PC Packet 04.18.17
AGENDA
HUTCHINSON PLANNING COMMISSION
Tuesday,April 18, 2017
5:30 p.m.
1.CALL TO ORDER 5:30 P.M.
2.PLEDGE OF ALLEGIANCE
3.OATH OF OFFICE
A.Tom Wirt
4.CONSENT AGENDA
A.CONSIDERATION OF MINUTES DATED March 21, 2017.
5.PUBLIC HEARINGS
A.CONSIDERATION OF A CONDITIONAL USE PERMIT FOR AMURAL
IN THE MAIN STREET AREADISTRICT LOCATED AT 105
WASHINGTON AVE E.
6.NEW BUSINESS
A.CONSIDERATION OF A SITE PLAN FOR CEN BANK LOCATED AT
1380 MONTREAL ST SE.
7.UNFINISHED BUSINESS
8.COMMUNICATION FROM STAFF
A.Upcoming Meetings
9.ADJOURNMENT
MINUTES
HUTCHINSON PLANNING COMMISSION
Tuesday,March 21, 2017
5:30 p.m.
1.CALL TO ORDER 5:30P.M.
The March 21, 2017Planning Commission meeting was called to order by ChairHantge
at 5:30p.m. Members in bold were present Chair Hantge,Commissioner Garberg,
Commissioner Wirt, Commissioner Lofdahl,Commissioner Wick,Commissioner
Forcier,andCommissioner Fahey. Also present were Dan Jochum,City Planner,
John Olson, City Public Works,Marc Sebora,City Attorney,John Paulson, City
Environmental Specialist and Andrea Schwartz, City of Hutchinson Permit Technician
2.PLEDGE OF ALLEGIANCE
3.OATH OF OFFICE
A.Bill Garberg
4.ELECTION OF OFFICERS
We will elect a new Chair and Vice Chair. Chair and Vice Chair must have
served1 year and not serve on City Council. Nomination made of Jim Fahey for Chair
by Commissioner Lofdahl, second by Commissioner Wick. A nomination for Vice Chair
of Brad Wick by Commissioner Fahey, second by Commissioner Lofdahl.
5.CONSENT AGENDA
A.CONSIDERATION OF MINUTES DATED January 17, 2017.
Motion by Commissioner Fahey, Second by Commissioner Wick.Motion
approved.
Motion to Approve–Motion to Reject
6.PUBLIC HEARINGS
A.CONSIDERATION OF A CONDITIONAL USE PERMIT FOR AN
INTEGRATED ADULT ACTIVITY CENTER IN AC-5ZONING DISTRICT
RD
LOCATED AT 261 3AVE NW,KURT & MONA HJERPE, APPLICANT.
Dan Jochum, City Planner addressed the Commission.
Mr. Jochum reviewed the application as outlined in the Commission’s packets.
Minutes
Hutchinson Planning Commission
March 21, 2017
Page 2
Building has previously been used as office use for contracting company and
warehouse use in the back. Office area will be remodeled, warehouse portion
will stay as is.Parking area staff feels is sufficient. Staff is recommending
approval upon 4 conditions; standards for the conditional use permit would be
met, proposed building improvements shall comply with standards of the C-5
zoning district and ordinance, conditional use permit shall remain in effect as
long as the conditions required by the permitare observed, applicant must obtain
all necessary permits for construction.
Motion by Commissioner Fahey,second by Commissioner Wickto close hearing
at 5:42p.m.
Motion by Commissioner Faheyto approve with staff recommendations. Second
by Commissioner Wick. Motion approved. Item will be on City Council
consent agenda on 3/28/2017.
Motion to close hearing –Motion to approve with staff recommendations–Motion to reject
B.CONSIDERATION OF AN AMENDMENT TO THE LANDSCAPE
ORDINANCE 154.115
Dan Jochum, City Planner addressed the Commission.
The old ordinance read1tree/800square feet and was proposed to changeto 1
tree/1750square feet.The new proposal looks at apreferred species list with
1tree/1500square feet. This allows for a 20% open space requirement.
John Olson explained thelandscape plan to show proposed planting in mature
state, to show 80% coverage. The mature state will make sure we are not
planting too many trees in an area so they are allowed to grow and stay healthy.
Current ordinance does not give a lot of guidance to site plan developers.New
proposed ordinance is longer but simplifies what we are looking for.
New minimum tree size requirements.1 ½ inch diameter for deciduous tree and
6 feet height for coniferous/evergreen tree.
Commercial and industrial areas to have at least 20% of the lot area a managed
landscaped area.
Fahey, what qualificationsfor landscape designer? Mr. Olson –there are
different accreditations at bothstate and nationallevel for the architect. Some
local landscape companies do have these credentials.
Motion by Commissioner Lofdahl,second by Commissioner Forcierto close
hearing at 5:59p.m.
Minutes
Hutchinson Planning Commission
March 21, 2017
Page 3
Motion by Commissioner Garbergto approve with staff recommendations.
Second by Commissioner Forcier. Motion approved. Item will be on City
Council consent agenda on 3/28/2017.
Motion to close hearing –Motion to approve with staff recommendations–Motion to reject
7.NEW BUSINESS
One-stop-shop for Century Court on ThursdayMarch 23. New owner will be
presenting to the city after 2 applications (concept plans) previously.
8.UNFINISHED BUSINESS
9.COMMUNICATION FROM STAFF
A.Upcoming Meetings
Dan Jochum noted that we have oneapplicationfor theAprilPlanning
Commission meetingat this time.
Thank you Christie Hantge for your service and knowledge brought to the board.
10.ADJOURNMENT
Motion by Commissioner Fahey, Second by Commissioner Wickto adjourn at
6:03p.m.
STAFFREPORT –PLANNING DEPARTMENT
To:Hutchinson Planning Commission
From:Dan Jochum, AICP
Date:April 12, forApril 18,2017, Planning Commission Meeting
Application:CONSIDERATION OF A CONDITIONAL USE PERMIT FOR AMURAL LOCATED AT 105
WASHINGTON AVE E.
Applicant:David C. Wegschied
CONDITIONAL USE PERMITFOR MURAL
David Wegschied has applied for a Conditional Use Permit to put up a mural on the west side of the Ace
Hardware Building, located at 105 Washington Avenue East. The mural is proposed to be a reproduction of Les
Kouba’s “Country Store” painting.
Conditional Use Permit
105 Washington Ave E
Planning Commission –4-18-17
Page 2
GENERAL INFORMATION
Existing Zoning:C-3Central Commercial District
Property Location:105 Washington Ave E
Lot Size:.386acres
Existing Land Use:Commercial
Adjacent Land Use:Commercial
Adjacent Zoning:C-3–Central Commercial District
Comprehensive
Land Use Plan:Mixed Use
Applicable
Regulations:Sections154.042(E) (10)
Analysis:
Overview:
The applicant is seeking to put a mural on the west side of the Ace Hardware building, which will be a
reproduction of Les Kouba’s “Country Store” (see attached). The mural would be put on several panels and be
14’x24’ in size. The panels would stick a few inches out from the building wall.
Public Arts Commission:
The Public Arts Commission also had a chance to review Mr. Wegshied’s proposal and offers the following
recommended conditions:
1.Ownership of the mural is clear.
a.There should be no expectation that the City will take ownership at any point.
2.A drawing of the mural and the building drawn to scale is provided prior to approval.
3.Copy write approval in writing is provided to the City and public arts commission before the mural
is installed.
4.All necessary permits are obtained by the owner before the mural is installed.
5.The mural must be painted on panels that can be removed and not painted directly on the building.
6.The mural, including any mounting device and frame, shall not extend into the walkway area more
thanone and a halfinches.
7.The bottom of the mural, including any mounting device and frame, shall be at leastthree feetabove
the sidewalk surface.
8.Painting and construction techniques shall be appropriate forprolonged outdoor exposure.
Conditional Use Permit
105 Washington Ave E
Planning Commission –4-18-17
Page 3
9.A copy of a signed maintenance agreement agreed upon by the artist and the building owner shall
beprovided to the City and the public arts commission before installation.
10.The City and its contractors shall be held harmless and have no liability for:
a.Damage due to future roadwork, sidewalk repair, snow removal, streetlight repair, or other
city related work.
b.Accidents (personal or property).
11.The City shall be held harmless for any use in promoting the City.
12.There is no expectation that PAC or City fundswill be contributedto the project.
13.The City reserves the right to have the mural removed if it is not maintained, becomes a nuisance or
becomes a public safety hazard.
14.No installation work, preparation or otherwise, can be done on the building until the mural is
completed and ready to be installed.
Conditional Use Permit:
The Conditional Use Permit (CUP) is required per section 154.042(E) (10) of City Code.
The following are standards for granting a conditional use permit:
(a)The proposed building or use at the particular location requested is necessary or desirable to provide
a service or a facility which is in the interest of the public convenience and willcontribute to the
general welfare of the neighborhood or community;
(b)The proposed building or use will not have a substantial or undue adverse effect upon adjacent
property, the character of the neighborhood, traffic conditions, utility facilities and other matters
affecting the public health, safety and general welfare; and
(c)The proposed building or use will be designed, arranged and operated so as to permit the
development and use of neighboring property in accordance with the applicable district regulations.
Recommendation:
Staff recommends approval of the proposal with the following conditions:
1.Ownership of the mural is clear.
a.There should be no expectation that the City will take ownership at any point.
2.A drawing of the mural and the building drawn to scale is provided prior to approval.
3.Copy write approval in writing is provided to the City and public arts commission before the mural
is installed.
Conditional Use Permit
105 Washington Ave E
Planning Commission –4-18-17
Page 4
4.All necessary permits are obtained by the owner before the mural is installed.
5.The mural must be painted on panels that can be removed and not painted directly on the building.
6.The mural, including any mounting device and frame, shall not extend into the walkway area more
thanone and a halfinches.
7.The bottom of the mural, including any mounting device and frame, shall be at leastthree feetabove
the sidewalk surface.
8.Painting and construction techniques shall be appropriate forprolonged outdoor exposure.
9.A copy of a signed maintenance agreementagreed upon by the artist and the building owner shall
beprovided to the City and the public arts commission before installation.
10.The City and its contractors shall be held harmless and have no liability for:
a.Damage due to future roadwork, sidewalk repair, snow removal, streetlight repair, or other
city related work.
b.Accidents (personal or property).
11.The City shall be held harmless for any use in promoting the City.
12.There is no expectation that PAC or City fundswill be contributedto the project.
13.The City reserves the right to have the mural removed if it is not maintained, becomes a nuisance or
becomes a public safety hazard.
14.No installation work, preparation or otherwise, can be done on the building until the mural is
completed and ready to be installed.
Page 1of 1
http://leskoubaoutdoors.com/wp-content/uploads/2015/01/banner5-By-the-Country-Store.jpg4/14/2017
STAFFREPORT –PLANNING DEPARTMENT
To:Hutchinson Planning Commission
From:Dan Jochum, AICP
Date:April 14, forApril 18,2017, Planning Commission Meeting
Application:CONSIDERATION OF ASITE PLAN REVIEW FOR CENBANK LOCATED AT 1380
MONTREAL ST SE.
Applicant:Don Martinez, CenBank
Site Plan Review for Proposed CenBank
The applicant has submitted applications for a site plan reviewfor thedevelopment of a bank located at 1380
Montreal St SE, Hutchinson.
Site Plan Review
1380 Montreal St SE
Planning Commission –4-18-17
Page 2
GENERAL INFORMATION
Existing Zoning:C-2Automotive Service Commercial District
Property Location:1380 Montreal St SE
Lot Size:.72acres
Existing Land Use:Vacant
Adjacent Land Use:Commercial
Adjacent Zoning:C-2–Automotive ServiceCommercial District; C-4 Fringe Commercial District
Comprehensive
Land Use Plan:Commercial
Applicable
Regulations:Sections154.174
Site PlanAnalysis:
The City Council deems it is necessary and appropriate to require site plan approval of developments in certain
zoning districts to preserve and promote attractive, well-planned, stable urban conditions. The following is an
overview of site plan considerations.
Building:
The proposed building is a3,669square foot one-story flat roof structurethat would be constructed primarily
withbrick/stone veneer finish.The building is proposed to be one story tall.Refer to attached building
elevations for the draft building elevation.It should also be noted that the building features a drive through on
the eastside. The proposed building would meet all applicable setback requirements.
Parking/Access/Circulation
18parking spaces are shown on the site plan. The proposed number of parking stalls satisfies the City parking
requirement.The four parkingspaces on the west side of the lot near the ATM will be for staff parking. Staff
believes parking will be adequate on site.
The site has two curb cuts off of Montreal St. The southerly curb cut is a full access allowing both ingress and
egress. The northerly curb cut is an egress point only for traffic using the drive-through or ATM.The southerly
curb cutis 25feet wide and the northerly is 13 feet wide. Both of these appear to be acceptable.
The circulation of the site is adequate. For customers going inside the bank would park in the front parking lot
in front of the bank and enter and exit on the southerly access drive. Customers using the drive-through would
go under the canopy and exit via the northerly drive aisle to Montreal St. Customers using the ATM would also
exit using the northerly drive aisle.
One issuerelated to circulationis fire truck/emergency vehicle access. Per fire code fire trucks require an
adequate turnaround. Themaximum a fire truck is required to back out of a site is 150 feet. Because thissite
would require more than 150 feet of backing up a turnaround or loop of some sort is required. Staff suggests
Site Plan Review
1380 Montreal St SE
Planning Commission –4-18-17
Page 3
the developerwork withthe owner of the Maurice’s building to the north and work out an easement agreement
that would allow the firetrucks to drive out of theCenBank site though the Maurice’s parking lot. Staff would
prefer of the area between the CenBank lot and the Maurice’s lot is paved or hard surfaced.
Landscaping and Lighting:
Staff has reviewed the landscaping plans and they appear adequate for this project.Per the Zoning Ordinance,
lighting installed must be indirect and shall not produce glare on adjacent properties or public right of ways.
Stormwater Management/Erosion Control:
This site is accounted for within the Menards pond to the east of this site. The developer will be required to
submit pre-development and post-development drainage coefficientsfor city records and review.
Recommendation:
Staff recommends approval of the site plan with the following conditions:
1.The proposed building and site improvements shall complywith the standards of the C-2district and
the Zoning Ordinance, as well as all other City regulations.
2.The developer shall get approvalfrom theFire Chief on a plan for acceptable fire truck turnaround
prior to a building permit being issued.
3.Exterior refuse collection area must be fully screened.
4.Moving or relocating utility services will be at the property owner’s expense.
5.Because the some of the easement areas are being proposed to be covered with hard-surfacing, if at
any point in the future the parking lot needs to be opened up to repair buried utilities, the cost to
repair the parking lot will be the responsibility of the building ownerand not the City of Hutchinson,
Hutchinson Utilitiesor any other utility provider.
6.The property owner is response for mowing the right-of-way on Hwy 15 adjacent to their lot.
7.Positive drainage must be maintained on both the north and south property lines.
8.SAC/WAC charges will be due at the timebuilding permits are issued.
9.A parkland contribution fee will be collected with the building permit.
10.The City of Hutchinson must approve a traffic control plan prior to any construction activity
impactingMontreal St.
11.The City of Hutchinson must be notified 7 days prior to any roadway or utility work that is going to
be done within the City right of way. All roadway work must be fully completed to City standards
within 10 calendar days of the original disturbance. If the work isn’t fully completed within 10
calendar days, the City reserves the right to have the work completed and invoice/assess the property
owner for all associated costs.