days
advance written notice of such change to the other Party, in any manner above specified
12.3 lull Agreement. The Parties acknowledge that this Agreement represents the full
and complete agreement of the Parties relating to the purchase and sale of the Property and all
matters related to the purchase and sale of the Property. This Agreement supersedes and replaces
any prior agreements between the Parties, either oral ".or written, and any amendments or
modifications to this Agreement must, be in.writing and.executed by both Parties to be effective..
12.4 Governin Law. This Agreement has been made under the laws of the, State of
Minnesota and such.- laws control its interpretation.
12.5 Counterparts This'Agreement may be executed in counterparts, each of which,
when taken together, constitute fully executed originals.
12.6 E-Mail or PDY Signatures: Signatures transmitted by electronic mail in PDF
format, via facsimile or via-Docusign are valid and enforceable as original signatures:
12.7 Successors and Assigns. The rights and obligations of the Parties inure to the
benefit of and bind the Parties' successors and assigns.
175352372v2
[Signature page to Purchase and Sale Agreement]
Seller and Buyer have executed this Purchase and Sale Agreement as of the Agreement
Date.
SELLER:
City of Hutchinson, Minnesota,
a Minnesota municipal corporation
By
Printed
Title
By _
Printed
Title
BUYER:
Hutchinson — The Landing, LLC,
a Minnesota limit liab' 'ty co pany
By . G .-
Print : Andrew Martin
Title: Managing Member
175352372v2
EXHIBIT A
TO PURCHASE AND SALE AGREEMENT
(Legal Description)
[TO BE ADDED IN CONFORMANCE WITH THE TITLE COMMITMENT]
- EXHIBIT A-1
TO' PURCHASE AND SALE AGREEMENT
(Depiction of Land)
230562930
230562920
230562910
230SU900 1 230562890
230562860
EXHIBIT B
TO PURCHASE AND SALE AGREEMENT
(Form of Deed)
(Top 3 inches reserved for recording data)
LIMITED WARRANTY DEED Minnesota Uniform Conveyancing Blanks
Business Entity to Business Entity Form 10.2.9 (2013)
eCRV Number:
DEED TAX DUE: $
DATE:
(m-th/day/year)
FOR VALUABLE CONSIDERATION, the City of Hutchinson, Minnesota, a public body corporate and politic under the laws of
Minnesota ("Grantor"), hereby conveys and quitclaims to Hutchinson — The Landing, LLC, a Limited Liability Company under
the laws of Minnesota ("Grantee"), real property in McLeod County, Minnesota, legally described as follows:
See Exhibit "A" attached hereto and made a part hereof.
Check here if all or part of the described real property is Registered (Torrens) ❑
together with all hereditaments and appurtenances belonging thereto and subject to the Covenant (defined below) and Right of
Re -Entry (defined below) for in favor of Grantor as set forth herein.
This Deed conveys after -acquired title. Grantor warrants that Grantor has not done or suffered anything to encumber the
property, EXCEPT:
See Exhibit "B" attached hereto and made a part hereof.
COVENANT AND RIGHT OF RE-ENTRY
Grantor's delivery of this Deed and conveyance of title, and Grantee's acceptance of this Deed and title to the real property, are
expressly subject to the following terms relating to the use and transfer of the real property described herein (collectively the
"Covenant"). Grantee shall commence work on the improvements constituting the apartment complex Project upon the real
property within one year from the date of this Deed and Grantee must not transfer title to the real property described herein
within one year of the date of this Deed without the prior written consent of Grantor. If the Covenant is violated, Grantor may
declare a breach of the Covenant and seek a judicial decree from the District Court declaring a forfeiture and a cancellation of
this Deed (the "Right of Re -Entry"). The Covenant hereby created shall run with the land and shall be binding on Grantee, its
successors and assigns for a period of two (2) years from the date of this Deed, at which time said Covenant shall expire,
unconditionally and without further action of Grantor or Grantee, and shall thereafter be of no further force or effect.
Check applicable box:
❑ The Seller certifies that the Seller does not know
of any wells on the described real property.
❑ A well disclosure certificate accompanies this
document or has been electronically filed. (If
electronically filed, insert WDC number:
❑ I am familiar with the property described in this
instrument and I certify that the status and
number of wells on the described real property
have not changed since the last previously filed
well disclosure certificate.
State of Minnesota, County of
This instrument was acknowledged before me on
and
as
(type of authority)
(Stamp)
THIS INSTRUMENT WAS DRAFTED BY'
(insert name and address)
Taft Stettinius & Hollister LLP
2200 IDS Center
80 South 8th Street
Minneapolis, MN 56402-2157
Tel: 612.977.8400 1 Fax: 612.977.8650
taftlaw.com
Grantor
City of Hutchinson, a public
under the laws of Minnesota
(name of Grantor)
By:
(signature)
Its:
body corporate and politic
(type of authority)
By:
(signature)
Its:
(type of authority)
by
(month/day/year)
as
(name of authorized signer)
of
(name of authorized signer)
(type of authority)
(name of Grantor)
(signature of notarial officer)
Title (and Rank):
My commission expires:
(month/day/year)
TAX STATEMENTS FOR THE REAL PROPERTY
DESCRIBED IN THIS INSTRUMENT SHOULD BE SENT
TO:
(insert legal name and residential or business address of Grantee)
by
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
1st Reading - Consideration of an Ordinance of the City of Hutchinson, Minnesota
Agenda Item: vacating the alley located near 126 Franklin St NW.
Department: Planning
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Dan Jochum
Agenda Item Type:
Presenter: Dan Jochum
Reviewed by Staff
New Business
Time Requested (Minutes): 5
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
As the Planning Commission is aware, City Staff has been working with a developer to redevelop
the old Medical Center site into an apartment complex. The City Council approved a preliminary
and final plat for the subject property in July 2025. That plat eliminated the alley, which is no
longer needed, thus the request to vacate the alley.
Nobody from the Public spoke regarding this request.
The Planning Commission did not have any questions regarding this request.
The Planning Commission voted unanimously (6-0) to recommend approval of this request.
BOARD ACTION REQUESTED:
Approval of first reading of ordinance to vacate alley.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: New Bu
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source: N/A
Remaining Cost: $ 0.00 Funding Source: N/A
PUBLICATION NO.
ORDINANCE NO. 25-859
AN ORDINANCE OF THE CITY OF HUTCHINSON, MINNESOTA VACATING THE
ALLEY IN BLOCK 41, NORTH HALF HUTCHINSON
THE CITY COUNCIL OF THE CITY OF HUTCHINSON, MINNESOTA ORDAINS:
Section 1. Notice of hearing was duly given and publication of said hearing was duly made and
was made to appear to the satisfaction of the City Council that it would be in the best interests of
the City to vacate the alley located in Block 41, North Half Hutchinson.
Section 2. That the alley to be vacated is described as follows:
All of the alley in Block 41, as dedicated in the plat, North Half of Hutchinson, according to the
plat thereof on file and of record in the office of the County Recorder, McLeod County,
Minnesota.
Section 3. This ordinance shall take effect from and after passage and publication.
Adopted by the City Council this 9t1i day of September, 2025.
ATTEST:
Matthew Jaunich Gary T. Forcier
City Administrator Mayor
u
FIRM
HUTCHINSON
A CITY ON PURPOSE.
DIRECTORS REPORT - PLANNING DEPARTMENT
To: Hutchinson Planning Commission
From: Dan 7ochum, AICP and City of Hutchinson Planning Staff
Date: August 19, 2025
Application: Consideration of an Ordinance of the City of Hutchinson, Minnesota
vacating the alley located near 126 Franklin St NW.
Applicant: City of Hutchinson
VACATION OF ALLEY:
" Indicates property described in this notice
145
135
125 126
z
LU
J
1
145 135
¢
L
1STAVE NW
GENERAL INFORMATION
Applicable Regulations: Section 13.05 Vacation of Streets - City Charter
Brief Description:
As the Planning Commission is aware, City Staff has been working with a developer to
redevelop the old Medical Center site into an apartment complex. The City Council approved a
preliminary and final plat for the subject property in July 2025. That plat eliminated the alley,
which is no longer needed, thus the request to vacate the alley.
Recommendation:
1. Vacate Alley.
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
1st Reading - Consideration of an Ordinance of the City of Hutchinson, Minnesota
Agenda Item: vacating a sanitary sewer easement located at 126 Franklin St NW.
Department: Planning
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Dan Jochum
Agenda Item Type:
Presenter: Dan Jochum
Reviewed by Staff
New Business
Time Requested (Minutes): 5
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
The City of Hutchinson is requesting to vacate an easement for a sanitary sewer that is located
on lot 3, block 41, north half City of Hutchinson. As part of the proposed Landing Apartment
project the Sanitary Sewer will be rerouted. The Plat that was approved for the Landing Project
in July of 2025 has a new easement for the proposed new sanitary sewer line.
The legal description of the area to be vacated is as follows:
A right-of-way easement 10 feet wide over and across Lot 3, Block 41, North half for a distance
of 132 feet, City of Hutchinson, McLeod County, Minnesota.
Nobody from the public spoke regarding this request.
The Planning Commission voted unanimously (6-0) to recommend approval of this request.
BOARD ACTION REQUESTED:
Approval of first reading of ordinance.
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: New Bu
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source: N/A
Remaining Cost: $ 0.00 Funding Source: N/A
PUBLICATION NO.
ORDINANCE NO. 25-860
AN ORDINANCE OF THE CITY OF HUTCHINSON, MINNESOTA VACATING THE
RIGHT-OF-WAY (SANITARY SEWER) EASEMENT LOCATED AT 126 FRANKLIN
ST. NW
THE CITY COUNCIL OF THE CITY OF HUTCHINSON, MINNESOTA ORDAINS:
Section 1. Notice of hearing was duly given and publication of said hearing was duly made and
was made to appear to the satisfaction of the City Council that it would be in the best interests of
the City to vacate the Right-of-way (sanitary sewer) easement located on 126 Franklin St NW,
Hutchinson.
Section 2. That the easement to be vacated is described as follows:
The legal description of the area to be vacated is as follows:
A right-of-way easement 10 feet wide over and across Lot 3, Block 41, North half for a distance
of 132 feet, City of Hutchinson, McLeod County, Minnesota.
Section 3. This ordinance shall take effect from and after passage and publication.
Adopted by the City Council this 9t1i day of September, 2025.
ATTEST:
Matthew Jaunich Gary T. Forcier
City Administrator Mayor
u
HUTCHINSON
A CITY ON PURPOSE.
DIRECTORS REPORT - PLANNING DEPARTMENT
To: Hutchinson Planning Commission
From: Dan 7ochum, AICP and City of Hutchinson Planning Staff
Date: August 19, 2025
Application: Consideration of an Ordinance of the City of Hutchinson, Minnesota
vacating a sanitary sewer easement located at 126 Franklin St NW.
Applicant: City of Hutchinson
Vacation of Easements
The City of Hutchinson is requesting to vacate an easement for a sanitary sewer that is located
on lot 3, block 41, north half City of Hutchinson. As part of the proposed Landing Apartment
project the Sanitary Sewer will be rerouted. The Plat that was approved for the Landing Project
in July of 2025 has a new easement for the proposed new sanitary sewer line.
The legal description of the area to be vacated is as follows:
A right-of-way easement 10 feet wide over and across Lot 3, Block 41, North half for a distance
of 132 feet, City of Hutchinson, McLeod County, Minnesota.
Applicable Regulations: City Charter Section 13.05
Vacation: Section 13.05 of the City Charter states: "A majority of the council may by resolution
vacate any street, alley or any public grounds within the city. Such vacation may be made only
after published notice and an opportunity of affected property owners and public to be heard,
and upon such further terms and by such procedure as is prescribed in MN Stat 412.851, and
which the council by resolution may prescribe. A notice of completion of such proceedings shall
be filed with the proper county officers in accordance with law."
Recommendation:
Staff recommends approval of the vacation and release of easement as described in the
vacation of easement legal description.
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
Authorizing Resolution 15901 for the Sale of General Obligation Improvement
Agenda Item: Bonds, Series 2025A
Department: Finance
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Andy Reid
Agenda Item Type:
Presenter: Andy Reid
Reviewed by Staff
New Business
Time Requested (Minutes): 5
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
Nick Anhut from Ehlers has a conflict and is not available for the meeting. Instead, Andy Reid
will present the 2025 pre -sale report for the issuance of General Obligation bonds with a total
estimated par value of $2,405,000.
The bonds will fund the following roadway and infrastructure improvement projects:
1) Dale Street (South Grade Road SW to Roberts Road SW
2) Hassan Street (1st Ave NE to Oakland Ave SE), including improvements on side streets
The first step in this process is for council to authorize a resolution to move forward with
providing a bond issuance to finance the improvement costs. Once the resolution is approved,
Ehlers, who is the City's financial advisor, will initiate the process. Ehlers will compile documents
with city staff assistance, coordinate a bond rating call with city staff and solicit competitive bids
on behalf of the City. The proposed Debt Issuance Schedule is provided within the Pre -Sale
Report which accompanies this board action form.
The bond sale will be awarded to the winning bidder at the September 23 council meeting and
the bond proceeds are expected to be received in late October. The debt will be repaid by the
City's debt tax levy and special assessments levied against benefiting property owners.
BOARD ACTION REQUESTED:
Approve Resolution 15901
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: No
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source: N/A
Remaining Cost: $ 0.00 Funding Source: N/A
CERTIFICATION OF MINUTES RELATING TO
GENERAL OBLIGATION IMPROVEMENT BONDS, SERIES 2025A
Issuer: City of Hutchinson, Minnesota
Governing Body: City Council
Kind, date, time and place of meeting: A regular meeting, held on August 26, 2025, at
5:30 o'clock p.m., in the Council Chambers at the Hutchinson City Center.
Councilmembers present:
Councilmembers absent:
Documents Attached:
Minutes of said meeting (pages):
RESOLUTION NO. _15901_
RESOLUTION PROVIDING FOR THE SALE OF
GENERAL OBLIGATION IMPROVEMENT BONDS, SERIES 2025A
I, the undersigned, being the duly qualified and acting recording officer of the public
corporation issuing the obligations referred to in the title of this certificate, certify that the
documents attached hereto, as described above, have been carefully compared with the original
records of said corporation in my legal custody, from which they have been transcribed; that said
documents are a correct and complete transcript of the minutes of a meeting of the governing body
of said corporation, and correct and complete copies of all resolutions and other actions taken and
of all documents approved by the governing body at said meeting, so far as they relate to said
obligations; and that said meeting was duly held by the governing body at the time and place and
was attended throughout by the members indicated above, pursuant to call and notice of such
meeting given as required by law.
WITNESS my hand officially as such recording officer this day of August, 2025.
(SEAL)
Matt Jaunich
City Administrator
4904-1628-6045\1
Councilmember introduced the following resolution (the "Resolution") and
moved its adoption, which motion was seconded by Councilmember
RESOLUTION NO. _15901_
RESOLUTION PROVIDING FOR THE SALE OF
GENERAL OBLIGATION IMPROVEMENT BONDS, SERIES 2025A
A. WHEREAS, the City Council (the "Council") of the City of Hutchinson, Minnesota (the
"City"), has heretofore determined that it is necessary and expedient to issue the City's
General Obligation Improvement Bonds, Series 2025A (the "Bonds"), in the approximate
principal amount of $2,405,000, pursuant to Minnesota Statutes, Chapters 429 and 475, to
finance the City's 2025 street improvement projects and to pay costs of issuance of the
Bonds; and
B. WHEREAS, the City has retained Ehlers & Associates, Inc., in Roseville, Minnesota
("Ehlers"), as its independent municipal advisor for the Bonds in accordance with
Minnesota Statutes, Section 475.60, Subdivision 2(9).
NOW, THEREFORE, BE IT RESOLVED by the Council of the City, as follows:
1. Authorization; Findings. The City Council hereby authorizes Ehlers to assist the City in the
sale of the Bonds.
2. Meeting, Proposal Opening. The City Council shall meet at 5:30 p.m. on September 23, 2025,
or on such other date and time as the Council deems appropriate, for the purpose of considering
proposals for and awarding the sale of the Bonds.
3. Official Statement. In connection with said sale, the officers or employees of the City are
hereby authorized to cooperate with Ehlers and participate in the preparation of an official
statement for the Bonds and to execute and deliver it on behalf of the City upon its completion.
4. Staff Authorizations. City staff are authorized and directed to take all other actions necessary
to carry out the intent of this resolution.
4904-1628-6045\1
Attest:
Mayor
City Administrator
The motion for the adoption of the foregoing resolution was duly seconded by
Councilmember , and upon vote being taken thereon, the following
Councilmembers voted in favor thereof:
and the following Councilmembers voted against the same:
whereupon said resolution was declared duly passed and adopted, and was signed by the Mayor,
which was attested by the City Administrator.
City Administrator
4904-1628-6045\1
August 26, 2025
PRE -SALE REPORT FOR
City of Hutchinson, Minnesota
$2,405,000 General Obligation Improvement Bonds,
Series 2025A
rSk
::m NEHLERS
PUt3LIC FINANCE ADVISORS
Prepared by:
Ehlers
3060 Centre Pointe Drive
Roseville, MN 55113
Advisors:
Nick Anhut, Senior Municipal Advisor
Bruce Kimmel, Senior Municipal Advisor
BUILDING COMMUNITIES. IT'S WHAT WE DO.
BUILDING COMMUNITIES. IT'S WHAT WE DO. ® info@ehlers-inc.com '�, 1 (800) S52-1171 ® www.ehlers-inc.com
EXECUTIVE SUMMARY OF PROPOSED DE�
Proposed Issue:
$2,405,000 General Obligation Improvement Bonds, Series 2025A (the "Bonds")
Purposes:
The proposed issue includes tax-exempt, fixed-rate financing for the city's Dale Street SW
and 2025 Street Improvements projects inclusive of estimated financing costs and net of
utility and municipal state aid contributions. Debt service will be paid from a combination of
special assessments collected over a 10 year term starting in 2026, and a dedicated tax levy
over a 15-year term from 2026 to 2040.
Authority:
The Bonds will be general obligations of the City for which its full faith, credit and taxing
powers are pledged. The Bonds are being issued pursuant to Minnesota Statutes, Chapters
429 (Improvement Bonds) and 475 (General Bonding Authority).
Under the provisions of M.S. Chapter 429, because the City is assessing at least 20% of the
improvement projects costs, the Bonds can be a general obligation without a referendum and
will not count against the City's debt limit.
Term/Call Feature:
The Bonds are being issued for a term of 15 years, four months in total. Principal on the Bonds
will be due on February 1 in the years 2027 through 2041. Interest will be due every six months
beginning August 1, 2026. The Bonds will be offered with a call option allowing prepayment
at the discretion of the City without penalty starting February 1, 2035 or any date thereafter.
Bank Qualification:
The City will be able to designate the Bonds as "bank qualified" obligations because it is
expecting to issue no more than $10 million in tax-exempt debt during 2025. Bank qualified
status broadens the market for the Bonds, which is expected to result in lower interest rates.
Credit Rating:
The City's most recent bond issues were rated by S&P Global Ratings. The current rating on
those bonds is "AA-". To enhance marketability of the Bonds, we recommend the City request
a new rating evaluation to update and apply the credit rating to the Bonds.
The underwriter on the Bonds may elect to purchase bond insurance within the parameters
of their bid. In that instance, the credit rating for the issue may be higher in the event the
credit rating of the insurer is higher than that of the City.
Presale Report August 26, 2025
City of Hutchinson, Minnesota Page 1
Method of Sale/Placement:
We are recommending the Bonds be issued as municipal securities and offered through a
competitive underwriting process. The process will solicit competitive bids, which we will
compile on your behalf, for the purchase of the Bonds from underwriters and banks. An
allowance for discount bidding will be incorporated in the terms of the issue. The discount is
treated as an interest item and provides the underwriter with all or a portion of their
compensation in the transaction. If the Bonds are purchased at a price greater than the
minimum bid amount (maximum discount), the unused allowance may be used to reduce the
final borrowing amount.
Premium Pricing:
In some cases, investors in municipal bonds prefer "premium" pricing structures. A premium
is achieved when the purchaser pays an amount in excess of the face value of a maturity in
return for a higher coupon (the interest rate paid by the issuer) than the prevailing market
yields. The sum of the amounts paid in excess of face value is considered "reoffering
premium." The amount varies, but it is not uncommon to see premiums for new issues in the
range of 2.00% to 10.00% of the face amount of the issue. This means that an issuer with a
$2,000,000 offering may receive bids that result in proceeds of $2,040,000 to $2,200,000.
The amount of premium can be restricted in the bid specifications. Restrictions on premium
may result in fewer bids, but may also eliminate large adjustments on the day of sale and
unintended impacts with respect to debt service payment. Ehlers will identify appropriate
premium restrictions for the Bonds intended to achieve the City's objectives for this financing.
Review of Existing Debt:
We have reviewed all outstanding indebtedness for the City and find that there are no viable
refunding opportunities to consider adding to the bond issue at this time. We will continue
to monitor the market and the call dates for the City's outstanding debt and will alert you to
any future refunding opportunities as they arise.
Continuing Disclosure:
The City will be agreeing to provide certain updated Annual Financial Information and its
Audited Financial Statement annually, as well as providing notices of the occurrence of certain
reportable events to the Municipal Securities Rulemaking Board (the "MSRB"), as required by
rules of the Securities and Exchange Commission (SEC). The City is already obligated to
provide such reports for its existing bonds and engages with Ehlers as its disseminating agent
to prepare and file the reports.
Arbitrage Monitoring:
The City must ensure compliance with certain sections of the Internal Revenue Code and
Treasury Regulations ("Arbitrage Rules") throughout the life of the issue to maintain the tax-
exempt status of the Bonds. These Arbitrage Rules apply to amounts held in construction
and debt service accounts, along with related investment income on each fund/account.
IRS audits will verify compliance with rebate, yield restriction and records retention
requirements within the Arbitrage Rules. The City's specific arbitrage responsibilities will be
Presale Report August 26, 2025
City of Hutchinson, Minnesota Page 2
detailed in the Signature, No -Litigation, Arbitrage Certificate and Purchase Price Receipt (the
"Tax Compliance Document") prepared by your Bond Attorney and provided at closing.
The Bonds may qualify for one or more exception(s) to the Arbitrage Rules by meeting 1)
small issuer exception, 2) spend down requirements, 3) bona fide debt service fund limits, 4)
investments yield restrictions, or 5) de minimis rules. An Ehlers arbitrage expert will contact
the City within 30 days after the sale date to review the City's specific responsibilities within
the Tax Compliance Document for the Bonds.
Investment of Bond Proceeds:
Subject to the Arbitrage Rules and Tax Compliance Document mentioned above, the City may
maximize the funding opportunity for its projects by temporarily investing the proceeds until
the funds are needed to pay for construction expenditures. The City expects to utilize its
designated investment advisor under the objectives of the City's investments practices.
Risk Factors:
Special Assessments: The initial sizing and repayment structure of the Bonds assumes the
City will levy $628,034 of special assessments in total, assuming $69,665 is prepaid and
available to fund project costs. If the City receives a significant increase in pre -paid
assessments or subsequently delays or changes the assessment amount, it may need to adjust
the debt service levy to make up for changes to the expected assessment revenues.
Other Service Providers:
Ehlers will coordinate for the engagement of other public finance service providers required
for the debt issuance and identified below. Where you have previously used a particular firm
to provide a service, we have assumed that you will continue that relationship. Fees charged
by these service providers will be paid from proceeds of the Bonds, unless you notify us that
you wish to pay them from other sources. Our pre -sale bond sizing includes a good faith
estimate of these fees, but the final fees may vary. If you have any questions pertaining to the
identified service providers, please contact us.
Bond Counsel: Dorsey & Whitney LLP
Paying Agent: Bond Trust Services Corporation
Rating Agency: S&P Global Ratings (S&P)
Basis for Recommendation:
Based on the City's objectives; financial situation; risk tolerance; liquidity needs; experience
with the issuance of Bonds; long-term financial capacity; as well as the tax status
considerations, structure, timing and other similar matters related to the Bonds; we are
recommending the issuance of Bonds as a suitable option to fund the 2025 Street
Improvements Projects.
Summary:
The decisions to be made by the City Council are to accept or modify the finance assumptions
described in this report in consideration of a resolution provided by the City's bond counsel
to schedule a competitive sale to be awarded at the September 23, 2025 city council meeting.
Presale Report August 26, 2025
City of Hutchinson, Minnesota Page 3
Pre -Sale Review by City Council:
August 26, 2025
Due Diligence Call to Review Official Statement:
Week of September 8, 2025
Conference with Rating Agency:
September 10, 2025
Distribute Official Statement:
By September 12, 2025
City Council Meeting to Award Sale of the Bonds:
September 23, 2025
Estimated Closing Date:
October 16, 2025
Attachments
Estimated Sources and Uses of Funds
Estimated Debt Service Schedule and Levy Calculation
Nick Anhut, Senior Municipal Advisor
(651) 697-8507
Bruce Kimmel, Senior Municipal Advisor
(651) 697-8572
Silvia Johnson, Lead Public Finance Analyst
(651) 697-8580
Alicia Gage, Senior Financial Analyst
(651) 697-8551
Presale Report August 26, 2025
City of Hutchinson, Minnesota Page 4
Hutchinson, Minnesota
$2,405,000 General Obligation Improvement Bonds, Series 2025A
Assumes Current Market BQ AA- Rates plus 35bps
Estimated Sources & Uses
Dated 10/16/2025 1 Delivered 10/16/2025
Sources Of Funds
Par Amount of Bonds $2,405,000.00
Prepaid Assessments 69,665.00
Total Sources $2,474,665.00
Uses Of Funds
Total Underwriter's Discount (1200%) 28,860.00
Costs of Issuance 62,000.00
Deposit to Project Construction Fund 2,379,224.00
Rounding Amount 4,581.00
Total Uses $2,474,665.00
2025A GO Imp Bonds - PreS I SINGLE PURPOSE 1 8/18/2025 1 8:16 AM
EHLE^RS
wisous
Hutchinson, Minnesota
$2,405,000 General Obligation Improvement Bonds, Series 2025A
Assumes Current Market BQ AA- Rates plus 35bps
Estimated Debt Service Schedule
Date
Principal
Coupon
Interest
Total P+I
Fiscal Total
10/16/2025
-
-
08/01/2026
-
-
69,842.81
69,842.81
-
02/01/2027
135,000.00
3.050%
44,111.25
179,111.25
248,954.06
08/01/2027
-
-
42,052.50
42,052.50
-
02/01/2028
160,000.00
3.000%
42,052.50
202,052.50
244,105.00
08/01/2028
-
-
39,652.50
39,652.50
-
02/01/2029
160,000.00
3.000%
39,652.50
199,652.50
239,305.00
08/01/2029
-
-
37,252.50
37,252.50
-
02/01/2030
165,000.00
3.050%
37,252.50
202,252.50
239,505.00
08/01/2030
-
-
34,736.25
34,736.25
02/01/2031
165,000.00
3.200%
34,736.25
199,736.25
234,472.50
08/01/2031
-
-
32,096.25
32,096.25
-
02/01/2032
170,000.00
3.350%
32,096.25
202,096.25
234,192.50
08/01/2032
-
-
29,248.75
29,248.75
-
02/01/2033
175,000.00
3.550%
29,248.75
204,248.75
233,497.50
08/01/2033
-
-
26,142.50
26,142.50
-
02/01/2034
175,000.00
3.700%
26,142.50
201,142.50
227,285.00
08/01/2034
-
-
22,905.00
22,905.00
-
02/01/2035
180,000.00
3.800%
22,905.00
202,905.00
225,810.00
08/01/2035
-
-
19,485.00
19,485.00
02/01/2036
185,000.00
4.000%
19,485.00
204,485.00
223,970.00
08/01/2036
-
-
15,785.00
15,785.00
-
02/01/2037
135,000.00
4.150%
15,785.00
150,785.00
166,570.00
08/01/2037
-
-
12,983.75
12,983.75
-
02/01/2038
140,000.00
4.250%
12,983.75
152,983.75
165,967.50
08/01/2038
-
-
10,008.75
10,008.75
-
02/01/2039
145,000.00
4.300%
10,008.75
155,008.75
165,017.50
08/01/2039
-
-
6,891.25
6,891.25
-
02/01/2040
155,000.00
4.350%
6,891.25
161,891.25
168,782.50
08/01/2040
-
-
3,520.00
3,520.00
02/01/2041
160,000.00
4.400%
3,520.00
163,520.00
167,040.00
Total
$2,405,000.00
-
$779,474.06
$3,184,474.06
-
Yield Statistics
Bond Year Dollars $19,856.46
Average Life 8.256 Years
Average Counon 3.9255443%
Net Interest Cost (NIC)
4.0708874%
True Interest Cost (TIC)
4.0708601%
Bond Yield for Arbitrage Purposes
3.8931170%
All Inclusive Cost (AIC)
4.4633885%
IRS Form 8038
Net Interest Cost
3.9255443%
Weighted Average Maturitv
8.256 Years
2025A GO Imp Bonds - PreS I SINGLE PURPOSE 1 8/18/2025 1 8:16 AM
191*,14EHLERS
P-L 1,
Hutchinson, Minnesota
$2,405,000 General Obligation Improvement Bonds, Series 2025A
Assumes Current Market BQ AA- Rates plus 35bps
Estimated Debt Service Schedule and Levy Calculation
Less:
Assessment
Remaining
Date
Principal
Coupon
Interest
Total P+I
105% of Total
Revenue
Levy
02/01/2026
-
-
-
-
-
-
-
02/01/2027
135,000.00
3.050%
113,954.06
248,954.06
261,401.76
84,313.72
177,088.04
02/01/2028
160,000.00
3.000%
84,105.00
244,105.00
256,310.25
81,466.04
174,844.21
02/01/2029
160,000.00
3.000%
79,305.00
239,305.00
251,270.25
78,618.36
172,651.89
02/01/2030
165,000.00
3.050%
74,505.00
239,505.00
251,480.25
75,770.68
175,709.57
02/01/2031
165,000.00
3.200%
69,472.50
234,472.50
246,196.13
72,923.00
173,273.13
02/01/2032
170,000.00
3.350%
64,192.50
234,192.50
245,902.13
70,075.30
175,826.83
02/01/2033
175,000.00
3.550%
58,497.50
233,497.50
245,172.38
67,227.62
177,944.76
02/01/2034
175,000.00
3.700%
52,285.00
227,285.00
238,649.25
64,379.94
174,269.31
02/01/2035
180,000.00
3.800%
45,810.00
225,810.00
237,100.50
61,532.26
175,568.24
02/01/2036
185,000.00
4.000%
38,970.00
223,970.00
235,168.50
58,684.58
176,483.92
02/01/2037
135,000.00
4.150%
31,570.00
166,570.00
174,898.50
-
174,898.50
02/01/2038
140,000.00
4.250%
25,967.50
165,967.50
174,265.88
174,265.88
02/01/2039
145,000.00
4.300%
20,017.50
165,017.50
173,268.38
173,268.38
02/01/2040
155,000.00
4.350%
13,782.50
168,782.50
177,221.63
177,221.63
02/01/2041
160,000.00
4.400%
7,040.00
167,040.00
175,392.00
175,392.00
Total
$2,405,000.00
-
$779,474.06
$3,184,474.06
$3,343,697.76
$714,991.50
$2,628,706.26
Significant
Dates
Dated
10/16/2025
First Coupon Date
8/01/2026
Yield Statistics
Bond Year Dollars $19,856.46
Average Life 8.256 Years
Average Coupon 3.9255443%
Net Interest Cost (NIC) 4.0708874%
True Interest Cost (TIC) 4.0708601%
Bond Yield for Arbitrage Purposes 3.8931170%
All Inclusive Cost (AIC) 4.4633885%
2025A GO Imp Bonds - PreS I SINGLE PURPOSE 1 8/18/2025 1 8:16 AM
9 EHLERS
- A—SORs
Hutchinson, Minnesota
$558,369 Assessments
Remaining after $69,665 prepaid
TIC plus 1.00% - Equal Principal
Assessments Revenue
Date Principal Coupon Interest Total P+I
12/31/2026
55,836.90
5.100%
28,476.82
84,313.72
12/31/2027
55,836.90
5.100%
25,629.14
81,466.04
12/31/2028
55,836.90
5.100%
22,781.46
78,618.36
12/31/2029
55,836.90
5.100%
19,933.78
75,770.68
12/31/2030
55,836.90
5.100%
17,086.10
72,923.00
12/31/2031
55,836.90
5.100%
14,238.40
70,075.30
12/31/2032
55,836.90
5.100%
11,390.72
67,227.62
12/31/2033
55,836.90
5.100%
8,543.04
64,379.94
12/31/2034
55,836.90
5.100%
5,695.36
61,532.26
12/31/2035
55,836.90
5.100%
2,847.68
58,684.58
Total
$558,369.00
-
$156,622.50
$714,991.50
Significant Dates
Filing Date 1/01/2O26
First Payment Date 12/31/2026
Series 2025A GO Bonds - A I SINGLE PURPOSE 1 8/18/2025 1 8:15 AM
MSHLERS
2025 Bonded Improvements
Let Project
1 Dale St
2 Hassan St/1st-3rd-Rh-7th/Stoney Pt
Bonding Contingency
Costs
Construction
Other
Enginering
15%
6%
Bid Costs
Costs
Contract
Eng Fees
Adm Fees
TOTAL
1,532,617
-
72,500
229,892
91,957
1,926,966
1,645,394
84,260
68,000
246,809
98,724
2,143,187
150,000
150,000
3,328,011
84,260
140,500
476,701
190,681
4,220,153
Funding
Storm Other City
MSA Water
Sewer
Water Funds
Assorts
Bonding
TOTAL
1,462,862 113,850
47,066
22,356 -
219,528
61,304
1,926,966
- 8,268
79,431
107,096 -
408,506
1,539,887
2,143,187
150,000
150,000
1,462,862 122,118
126,497
129,452
628,034
1,751,190
4,220,153
Assessments prepaid to date: 69,665
Schedule:
Balance of Assessments to finance 558,369
08/26/2025
PreSale approval
Mid Sept
S&P call
09/23/2025
Bond Sale
429 Bonding Summary:
Mid/Late Oct
Receive Proceeds
Total Costs to Bond
$2,309,559
Estimated Bond Issuance Costs
$90,860
Total Bonding Need (rounded up)
$2,405,000
Max Bonding per 429, 20% Assessment Rule
$3,140,169
429 Bonding Surplus/ -Shortfall
$735,169
Current
Debt Plan
City Costs to Finance 1,751,190
Bond Issuance Costs 90,860
Total City Debt $1,842,050
Annual Target Debt Level 1,900,000
Above (Below) Debt Target ' ($57,950)
RA
HUTCHINSON CITY COUNCIL
HUTCHINSON Request for Board Action
A CITY ON PURPOSE.
July 2025 Financial and Investment Reports
Agenda Item:
Department: Finance
LICENSE SECTION
Meeting Date: 8/26/2025
Application Complete N/A
Contact: Andy Reid
Agenda Item Type:
Presenter:
Reviewed by Staff
Governance
Time Requested (Minutes): 0
License Contingency N/A
Attachments: Yes
BACKGROUND/EXPLANATION OFAGENDA ITEM:
For Council review, attached are the July Financial Reports for the general fund and enterprise
funds. Also attached is the July Investment Report.
Feel free to contact me with any questions. Thank you.
BOARD ACTION REQUESTED:
Fiscal Impact: Funding Source:
FTE Impact: Budget Change: Govern;
Included in current budget: No
PROJECT SECTION:
Total Project Cost:
Total City Cost: Funding Source: N/A
Remaining Cost: $ 0.00 Funding Source: N/A
REVENUE AND EXPENDITURE REPORT for CITY of HUTCHINSON
PERIOD ENDING JULY 31, 2025
2025
2024
2025 ACTUALS
2025
AVAILABLE
% BDGT
2024 YTD
2024
% BDGT
JULY
YTD
BUDGET
BALANCE
USED
ACTUAL
BUDGET
USED
General Fund
Taxes
-
3,594,976
6,741,034
3,146,058
53.3
3,309,308
6,370,436
51.9
Other Taxes
58,014
142,074
320,000
177,926
44.4
147,173
330,000
44.6
Licenses & Permits
47,260
231,706
415,725
184,019
55.7
273,474
392,100
69.7
Intergovernmental Revenue
1,308,636
1,633,704
2,166,525
532,821
75.4
1,609,124
2,028,194
79.3
Charges for Services
281,467
1,461,771
2,816,417
1,354,646
51.9
1,477,462
2,547,142
58.0
Miscellaneous Revenues
111,503
273,388
382,400
109,012
71.5
263,152
353,900
74.4
Transfers -In
485,657
1,456,971
2,812,628
1,355,657
51.8
1,456,971
2,812,628
51.8
Fines & Forfeitures
3,552
26,487
55,000
28,513
48.2
29,117
55,000
52.9
TOTAL REVENUES 2,296,089 8,821,077 15,709,729 6,888,652 56.2 8,565,781 14,889,400 57.5
Wages & Benefits
966,702
5,670,362
10,542,600
4,872,238
53.8
5,462,892
10,050,414
54.4
Supplies
183,560
684,010
1,218,850
534,840
56.1
767,859
1,072,833
71.6
Services & Charges
402,863
1,990,360
3,022,832
1,032,472
65.8
1,843,897
2,867,722
64.3
Miscellaneous Expenses
50,031
212,053
379,905
167,852
55.8
200,321
381,400
52.5
Transfers -Out
-
60,271
545,542
485,271
11.0
58,516
517,031
11.3
Capital Outlay
29,391
(29,391)
-
838
-
TOTAL EXPENDITURES
1,603,156
8,646,447
15,709,729
7,063,282
55.0
8,334,323
14,889,400
56.0
NET REVENUE
692,932
174,630
-
(174,630)
231,457
-
Comments
Licenses & Permits
Building Permit revenue is lagging behind last year by $35,451, through July.
Services & Charges Contracted Repair & Maintenance is running higherthis year due to critical repairs to the refrigeration system at the Civic Arena
General Fund Expense by 2025 2024
Department: 2025 YTD 2025 AVAILABLE % BDGT 2024 YTD 2024 % BDGT
JULY ACTUAL BUDGET BALANCE USED ACTUAL BUDGET USED
Mayor & City Council
2,969
20,667
47,488
26,821
43.5
20,901
47,477
44.0
City Administrator
41,655
296,565
544,862
248,297
54.4
297,291
519,041
57.3
Elections
-
-
-
-
-
12,891
29,850
43.2
Finance Department
28,951
268,233
448,831
180,598
59.8
282,617
427,823
66.1
Motor Vehicle
32,917
230,984
398,892
167,908
57.9
195,012
338,131
57.7
Assessing
-
-
-
-
-
-
61,499
-
Legal
26,278
175,590
348,219
172,629
50.4
166,087
329,055
50.5
Planning
14,161
101,879
187,488
85,609
54.3
100,654
181,040
55.6
Information Services
74,995
368,828
723,131
354,303
51.0
321,117
619,744
51.8
City Hall Building
15,789
110,878
213,097
102,219
52.0
116,087
202,295
57.4
Police Department
343,928
2,449,531
4,405,365
1,955,834
55.6
2,291,659
4,210,713
54.4
Emergency Management
5,673
10,657
13,500
2,843
78.9
18,236
13,500
135.1
Safety Committee
-
11,405
14,335
2,930
79.6
10,807
13,950
77.5
Fire Department
58,229
257,215
556,153
298,938
46.2
228,205
447,485
51.0
Protective Inspections
33,452
234,474
414,616
180,142
56.6
246,416
397,864
61.9
Engineering
69,381
353,891
547,217
193,326
64.7
260,782
479,881
54.3
Streets & Alleys
282,100
1,132,765
1,717,314
584,549
66.0
1,159,210
1,777,633
65.2
Park/Recreation Administration
24,692
168,875
299,036
130,161
56.5
162,121
280,458
57.8
Recreation
32,124
129,524
237,115
107,591
54.6
139,408
225,861
61.7
Senior Citizen Center
6,016
48,947
83,426
34,479
58.7
44,300
79,564
55.7
Civic Arena
32,814
275,790
445,718
169,928
61.9
205,865
413,137
49.8
Park Department
131,100
673,920
1,230,328
556,408
54.8
688,819
1,187,993
58.0
Recreation Building
30,016
185,760
324,132
138,372
57.3
159,451
280,335
56.9
Events Center
12,673
87,850
158,993
71,143
55.3
90,494
151,082
59.9
Evergreen Building
1,308
15,832
36,080
20,248
43.9
18,445
35,080
52.6
Library
3,252
125,581
257,808
132,227
48.7
121,202
247,865
48.9
Waterpark
136,148
272,692
473,834
201,142
57.6
324,637
467,082
69.5
Cemetery
14,365
89,012
157,200
68,188
56.6
92,348
153,077
60.3
Airport
42,195
179,075
248,888
69,813
72.0
187,909
129,260
145.4
Unallocated General Expense
105,973
370,027
1,176,663
806,636
31.4
371,352
1,141,625
32.5
TOTAL EXPENDITURES
1,603,156
8,646,447
15,709,729
7,063,282
55.0
8,334,323
14,889,400
56.0
REVENUE AND EXPENDITURE REPORT for CITY of HUTCHINSON
PERIOD ENDING JULY 31, 2025
2025
2024
2025 ACTUALS
2025
AVAILABLE
% BDGT
2024 YTD
2024
% BDGT
JULY
YTD
BUDGET
BALANCE
USED
ACTUAL
BUDGET
USED
Water Fund
Sales
139,493
787,285
1,550,000
762,715
50.8
752,088
1,675,000
44.9
Sales - Other
90,233
583,583
1,051,000
467,417
55.5
596,775
1,006,000
59.3
Local Sales Tax
64,923
366,918
990,000
623,082
37.1
442,953
1,057,000
41.9
Charges for Services
2,724
88,985
100,000
11,015
89.0
87,518
88,668
98.7
Miscellaneous Revenues
14,283
113,596
162,500
48,904
69.9
104,810
114,500
91.5
TOTAL REVENUES
311,656
1,940,367
3,853,500
1,913,133
50.4
1,984,143
3,941,168
50.3
Wages & Benefits
53,902
353,487
702,663
349,176
50.3
368,638
631,441
58.4
Supplies
17,212
111,636
253,900
142,264
44.0
351,649
244,225
144.0
Services & Charges
80,449
333,532
556,490
222,958
59.9
275,046
599,400
45.9
Miscellaneous Expenses
460
9,962
15,500
5,538
64.3
11,634
13,500
86.2
Transfers -Out
-
-
90,000
90,000
-
-
90,000
-
CapitalOutlay
88,136
1,388,812
1,300,676
6.3
113,513
982,310
11.6
Depreciation Expense
-
-
1,120,000
1,120,000
-
-
1,120,000
-
Debt Service
17,250
319,566
1,150,228
830,662
27.8
170,198
1,366,550
12.5
TOTAL EXPENDITURES
169,274
1,216,319
5,277,593
4,061,274
23.0
1,290,679
5,047,426
25.6
NET of REVENUES & EXPENDITURES
142,382
724,048
(1,424,093)
(2,148,141)
693,465
(1,106,258)
Year to Date Water Sales
Comments
2025
2024
Change
Water Sales Revenue:
Residential
519,007
490,010
5.9%
Commercial
152,688
143,158
6.7%
Industrial
115,590
118,920
-2.8%
Water Sales
787,285
752,088
4.7%
Base Charge
484,252
482,944
0.3%
Water Connection Charge
17,500
35,840
-51.2%
Other
81,832
77,991
4.9%
Other Sales
583,583
596,775
-2.2%
Wastewater Fund
Sales
266,339
1,645,984
2,810,000
1,164,016
58.6
1,591,757
2,875,000
55.4
Sales - Other
96,206
627,325
1,086,800
459,475
57.7
642,203
1,031,500
62.3
Local Sales Tax
64,923
366,918
990,000
623,082
37.1
341,135
815,000
41.9
Licenses & Permits
-
5,600
6,000
400
93.3
5,600
6,000
93.3
Charges for Services
620
4,730
5,000
270
94.6
10,116
7,500
134.9
Miscellaneous Revenues
27,414
152,364
226,000
73,636
67.4
158,393
176,000
90.0
TOTAL REVENUES 455,501 2,802,921 5,123,800 2,320,879 54.7 2,749,204 4,911,000 56.0
Wages & Benefits
73,818
485,417
990,321
504,904
49.0
467,295
892,971
52.3
Supplies
23,685
114,106
289,400
175,294
39.4
140,442
297,600
47.2
Services & Charges
52,796
642,528
895,390
252,862
71.8
580,137
840,650
69.0
Miscellaneous Expenses
14,535
15,996
33,000
17,004
48.5
21,296
36,000
59.2
Transfers -Out
-
-
110,000
110,000
-
-
110,000
-
CapitalOutlay
474,268
503,711
3,721,629
3,217,918
13.5
755,867
2,410,249
31.4
Depreciation Expense
-
-
1,200,000
1,200,000
-
-
1,200,000
-
Debt Service
47,925
690,576
1,614,347
923,771
42.8
694,909
1,609,355
43.2
TOTAL EXPENDITURES
687,027
2,452,335
8,854,087
6,401,752
27.7
2,659,947
7,396,825
36.0
NET of REVENUES & EXPENDITURES
(231,526)
350,586
(3,730,287)
(4,080,873)
89,258
(2,485,825)
Year to Date Sewer Sales
Comments
2025
2024
Change
Wastewater Sales Revenue:
Residential
931,393
911,184
2.2%
Commercial
292,970
275,392
6.4%
Industrial - Flow
259,745
225,938
15.0%
Industrial - Violation
Surcharges
161,876
179,243
-9.7%
Sewer Sales
1,645,984
1,591,757
3.4%
Base Charge
529,880
527,679
0.4%
Sewer Connection Charge
20,700
47,104
-56.1%
Other
76,745
67,420
13.8%
Other Sales
627,325
642,203
-2.3%
REVENUE AND EXPENDITURE REPORT for CITY of HUTCHINSON
PERIOD ENDING JULY 31, 2025
2025
2024
2025 ACTUALS
2025
AVAILABLE
% BDGT
2024 YTD
2024
% BDGT
JULY
YTD
BUDGET
BALANCE
USED
ACTUAL
BUDGET
USED
Liquor Fund
Sales
741,080
4,251,325
7,899,000
3,647,675
53.8
4,344,649
7,708,000
56.4
Miscellaneous Revenues
146
2,186
10,500
8,314
20.8
1,863
10,500
17.7
TOTAL REVENUES
741,226
4,253,510
7,909,500
3,655,990
53.8
4,346,512
7,718,500
56.3
Cost of Sales
593,826
3,164,617
5,983,000
2,818,383
52.9
3,277,465
5,852,000
56.0
Wages & Benefits
73,906
523,100
936,298
413,198
55.9
506,153
924,229
54.8
Supplies
1,782
11,618
25,500
13,882
45.6
18,163
25,500
71.2
Services & Charges
37,939
164,394
312,270
147,876
52.6
152,770
308,150
49.6
Miscellaneous Expenses
35
5,740
6,500
760
88.3
5,750
6,500
88.5
Transfers -Out
-
-
550,000
550,000
-
-
550,000
-
CapitalOutlay
42,607
45,000
2,393
94.7
81,965
100,000
82.0
Depreciation Expense
58,000
58,000
58,000
-
TOTAL EXPENDITURES
707,488
3,912,077
7,916,568
4,004,492
49.4
4,042,267
7,824,379
51.7
NET REVENUE
33,738
341,434
(7,068)
(348,502)
304,245
(105,879)
Year to Date Sales
July Sales
Comments
2025
2024
Change
2025
2024
Change
Liquor Sales Revenue:
Liquor
1,632,535
1,639,994
-0.5%
271,985
272,877
-0.3%
Beer
1,873,321
1,985,001
-5.6%
334,570
356,892
-6.3%
Wine
512,643
534,873
-4.2%
93,608
95,729
-2.2%
THC Products
115,842
73,865
56.8%
18,717
15,408
21.5%
Other
116,983
110,916
5.5%
22,201
20,491
8.3%
Total Sales
4,251,325
4,344,649
-2.1%
741,080
761,397
-2.7%
Gross Profit
$1,086,707
$1,067,184
$147,254
$185,945
Gross Margin on Sales
25.6%
24.6%
1.0%
19.9%
24.4%
-4.6%
Customer Count
136,855
139,011
-1.6%
22,553
22,847
-1.3%
Average Sale per Customer
$31.06
$31.25
-0.6%
$32.86
$33.33
-1.4%
Labor to Sales Ratio
12.3%
11.7%
0.7%
10.0%
9.7%
0.3%
Capital Outlay
We installed new flooring in the wine
section along with new wine racks.
Refuse Fund
Sales
124,331
852,880
1,461,000
608,120
58.4
799,418
1,352,000
59.1
Sales - Other
4,376
29,449
46,700
17,251
63.1
27,655
46,100
60.0
Intergovernmental Revenue
-
12,870
4,500
(8,370)
286.0
13,515
21,500
62.9
Miscellaneous Revenues
2,969
70,551
50,000
(20,551)
141.1
29,807
30,000
99.4
TOTAL REVENUES
131,676
965,750
1,562,200
596,450
61.8
870,395
1,449,600
60.0
Wages & Benefits
28,633
181,258
349,221
167,963
51.9
188,377
337,416
55.8
Supplies
3,138
21,748
45,000
23,252
48.3
32,222
60,750
53.0
Services & Charges
80,980
514,120
1,032,135
518,015
49.8
496,870
969,000
51.3
Miscellaneous Expenses
1,028
1,400
2,500
1,100
56.0
1,439
1,150
125.1
Transfers -Out
-
-
105,000
105,000
-
-
55,000
-
CapitalOutlay
35,000
35,000
126,301
817,500
15.4
Depreciation Expense
-
-
172,000
172,000
-
-
172,000
-
TOTAL EXPENDITURES 113,779
718,527
1,740,856
1,022,329
41.3
845,209
2,412,816
35.0
NET of REVENUES & EXPENDITURES 17,896
247,223
(178,656)
(425,879)
25,185
(963,216)
REVENUE AND EXPENDITURE REPORT for CITY of HUTCHINSON
PERIOD ENDING JULY 31, 2025
Comaost Fund
Sales
Charges for Services
Miscellaneous Revenues
TOTAL REVENUES
Cost of Sales
Inventory Cost Adjustment
Wages & Benefits
Supplies
Services & Charges
Miscellaneous Expenses
Transfers -Out
Capital Outlay
Depreciation Expense
Debt Service
TOTAL EXPENDITURES
NET of REVENUES & EXPENDITURES
2025 2024
2025 ACTUALS 2025 AVAILABLE % BDGT 2024 YTD 2024 % BDGT
JULY YTD BUDGET BALANCE USED ACTUAL BUDGET USED
78,283
2,065,045
2,372,500
978
1,032
107,000
9,155
60,051
72,000
88,415
2,126,127
2,551,500
307,455
87.0
2,142,466
105,968
1.0
7,233
11,949
83.4
40,368
425,373
83.3
2,190,067
2,620,300 81.8
95,500 7.6
52,000 77.6
2,767,800 79.1
57,157
1,296,455
1,591,200
294,745
81.5
1,427,143
1,759,400
81.1
(48,723)
(380,773)
(703,250)
(322,477)
54.1
(268,081)
(703,528)
38.1
62,762
468,370
897,840
429,470
52.2
442,528
888,535
49.8
27,139
72,077
126,850
54,773
56.8
65,260
149,500
43.7
37,599
119,663
308,390
188,727
38.8
83,807
287,500
29.2
3,863
7,119
13,500
6,381
52.7
7,928
13,500
58.7
-
-
120,000
120,000
-
-
120,000
-
2,910
170,052
305,000
134,948
55.8
47,368
197,000
24.0
-
-
290,000
290,000
-
-
290,000
-
73,808
73,808
(0)
100.0
73,808
73,808
100.0
142,706
1,826,771
3,023,338
1,196,567
60.4
1,879,761
3,075,715
61.1
(54,291)
299,356
(471,838)
(771,194)
310,306
(307,915)
Year to Date Sales
Comments
2025
2024
Change
Compost Sales
Bagged
1,801,466
1,778,944
1.3%
Bulk
140,571
228,360
-38.4%
Other (Freight)
123,008
135,163
-9.0%
Total Sales
2,065,045
2,142,466
-3.6%
Gross Profit
768,590
715,323
Gross Margin
37.2%
33.4%
Capital Outlay Capital Outlay for 2025 includes $112,090 to enclose Creekside's blending building.
Storm Water Utility
Sales
99,878
691,569
1,185,000
493,431
58.4
642,153
1,097,000
58.5
Sales - Other
756
4,050
7,000
2,950
57.9
4,207
3,500
120.2
Intergovernmental Revenue
81,200
81,200
-
(81,200)
-
59,120
-
-
Licenses & Permits
435
1,995
6,000
4,005
33.3
3,015
5,500
54.8
Miscellaneous Revenues
4,150
21,828
26,800
4,972
81.4
22,809
26,300
86.7
Transfer In
-
-
50,000
50,000
-
-
-
-
TOTAL REVENUES
186,419
800,642
1,274,800
474,158
62.8
731,305
1,132,300
64.6
Wages & Benefits
18,368
121,311
313,368
192,057
38.7
167,369
311,298
53.8
Supplies
3,849
12,143
48,350
36,207
25.1
16,081
51,350
31.3
Services & Charges
22,097
148,504
256,020
107,516
58.0
110,461
223,375
49.5
Miscellaneous Expenses
-
10,303
6,000
(4,303)
171.7
4,725
6,000
78.7
Capital Outlay
357,330
558,818
201,488
63.9
-
467,145
-
Depreciation Expense
-
-
255,000
255,000
-
-
255,000
-
Debt Service
11,265
186,205
186,180
(25)
100.0
187,505
187,480
100.0
TOTAL EXPENDITURES
55,579
835,797
1,623,736
787,939
51.5
486,141
1,501,648
32.4
NET of REVENUES & EXPENDITURES
130,840
(35,155)
(348,936)
(313,781)
245,164
(369,348)
Comments
Capital Outlay This category includes the $220,000 land acquisition for a future storm water pond that will serve the Michigan Street area. A new
leaf vaccum was purchased for $137,330. The Refuse fund will contribute $50,000 towards the leaf vacuum at year-end.
City of Hutchinson - Investment Report
For the Month Ended July 31, 2025
Trade
Fixed or
Par
Purchase
Premium
Current
Unrealized
Annual
Date
Maturity
Coupon
Callable
Value
Amount
-Discount
Value
Gain/ -Loss
Earnings
CERTIFICATES OF DEPOSIT:
Forbright Bank
08/31/2022
09/16/2025
3.500%
Fixed
$245,000
$245,000
$0
$244,711
-$289
$8,575
First Citizens Bk & Tr Co Raleigh
10/26/2022
10/25/2025
4.700%
Fixed
244,000
244,000
0
244,098
98
11,468
Regions Bank Birmingham AL
10/28/2019
10/31/2025
2.000%
Fixed
245,000
245,000
0
243,572
-1,428
4,900
Flushing Bank Primary
10/26/2022
11/04/2025
4.700%
Fixed
245,000
245,000
0
245,216
216
11,515
Ally Bk Sandy Utah
11/0212022
11/10/2025
4.800%
Fixed
244,000
244,000
0
244,166
166
11,712
Toyota Financial Sgs Bk
07/14/2021
07/22/2026
0.950%
Fixed
245,000
245,000
0
237,339
-7,661
2,328
Vantage West Credit Union
09/05/2024
09/14/2026
4.100%
Fixed
249,000
249,000
0
248,811
-189
10,209
Synchrony Bank
09/01/2022
09/09/2027
3.500%
Fixed
245,000
245,000
0
242,665
-2,335
8,575
Discover Bank DE
11/16/2022
11/30/2027
4.900%
Fixed
242,000
242,000
0
246,876
4,876
11,858
Morgan Stanley Bank NA
03/10/2023
03/16/2028
4.800%
Fixed
244,000
244,000
0
248,848
4,848
11,712
Affinity Bank
03115/2023
03117/2028
4.900%
Fixed
195,000
195,000
0
199,477
4,477
9,555
Customers Bank
06/07/2023
06/14/2028
4.500%
Fixed
244,000
244,000
0
247,299
3,299
10,980
Thread Bank Rogers TN
06/07/2023
06/16/2028
4.400%
Fixed
245,000
245,000
0
252,784
7,784
10,780
Univest Bank & Trust Co
06/02/2023
06/21/2028
4.500%
Fixed
245,000
245,000
0
248,420
3,420
11,025
CIBC Bk USA
0611612023
06/30/2028
4.450%
Fixed
244,000
244,000
0
251,335
7,335
10,858
Providence Bk Rocky Mt NC
08/03/2023
08/21/2028
4.400%
Fixed
249,000
249,000
0
251,916
2,916
10,956
United Roosevelt Savings
09/06/2023
09/12/2028
4.500%
Fixed
249,000
249,000
0
256,520
7,520
11,205
Central Fe S&L/Cicero IL
09/06/2023
09/14/2028
4.500%
Fixed
249,000
249,000
0
252,698
3,698
11,205
Community Bk & Tr Waco TX
11/01/2023
11/10/2028
5.050%
Fixed
243,000
243,000
0
250,696
7,696
12,272
Liberty First Credit Union
01/23/2024
01/30/2029
4.150%
Fixed
249,000
249,000
0
250,262
1,262
10,334
Morgan Stanley Private Bank
02/28/2024
03/06/2029
4.350%
Fixed
244,000
244,000
0
246,752
2,752
10,614
Carter Bank & Trust
03/08/2024
03/20/2029
4.300%
Fixed
245,000
245,000
0
247,494
2,494
10,535
Mizrahi Tefahot Bank/LA
03/26/2024
03/07/2030
4.500%
Fixed
244,000
244,000
0
249,026
5,026
10,980
State Bank of India Chicago IL
06/13/2025
06/21/2030
4.350%
Fixed
244,000
244,000
0
247,716
3,716
10,614
CBC Federal Credit Union
05/03/2024
05/14/2031
4.650%
Fixed
249,000
249,000
0
257,835
8,835
11,579
Celtic Bank
12/11/2024
12/20/2032
4.150%
Fixed
249,000
249,000
0
251,774
2,774
10,334
Total CDs $6,335,000 $6,335,000 $0 $6,408,304 $73,304 $266,678
MUNICIPAL BONDS:
Austin TX Cmnty CIg
04/27/2022
08101/2025
0.992%
Fixed
$245,000
$229,482
-$15,518
$245,000
$15,518
$2,430
Jobs Ohio Beverage Sys Stwd
04/27/2022
01/01/2026
2.034%
Fixed
310,000
298,815
-11,185
306,931
2,778
6,305
Oklahoma City OK Econ Dev Trust
02/08/2022
03/01/2026
1.118%
Fixed
300,000
292,833
-7,167
294,477
1,644
3,354
New York St Urban Dev Dorp
08126/2022
03/15/2026
3.170%
Fixed
190,000
187,925
-2,075
188,619
694
6,023
Anchor Bay MI School Dist
07/01/2020
05/01/2026
1.250%
Fixed
500,000
503,630
3,630
489,395
-14,235
6,250
Phoenix Az Civic Impt Corp
12/10/2021
07/01/2026
1.157%
Fixed
135,000
134,150
-851
131,252
-2,897
1,562
San Juan CA Unif Sch Dist
11/09/2021
08/01/2026
1.201%
Fixed
140,000
140,000
0
135,633
-4,367
1,681
Phoenix Az Civic Impt Corp
03/30/2022
07/01/2027
1.257%
Fixed
175,000
161,088
-13,913
165,618
4,531
2,200
Indiana St Fin Authority Rev
01/27/2023
07/15/2027
4.109%
Fixed
1,000,000
1,000,000
0
1,001,010
1,010
41,090
NY Personal Income Tax
12/09/2022
09/15/2027
5.051%
Fixed
300,000
308,277
8,277
304,080
-4,197
15,153
Pima County AZ Revenue
11/09/2022
12/01/2027
5.382%
Fixed
1,000,000
1,014,580
14,580
1,019,740
5,160
53,820
Wisconsin St Gen Fund Rev
02/21/2023
05/01/2028
4.330%
Fixed
500,000
497,905
-2,095
501,925
4,020
21,650
Pima County AZ Revenue
11/22/2023
12/01/2028
5.961%
Fixed
175,000
183,171
8,171
182,781
-390
10,432
New York NY City Transitional
07/05/2023
02/01/2029
4.750%
Callable
385,000
385,920
920
377,771
-8,149
18,288
New York NY City Transitional
02/14/2024
02/01/2029
4.430%
Callable
375,000
375,000
0
391,830
16,830
16,613
Wisconsin St Gen Fund Rev
03/13/2024
05/01/2029
4.346%
Fixed
500,000
497,905
-2,095
502,250
4,345
21,730
Albertville AL
01/19/2024
06/01/2029
4.900%
Fixed
235,000
241,103
6,103
239,627
-1,476
11,515
Middlesex County NJ
09/13/2023
08/15/2029
4.603%
Fixed
250,000
248,115
-1,885
253,825
5,710
11,508
California St
10/24/2023
10/01/2029
5.100%
Fixed
200,000
199,788
-212
205,820
6,032
10,200
New York NY City Transitional
12/05/2023
11/01/2029
5.050%
Callable
300,000
308,451
8,451
309,318
867
15,150
Palm Beach Cnty Fla
12/15/2023
12/01/2029
4.150%
Fixed
265,000
263,614
-1,386
264,027
413
10,998
Palm Beach Cnty Fla
10/25/2024
12/01/2029
4.150%
Fixed
500,000
499,300
-700
498,165
-1,135
20,750
Andalusia AL
03120/2025
05/01/2030
4.250%
Fixed
140,000
140,000
0
139,286
-714
5,950
Connecticut State
04/12/2024
05/15/2030
4.657%
Fixed
140,000
140,000
0
142,545
2,545
6,520
Las Cruces NM Gross Recpts Tax
02/20/2025
06/01/2030
4.850%
Fixed
150,000
152,775
2,775
153,584
809
7,275
Palm Beach Cnty Fla
06/28/2024
06/01/2030
4.500%
Fixed
740,000
740,000
0
751,307
11,307
33,300
Apache Junction AZ
0811512024
07/01/2030
4.281%
Fixed
825,000
830,973
5,973
824,175
-6,798
35,318
Virginia Sts Pub Bldg
05/24/2024
08/01/2030
4.830%
Fixed
340,000
343,196
3,196
350,339
7,143
16,422
Corpus Christi TX ISD
12/30/2024
08/15/2030
4.450%
Fixed
500,000
499,485
-515
500,010
525
22,250
New York City Transitional
02/07/2025
02/01/2031
4.560%
Fixed
500,000
500,000
0
503,915
3,915
22,800
Las Cruces NM Gross Recpts Tax
02/20/2025
06/01/2030
4.880%
Fixed
145,000
147,577
2,577
148,587
1,011
7,076
Portland OR Revenue
01/03/2025
06/01/2031
4.450%
Fixed
470,000
468,684
-1,316
471,142
2,458
20,915
Santa Clara Valley CA
07/11/2024
06/01/2031
4.400%
Fixed
300,000
299,103
-897
299,778
675
13,200
San Francisco City & Cty CA
09/12/2024
09/01/2031
3.918%
Fixed
460,000
460,000
0
444,921
-15,079
18,023
San Diego CA Public Fac
08/22/2024
10/15/2031
3.980%
Callable
500,000
499,360
-640
485,110
-14,250
19,900
Oregon St Dept of Admin Svcs
02/05/2025
04/01/2032
4.353%
Fixed
170,000
169,505
-495
168,660
-845
7,400
Spotsylvania County VA Econ Dev
09/05/2024
06/01/2032
4.200%
Fixed
295,000
299,838
4,838
288,805
-11,033
12,390
Waterloo IA
01/16/2025
06/15/2032
4.160%
Fixed
395,000
398,622
3,622
399,333
711
16,432
Connecticut State
08/27/2024
06/15/2032
4.160%
Fixed
100,000
100,000
0
98,264
98,264
4,160
Connecticut State
07/01/2025
06/15/2032
4.160%
Fixed
405,000
405,000
0
397,969
397,969
16,848
Los Angeles CA
12/13/2024
09/01/2032
4.400%
Fixed
275,000
275,000
0
274,018
-982
12,100
Total Municipal Bonds $14,830,000 $14,840,169 $10,169 $14,850,845 $510,338 $606,981
July 31, 2025
Trade Fixed or Par Purchase Premium Current Unrealized Annual
Date Maturitv Coupon Callable Value Amount -Discount Value Gain/ -Loss Earninq
FEDERAL BONDS:
Federal Home Loan Bank
Total Federal Bonds
MONEY MARKET FUNDS:
Money Market - Citizens Bank
Money Market - Oppenheimer
Total Money Market Funds
GRAND TOTALS
09/28/2021 10/26/2026 1.180% Callable $500,000 $500,000 $0 $481,885-$18,115 S5.900
$500,000 $500,000 $0 $481,885-$18,115 $5,900
Current Rate: 3.780% N/A $16,379,612 $16,379,612 $0 $16,379,612 $0 $619,149
Current Rate: 4.159% N/A 52,772 52,772 0 52,772 0 2,195
$16,432,384 $16,432,384 $0 $16,432,384 $0 $621,344
$38,097,384 $38,107,553 $10,169 $38,173,419 $565,528 $1,500,903
CITY PORTFOLIO BY PRODUCT TYPE
Ah
CITY MATURITY SCHEDULE
Par Value
Current
Average
Municipal
Federal
Total
%of
Average
Total
% of Total
Value
Coupon
Year
CD's
Bonds
Bonds
Par Value
Total
Coupon
2025
$1,223,000
$245,000
$0
$1,468,000
6.8%
3.4%
CDs $6,335,000 16.6% $6,408,304 4.2%
Municipal Bonds $14,830,000
38.9%
$14,850,845
4.1%
2026
$494,000
$1,575,000
$500,000
$2,569,000
11.9%
1.7%
Federal Bonds $500,000
1.3%
$481,885
1.2%
2027
$487,000
$2,475,000
$0
$2,962,000
13.7%
4.5%
Subtotal $21,665,000
$21,741,035
4.1%
2028
$2,407,000
$675,000
$0
$3,082,000
14.2%
4.6%
Money Market $16,432,384
43.1%
$16,432,384
2029
$738,000
$3,010,000
$0
$3,748,000
17.3%
4.5%
Total $38,097,384
100.0%
$38,173,419
2030
$488,000
$2,835,000
$0
$3,323,000
15.3%
4.5%
Unrealized Gain / -Loss
$565,528
2031
$249,000
$2,375,000
$0
$2,624,000
12.1%
4.3%
Prior Year Unrealized Gain /-Loss
-$195,379
2032
$249,000
$1,640,000
$0
$1,889,000
8.7%
4.3%
Totals
$6,335,000
$14,830,000
$500,000
$21,665,000
100.0%
4.1%
Investment Gain/ -Loss for 2025 $760,907
$4,000,000
$3,748,000
$3,323,000
$3,000,000
$2,962,000
nU
Money Market
$2,569,000
43.1%
Municipal Bonds
$1,889,000
$2,000,000
38.9%
$1,468,000
$1,000,000
Federal Bonds
$0
1.3%
2025 2026 2027
2028
2029 2030
2031
2032
FINANCIAL INDICES:
One -Year Comparison
Treasury Yield Curve
7/31/2025
7/31/2024
Change
City's Average Coupon Rate
4.07%
3.61%
0.46%
6.00 %
Average Yield to Maturity
4.20%
4.43%
-0.23%
(excluding Money Market funds)
5.00%
4.00
Federal Lending Rate
4.50%
5.50%
-1.00%
Prime Rate
7.50%
8.50%
-1.00%
3.00%
-
Treasury Rates: 1-Year
4.10%
4.73%
-0.63%
2.00%
2-Year
3.94%
4.29%
-0.35%
1.00%
3-Year
3.89%
4.10%
-0.21%
5-Year
3.96%
3.97%
-0.01%
0.00%
10-Year
4.37%
4.09%
0.28%
1-Year
2-Year
3-Year
5-Year 10-Year
20-Year
4.89%
4.44%
0.45%
--o-7/31/2025 t7/31/2024